Support frame suitable for mounting tie bars in net rack or net shell

By using L-shaped components and lifting components of support frames in steel structure mesh frames or mesh shells, the precise installation of the tether is achieved, solving the problems of difficult and low accuracy of tether adjustment in the existing technology, and improving construction efficiency and precision reduces costs.

CN222140816UActive Publication Date: 2024-12-10CHINA MCC5 GROUP CORP LTD
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202420827072.2
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-04-19
Publication Date
2024-12-10
Estimated Expiration
2034-04-19

AI Technical Summary

Technical Problem

During the installation of tie rods in steel structure mesh frames or mesh shells, the prior art requires frequent adjustment of component angles and positions, which leads to high difficulty in operation of lifting equipment, low accuracy, waste of labor and mechanical resources, and prolonged construction period.

Method used

Design a support frame suitable for mounting the tie rod in the mesh frame or mesh shell, including two sets of L-shaped components and lifting components. By forming a gantry frame to connect with the main pipe member, the lifting and position adjustment of the tie rod is realized, reducing the Reliance on large-scale hoisting equipment.

Benefits of technology

The adjustment accuracy of the tie rod relative to the main pipe components is improved, the construction time and cost is reduced, the construction process is simplified, the equipment is shaken, and the installation accuracy is improved.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222140816U_ABST
    Figure CN222140816U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of steel structure construction, and particularly discloses a supporting frame suitable for mounting tie bars in a net rack or a net shell. Comprising two L-shaped assemblies which are the same in structure and are symmetrically arranged, a supporting arm which is arranged between the two L-shaped assemblies and is in sliding fit with the two L-shaped assemblies to form a portal frame, and a hoisting assembly which is installed on the supporting arm and slides in the length direction of the supporting arm. Through cooperation of the L-shaped assembly and the supporting arm, the tie rod can be effectively installed on two sets of main pipe components, and the lifting assembly is arranged to effectively lift the tie rod and adjust the position of the tie rod relative to the main pipe components; compared with hoisting by adopting large hoisting equipment, the adjustment difficulty of the tie bar relative to the main pipe component is reduced, and the connection precision is higher; the construction period is greatly shortened, and the construction cost is reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of steel structure construction, and more specifically to a support frame suitable for installing tie rods in a grid frame or a grid shell. Background Art

[0002] During the installation of tie rods in steel structure grids and lattice shells (all components are welded round tubes), cranes or tower cranes are often used for hoisting. Since the tie rods are all embedded on the main components, the angle and position of the components need to be adjusted continuously for installation accuracy. When the crane and tower crane are hoisting, the driver is far away from the installation location and needs to transmit signals to the command personnel. In addition, the hook wire rope is long and shakes greatly, which makes it more difficult to accurately position the tie rods and takes a long time to adjust. This not only wastes labor and machinery, but also delays the construction period. Utility Model Content

[0003] The technical problem to be solved by the utility model is to provide a support frame suitable for installing tie rods in a grid or grid shell;

[0004] The solution adopted by the utility model to solve the technical problem is:

[0005] A support frame suitable for installing tie rods in a grid or grid shell, used for connecting the two ends of the tie rods with two sets of main pipe components;

[0006] It includes two groups of L-shaped components with the same structure and symmetrical arrangement, a support arm arranged between the two groups of L-shaped components and slidingly matched with the two groups of L-shaped components to form a gantry, and a lifting component installed on the support arm and sliding along the length direction of the support arm.

[0007] When in use, the bottom of the formed gantry is connected and fixed to the two sets of main pipe components respectively; then the lifting assembly is connected and fixed to the tie rod, the tie rod is lifted by the lifting assembly and its relative position relative to the two sets of main pipe components is adjusted, and when it meets the design requirements, the two ends of the tie rod are connected to the main pipe components;

[0008] Compared with the existing technology, it does not need to use large lifting equipment (crane or tower crane) for lifting, which reduces the difficulty of adjusting the tie rod relative to the main component and has higher connection accuracy; it greatly increases the construction period and reduces the construction cost;

[0009] In some possible implementations, in order to enable the L-shaped assembly to be effectively fixed to the main pipe member, and to enable the formed portal frame to be installed on two sets of main pipe members with different wheelbases;

[0010] The L-shaped assembly comprises an L-shaped frame with an L-shaped structure and a clamping member installed at one end of the L-shaped frame and used for clamping the main pipe component; the other end of the L-shaped frame is connected to the support arm and slidably matched.

[0011] In some possible implementations, in order to make the L-shaped frame have good stability;

[0012] The L-shaped frame includes a cross bar with one end connected to the support arm and slidingly matched, a vertical bar connected to the end of the cross bar away from the support arm and forming an L-shaped structure, and a diagonal brace for connecting the cross bar and the vertical bar; the end of the vertical bar away from the cross bar is connected to the clamping member.

[0013] In some possible implementations, in order to effectively realize the sliding cooperation between the L-shaped frame and the support arm, the relative positions of the two groups of L-shaped components are adjusted to meet the installation of two groups of main pipe components with different wheelbases;

[0014] The support arm is a tubular structure, the cross bar is sleeved in the support arm and is coaxially arranged with the support arm, a plurality of through holes are respectively arranged on the support arm and the cross bar along their axial directions, and the support arm and the cross bar are fixed by the cooperation of bolts and through holes;

[0015] In some possible implementations, in order to effectively achieve the effective connection between the L-shaped frame and the main pipe component;

[0016] The clamping member comprises an upper hoop connected to the L-shaped frame, a lower hoop hinged to one end of the upper hoop and cooperating with the upper hoop to form a clamping cavity, and a locking member used for locking the upper hoop and the lower hoop.

[0017] In some possible implementations, in order to make the connection between the L-shaped frame and the main pipe component more stable;

[0018] A support plate is arranged on the upper hoop, which is coplanar with the inner side surface of the upper hoop and is arranged along the length direction of the main pipe component.

[0019] In some possible implementations,

[0020] The clamping cavity is cylindrical.

[0021] In some possible implementations, in order to effectively adjust the position of the tie rod relative to the two sets of main pipe components through the lifting assembly;

[0022] The lifting assembly comprises a sleeve sleeved on the outside of the support arm, an ear seat arranged at the bottom of the sleeve, two groups of manual hoists installed on the ear seats, and two groups of steel ropes connected to the manual hoists and the tie rods respectively.

[0023] In some possible implementations,

[0024] During lifting, the angle formed by the two sets of steel ropes and the axis direction of the tie rod is A, 45°≤A≤60°.

[0025] Compared with the prior art, the utility model has the following beneficial effects:

[0026] The utility model can effectively realize installation on two sets of main pipe components through the cooperation of L-shaped components and support arms, and effectively lift the tie rod and adjust its position relative to the main pipe component by setting the lifting component; compared with the use of large lifting equipment for lifting, the difficulty of adjusting the tie rod relative to the main pipe component is reduced, and the connection accuracy is higher; the construction period is greatly shortened and the construction cost is reduced;

[0027] The utility model effectively connects the gantry frame and the main pipe component by arranging the clamping piece;

[0028] The utility model has a simple structure and strong practicability. BRIEF DESCRIPTION OF THE DRAWINGS

[0029] Figure 1 It is an elevation view of the utility model;

[0030] Figure 2 It is a top view of the utility model;

[0031] Among them: 1-L-type assembly, 11-L-type frame, 111-cross bar, 112-vertical bar, 113-diagonal brace, 12-clamping piece, 121-upper hoop, 122-lower hoop, 123-locking piece, 124-support plate, 2-support arm, 3-lifting assembly, 31-sleeve, 32-ear seat, 33-manual hoist, 34-steel rope, 100-tie rod. DETAILED DESCRIPTION

[0032] In the present utility model, unless otherwise clearly specified and limited, the terms "installed", "connected", "connected", "fixed" and the like should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral body; it can be directly connected, or indirectly connected through an intermediate medium, it can be the internal connection of two elements or the interaction relationship between two elements. The "first", "second" and similar words mentioned in this application do not indicate any order, quantity or importance, but are only used to distinguish different components. Similarly, "one" or "one" and other similar words do not indicate a quantity limit, but indicate the existence of at least one. In the implementation of this application, "and / or" describes the association relationship of the associated objects, indicating that there can be three relationships, for example, A and / or B can indicate: A exists alone, A and B exist at the same time, and B exists alone. In the description of the embodiments of the present application, unless otherwise specified, the meaning of "multiple" refers to two or more. For example, multiple positioning columns refer to two or more positioning columns. For ordinary technicians in this field, the specific meanings of the above terms in the utility model can be understood according to the specific circumstances.

[0033] The utility model is described in detail below.

[0034] like Figure 1-Figure 2 As shown:

[0035] A support frame suitable for installing a tie rod 100 in a grid or grid shell, used for connecting the two ends of the tie rod 100 with two sets of main pipe components;

[0036] It includes two groups of L-shaped components 1 with the same structure and symmetrical arrangement, a support arm 2 arranged between the two groups of L-shaped components 1 and slidingly matched with the two groups of L-shaped components 1 to form a gantry, and a lifting component 3 installed on the support arm 2 and sliding along the long direction of the support arm 2.

[0037] When in use, the bottom of the formed gantry is connected and fixed to the two sets of main pipe components respectively; then the lifting assembly 3 is connected and fixed to the tie rod 100, and the tie rod 100 is lifted by the lifting assembly 3 and its relative position relative to the two sets of main pipe components is adjusted. When it meets the design requirements, the two ends of the tie rod 100 are connected to the main pipe components;

[0038] Compared with the prior art, it is not necessary to use large-scale lifting equipment (crane or tower crane) for lifting, which reduces the difficulty of adjusting the tie rod 100 relative to the main component, and the connection accuracy is higher; the construction period is greatly shortened and the construction cost is reduced; compared with using large-scale lifting equipment to lift and adjust the tie rod 100, the entire device in the utility model is small, so that the distance between the lifting assembly 3 and the tie rod 100 is shorter, so that the tie rod 100 shakes less during the lifting and adjustment process, making the adjustment of the tie rod 100 more accurate;

[0039] In some possible implementations, in order to enable the L-shaped assembly 1 to be effectively fixed to the main pipe member, and to enable the formed portal frame to be installed on two sets of main pipe members with different wheelbases;

[0040] The L-shaped assembly 1 comprises an L-shaped frame 11, and a clamping member 12 installed at one end of the L-shaped frame 11 and used for clamping the main pipe component; the other end of the L-shaped frame 11 is connected to the support arm 2 and is slidably matched;

[0041] Two groups of L-shaped frames 11 are connected to the support arm 2 to form a portal frame, and clamping members 12 are respectively arranged at the bottom of the portal frame. The two groups of clamping members 12 are respectively clamped and fixed with the two groups of main pipe components, so that the portal frame can be stably installed on the two groups of main pipe components;

[0042] The two sets of L-shaped frames 11 and the support frame are slidably matched, so that the distance between the two sets of L-shaped frames 11 can be adjusted according to the length of the two sets of main pipe components and the tie rod 100. After the adjustment is in place, the support arm 2 and the two sets of L-shaped frames 11 can be fixed;

[0043] In some possible implementations, in order to make the L-shaped frame 11 have good stability;

[0044] The L-shaped frame 11 includes a cross bar 111 whose one end is connected to the support arm 2 and is slidably matched, a vertical bar 112 connected to the end of the cross bar 111 away from the support arm 2 and forming an L-shaped structure, and a diagonal brace 113 for connecting the cross bar 111 and the vertical bar 112; the end of the vertical bar 112 away from the cross bar 111 is connected to the clamping member 12.

[0045] One end of the crossbar 111 is slidably matched with the support arm 2 and the other end is vertically connected to the vertical rod 112. The diagonal brace 113 is used to connect the vertical rod 112 with the crossbar 111 correspondingly connected to the vertical rod 112 to form a stable whole; the clamping member 12 is installed at the bottom of the vertical rod 112 (the end of the vertical rod 112 away from the crossbar 111); when adjusting the distance according to the tie rod 100 and the two sets of main pipe components, the crossbar 111 can be moved along the length direction of the crossbar 111. After the distance is adjusted to the right position, the support arm 2 and the crossbar 111 are connected and fixed to ensure that the adjusted gantry is a stable whole;

[0046] In some possible implementations, in order to effectively realize the sliding cooperation between the L-shaped frame 11 and the support arm 2, the relative positions of the two groups of L-shaped components 1 are adjusted to meet the installation of two groups of main components with different wheelbases;

[0047] The support arm 2 is a tubular structure, the cross bar 111 is sleeved inside the support arm 2 and is coaxially arranged with the support arm 2, a plurality of through holes are respectively arranged on the support arm 2 and the cross bar 111 along their axial directions, and the support arm 2 and the cross bar 111 are fixed by bolts and through holes;

[0048] The support arm 2 is sleeved on the outside of the cross bar 111, and the two sets of cross bars 111 are close to each other and extend into the support arm 2 at one end. When adjusting, the two sets of cross bars 111 can be slid along the axis of the support arm 2; through holes are respectively provided on the support arm 2 and the cross bar 111, so that the support arm 2 and the cross bar 111 can be fixed by the cooperation of the through holes and bolts after being adjusted in place;

[0049] In some possible implementations, in order to effectively achieve the effective connection between the L-shaped frame 11 and the main pipe component;

[0050] The clamping member 12 includes an upper hoop 121 connected to the L-shaped frame 11, a lower hoop 122 hinged to one end of the upper hoop 121 and cooperating with the upper hoop 121 to form a clamping cavity, and a locking member 123 for locking the upper hoop 121 and the lower hoop 122;

[0051] The upper hoop 121 cooperates with the lower hoop 122 to form a clamping hoop with a clamping cavity, and the upper hoop 121 and the lower hoop 122 are locked by the locking member 123, so that the gantry frame and the main pipe component can be effectively connected and fixed;

[0052] In some possible implementations, in order to make the connection between the L-shaped frame 11 and the main pipe component more stable;

[0053] A support plate 124 is disposed on the upper hoop 121 and is coplanar with the inner side surface of the upper hoop 121 and is disposed along the length direction of the main pipe component.

[0054] The support plate 124 is arranged on the upper hoop 121. When the upper hoop 121 and the lower hoop 122 effectively clamp and fix the main pipe component, the support plate 124 will act on the top surface of the main pipe component, effectively increasing the contact area between the gantry frame and the main pipe component, making the support for the gantry frame more stable and reliable;

[0055] In some possible implementations, the main pipe component is often a cylindrical pipe. In order to effectively clamp and fix the main pipe component through the cooperation between the upper hoop 121 and the lower hoop 122, the clamping cavity is cylindrical.

[0056] In some possible implementations, in order to effectively adjust the position of the tie rod 100 relative to the two sets of main pipe components through the lifting assembly 3;

[0057] The lifting assembly 3 includes a sleeve 31 sleeved on the outside of the support arm 2, an ear seat 32 arranged at the bottom of the sleeve 31, two groups of manual hoists 33 installed on the ear seat 32, and two groups of steel ropes 34 connected to the manual hoists 33 and the tie rods 100 respectively.

[0058] The sleeve 31 is coaxially arranged with the support arm 2 and is sleeved on the outside of the support arm 2. It can move along the axial direction of the support arm 2. When it moves to a specified position, the sleeve 31 and the support arm 2 are connected and fixed by connecting bolts. Specifically, both the sleeve 31 and the support arm 2 are provided with through holes used in conjunction with the connecting bolts.

[0059] The sleeve 31 is provided with an ear seat 32 for connecting two sets of manual hoists 33. The two sets of manual hoists 33 are connected to the lifting ears provided on the tie rod 100 through steel ropes 34 respectively.

[0060] When the tie rod 100 is hoisted and adjusted, the position of the tie rod 100 and the main component can be adjusted by adjusting one or two sets of manual hoists 33;

[0061] In some possible implementations, in order to reduce the stress on the steel rope 34 and prevent the steel rope 34 from breaking;

[0062] During hoisting, the angle formed by the two sets of steel ropes 34 and the axis direction of the tie rod 100 is A, 45°≤A≤60°.

[0063] A method for using a support frame suitable for installing tie rods 100 in a grid or grid shell according to the above claims, specifically comprising the following steps:

[0064] Step S1: assembling the support frame according to the length of the tie rod 100 and the wheelbase between the two sets of main pipe components so that the formed portal frame can be installed on the two sets of main pipe components;

[0065] Step S2: Determine the clamping position of the clamping member 12 on the main pipe component and mark it with A, and assemble and fix the support frame and the main pipe component according to the mark A;

[0066] Step S3: moving the sleeve 31 along the axial direction of the support arm 2 to adjust the position of the ear seat 32 so that the ear seat 32 is located at the center of the tie rod 100;

[0067] Step S4: Determine the connection position of the tie rod 100 on the main pipe component and mark it as B;

[0068] Step S5: adjusting the position of the tie rod 100 relative to the main component by the manual hoist 33 so that both ends of the tie rod 100 are located at the mark B;

[0069] Step S6: welding the two ends of the tie rod 100 to the two sets of main pipe components to complete the construction;

[0070] Step S7: dismantle the support frame and lift it using lifting equipment.

[0071] The present invention is not limited to the above-mentioned specific implementation modes, but extends to any new features or any new combination disclosed in this specification, as well as any new method or process steps or any new combination disclosed.

Claims

1. A support frame suitable for installing tie rods in a grid or grid shell, characterized in that: It includes two groups of L-shaped components with the same structure and symmetrical arrangement, a support arm arranged between the two groups of L-shaped components and slidingly matched with the two groups of L-shaped components to form a gantry frame, and a lifting component installed on the support arm and sliding along the length direction of the support arm.

2. A support frame suitable for tie rod installation in a grid or grid shell according to claim 1, characterized in that: The L-shaped assembly comprises an L-shaped frame with an L-shaped structure and a clamping member installed at one end of the L-shaped frame and used for clamping the main pipe component; the other end of the L-shaped frame is connected to the support arm and slidably matched.

3. A support frame suitable for tie rod installation in a grid or grid shell according to claim 2, characterized in that: The L-shaped frame includes a cross bar with one end connected to the support arm and slidingly matched, and a vertical bar connected to the end of the cross bar away from the support arm to form an L-shaped structure; the end of the vertical bar away from the cross bar is connected to the clamping member.

4. A support frame suitable for tie rod installation in a grid or grid shell according to claim 3, characterized in that: The L-shaped frame also includes a diagonal brace for connecting the horizontal rod and the corresponding vertical rod.

5. A support frame suitable for tie rod installation in a grid or grid shell according to claim 3, characterized in that: The support arm is a tubular structure, the cross bar is sleeved in the support arm and coaxially arranged with the support arm, a plurality of through holes are respectively arranged on the support arm and the cross bar along their axial directions, and the support arm and the cross bar are fixed by the cooperation of bolts and through holes.

6. A support frame suitable for tie rod installation in a grid or grid shell according to claim 2, characterized in that: The clamping member comprises an upper hoop connected to the L-shaped frame, a lower hoop hinged to one end of the upper hoop and cooperating with the upper hoop to form a clamping cavity, and a locking member used for locking the upper hoop and the lower hoop.

7. A support frame suitable for tie rod installation in a grid or grid shell according to claim 6, characterized in that: A support plate is arranged on the upper hoop, which is coplanar with the inner side surface of the upper hoop and is arranged along the length direction of the main pipe component.

8. A support frame suitable for tie rod installation in a grid or grid shell according to claim 6, characterized in that: The clamping cavity is cylindrical.

9. A support frame suitable for tie rod installation in a grid or grid shell according to claim 1, characterized in that: The lifting assembly comprises a sleeve sleeved on the outside of the support arm, an ear seat arranged at the bottom of the sleeve, two groups of manual hoists installed on the ear seats, and two groups of steel ropes connected to the manual hoists and the tie rods respectively.

10. A support frame suitable for tie rod installation in a grid or grid shell according to claim 9, characterized in that: During lifting, the angle formed by the two sets of steel ropes and the axis direction of the tie rod is A, 45°≤A≤60°.

Citation Information

Cited By

  • Supporting frame suitable for mounting tie bars in net rack or net shell and using method

    CN118292669A