Drilling pressure injection water pumping test device and system
By directly controlling the pressurization and pressure relief of the airbag cavity using the airbag control valve in the drilling and pumping test device, the safety hazards and winding problems of the high-pressure inflation pipe are solved, and safe and efficient airbag operation is achieved.
Patent Information
- Application Number
- CN202420144129.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-01-19
- Publication Date
- 2024-12-06
- Estimated Expiration
- 2034-01-19
AI Technical Summary
In the existing drilling and water pumping test equipment, the use of high-pressure inflation pipes has safety risks and is easy to wrap around, making it difficult to effectively control the expansion and pressure relief of the airbag.
The airbag control valve is used to control the pressurization, expansion, maintenance and pressure relief of the airbag cavity through water flow, and directly use the water in the tube to realize the operation of the airbag, avoiding the use of high-pressure inflation devices and high-pressure inflation pipes.
The safety of the device is improved, the problem of high-pressure inflatable pipe is avoided, and the stable control and safe operation of the airbag are achieved.
Smart Images

Figure CN222121495U_ABST
Abstract
Description
Technical Field
[0001] The utility model belongs to the technical field of water pumping test in geotechnical engineering investigation technology, and specifically relates to a drilling pressure injection water pumping test device and system. Background Art
[0002] Borehole pumping test, water injection test and water pressure test are commonly used methods for hydrogeological survey of hydropower projects. The pumping test of multiple aquifers in the same borehole is crucial for accurately obtaining detailed hydrogeological parameters of groundwater, obtaining data on the chemical field, dynamic field and temperature field of the aquifer in space, and realizing the stratified characterization of the aquifer, which is crucial for objectively understanding the hydrogeological conditions.
[0003] The utility model patent with application number CN 201911136478.6 discloses "a gas bag type stratified pumping test system and method for holes drilled in the same diameter". The device includes an upper water-stopping gas bag assembly, a pumping assembly and a lower water-stopping gas bag assembly arranged in sequence; the upper water-stopping gas bag assembly is provided with a hollow connecting pipe, both ends of the hollow connecting pipe pass through the upper water-stopping gas bag assembly, and the lower end of the hollow connecting pipe is connected to the pumping assembly; the lower water-stopping gas bag assembly is provided with a connecting pipe with a sealed lower end, the upper end of the connecting pipe extends out of the lower water-stopping gas bag assembly and is connected to the pumping assembly; the upper water-stopping gas bag assembly and the lower water-stopping gas bag assembly are connected to each other, the upper water-stopping gas bag assembly is provided with a first hollow tube and a second hollow tube, the upper end of the first hollow tube is connected to a pressure measuring tube, and the upper end of the second hollow tube is connected to a return pipe.
[0004] The above technology has the following defects:
[0005] 1. The upper and lower water-stop airbag assemblies are controlled by high-pressure gas cylinders connected to the outside of the drilling well through high-pressure gas charging pipes. That is, a set of high-pressure gas charging devices is required on the drilling site. High-pressure gas cylinders are special equipment with complicated use and management procedures, and there are certain safety hazards.
[0006] 2. The high-pressure inflation tube is easily entangled with the drill rod in deep holes and small-diameter holes and is difficult to remove. Utility Model Content
[0007] In order to solve the problem that the existing method uses a high-pressure inflation device to control the airbag, which requires a high-pressure inflation tube, thus posing a safety hazard and being easy to entangle, the utility model provides a drilling pressure injection water pumping test device and system, which does not require a high-pressure inflation tube, and directly uses the water in the tube to control the airbag, thereby having high safety.
[0008] The purpose of the utility model is achieved through the following technical solutions:
[0009] The first aspect of the utility model provides a drilling pressure injection water pumping test device, comprising a first water-stopping airbag assembly, a water pumping assembly and a second water-stopping airbag assembly which are arranged in sequence, the first water-stopping airbag assembly being provided with a first connecting pipe for communicating with the water pumping assembly; the airbag cavities of the first water-stopping airbag assembly and the second water-stopping airbag assembly being connected via a second connecting pipe; a third connecting pipe provided with a water-permeable hole is connected between the water pumping assembly and the second water-stopping airbag assembly; the first water-stopping airbag assembly is connected with an airbag control valve which is connected with the first connecting pipe and can control the connection state between the airbag cavity of the first water-stopping airbag assembly and the first connecting pipe by rotating or moving up and down.
[0010] The second aspect of the utility model provides a drilling pressure injection pumping test system, comprising:
[0011] A drilling pressure injection pumping test device as described in the first aspect;
[0012] a drill rod in communication with the airbag control valve;
[0013] A pressure flow sensor disposed between the first water-stopping airbag assembly and the water pumping assembly;
[0014] A water level sensor disposed in the drill rod for detecting the water level;
[0015] Pressure flow sensor;
[0016] An electromagnetic flowmeter for detecting the water flow rate out of the drill pipe;
[0017] a water pump for supplying water into the drill pipe;
[0018] A control unit connected to the pressure flow sensor, water level sensor, pressure flow sensor, electromagnetic flow meter, and water pump.
[0019] Compared with the prior art, the utility model has at least the following advantages and beneficial effects:
[0020] The utility model adopts an airbag control valve to control the communication state between the first connecting pipe and the airbag cavity of the first water-stop airbag assembly, thereby realizing the control of pressurized expansion, collision maintenance and drainage and pressure relief in the airbag cavity. The entire device does not require a high-pressure inflation device to inflate the airbag, and does not require a high-pressure inflation tube, so entanglement will not occur and the safety is high. BRIEF DESCRIPTION OF THE DRAWINGS
[0021] In order to more clearly illustrate the embodiments of the utility model or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the utility model. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0022] Figure 1 This is a structural schematic diagram of the drilling pressure injection pumping test device of the utility model;
[0023] Figure 2 It is a cross-sectional view of the first section of the airbag control valve in stage 1;
[0024] Figure 3 is a cross-sectional view of the second section of the airbag control valve in stage 1;
[0025] Figure 4 It is a cross-sectional view of the first section of the airbag control valve in stage 2;
[0026] Figure 5 is a cross-sectional view of the second section of the airbag control valve in stage 2;
[0027] Figure 6 It is a cross-sectional view of the first section of the airbag control valve in stage 3;
[0028] Figure 7 is a cross-sectional view of the second section of the airbag control valve at stage 3;
[0029] Figure 8 It is a structural schematic diagram of the first water-stop airbag assembly;
[0030] Fig. 9 is a schematic structural diagram of a second water-stop airbag assembly;
[0031] Fig.10 is a structural schematic diagram of an orifice closure device;
[0032] The reference numerals in the figures are:
[0033] 1. Orifice sealer; 11. Cross-way pipe; 12. Pressing block; 13. Rubber pad; 14. Pressing cap;
[0034] 2. Drill pipe;
[0035] 3. airbag control valve; 31. inner tube; 311. first water hole; 312. second water hole; 313. limit structure; 314. first positioning pin; 315. second positioning pin;
[0036] 321, third water hole; 322, first connector; 323, first adjustment cylinder; 324, first adjustment groove;
[0037] 331, fourth water hole; 332, second connector; 333, second adjustment cylinder; 334, second adjustment groove;
[0038] 34. Sealing structure;
[0039] 4. First water-stopping airbag assembly; 41. First water hole; 431. First fixing block; 432. Second fixing block; 44. Outlet pipe; 46. First airbag;
[0040] 5. Second water-stopping airbag assembly; 51. Second water hole; 52. Plug; 53. Second airbag; 541. Third fixing block; 542. Fourth fixing block;
[0041] 6. Pumping assembly;
[0042] 71. Pressure flow sensor; 72. Water level sensor;
[0043] 81. First connecting pipe; 82. Second connecting pipe; 83. Third connecting pipe; 84. Fourth connecting pipe; 85. Fifth connecting pipe. DETAILED DESCRIPTION
[0044] In order to make the purpose, technical scheme and advantages of the embodiments of the present invention clearer, the technical scheme in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. The components of the embodiments of the present invention described and shown in the drawings here can be arranged and designed in various different configurations.
[0045] Therefore, the following detailed description of the embodiments of the present invention provided in the accompanying drawings is not intended to limit the scope of the claimed invention, but merely represents selected embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in the field without creative work are within the scope of protection of the present invention.
[0046] It should be noted that, in the absence of conflict, the embodiments of the present invention and the features thereof may be combined with each other.
[0047] It should be noted that similar reference numerals and letters denote similar items in the following drawings, and therefore, once an item is defined in one drawing, further definition and explanation thereof is not required in subsequent drawings.
[0048] In the description of the present utility model, it should be noted that the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inside", "outside", etc. indicate positions or positional relationships based on the positions or positional relationships shown in the accompanying drawings, or the positions or positional relationships in which the utility model product is usually placed when in use, or the positions or positional relationships commonly understood by those skilled in the art, which are only for the convenience of describing the present utility model and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present utility model. In addition, the terms "first", "second", etc. are only used to distinguish the description, and cannot be understood as indicating or implying relative importance.
[0049] In the description of the present invention, it is also necessary to explain that, unless otherwise clearly specified and limited, the terms "set", "install", "connect", and "connect" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0050] like Figure 1 As shown, the first aspect of the utility model provides a drilling pressure injection pumping test device, comprising an airbag control valve 3, a first water-stop airbag assembly 4, a pumping assembly 6 and a second water-stop airbag assembly 5 arranged in sequence. The first water-stop airbag assembly 4, the pumping assembly 6 and the second water-stop airbag assembly 5 can all be implemented using existing structures. Specifically, the first water-stop airbag assembly is provided with a first connecting pipe 81 for communicating with the pumping assembly 6; the first connecting pipe 81 is a hard pipe with good pressure bearing performance, which is convenient for testing. The airbag cavities of the first water-stop airbag assembly and the second water-stop airbag assembly are connected through a second connecting pipe 82; a third connecting pipe 83 provided with a water-permeable hole is connected between the pumping assembly and the second water-stop airbag assembly. During the test installation, the airbag control valve 3 is placed above the first water-stop airbag assembly 4 to control the communication state between the first connecting pipe 81 and the airbag cavity of the first water-stop airbag assembly, that is, to control the water injection, maintenance and drainage of the airbag cavities of the first water-stop airbag assembly and the second water-stop airbag assembly. The airbag control valve 3 is connected to the first connecting pipe 81 and communicates with the first connecting pipe 81 , and controls the communication state between the airbag cavity of the first waterproof airbag assembly and the first connecting pipe 81 by rotating or moving up and down.
[0051] By adopting the above device, the connection state between the first connecting pipe 81 and the airbag cavity of the first water-stopping airbag assembly is controlled through the airbag control valve 3, and the water in the first connecting pipe 81 can be injected into the airbag cavity of the first water-stopping airbag assembly and the second water-stopping airbag assembly to pressurize and expand, collide and maintain, and drain and depressurize. The whole device does not require a high-pressure inflation device to inflate the airbag, and does not require a high-pressure inflation tube, so entanglement will not occur.
[0052] The airbag control valve can be used as follows Figure 1 , 2 The structure shown is realized, the airbag control valve includes an inner tube 31, a first valve body, and a second valve body, the inner tube 31 is provided with a first water hole 311 and a second water hole 312 at both ends; the first valve body is provided with a third water hole 321, and the first valve body can be controlled to achieve the control of the communication state between the first water hole 311 and the third water hole 321; the second valve body is provided with a fourth water hole 331, and the second valve body can be controlled to achieve the control of the communication state between the second water hole 312 and the fourth water hole 331. The fourth water hole 331 is connected to the airbag cavity of the first water-stop airbag assembly through the fourth connecting pipe 84.
[0053] The inner tube 31 is provided with a first positioning pin 314, a second positioning pin 315, and a limiting structure 313. The limiting structure is placed between the first valve body and the second valve body. The first positioning pin 314, the second positioning pin 315, and the limiting structure 313 are fixedly connected to the inner tube.
[0054] The first valve body includes a first connector 322 with one end sealingly sleeved on the inner tube 31 and the other end being open, and a first adjusting cylinder 323 connected to the open end of the first connector 322, the first adjusting cylinder 323 is placed on one end of the first connector 322 and is provided with a first adjusting groove 324 for clamping the first positioning pin 314, the distance between the port of the first adjusting cylinder 323 and the inner bottom of the first connector 322 is greater than the thickness of the first positioning pin 314, and the third water hole 321 is provided on the first adjusting cylinder 323.
[0055] The second valve body includes a second connector 332 with one end sealed on the inner tube 31 and the other end being open, and a second adjusting cylinder 333 connected to the open end of the second connector 332. The second adjusting cylinder 333 is placed on one end of the second connector 332 and is provided with a second adjusting groove 334 for clamping the second positioning pin 315. The fourth water hole 331 is provided on the second adjusting cylinder 333.
[0056] In order to enhance the sealing performance of the structure, a sealing structure 34 is provided in the second adjustment cylinder 333 and the first adjustment cylinder 323. The sealing structure 34 can be realized by using structures such as an O-ring.
[0057] With the above-mentioned airbag control valve structure, since the valve body and other structures have a certain weight, the control method of the three processes of pressurizing and expanding, maintaining expansion and draining and depressurizing the airbag cavity is as follows:
[0058] Reference Figure 2 During installation, the first valve body is placed at the top and the second valve body is placed at the bottom.
[0059] Stage 1: If Figure 3 As shown, the first positioning pin 314 is placed between the first adjustment tube 323 port and the inner bottom of the first connector 322, and is offset from the first adjustment groove 324. Under the action of the first adjustment tube 323 and the first positioning pin 314, the inner tube 31 and the first valve body are locked. At this time, the first water hole 311 and the third water hole 321 are offset and not connected. At this time, Figure 2 As shown, the second positioning pin 315 is placed in the second adjustment groove 334. Under the action of the valve body's own weight, the second valve body moves downward relative to the inner tube 31, and the second positioning pin 315 is placed on the top of the second adjustment groove 334. At this time, the second water hole 312 is connected with the fourth water hole 331. At this time, the water in the inner tube 31 can enter the airbag cavity of the first water-stopping airbag assembly and the airbag cavity of the second water-stopping airbag assembly through the second water hole 312 and the fourth water hole 331 to achieve pressurized expansion control.
[0060] Stage 2: After the airbag cavities of the first and second water-stop airbag assemblies are pressurized and expanded to fit against the hole wall, the first regulating tube 323 is controlled to move downward. Since the inner tube 31 and the first valve body are still in a locked state, the inner tube moves downward relative to the lower valve body. Figure 4 , 5 As shown, the states of the first valve body and the inner tube 31 remain unchanged, the second positioning pin 315 moves downward along the second adjusting groove 334, and stops moving downward after being placed at the bottom of the second adjusting groove 334 or the second connector 332 stops moving downward after abutting against the limiting structure 313. At this time, the second water hole 312 and the fourth water hole 331 are misaligned and not connected. At this time, the water in the inner tube 31 enters the test section, and the airbag cavity of the first water-stopping airbag assembly and the airbag cavity of the second water-stopping airbag assembly enter the expansion holding state.
[0061] Stage 3: After the test is completed, the water in the airbag cavity needs to be discharged. At this time, the first adjustment cylinder 323 is controlled to rotate so that the first positioning pin 314 is aligned with the first adjustment groove 324, and then the first adjustment cylinder 323 is controlled to move upward. At this time, under the action of its own weight, the first valve body moves upward relative to the inner tube, and the second valve body moves downward relative to the inner tube. Figure 6 , 7As shown, the first water hole 311 is connected to the third water hole 321, and the second water hole 312 is connected to the fourth water hole 331, so the airbag cavity of the first water-stopping airbag assembly and the airbag cavity of the second water-stopping airbag assembly can be drained and depressurized.
[0062] like Figure 8 As shown, the first water-stopping airbag assembly includes a first fixing block 431, a second fixing block 432, and a first airbag 46 sealed and fixed outside the first fixing block 431 and the second fixing block 432;
[0063] The first connecting pipe 81 passes through the first fixing block 431 and the second fixing block 432 at the same time;
[0064] The first fixing block 431 and the second fixing block 432 are both provided with a first water hole 41;
[0065] The first fixing block 431 and the second fixing block 432 are penetrated and fixed with an outlet pipe 44. Two outlet pipes 44 can be provided, one for leading out the cable of the pumping assembly, and the other for leading out the cable of the pressure flow sensor 71.
[0066] like Fig. 9 As shown, the second water-stopping airbag assembly includes a third fixing block 541, a fourth fixing block 542, and a second airbag 53 sealed and fixed outside the third fixing block 541 and the fourth fixing block 542; the third fixing block 541 is provided with a second water hole 51. Preferably, a fifth connecting pipe 85 is also passed through between the third fixing block 541 and the fourth fixing block 542, one end of the fifth connecting pipe 85 is connected to the third connecting pipe 83, and the other end is sealed by a plug 52.
[0067] Based on the above-mentioned device, the second aspect of the utility model discloses a drilling pressure injection and water pumping test system, including a drilling pressure injection and water pumping test device described in the first aspect and any possible design thereof, a drill rod 2 connected to the airbag control valve, a pressure flow sensor 71, a water level sensor 72, a pressure flow sensor, an electromagnetic flowmeter, a water pump and a control unit, wherein the pressure flow sensor 71 is arranged between the first water-stop airbag assembly and the pumping assembly; the water level sensor 72 is arranged in the drill rod 2 for detecting the water level; the electromagnetic flowmeter is used to detect the water flow rate of the drill rod; the water pump is used to supply water to the drill rod; the control unit is connected to the pressure flow sensor 71, the water level sensor 72, the pressure flow sensor, the electromagnetic flowmeter, and the water pump to realize data acquisition and / or control.
[0068] In order to further achieve sealing, a hole sealer 1 is provided at the top of the drill pipe 2. Fig.10As shown, the orifice sealer includes a four-way pipe 11 and a sealing structure connected to a pipe mouth of the four-way pipe 11; the pipe mouth of the four-way pipe 11 is provided with a step structure, and the sealing structure includes a pressure block 12 and a rubber pad 13 placed on the step structure and stacked, and a pressure cap 14 threadedly fixed on the pipe mouth. Among them, the remaining three ports of the four-way pipe 11 are respectively a water inlet, a water outlet and a port connected to the drill pipe. The cable of the water level sensor is led out through the hole structure provided on the sealing structure.
[0069] When the above system is used to implement the layered pumping and injection water pressure test, the test method is as follows:
[0070] A. Drilling structure design.
[0071] The borehole structure refers to the change in depth and diameter of each hole section in the borehole profile from the opening to the end of the borehole. The borehole structure is determined based on the use and purpose of the borehole, geological structure, design depth, required end hole diameter, pumping methods and equipment, drilling methods and drilling equipment parameters, and the borehole structure diagram is compiled.
[0072] B. Drilling construction.
[0073] Use geological drilling rigs and supporting equipment to drill to the designed hole depth, and lower the overburden layer into the casing wall. The diameter of the test section hole should not be less than 113mm.
[0074] C. Wash the hole.
[0075] Use a drill rod connected to a piston to pump water to lift the hole, use an air compressor to pump air and water to lift the piston to wash the hole, or use a wire rope to connect the piston to lift and wash the hole with a large stroke to clean the mud in the hole.
[0076] D. Equipment installation.
[0077] According to the core and electrical logging data, the position and thickness of the waterproof layer and the aperture of the water-stopping part are accurately grasped. According to the position and thickness of the waterproof layer, the position of the first waterproof airbag assembly 4 and the second waterproof airbag assembly 5 and the length of the third connecting pipe 83 are determined, and the hole is lowered in the order of the second waterproof airbag assembly 5, the third connecting pipe 83, the pumping assembly, the first waterproof airbag assembly 4, the airbag control valve 3, the drill pipe, and the orifice closure device 1. The joints of the second waterproof airbag assembly 5, the third connecting pipe 83, the pumping assembly, the first waterproof airbag assembly 4, the airbag control valve 3, the drill pipe, and the orifice closure device 1 are wrapped with raw tape for sealing. The outlet pipe of the first waterproof airbag assembly 4 and the orifice closure device 1 are both provided with cable-through joints, and the cable is passed through and sealed by the pressure block, rubber pad and pressure cap.
[0078] E. Stop water.
[0079] The above-mentioned drilling pressure injection pumping test device is placed at the depth of the test, and the water path from the drill pipe to the test section is closed, that is, the pumping pipeline is closed to control the airbag control valve 3 so that the first connecting pipe 81 is connected to the airbag cavity of the first water-stopping airbag assembly. Based on the above-mentioned specific valve body structure, the airbag control valve 3 is in an open state under the self-weight of the first water-stopping airbag assembly 4, the second water-stopping airbag assembly 5, the third connecting pipe 83 and other components, that is, it is in the above-mentioned stage 1. At this time, the first water hole 311 and the third water hole 321 are misaligned and not connected, and the second water hole 312 is connected to the fourth water hole 331. The surface water pump injects water through the drill pipe, the upper valve body, the inner tube 31, the second water hole 312, the fourth water hole 331, the airbag cavity of the first water-stopping airbag assembly 4, and the airbag cavity of the second water-stopping airbag assembly 5 in sequence. When the two airbag cavities are filled with water, continue to pressurize the airbag cavity to make it expand and close to the hole wall, that is, complete the water stop.
[0080] F. Test of water-stopping effect.
[0081] The inspection shall be carried out by water level pressure difference method, pump pressure method or salt diffusion method, with pump pressure method being preferred.
[0082] Water level pressure difference method inspection: measure the water level inside and outside the drill pipe 2 after water stopping, use water injection or pumping to create a water level difference between the inside and outside of the drill pipe, and make the difference reach 10m or the maximum depth drop value during the pumping test. After stabilization for half an hour, if the water level fluctuation does not exceed 0.1m, the water stopping is effective.
[0083] Pump pressure test: close the water stop pipe opening, use a water pump to send water into the pipe, and make the water pump pressure reach the maximum pressure value that the water stop section may be subjected to during the test period. Stabilize it for half an hour. If the water consumption does not exceed 1.5L, the water stop is effective.
[0084] Salt diffusion method test: first measure the resistivity in the hole, then pour a 5% salt solution into the annular gap between the waterstop pipe and the drilled hole, and measure the resistivity of the liquid in the waterstop pipe after 2 hours. If it is basically the same as the resistivity of the liquid in the pipe measured before pouring the salt solution, the waterstop is effective.
[0085] G. Experiment.
[0086] 1. Water injection test or water pressure test.
[0087] The airbag control valve 3 is controlled to prevent the first connecting pipe 81 from being connected to the airbag cavity of the first water-stop airbag assembly, and the water path from the drill pipe to the test section is opened, water is injected into the test section, and a test is performed.
[0088] Specifically, since the pressure in the capsule cavity of the first water-stopping airbag assembly 4 and the second water-stopping airbag assembly 5 is 2 to 4 times greater than the test pressure, the capsule has been tightly attached to the hole wall, the vertical shaft chuck of the drilling rig clamps the vertical shaft, and the drill rod is lifted about 3 cm into the hole, the orifice clamp is loosened, and the drilling rig operating valve is used to make the clamped vertical shaft run downward, and the descending height is close to the height of the threaded notch at the lower end of the lower valve body. At this time, the first water hole 311 and the third water hole 321 are misaligned and not conductive, and the second water hole 312 and the fourth water hole 331 are misaligned and not conductive, that is, the upper valve body and the lower valve body are both in a closed state. The ground water pump, the drill rod, the inner tube 31, the first connecting pipe 81, and the test section rock formation form a loop, and the injected water only enters the test section, while the pressure applied in the capsule cavity of the first water-stopping airbag assembly 4 and the second water-stopping airbag assembly 5 remains unchanged. Start the water pump to inject water into the test section rock formation, and perform a water injection test or a water pressure test according to the test regulations. After the pump pressure method is used to test that the water-stopping effect is effective, a water pressure test can be carried out simultaneously.
[0089] 2 Experimental pumping.
[0090] Through experimental pumping, the operation and working effect of test equipment such as power, water pumps, and pressure measuring tubes are comprehensively checked, and the maximum possible drawdown is measured.
[0091] 3 Pumping test.
[0092] Conduct steady flow or non-steady flow pumping tests in accordance with industry regulations, and simultaneously observe and record the pumping volume and dynamic water level of the pumping holes.
[0093] H. Pressure relief plug.
[0094] Close the water path from the drill pipe to the test section, control the airbag control valve 3 to connect the first connecting pipe 81 with the airbag cavity of the first water-stop airbag assembly, and achieve pressure relief of the airbag cavities of the first water-stop airbag assembly 4 and the second water-stop airbag assembly 5.
[0095] Specifically, when the pumping and injection work of a test section is completed, the water pump return valve is opened to release the pressure in the drilling test section. After the pressure water in the test section is released, the first adjustment cylinder 323 is controlled to rotate so that the first positioning pin 314 is aligned with the first adjustment groove 324, and then the first adjustment cylinder 323 is controlled to move up. Under the action of deadweight, the first valve body moves up relative to the inner tube, and the second valve body moves down relative to the inner tube, so that the first water hole 311 is connected with the third water hole 321, and the second water hole 312 is connected with the fourth water hole 331. At this time, the water path from the drill pipe to the test section is closed, and the airbag cavity of the first water-stopping airbag assembly 4 and the second water-stopping airbag assembly 5, the first water hole 311, the inner tube 31, and the third water hole 321 form a loop. The high pressure in the airbag cavity automatically releases the contraction and detaches from the hole wall, and then the test section can be moved to the next test section for testing.
[0096] I. Test the next test section.
[0097] The length of the third connecting pipe 83 between the upper water stop plug and the lower water stop plug is adjusted according to the length of the next test section. After the pumping test of the test section is completed, the above steps E to H are repeated to perform the pumping and injection water pressure test on the next test section, so that the pumping and injection water pressure test of different test sections can be completed.
[0098] This method is suitable for water pressure test, water injection test and pumping test. It can perform segmented tests in one hole and conduct comparative test analysis to avoid duplication of work in different tests or different segments of the same test, greatly reducing the test cost, saving construction time and improving the reliability of test results.
[0099] Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art can still modify the technical solutions described in the aforementioned embodiments, or make equivalent substitutions for some of the technical features therein. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the protection scope of the present invention.
Claims
1. A drilling pressure injection water pumping test device, comprising a first water-stopping airbag assembly (4), a water pumping assembly (6) and a second water-stopping airbag assembly (5) arranged in sequence, wherein the first water-stopping airbag assembly is provided with a first connecting pipe (81) for communicating with the water pumping assembly (6); the airbag cavities of the first water-stopping airbag assembly and the second water-stopping airbag assembly are connected via a second connecting pipe (82); a third connecting pipe (83) provided with a water-permeable hole is connected between the water pumping assembly and the second water-stopping airbag assembly; the characteristics are as follows: The first waterproof airbag assembly is connected to an airbag control valve (3) which is in communication with the first connecting pipe (81) and can control the communication state between the airbag cavity of the first waterproof airbag assembly and the first connecting pipe (81) by rotating or moving up and down.
2. A drilling pressure injection pumping test device according to claim 1, characterized in that: The airbag control valve comprises an inner tube (31) having a first water through hole (311) and a second water through hole (312) respectively disposed at two ends, a first valve body having a third water through hole (321) and used for controlling the communication state between the first water through hole (311) and the third water through hole (321), and a second valve body having a fourth water through hole (331) and used for controlling the communication state between the second water through hole (312) and the fourth water through hole (331); The fourth water hole (331) is connected to the airbag cavity of the first water-stopping airbag assembly via a fourth connecting pipe (84).
3. A drilling pressure injection pumping test device according to claim 2, characterized in that: The inner tube (31) is provided with a first positioning pin (314) and a second positioning pin (315); The first valve body comprises a first connector (322) having one end sealingly sleeved on the inner tube (31) and the other end being open, and a first adjusting cylinder (323) connected to the open end of the first connector (322); the first adjusting cylinder (323) is disposed on one end of the first connector (322) and is provided with a first adjusting groove (324) for clamping the first positioning pin (314); the distance between the port of the first adjusting cylinder (323) and the inner bottom of the first connector (322) is greater than the thickness of the first positioning pin (314); and the third water hole (321) is provided on the first adjusting cylinder (323); The second valve body comprises a second connector (332) having one end sealingly sleeved on the inner tube (31) and the other end being open, and a second adjusting cylinder (333) connected to the open end of the second connector (332); the second adjusting cylinder (333) is disposed on one end of the second connector (332) and is provided with a second adjusting groove (334) for clamping the second positioning pin (315); and the fourth water hole (331) is provided on the second adjusting cylinder (333).
4. A drilling pressure injection pumping test device according to claim 3, characterized in that: The second adjustment cylinder (333) and the first adjustment cylinder (323) are provided with sealing structures (34).
5. The drilling pressure injection pumping test device according to claim 1 is characterized in that: The first water-stopping airbag assembly comprises a first fixing block (431), a second fixing block (432), and a first airbag (46) sealed and fixed outside the first fixing block (431) and the second fixing block (432); The first connecting pipe (81) passes through the first fixing block (431) and the second fixing block (432) at the same time; The first fixing block (431) and the second fixing block (432) are both provided with a first water hole (41); An outlet pipe (44) is fixedly passed through the first fixing block (431) and the second fixing block (432).
6. A drilling pressure injection pumping test device according to claim 1, characterized in that: The second water-stopping airbag assembly comprises a third fixing block (541), a fourth fixing block (542), and a second airbag (53) sealed and fixed outside the third fixing block (541) and the fourth fixing block (542); the third fixing block (541) is provided with a second water hole (51).
7. A drilling pressure injection pumping test device according to claim 6, characterized in that: A fifth connecting pipe (85) is also passed through between the third fixing block (541) and the fourth fixing block (542); one end of the fifth connecting pipe (85) is connected to the third connecting pipe (83), and the other end is sealed by a plug (52).
8. A drilling pressure injection pumping test system, characterized in that: include: A drilling pressure injection pumping test device as described in any one of claims 1 to 7; A drill rod (2) connected to the airbag control valve; A pressure flow sensor (71) disposed between the first water-stopping airbag assembly and the water pumping assembly; A water level sensor (72) disposed in the drill rod (2) for detecting the water level; Pressure flow sensor; An electromagnetic flowmeter for detecting the water flow rate out of the drill pipe; a water pump for supplying water into the drill pipe; A control unit connected to the pressure flow sensor (71), the water level sensor (72), the pressure flow sensor, the electromagnetic flow meter, and the water pump.
9. A drilling pressure injection pumping test system according to claim 8, characterized in that: A hole sealer (1) is provided at the top of the drill pipe (2), and the hole sealer comprises a four-way pipe (11) and a sealing structure connected to a pipe opening of the four-way pipe (11); a step structure is provided at the pipe opening of the four-way pipe (11), and the sealing structure comprises a pressure block (12) and a rubber pad (13) which are placed on the step structure and stacked, and a pressure cap (14) which is threadedly fixed to the pipe opening.