Guniting system of heading machine and heading machine

By introducing a crane and a slewing base into the boring machine spraying system, the labor intensity problem caused by manual handling is solved, and the automatic lifting of the spraying pipeline and the spraying head is realized, which improves the replacement efficiency.

CN222121533UActive Publication Date: 2024-12-06CHINA RAILWAY ENGINEERING EQUIPMENT GROUP CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420682429.2
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-04-03
Publication Date
2024-12-06
Estimated Expiration
2034-04-03

AI Technical Summary

Technical Problem

The existing boring machine spraying system requires manual handling when replacing the spraying pipeline and spraying head, resulting in high labor intensity and low efficiency for workers.

Method used

A boring machine spraying system is designed, including a spray bridge, a carriage, a spraying robot arm, a crane and a slewing base. The lifting and lifting of replaced components is achieved through the crane and the load-bearing hook, reducing manual participation.

Benefits of technology

Through the cooperation of the crane and the slewing base, the automatic lifting of the spray pipe and the spray head is achieved, reducing the labor intensity and improving the replacement efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222121533U_ABST
    Figure CN222121533U_ABST
Patent Text Reader

Abstract

The utility model relates to the field of heading machines, in particular to a heading machine guniting system and a heading machine. The guniting system of the heading machine comprises a guniting bridge and a sliding frame arranged on the guniting bridge in a sliding mode, and a crane used for hoisting a to-be-replaced part at the bottom of a tunnel or hoisting a replaced part to the bottom of the tunnel when a guniting head is replaced is arranged on the sliding frame or the end portion of the guniting bridge. And a rotary base capable of rotating is arranged at the bottom of the crane. The crane is arranged on the sliding frame or at the end of the guniting bridge, so that a to-be-replaced part at the bottom of the tunnel can be conveniently hoisted or a replaced part can be conveniently hoisted to the bottom of the tunnel, and meanwhile, the rotary base is arranged at the bottom of the crane, so that the crane can conveniently rotate; due to the fact that the crane is adopted in the hoisting process, manual work is not used any more, and the problem that in the prior art, when a guniting pipeline and a guniting head of a guniting system are replaced, manual carrying is adopted, and the manual labor intensity is large is solved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the field of tunneling machines, in particular to a tunneling machine shotcrete system and a tunneling machine. Background Art

[0002] The tunnel boring machine is widely used in the process of tunnel construction. The tunnel boring machine includes a cutter disc at the front end, which rotates to carry out tunneling. After the tunneling is completed, the tunnel formed is not strong enough and there will be debris falling. It is impossible to directly form a tunnel for trains to pass through. The tunnel needs to be strengthened. Usually, it is necessary to assemble pipe segments and spray to strengthen the tunnel. Therefore, a rear supporting system is also set at the rear end of the tunnel boring machine. The rear supporting system is generally provided with a spraying area, and a spraying system is provided on the spraying area. The tunnel is sprayed by the spraying system.

[0003] Specifically, the shotcrete system includes a shotcrete bridge, a slide is slidably arranged on the shotcrete bridge, a shotcrete mechanical arm and a shotcrete head located at the end of the shotcrete mechanical arm are arranged on the slide. The slide can also rotate relative to the shotcrete bridge to increase the area covered by the shotcrete head, and a shotcrete pipeline connected to the shotcrete head is also arranged on the shotcrete mechanical arm.

[0004] Different construction environments and construction standards require different shotcrete pipes and heads, so they need to be replaced. Specifically, the shotcrete head and shotcrete robot are moved to the top of the shotcrete bridge, and the parts to be replaced are moved to the shotcrete bridge, where they are replaced. These parts that need to be replaced are usually moved manually. Lightweight items can be moved manually, but heavy items moved manually greatly increase the labor intensity of workers. Utility Model Content

[0005] The purpose of the utility model is to provide a tunnel boring machine shotcreting system, which is used to solve the problem of high labor intensity caused by manual handling when replacing the shotcrete pipeline and the shotcrete head in the prior art shotcrete system; the purpose of the utility model is also to provide a tunnel boring machine, which is used to solve the above technical problems.

[0006] In order to achieve the above-mentioned purpose, the tunnel boring machine shotcrete system in the utility model adopts the following technical scheme:

[0007] A tunnel boring machine shotcrete system comprises a shotcrete bridge and a slide slidably arranged on the shotcrete bridge, a shotcrete mechanical arm is arranged on the slide, a shotcrete head is installed on the shotcrete mechanical arm, a crane is arranged on the slide or at the end of the shotcrete bridge for lifting the parts to be replaced at the bottom of the tunnel or lifting the replaced parts to the bottom of the tunnel when replacing the shotcrete head, and a rotatable swivel base is arranged at the bottom of the crane.

[0008] Furthermore, the crane is arranged on a slide, one of the crane and the spray head is arranged at the front end of the slide, and the other is arranged at the rear end of the slide.

[0009] Furthermore, the slide comprises a ladder and a shotcrete operating platform located at the top of the ladder, and the crane is arranged on the shotcrete operating platform.

[0010] Furthermore, the tunnel boring machine shotcrete system also includes a load-bearing hook for arrangement on the top of the tunnel, on which a lifting device is installed, and the lifting device is used to transfer the parts to be replaced hoisted by the crane or to transfer the replaced parts to the crane.

[0011] Furthermore, the load-bearing hook is used to be arranged above the crane and the spraying head.

[0012] Furthermore, the crane is arranged behind the spraying head.

[0013] Furthermore, at least two load-bearing hooks are provided, and the plurality of load-bearing hooks are arranged at intervals along the front-to-back direction.

[0014] Furthermore, the crane includes a movable support rod hingedly arranged on a slewing base and a telescopic support rod fixedly arranged on the slewing base, and a boom is hingedly arranged at the ends of the movable support rod and the telescopic support rod, and a lifting component for lifting is arranged on the boom.

[0015] Furthermore, the telescopic support rod is a hydraulic rod, and the hydraulic circuit of the hydraulic rod is connected to the hydraulic circuit of the spraying system.

[0016] The beneficial effects of the tunnel boring machine shotcreting system of the utility model are as follows: the utility model improves the existing tunnel boring machine shotcreting system, by arranging a shotcrete bridge and a slide, and arranging a shotcrete mechanical arm and a shotcrete head on the slide, so as to increase the area covered by the shotcrete; by arranging a crane on the slide or at the end of the shotcrete bridge, it is convenient to lift the parts to be replaced at the bottom of the tunnel or to lift the replaced parts to the bottom of the tunnel, and at the same time, a slewing base is arranged at the bottom of the crane, and since the slewing base can rotate relatively, it is convenient to rotate the crane, and it is convenient to first face the two sides of the tunnel during the lifting process, and then lift it to the shotcrete bridge through rotation; since the crane is used in the lifting process, manual labor is no longer used, thereby solving the problem of high manual labor intensity caused by manual transportation when replacing the shotcrete pipeline and the shotcrete head in the prior art shotcrete system.

[0017] In order to achieve the above-mentioned purpose, the tunnel boring machine in the utility model adopts the following technical solutions:

[0018] A tunnel boring machine comprises a shotcrete system, wherein the shotcrete system comprises a shotcrete bridge and a slide slidably arranged on the shotcrete bridge, a shotcrete mechanical arm is arranged on the slide, a shotcrete head is mounted on the shotcrete mechanical arm, a crane is arranged on the slide or at the end of the shotcrete bridge for lifting the parts to be replaced at the bottom of the tunnel or lifting the replaced parts to the bottom of the tunnel when replacing the shotcrete head, and a rotatable swivel base is arranged at the bottom of the crane.

[0019] Furthermore, the crane is arranged on the slide, and one of the crane and the spraying head is arranged at the front end of the slide, and the other is arranged at the rear end of the slide.

[0020] Furthermore, the slide comprises a ladder and a shotcrete operating platform located at the top of the ladder, and the crane is arranged on the shotcrete operating platform.

[0021] Furthermore, the tunnel boring machine shotcrete system also includes a load-bearing hook for arrangement on the top of the tunnel, on which a lifting device is installed, and the lifting device is used to transfer the parts to be replaced hoisted by the crane or to transfer the replaced parts to the crane.

[0022] Furthermore, the load-bearing hook is used to be arranged above the crane and the spraying head.

[0023] Furthermore, the crane is arranged behind the spraying head.

[0024] Furthermore, at least two load-bearing hooks are provided, and the plurality of load-bearing hooks are arranged at intervals along the front-to-back direction.

[0025] Furthermore, the crane includes a movable support rod hingedly arranged on a slewing base and a telescopic support rod fixedly arranged on the slewing base, and a boom is hingedly arranged at the ends of the movable support rod and the telescopic support rod, and a lifting component for lifting is arranged on the boom.

[0026] Furthermore, the telescopic support rod is a hydraulic rod, and the hydraulic circuit of the hydraulic rod is connected to the hydraulic circuit of the spraying system.

[0027] The beneficial effects of the tunnel boring machine shotcreting system of the utility model are as follows: the utility model improves the existing tunnel boring machine, and by arranging a shotcrete bridge and a slide, a shotcrete mechanical arm and a shotcrete head are arranged on the slide to increase the area covered by the shotcrete; by arranging a crane on the slide or at the end of the shotcrete bridge, it is convenient to lift the parts to be replaced at the bottom of the tunnel or to lift the replaced parts to the bottom of the tunnel, and at the same time, a slewing base is arranged at the bottom of the crane. Since the slewing base can rotate relatively, the rotation of the crane is convenient, and it is convenient to first face the two sides of the tunnel during the lifting process, and then lift it to the shotcrete bridge through rotation; since the crane is used in the lifting process, manual labor is no longer used, thereby solving the problem of high labor intensity caused by manual transportation when replacing the shotcrete pipeline and the shotcrete head in the prior art shotcrete system. BRIEF DESCRIPTION OF THE DRAWINGS

[0028] Figure 1 It is a structural schematic diagram of an embodiment of a tunnel boring machine shotcrete system of the utility model;

[0029] Figure 2 It is a schematic structural diagram of a rotary base in an embodiment of a tunnel boring machine shotcrete system of the utility model.

[0030] In the figure: 1. Shotcrete bridge; 2. Mechanical arm; 3. Shotcrete operating platform; 4. Base; 5. Mounting plate; 6. Movable support rod; 7. Hoisting motor; 8. Lifting support rod; 9. Movable boom; 10. Fixed boom; 11. Direct motion mechanism; 12. Wire rope; 13. Hook; 14. Hydraulic pipeline; 15. Tunnel; 16. Rotating drive member; 17. Load-bearing hook. DETAILED DESCRIPTION

[0031] The features and performance of the present invention are further described in detail below in conjunction with the embodiments.

[0032] The utility model provides a crane on the spraying system, and the objects required to be lifted are lifted by the crane, thus saving manpower.

[0033] In the embodiment of the tunnel boring machine shotcrete system (hereinafter referred to as the shotcrete system) in the utility model:

[0034] In this embodiment, the shotcrete system includes a shotcrete bridge and a carriage slidably arranged on the shotcrete bridge, a shotcrete mechanical arm and a shotcrete head are arranged on the carriage, the carriage includes a ladder and a shotcrete operation platform located at the top of the ladder, a crane is arranged on the shotcrete operation platform, the crane is arranged at the front end of the carriage, and the shotcrete head is arranged at the rear end of the carriage. Of course, in other embodiments, the crane can also be arranged at other positions on the carriage, or the crane can be arranged at the end of the shotcrete bridge so as not to affect the normal operation of the carriage. Of course, in other embodiments, the crane is arranged at the rear end of the carriage, and the shotcrete head is arranged at the front end of the carriage.

[0035] like Figure 1 As shown, a rotatable revolving base is installed on the shotcrete operating platform 3, and a crane for lifting objects is arranged on the revolving base. Since the crane is installed on the revolving base and the revolving base can rotate, the crane can also rotate, which is convenient for lifting objects on the side of the tunnel boring machine or the tunnel 15. By rotating, the heavy objects to be lifted can be lifted to the required shotcrete bridge area or the replaced parts can be lifted to the bottom of the tunnel 15.

[0036] During the process of replacing the spraying pipeline and the spraying head on the spraying robot arm 2, the parts to be replaced are in a suspended state. In order to reduce the burden on the operator during the replacement, the parts to be replaced need to be suspended during the replacement process. Therefore, a load-bearing hook 17 for suspending the parts to be replaced during the replacement is also provided on the top wall of the tunnel 15. The load-bearing hook 17 needs to be fixedly set on the top wall of the tunnel 15. In order to facilitate the installation of the load-bearing hook 17, the crane is set behind the spraying head, so that the areas where the crane and the load-bearing hook 17 are located have been hardened, which is more convenient for the arrangement of the load-bearing hook 17. Of course, in other embodiments, if the crane can cover a wider range, the load-bearing hook 17 may not be set. Of course, in other embodiments, the crane can also be set at the front end of the slide, and the spraying head is moved at this time so that the position where the load-bearing hook 17 is installed is a hardened position.

[0037] There are at least two load-bearing hooks 17, and multiple load-bearing hooks 17 are arranged in sequence along the front-to-back direction at the top of the tunnel 15, and the load-bearing hooks 17 are arranged in the air between the crane and the shotcrete head, so as to facilitate the transfer of the parts to be replaced during the lifting process. Specifically, after the crane lifts the parts to be replaced, the parts to be replaced are transferred to the top of the shotcrete bridge 1 along with the hooks 13 on the crane. Limited by the space in the tunnel 15, the boom of the crane will not extend too long, so the crane cannot directly transport the parts to be replaced to the required position. At this time, the load-bearing hooks 17 and lifting parts such as electric hoists are used to pull the parts to be replaced, so that the parts to be replaced can move forward under the relay of multiple load-bearing hooks 17, and finally move to the corresponding position. Of course, in other embodiments, only one load-bearing hook 17 can be set. Or in other embodiments, the load-bearing hooks 17 can also be arranged above the entire tunnel 15, and the load-bearing hooks 17 do not have to be located between the crane and the shotcrete head.

[0038] Specifically, Figure 1As shown, a slewing base is installed on the shotcrete operation platform 3, two support rods are arranged on the slewing base, a boom is hingedly arranged at the ends of the two support rods, a lifting component is arranged on the boom, and the lifting component includes a lifting motor 7, a steel wire rope 12 is connected to the lifting motor 7, and a hook 13 is arranged at one end of the steel wire rope 12 away from the lifting motor 7, and the lifting hook 13 is controlled to perform lifting and lowering movements by curling and storing the steel wire rope 12. Of course, in other embodiments, in order to increase the connection strength, three support rods, or four support rods or other numbers greater than two may also be arranged.

[0039] like Figure 2 As shown, the rotary base includes a base 4 and a mounting plate 5, and the base 4 and the mounting plate 5 can rotate relative to each other. The support rod is installed on the mounting plate 5, and the base 4 is fixedly set on the shotcrete operation platform 3. The base 4 is generally cylindrical, and a cavity is provided in the middle of the base 4. A rotating drive member 16 for driving the base 4 and the mounting plate 5 to move relative to each other is provided in the cavity. Specifically, the rotating drive member 16 is a hydraulic motor. Since hydraulic systems are widely used in tunneling machines, the hydraulic motor can use the hydraulic system provided on the tunneling machine for convenient arrangement. The mounting plate 5 is a flat plate, and a gear is provided at the bottom of the mounting plate 5. Another gear that meshes with the gear of the mounting plate 5 is also provided on the hydraulic motor. Of course, in other embodiments, the rotating drive member 16 can also be provided as a motor, and a gear is provided on the output shaft of the motor.

[0040] like Figure 1 As shown, there are two support rods, one of which is hingedly arranged on the rotating base to form a movable support rod 6, and the other support rod is fixedly arranged on the rotating base and can be lifted and lowered to form a lifting support rod 8. The end of the movable support rod 6 is hingedly arranged with the end of the boom, and the top of the lifting support rod 8 is hingedly connected with the middle of the boom. Correspondingly, in order to facilitate the hinged arrangement of the movable support rod 6 and the rotating base, a mounting ear is also provided on the mounting plate 5, and the mounting ear protrudes from the plate surface of the mounting plate 5 and extends back to the base 4. The lifting support rod 8 is arranged vertically, and the movable support rod 6 is arranged obliquely, so that the gap between the bottom of the movable support rod 6 and the lifting support rod 8 is smaller than the gap between the tops, so that the two support rods maintain sufficient gap for the support of the boom to maintain the stability of the support. The pitch angle of the boom is adjusted by the lifting and lowering adjustment of the lifting support rod 8. The lifting support rod 8, the mounting plate 5, the movable support rod 6 and the boom constitute a four-link structure, in which only the lifting support rod 8 and the mounting plate 5 are fixedly connected, so during the lifting and lowering adjustment of the lifting support rod 8, other structures will be adaptively adjusted to adapt. Similarly, the lifting support rod 8 is a hydraulic cylinder, and thus the hydraulic system on the tunnel boring machine can be borrowed.

[0041] Of course, in other embodiments, both support rods can also be fixedly arranged on the slewing base, in which case the boom is also fixedly arranged at the end of the support rod, and the boom maintains a fixed pitch angle and cannot be adjusted. Alternatively, in other embodiments, the axes of the movable support rod 6 and the lifting support rod 8 are both arranged vertically. Alternatively, in other embodiments, the lifting support rod 8 is no longer a hydraulic rod, but is set as an electric push rod.

[0042] like Figure 1 As shown, the boom is a telescopic boom, and the telescopic boom includes a fixed boom 10 connected to a support rod and a movable boom 9 guided and matched with the fixed boom 10. Specifically, in this embodiment, the fixed boom 10 is nested and arranged on the periphery of the movable boom 9, so that the movable boom 9 can slide in the hollow space of the fixed boom 10, so that the length of the boom can be changed. In order to automatically control the length of the telescopic boom, a direct motion mechanism 11 for controlling the movement of the movable boom 9 relative to the fixed boom 10 is also provided between the fixed boom 10 and the movable boom 9. The direct motion mechanism 11 can also limit the position of the fixed boom 10 and the movable boom 9 at the same time. When the direct motion mechanism 11 is moved into place, it acts as a locking structure to prevent the movement of the movable boom 9. The direct motion mechanism 11 is a hydraulic cylinder, which also borrows the hydraulic system in the tunnel boring machine, so that there is no need to rearrange the power source. Of course, in other embodiments, the telescopic boom may not be provided, and the length of the boom cannot be changed. Alternatively, in other embodiments, a slide groove is provided on the fixed boom 10, and a slider matched with the slide groove is provided on the movable boom 9, thereby achieving the guided movement of the movable boom 9 relative to the fixed boom 10. Alternatively, in other embodiments, the direct motion mechanism 11 can also be set as an electric push rod or a cylinder.

[0043] In order to carry out lifting, a lifting motor 7 and a steel wire rope 12 connected to the lifting motor 7 are provided on the boom, a hook 13 is provided at the end of the steel wire rope 12 away from the lifting motor 7, and a pulley is provided at the end of the movable boom 9 away from the fixed boom 10. The hook 13 can be driven and move along the steel wire rope 12 under the curling action of the lifting motor 7, and the setting of the pulley facilitates reversing. In this embodiment, the lifting motor 7 is an electric motor, and a roller for curling the steel wire rope 12 is provided at the end of the motor. Of course, in other embodiments, the lifting motor 7 can also be set as a hydraulic motor or a winch.

[0044] In the embodiment of the tunnel boring machine of the present utility model:

[0045] In this embodiment, the tunnel boring machine includes a shotcreting area arranged on a rear supporting device, a shotcreting area shotcreting system is arranged on the shotcreting area, a shotcreting bridge and a mechanical arm for shotcreting are also arranged on the shotcreting area, wherein the shotcreting area shotcreting system has the same structure as the above-mentioned tunnel boring machine shotcreting system, which will not be repeated here.

[0046] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. The patent protection scope of the present invention shall be based on the claims. All equivalent structural changes made using the description and drawings of the present invention shall be included in the protection scope of the present invention.

Claims

1. A tunnel boring machine shotcrete system, comprising a shotcrete bridge and a carriage slidably arranged on the shotcrete bridge, a shotcrete mechanical arm being arranged on the carriage, and a shotcrete head being installed on the shotcrete mechanical arm, characterized in that: A crane is provided on the slide or at the end of the shotcrete bridge for lifting the parts to be replaced at the bottom of the tunnel or lifting the replaced parts to the bottom of the tunnel when replacing the shotcrete head, and a rotatable swivel base is provided at the bottom of the crane.

2. The tunnel boring machine shotcrete system according to claim 1, characterized in that: The crane is arranged on the slide, one of the crane and the spray head is arranged at the front end of the slide, and the other is arranged at the rear end of the slide.

3. The tunnel boring machine shotcrete system according to claim 2, characterized in that: The slide comprises a ladder and a shotcrete operating platform located on the top of the ladder, and the crane is arranged on the shotcrete operating platform.

4. The tunnel boring machine shotcrete system according to any one of claims 1 to 3, characterized in that: The tunnel boring machine shotcrete system also includes a load-bearing hook for arrangement on the top of the tunnel, on which a lifting device is installed, and the lifting device is used to transfer the parts to be replaced lifted by the crane or to transfer the replaced parts to the crane.

5. The tunnel boring machine shotcrete system according to claim 4, characterized in that: The load-bearing hook is used to be arranged above between the crane and the spraying head.

6. The tunnel boring machine shotcrete system according to claim 5, characterized in that: The crane is arranged behind the spraying head.

7. The tunnel boring machine shotcrete system according to claim 4, characterized in that: At least two load-bearing hooks are provided, and the plurality of load-bearing hooks are arranged at intervals along the front-to-back direction.

8. The tunnel boring machine shotcrete system according to any one of claims 1 to 3, characterized in that: The crane comprises a movable support rod hingedly arranged on a slewing base and a telescopic support rod fixedly arranged on the slewing base; a boom is hingedly arranged at the ends of the movable support rod and the telescopic support rod; and a lifting component for lifting is arranged on the boom.

9. The tunnel boring machine shotcrete system according to claim 8, characterized in that: The telescopic support rod is a hydraulic rod, and the hydraulic circuit of the hydraulic rod is connected to the hydraulic circuit of the spraying system.

10. A roadheader, comprising a shotcrete system, characterized in that: The shotcrete system is the same as the shotcrete system described in any one of claims 1-9.