Slope reinforcing structure for trench in warfare ruins

The trench slope is reinforced by stone building and covered with soil layers of a specific proportion, combined with steel wire mesh and bamboo anchor rods, the problem of instability in the trench slope structure is solved, and the stability of the structure and historical style are achieved.

CN222140069UActive Publication Date: 2024-12-10SHANGHAI JIANWEI CULTURAL HERITAGE CONSERVATION TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202323604410.0
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2023-12-28
Publication Date
2024-12-10
Estimated Expiration
2033-12-28

AI Technical Summary

Technical Problem

The trench slopes in war sites have erosion, collapse and ditches to varying degrees due to rainwater erosion and plant root erosion, which leads to structural instability, making it difficult to take into account both restoration and safety in cultural relics protection.

Method used

Stones are built to reinforce the slope, a retaining wall is set up and a steel wire mesh is added, covering a mixture of pure soil, lime and brown wire with a ratio of 10:1:0.5, an isolation layer is installed on the top, and a steel wire mesh is fixed with bamboo bar anchors. , ensure structural stability.

Benefits of technology

It has achieved the prevention of soil erosion, maintained a historical appearance, simple construction, low cracking rate, no shedding or hollowing, ensuring the stability and safety of the structure.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222140069U_ABST
    Figure CN222140069U_ABST
Patent Text Reader

Abstract

The utility model discloses a war ruin trench slope reinforcing structure which comprises an original slope body, the trench wall of the original slope body is cleaned to form a reinforcing area, a retaining wall is built and formed in the reinforcing area, a steel wire net is arranged on the outer side of the retaining wall, a first soil covering layer is arranged on the outer side of the steel wire net, and an isolating layer is arranged on the top of the retaining wall. And the top of the isolating layer is provided with an overburden layer II flush with the top of the original slope body. Stone building is used for reinforcing the slope to prevent water and soil loss, then original soil covering is used for keeping the historical style and appearance of the slope, construction is easy, the cracking rate is low, falling and hollowing are avoided, gaps do not exist at new and old connectors around rammed earth, the structure of the trench slope is completely restored, and meanwhile the structural stability and safety are guaranteed.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the field of slope reinforcement, in particular to a trench slope reinforcement structure for war ruins. Background Art

[0002] The trenches in the war site have been baptized by the years, washed by rain, eroded by plant roots, etc., and there are different degrees of slope erosion, collapse, erosion and gullying. In the process of cultural relics protection, it is necessary to ensure the restoration of the trenches and their durability. However, as a war site, it is temporary when it is used and has certain structural problems. How to balance the restoration of the cultural relics and the safety of the structure is particularly important. Utility Model Content

[0003] In view of the shortcomings of the existing technology, the utility model provides a trench slope reinforcement structure for war sites, which uses stones to build and reinforce the slope to prevent soil erosion, and then uses original soil to cover it to maintain its historical appearance, thereby solving the problem that the trench slope repair process is complicated and cannot remain stable after repair.

[0004] To achieve the above purpose, the utility model is implemented through the following technical scheme: a trench slope reinforcement structure for war ruins, including an original slope, the trench wall of the original slope is cleaned to form a reinforcement area, a retaining wall is built in the reinforcement area, a wire mesh is provided on the outside of the retaining wall, a covering layer 1 is provided on the outside of the wire mesh, an isolation layer is provided on the top of the retaining wall, and a covering layer 2 flush with the top of the original slope is provided on the top of the isolation layer.

[0005] It is further defined that, in the above-mentioned trench slope reinforcement structure at a war site, a mortar layer is laid at the bottom of the reinforcement area.

[0006] It is further defined that, in the above-mentioned trench slope reinforcement structure for war ruins, the first covering soil layer is formed by mixing clean soil, lime and palm fiber in a ratio of 10:1:0.5, and the thickness of the first covering soil layer is 80 mm.

[0007] It is further defined that, in the above-mentioned trench slope reinforcement structure for war ruins, the second covering soil layer is made of clean soil with a covering thickness of 10 mm.

[0008] It is further defined that in the above-mentioned trench slope reinforcement structure at a war site, the steel wire mesh and the retaining wall are fixed by bamboo reinforcement anchor rods, the reinforcement angle is 70 degrees, and the bamboo reinforcement spacing is 300 mm.

[0009] The utility model has the following beneficial effects: the application utilizes stone masonry to reinforce the slope to prevent soil erosion, and then uses the original soil to cover it to maintain its historical appearance. The construction is simple, the cracking rate is low, there is no falling off and hollowing, there are no gaps at the new and old interfaces around the rammed earth, the structure of the trench slope is completely restored, and the structural stability and safety are guaranteed at the same time. BRIEF DESCRIPTION OF THE DRAWINGS

[0010] Figure 1 It is a schematic diagram of the structure of the utility model;

[0011] Figure 2 This is a site view of the utility model retaining wall after construction;

[0012] Figure 3 This is a site view of the utility model after the steel wire mesh is anchored;

[0013] Figure 4 It is a schematic diagram of film covering and curing of the present utility model.

[0014] In the figure: 1. Original slope; 2. Retaining wall; 3. Isolation layer; 4. Wire mesh; 5. Overburden layer 1; 6. Overburden layer 2; 7. Reinforcement area; 8. Trench. DETAILED DESCRIPTION

[0015] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0016] See also Figure 1 The utility model provides a technical solution: a trench slope reinforcement structure for war ruins, comprising an original slope 1, a trench wall of a groove 8 of the original slope 1 is cleaned to form a reinforcement area 7, a mortar layer is laid at the bottom of the reinforcement area 7 for blocking wet water, a retaining wall 2 is built in the reinforcement area 7, a steel mesh 4 is fixed to the outside of the retaining wall 2 by bamboo reinforcement anchor rods, the bamboo reinforcement angle is 70 degrees, the bamboo reinforcement spacing is 300mm, a covering soil layer 5 is arranged on the outside of the steel mesh 4, the covering soil layer 5 is formed by mixing clean soil, lime and palm fiber in a ratio of 10:1:0.5, the covering soil thickness of the covering soil layer 5 is 80mm, an isolation layer 3 is arranged on the top of the retaining wall 2, a covering soil layer 6 flush with the top of the original slope 1 is arranged on the top of the isolation layer 3, the covering soil layer 6 is made of clean soil, and the covering thickness is 10mm.

[0017] like Figure 1-4The construction process of this application is: base cleaning → laying out → cushion pouring → foundation masonry → stone stacking → bamboo reinforcement anchoring → hanging wire mesh 4 → surface covering with soil → compacting and maintenance.

[0018] The specific construction process is as follows:

[0019] 1) Base treatment: The original soil in this project area is relatively loose and has a high sand content. The loose base soil in the test area is cleaned to a hard base, and the floating dust on the surface is removed with a brush. According to the actual situation, the base is irregular in shape after cleaning.

[0020] 2) Laying out the lines: Laying out the lines along the bottom of the original trench wall and taking soil to the hard base layer, with a height laying out slope of 3% to form a reinforcement area 7.

[0021] 3) Pouring of cushion layer: The wet water of reinforcement area 7 is used to lay the mortar layer, and the natural stone is laid on the mortar layer with a width of 500mm.

[0022] 4) Foundation masonry: natural stone masonry height 300mm.

[0023] 5) Stone masonry: Natural stones are laid according to the shape of the site to form a retaining wall2.

[0024] 6) Installation of bamboo reinforcement and compaction of original soil in gaps: Anchor the bamboo reinforcement while laying the masonry, with an angle of 70 degrees and a spacing of 300mm.

[0025] 7) Hanging the wire mesh 4: Hang the wire mesh 4 on the stone retaining wall 24 hours after the stone retaining wall is built.

[0026] 8) Surface covering: Mix clean soil + slaked lime + water + palm fiber (the ratio of clean soil: lime: palm fiber is 10:1:0.5), soak for 15 minutes, mix and stir, the humidity is 80%, and stir thoroughly; tamp the soil with 80% humidity by artificial mud throwing, the thickness of the soil is 80mm, and a covering soil layer of 5 is formed.

[0027] 9) Cover the top of the retaining wall 2 with 50 mm cement mortar to form an isolation layer 3 and then cover with 10 mm clean soil until it is flush with the original slope 1 to form a second covering soil layer 6.

[0028] 10) Cover the soil area with film; ① Water once every 24 hours, and pat it down after 5 hours. The maintenance period is 15 days at an outdoor temperature of 9-23℃.

[0029] After the construction is completed, the test data is as follows:

[0030] 1) The cracking rate is 2% (a few fine cracks);

[0031] 2) No shedding, zero hollowing rate;

[0032] 3) The adhesion between the new and old interfaces around the rammed earth is seamless.

[0033] This application uses stone masonry to reinforce the slope to prevent soil erosion, and then uses the original soil to cover it to maintain its historical appearance. The construction is simple, the cracking rate is low, there is no falling off or hollowing, and there are no gaps at the new and old interfaces around the rammed earth, which completely restores the structure of the trench slope while ensuring structural stability and safety.

[0034] It should be noted that, in this article, the terms "comprises", "includes" or any other variations thereof are intended to cover non-exclusive inclusion, so that a process, method, article or apparatus that includes a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or apparatus.

[0035] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. A trench slope reinforcement structure for war ruins, comprising an original slope (1), characterized in that: The trench (8) of the original slope (1) is cleaned to form a reinforcement area (7), a retaining wall (2) is built in the reinforcement area (7), a steel mesh (4) is provided on the outside of the retaining wall (2), a first covering soil layer (5) is provided on the outside of the steel mesh (4), an isolation layer (3) is provided on the top of the retaining wall (2), and a second covering soil layer (6) flush with the top of the original slope (1) is provided on the top of the isolation layer (3).

2. The trench slope reinforcement structure for war ruins according to claim 1, characterized in that: The bottom of the reinforcement area (7) is paved with a mortar layer.

3. The trench slope reinforcement structure for war ruins according to claim 2, characterized in that: The second covering soil layer (6) is made of clean soil with a covering thickness of 10 mm.

4. A trench slope reinforcement structure for war ruins according to any one of claims 1 to 3, characterized in that: The steel wire mesh (4) and the retaining wall (2) are fixed by bamboo reinforcement anchor rods, the reinforcement angle is 70 degrees, and the bamboo reinforcement spacing is 300 mm.

5. The trench slope reinforcement structure for war ruins according to claim 4, characterized in that: The isolation layer is a 50 mm thick cement mortar layer.