Grouting reinforcement device for bridge pile foundation
The grouting reinforcement device addresses the inefficiency of manual hole drilling by allowing simultaneous drilling and grouting of multiple holes, enhancing efficiency and reducing collapse risks in bridge pile foundation construction.
Patent Information
- Application Number
- CN202420653385.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-01
- Publication Date
- 2024-12-10
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
Existing grouting reinforcement devices for bridge pile foundations require manual drilling of individual holes, significantly reducing efficiency as only a single hole can be drilled and grouted at a time, posing a risk of collapse due to karst caves and inefficiency in construction.
A grouting reinforcement device with multiple drilling devices and hydraulic cylinders that allow simultaneous drilling and grouting of multiple holes, using a telescopic hose and grouting pipes to efficiently inject cement slurry into surrounding rock holes.
Enhances grouting efficiency by enabling simultaneous drilling and grouting of multiple holes, reducing the risk of collapse and improving the quality of bridge pile foundations.
Smart Images

Figure CN222140042U_ABST
Abstract
Description
Technical Field
[0001] The utility model belongs to the technical field of grouting reinforcement for bridge pile foundations, in particular to a grouting reinforcement device for bridge pile foundations. Background Art
[0002] During the construction of bridge pile foundation, there is a risk of karst collapse leading to road collapse. Therefore, during the construction of bridge pile foundation, it is also necessary to seal the karst caves around the bridge pile foundation to block the ground collapse disaster caused by the change of groundwater level caused by the construction of bridge pile foundation, and form a closed space around the construction space of bridge pile foundation to reduce the possibility of collapse caused by construction, ensure the quality of bridge pile foundation, and prevent collapse accidents on the road surface and surrounding areas.
[0003] Most of the existing grouting reinforcement devices for bridge pile foundations require first drilling holes into the surrounding rock using a manual drilling device, and then injecting grout into the surrounding rock through a grouting pipe to increase the strength of the surrounding rock. However, this grouting method requires manual drilling of additional holes, and only a single hole can be drilled each time, and only a single hole can be grouted, which greatly reduces the efficiency of grouting. Therefore, a grouting reinforcement device for bridge pile foundations is urgently needed to improve this problem. Utility Model Content
[0004] The utility model aims to provide a grouting reinforcement device for bridge pile foundation to solve the problems raised in the background technology.
[0005] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: a grouting reinforcement device for a bridge pile foundation, comprising a mounting plate for mounting the grouting reinforcement device for a bridge pile foundation, the lower end of the mounting plate is fixedly connected to a walking wheel, the top surface of the mounting plate is fixedly connected to a U-shaped frame, the top surface of the U-shaped frame is fixedly connected to a hydraulic cylinder, the telescopic end of the hydraulic cylinder is laterally fixedly installed with a plurality of drilling devices, the top surface of the mounting plate is fixedly installed with a grouting barrel, the lower end of the grouting barrel is fixedly connected to a grouting pipe, and the wall of the grouting pipe is fixedly connected to the grouting barrel. A slurry pump is fixedly connected to the sleeve, and a telescopic hose is fixedly connected to the end of the slurry delivery pipe. A vertical plate is fixedly connected to one side of the lower end of the mounting plate. Slide grooves are longitudinally symmetrically provided on the side walls of the vertical plate. Slide blocks are slidably connected to the insides of the two slide grooves. A cross plate is fixedly connected between the two slide blocks. Fixed blocks are symmetrically fixedly connected to the side of the cross plate away from the slide block. A cross pipe is rotatably connected between the two fixed blocks. A plurality of grouting pipes are fixedly connected to the side walls of the cross pipe, and the end of the telescopic hose is fixedly connected to the side wall of the cross pipe.
[0006] Preferably, the inner walls of the two slide grooves are symmetrically provided with limiting grooves, and the side walls of the two sliding blocks are symmetrically fixedly connected with limiting blocks.
[0007] Preferably, the two limit blocks symmetrically arranged on the side wall of the sliding block are respectively slidably connected to the inside of two limit grooves symmetrically opened on the inner wall of the sliding groove.
[0008] Preferably, the inner top surfaces of the two fixing blocks are each provided with a mounting groove, and the top surfaces of the mounting groove are fixedly connected with a spring.
[0009] Preferably, a clamping block is fixedly connected to the lower end of the spring, and clamping grooves are symmetrically provided on the side walls of the grouting pipe, and the clamping block is clamped to the inside of the clamping groove.
[0010] Preferably, the inner wall of the installation groove is symmetrically provided with strip grooves, and the side wall of the clamping block is symmetrically fixedly connected with a rectangular block.
[0011] Preferably, the two rectangular blocks symmetrically fixedly connected on the side wall of the clamping block are respectively slidably connected to the inside of two strip grooves symmetrically opened on the inner wall of the installation groove.
[0012] Compared with the prior art, the technical effects and advantages of the utility model are as follows:
[0013] The grouting reinforcement device for bridge pile foundation, when it is necessary to grout the bridge pile foundation, first start multiple drilling devices and hydraulic cylinders, push the drilling device to drill the surrounding rock through the hydraulic cylinder, then reversely start the hydraulic cylinder to pull out the drill bit in the drilling device, then push the mounting plate to drive multiple grouting pipes to align with the surrounding rock holes, then press down multiple grouting pipes to insert into the surrounding rock holes, then start the grouting pump to pump the cement slurry in the grouting cylinder into the grouting pipe, then pass the cement slurry into the inside of the telescopic hose through the grouting pipe, and finally pass the cement pump into the inside of the grouting pipe through the telescopic hose, so as to inject the cement slurry into the inside of the surrounding rock hole, so as to grout the bridge pile foundation, and the number of drill bits in the drilling device and the number and diameter of the grouting pipes are relatively set. Compared with the prior art, the device can effectively drill multiple surrounding rock holes at the same time and grout the multiple surrounding rock holes, so as to effectively improve the grouting efficiency. BRIEF DESCRIPTION OF THE DRAWINGS
[0014] In order to more clearly illustrate the specific implementation methods of the utility model or the technical solutions in the prior art, the drawings required for use in the specific implementation methods or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are some implementation methods of the utility model. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0015] Figure 1 It is a schematic diagram of the structure of the utility model;
[0016] Figure 2 This is a schematic diagram of the connection of the horizontal plate, horizontal pipe and grouting pipe in the utility model;
[0017] Figure 3 For this utility model Figure 1 A schematic diagram of the structure enlargement of part A;
[0018] Figure 4 It is a planar cross-sectional view of the fixing block in the utility model.
[0019] Description of reference numerals:
[0020] In the figure: 1. mounting plate; 2. walking wheel; 3. U-shaped frame; 4. transverse tube; 5. hydraulic cylinder; 6. rectangular block; 7. drilling device; 8. grouting cylinder; 9. grouting pipe; 10. grouting pipe; 11. grouting pump; 12. telescopic hose; 13. vertical plate; 14. slide; 15. horizontal plate; 16. fixed block; 17. slider; 18. limit block; 19. mounting groove; 20. spring; 21. clamping block. DETAILED DESCRIPTION
[0021] In the following description, a large number of specific details are given to provide a more thorough understanding of the utility model. However, it is obvious to those skilled in the art that the utility model can be implemented without one or more of these details. In other examples, in order to avoid confusion with the utility model, some technical features known in the art are not described.
[0022] Unless otherwise defined, the directions of up, down, left, right, front, back, inside and outside involved in this document are based on the directions of up, down, left, right, front, back, inside and outside in the figures shown in the present utility model, and are explained here together.
[0023] The connection method can be bonding, welding, bolt connection, etc., depending on actual needs.
[0024] like Figures 1 to 4The main structure of the device shown is a mounting plate 1, the lower end of the mounting plate 1 is fixedly connected to a walking wheel 2, the top surface of the mounting plate 1 is fixedly connected to a U-shaped frame 3, the top surface of the U-shaped frame 3 is fixedly connected to a hydraulic cylinder 5, the telescopic end of the hydraulic cylinder 5 is transversely fixedly installed with a plurality of drilling devices 7, a grouting tube 8 is fixedly installed on the top surface of the mounting plate 1, the lower end of the grouting tube 8 is fixedly connected to a grouting pipe 10, a grouting pump 11 is fixedly sleeved on the pipe wall of the grouting pipe 10, and a telescopic hose 12 is fixedly connected to the end of the grouting pipe 10, a vertical plate 13 is fixedly connected to one side of the lower end of the mounting plate 1, and a slide groove 14 is longitudinally symmetrically provided on the side wall of the vertical plate 13, and sliders 17 are slidably connected to the inside of the two slide grooves 14, a horizontal plate 15 is fixedly connected between the two sliders 17, and a fixed block 16 is symmetrically fixedly connected to the side of the horizontal plate 15 away from the slider 17, a horizontal pipe 4 is rotatably connected between the two fixed blocks 16, and a plurality of grouting pipes are fixedly connected to the side wall of the horizontal pipe 4 9, and the number of drill bits in the drilling device 7 is arranged relative to the number and diameter of the grouting pipes 9. The inner top surfaces of the two fixed blocks 16 are provided with mounting grooves 19, and the top surfaces of the mounting grooves 19 are fixedly connected with springs 20, and the lower ends of the springs 20 are fixedly connected with clamping blocks 21. The side walls of the grouting pipes 9 are symmetrically provided with clamping grooves, and the clamping blocks 21 are clamped into the inside of the clamping grooves. When the grouting pipes 9 are moved out of the drilled holes, the grouting pipes 9 are rotated to drive the cross pipes 4 to rotate. When the clamping grooves opened on the side walls of the cross pipes 4 are aligned with the clamping blocks 21, the springs 20 will push the clamping blocks 21 to be clamped into the inside of the clamping grooves. At this time, because the clamping blocks 21 and the clamping grooves are both arc-shaped, when the cross pipes 4 rotate, the clamping blocks 21 will be moved out of the inside of the clamping grooves under the push of external force, thereby compressing the springs 20, and when the clamping blocks 21 are clamped into the inside of the clamping grooves without applying external force to them, the positions of the grouting pipes 9 and the cross pipes 4 can be limited, and the end of the telescopic hose 12 is fixedly connected to the side walls of the cross pipes 4.
[0025] The inner walls of the two slide grooves 14 are symmetrically provided with limit grooves, and the side walls of the two sliders 17 are symmetrically fixed with limit blocks 18. The two limit blocks 18 symmetrically arranged on the side walls of the sliders 17 are respectively slidably connected to the inside of the two limit grooves symmetrically provided on the inner walls of the slide grooves 14, and the two limit blocks 18 are slidably connected to the inside of the two limit grooves, thereby effectively limiting the sliding direction of the slider 17.
[0026] The inner wall of the installation groove 19 is symmetrically provided with strip grooves, and the side wall of the clamping block 21 is symmetrically fixedly connected with rectangular blocks 6. The two rectangular blocks 6 symmetrically fixedly connected on the side wall of the clamping block 21 are respectively slidably connected to the inside of the two strip grooves symmetrically provided on the inner wall of the installation groove 19.
[0027] How it works
[0028] When the grouting reinforcement device for the bridge pile foundation is used, the device is first pushed to the position where the drilling and grouting reinforcement is required, and then the multiple drilling devices 7 and the hydraulic cylinder 5 are started. The drilling devices 7 and the drill bit are pushed downward by the hydraulic cylinder 5 until they pass through the mounting plate 1 and drill holes in the surrounding rock. After the drilling is completed, the hydraulic cylinder 5 is started in reverse to pull out the drill bit in the drilling device 7, and then the mounting plate 1 is pushed to drive the multiple grouting pipes 9 to align with the drilled surrounding rock holes, and then the cross plate 15 and the cross tube 4 fixedly connected to the side wall of the cross plate 15 and the multiple grouting pipes 9 fixedly connected to the side wall of the cross tube 4 are pressed down and inserted into the interior of the surrounding rock hole, and then the grouting pump 11 is started to pump the cement slurry in the grouting barrel 8 into the grouting pipe 10, and then the cement slurry is passed into the interior of the telescopic hose 12 through the grouting pipe 10, and finally the cement pump is passed into the interior of the grouting pipe 9 through the telescopic hose 12. Finally, cement slurry will be injected into the surrounding rock hole through the grouting pipe 9 to reinforce the bridge pile foundation by grouting. The number of drill bits in the drilling device 7 is relatively set to the number and diameter of the grouting pipe 9. When the filling is completed, the cross plate 15 is pulled upward, so that the cross pipe 4 and the grouting pipe 9 are pulled upward and moved out of the borehole through the cross plate 15. After the grouting pipe 9 is moved out of the borehole, the grouting pipe 9 is rotated to drive the cross pipe 4 to rotate. When the slot opened on the side wall of the cross pipe 4 is aligned with the block 21, the spring 20 will push the block 21 to be connected to the inside of the slot. At this time, because the block 21 and the slot are both arc-shaped, when the cross pipe 4 rotates, the block 21 will be moved out of the inside of the slot under the push of external force, thereby compressing the spring 20, and when the block 21 is connected to the inside of the slot without applying external force to it, the position of the grouting pipe 9 and the cross pipe 4 can be limited.
[0029] It should be noted that, in this article, relational terms such as one and two are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device. In the absence of further restrictions. The sentence "includes an element defined by ... does not exclude the existence of other identical elements in the process, method, article or device including the element".
[0030] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. A grouting reinforcement device for a bridge pile foundation, comprising a mounting plate (1) for mounting the grouting reinforcement device for a bridge pile foundation, characterized in that: The lower end of the mounting plate (1) is fixedly connected to a walking wheel (2), the top surface of the mounting plate (1) is fixedly connected to a U-shaped frame (3), the top surface of the U-shaped frame (3) is fixedly connected to a hydraulic cylinder (5), the telescopic end of the hydraulic cylinder (5) is laterally fixedly mounted with a plurality of drilling devices (7), the top surface of the mounting plate (1) is fixedly mounted with a grouting cylinder (8), the lower end of the grouting cylinder (8) is fixedly connected to a grouting pipe (10), a grouting pump (11) is fixedly sleeved on the pipe wall of the grouting pipe (10), the end of the grouting pipe (10) is fixedly connected to a telescopic hose (12), and the mounting plate (1) is fixedly connected to the bottom of the grouting pipe (10). ) is fixedly connected to one side of the lower end thereof, a vertical plate (13) is longitudinally symmetrically provided with a slide groove (14) on the side wall of the vertical plate (13), a slider (17) is slidably connected to the inside of the two slide grooves (14), a horizontal plate (15) is fixedly connected between the two sliders (17), a fixed block (16) is symmetrically fixedly connected to the side of the horizontal plate (15) away from the slider (17), a horizontal tube (4) is rotatably connected between the two fixed blocks (16), a plurality of grouting pipes (9) are fixedly connected to the side wall of the horizontal tube (4), and the end of the telescopic hose (12) is fixedly connected to the side wall of the horizontal tube (4).
2. A grouting reinforcement device for bridge pile foundation according to claim 1, characterized in that: The inner walls of the two slide grooves (14) are symmetrically provided with limit grooves, and the side walls of the two sliding blocks (17) are symmetrically fixedly connected with limit blocks (18).
3. A grouting reinforcement device for bridge pile foundation according to claim 2, characterized in that: Two limit blocks (18) symmetrically arranged on the side wall of the sliding block (17) are respectively slidably connected to the inside of two limit grooves symmetrically opened on the inner wall of the sliding groove (14).
4. The grouting reinforcement device for bridge pile foundation according to claim 1, characterized in that: The inner top surfaces of the two fixing blocks (16) are each provided with a mounting groove (19), and the top surfaces of the mounting grooves (19) are fixedly connected to springs (20).
5. A grouting reinforcement device for bridge pile foundation according to claim 4, characterized in that: A clamping block (21) is fixedly connected to the lower end of the spring (20), and a clamping groove is symmetrically provided on the side wall of the grouting pipe (9), and the clamping block (21) is clamped into the interior of the clamping groove.
6. A grouting reinforcement device for bridge pile foundation according to claim 5, characterized in that: The inner wall of the installation groove (19) is symmetrically provided with strip grooves, and the side wall of the clamping block (21) is symmetrically fixedly connected with a rectangular block (6).
7. A grouting reinforcement device for bridge pile foundation according to claim 6, characterized in that: The two rectangular blocks (6) symmetrically fixedly connected on the side wall of the clamping block (21) are respectively slidably connected to the inside of two strip grooves symmetrically opened on the inner wall of the installation groove (19).