Construction channel dust falling device

By setting the second water supply pipe at the lower end of the enclosure and the misaligned spray port in the dust reduction device of the construction channel, the problem of poor dust reduction effect in the prior art is solved, and more efficient dust reduction effect and economy are achieved.

CN222151370UActive Publication Date: 2024-12-13CHINA 19TH METALLURGICAL CORP
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420267306.2
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-02-04
Publication Date
2024-12-13
Estimated Expiration
2034-02-04

AI Technical Summary

Technical Problem

The dust reduction measures for spray pipes on both sides of existing construction roads have poor dust reduction effects due to wind power, and the equipment maintenance and use cost is high, and the applicability and economy are insufficient.

Method used

A construction channel dust reduction device is designed, and the third is added by installing a second water supply pipe at the lower end of the enclosure and installing a high-pressure flushing flat nozzle nozzle nozzle and a spray hole with a diameter of 2-3mm on the first and second water supply pipes. The water pipes are distributed in dislocations to improve dust reduction effects and reduce costs.

Benefits of technology

It effectively reduces the impact of wind power on dust reduction devices, improves dust reduction effect, reduces equipment maintenance and use costs, and is suitable for changing construction sites.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222151370U_ABST
    Figure CN222151370U_ABST
Patent Text Reader

Abstract

The utility model discloses a dust falling device for a construction channel in the technical field of dust prevention of road construction. The construction channel dust falling device comprises a fence, a water pump and a water conveying pipe, the water conveying pipe is detachably connected to the fence, the water pump is used for conveying water to the water conveying pipe, the water conveying pipe comprises a first water conveying pipe fixed to the upper end of the fence, and the extending direction of the first water conveying pipe is consistent with the extending direction of the fence; the water conveying pipes further comprise second water conveying pipes fixed to the lower ends of the fences, the second water conveying pipes are parallel to the first water conveying pipes, and spraying openings are formed in the second water conveying pipes. According to the construction method, the second water conveying pipe is additionally arranged, specifically, the second water conveying pipe is fixed to the lower end of the fence, and compared with an existing method that only the first water conveying pipe and the second water conveying pipe are arranged at the lower end of the fence, even if external wind power is large, the second water conveying pipe in the construction area is slightly influenced or not influenced; and the dust falling effect is better than that of only arranging the first water conveying pipe at the top of the fence.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of dust prevention in road construction, in particular to a dust reduction device for a construction channel. Background Art

[0002] With the development of the times, people's awareness of environmental protection has been enhanced, and higher environmental protection requirements have been put forward in the construction field. High-dust operations such as earth excavation and transportation, foundation construction, etc. are unavoidable in construction. Dust reduction is particularly important in road construction.

[0003] There are two main dust reduction measures in current construction sites. First, through dust reduction equipment such as fog cannons, but the construction site is complex and changeable, the use of dust reduction equipment is often subject to many restrictions, and the investment in dust reduction equipment and the maintenance of equipment during use will greatly increase the economic cost, which is not very applicable and economical for most construction sites; second, laying out spray pipes on both sides of the construction road, usually arranged around the top of the fence, this type of dust reduction measure greatly reduces the investment in dust reduction equipment.

[0004] In the implementation of the aforementioned dust reduction measures of installing sprinkler pipes on both sides of the construction road, the prior art generally sets a long-distance sprinkler pipe on the top of the enclosure along the extension direction of the enclosure to uniformly supply water, and sets multiple sprinkler ports at intervals on the sprinkler pipe, each sprinkler port is provided with an atomizing nozzle, and provides dust reduction effect through atomizing water spray. The current atomizing water spray has the following problems: when there is wind influence, since the atomizing nozzle is set at the top of the enclosure, it is easily affected by the wind, and in practice, there are problems of poor dust reduction effect and blowing on passers-by outside the enclosure. Utility Model Content

[0005] In order to overcome the problem that the existing spray pipe dust reduction is easily affected by wind force, resulting in poor dust reduction effect, the utility model provides a construction channel dust reduction device which is less affected by wind force and has better dust reduction effect.

[0006] The technical solution adopted by the utility model to solve its technical problems is:

[0007] The dust suppression device for a construction channel comprises an enclosure, a water pump and a water pipe. The water pipe is detachably connected to the enclosure. The water pump is used to transport water to the water pipe. The water pipe comprises a first water pipe fixed at the upper end of the enclosure. The extension direction of the first water pipe is consistent with the extension direction of the enclosure. A spray port is provided on the first water pipe. The water pipe also comprises a second water pipe fixed at the lower end of the enclosure. The second water pipe is arranged parallel to the first water pipe. The second water pipe has a spray port.

[0008] In the present application, a second water pipe is added. Specifically, the second water pipe is fixed at the lower end of the enclosure. Compared with the existing method of only setting the first water pipe, since the second water pipe is set at the lower end of the enclosure, even if the external wind is strong, the impact on the second water pipe in the construction area is small or no impact. At this time, the dust reduction effect is better than that of only setting the first water pipe at the top of the enclosure.

[0009] In some embodiments, a high-pressure flushing flat-mouth nozzle is provided at the spray port on the second water pipe.

[0010] In this embodiment, a high-pressure flushing flat nozzle is provided on the second water delivery pipe for flushing the construction road surface, so that dust can be controlled in a lower space.

[0011] In some embodiments, the spray port on the first water pipe is configured as a spray hole with a diameter of 2-3 mm opened on the first water pipe.

[0012] In this embodiment, based on the fact that a high-pressure flushing flat-mouth nozzle has been installed on the aforementioned second water pipe, the spray port at the top, that is, the spray port on the first water pipe, has a lower dust reduction requirement. In order to reduce costs, it is preferably set here as a spray hole opened on the first water pipe. At this time, the liquid particles sprayed from the spray port are larger than those from the atomizing nozzle, and the influence of wind on the liquid particles can also be reduced.

[0013] In some embodiments, the first water pipe is divided into multiple independent sections, and each section of the first water pipe is connected to the second water pipe through a vertical pipeline.

[0014] In this embodiment, the first water pipe is provided with multiple sections, and the first water pipe is connected to the second water pipe through a vertical pipeline, which facilitates the installation and fixation of the first water pipe.

[0015] In some embodiments, a third water pipe is also included. The third water pipe is parallel to the first water pipe, located between the first water pipe and the second water pipe, and the third water pipe is connected to the second water pipe through a vertical pipeline. A spray port is opened on the third water pipe, and the spray port on the third water pipe is set to be a spray hole with a diameter of 2-3mm opened on the first water pipe.

[0016] In this embodiment, a third water pipe is added. The third water pipe is arranged between the first water pipe and the second water pipe. Like the first water pipe, the third water pipe uses a spray hole as a spray port to reduce costs and improve dust reduction effects.

[0017] In some embodiments, the first water pipe and the third water pipe have the same length, their vertical projections overlap, and in the vertical direction, the spray ports on the first water pipe and the third water pipe are staggered.

[0018] In this embodiment, the first water pipe and the third water pipe are preferably of the same length and have overlapping vertical projections for ease of implementation; in the vertical direction, the spray outlets on the first water pipe and the third water pipe are staggered to further enhance the dust reduction effect.

[0019] In some embodiments, each section of the first water pipe is 9-12 m long, and spray ports are provided in the first water pipe and the third water pipe every 1-3 m.

[0020] In this embodiment, the horizontal length of the enclosure commonly used in practice is 2.5-3.5m. Here, the preferred length of the first water pipe is 9-12m. Every 3-5 enclosures correspond to a section of the first water pipe to facilitate the fixed installation of the first water pipe. Spray ports are opened every 1-3m to facilitate effective dust reduction.

[0021] In some embodiments, the vertical pipe is connected to the middle of the first water pipe and the third water pipe.

[0022] In this embodiment, the vertical pipe is connected to the middle of the first water pipe and the third water pipe, so that the overall force is more uniform, which is convenient for installation and avoids deformation or displacement of the branch pipe during operation.

[0023] In some embodiments, the water pipe is a PE water pipe.

[0024] In this embodiment, the water pipe adopts a PE water supply pipe. The PE water supply pipe can withstand the pressure generated during flushing and dust reduction. It is a commonly used material on construction sites. It is simple to use and maintain in daily use. When the water pipe is damaged, it is easy to replace.

[0025] In some embodiments, the second water pipe is disposed above the lower end surface of the enclosure, and the second water pipe is 20-50 mm away from the lower end surface of the enclosure.

[0026] In this embodiment, the second water pipe is preferably arranged 20-50 mm away from the lower end surface of the enclosure to facilitate flushing of floating dust, soil and other debris on the construction road surface.

[0027] The beneficial effects of the utility model are as follows: a second water pipe is additionally arranged at the lower end of the enclosure, the second water pipe is less affected by external wind force, and the dust reduction effect is better; a high-pressure flushing flat nozzle is arranged at the spray port of the second water pipe, and a spray hole is opened in the first water pipe as the spray port to take into account both cost and dust reduction effect; the second water pipe is arranged 20-50mm above the lower end surface of the enclosure to facilitate flushing of floating dust, soil and other debris on the construction road surface; the first water pipe is arranged in sections, and the vertical pipeline is also connected to a third water pipe arranged parallel to the first water pipe to enhance the dust reduction effect; further, the spray ports on the first water pipe and the third water pipe are staggered to enhance the dust reduction effect; the vertical pipeline is connected to the middle of the first water pipe and the third water pipe to balance the force, facilitate installation, and enhance service life. BRIEF DESCRIPTION OF THE DRAWINGS

[0028] Figure 1 A schematic plan view of a construction channel segmented dust reduction device provided by the utility model;

[0029] Figure 2 This is a schematic elevation view of the segmented dust reduction device for a construction channel provided by the utility model.

[0030] Marked in the figure are, 1-third-stage sedimentation tank, 2-water pump, 31-first water pipe, 32-second water pipe, 33-third water pipe, 4-high-pressure flushing flat nozzle, 5-spray hole, 6-vertical pipeline, 7-enclosure, 8-construction road surface. DETAILED DESCRIPTION

[0031] The utility model is further described below in conjunction with the accompanying drawings.

[0032] In order to make the purpose, technical solution and advantages of the utility model more clear, the utility model is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described here are only used to explain the utility model and are not used to limit the utility model.

[0033] like Figure 1-Figure 2 As shown, the utility model provides a dust reduction device for a construction channel.

[0034] The dust suppression device for the construction channel includes an enclosure 7, a water pump 2 and a water pipe. The water pipe is detachably connected to the enclosure 7. The water pump 2 is used to transport water to the water pipe. The water pipe includes a first water pipe 31 fixed at the upper end of the enclosure 7. The extension direction of the first water pipe 31 is consistent with the extension direction of the enclosure 7. A spray port is provided on the first water pipe 31. The water pipe also includes a second water pipe 32 fixed at the lower end of the enclosure 7. The second water pipe 32 is arranged parallel to the first water pipe 31. A spray port is provided on the second water pipe 32.

[0035] In the present application, a second water pipe 32 is added. Specifically, the second water pipe 32 is fixed at the lower end of the enclosure 7. Compared with the existing arrangement of only the first water pipe 31, the second water pipe 32 is arranged at the lower end of the enclosure 7. Even if the external wind is strong, the second water pipe 32 in the construction area is less affected or has no effect. At this time, the dust reduction effect is better than that of only setting the first water pipe 31 at the top of the enclosure 7.

[0036] In the present application, the water pump 2 is a pressure water pump with a power of about 30kw, which provides sufficient water pressure for the first water pipe 31 and the second water pipe 32. The water pump 2 is connected to the tertiary sedimentation tank 1 to provide hydraulic replenishment to the water pipe.

[0037] In this embodiment, a high-pressure flushing flat nozzle 4 is provided at the spray port of the second water pipe 32 for flushing the construction road surface 8, so that dust can be controlled in a lower space.

[0038] In this embodiment, the spray port on the first water pipe 31 is set as a spray hole 5 with a diameter of 2-3 mm opened on the first water pipe 31. Based on the fact that the high-pressure flushing flat nozzle 4 has been set on the second water pipe 32, the spray port at the top, that is, the spray port on the first water pipe 31, has a lower dust reduction requirement. In order to reduce costs, it is preferably set as a spray hole 5 opened on the first water pipe 31. At this time, the liquid particles sprayed from the spray port are larger than those from the atomizing nozzle, which can also reduce the impact of wind on the liquid particles.

[0039] In this embodiment, the first water pipe 31 is divided into multiple independent sections, and each section of the first water pipe 31 is connected to the second water pipe 32 through a vertical pipeline 6, which facilitates the installation and fixation of the first water pipe 31.

[0040] In this embodiment, a third water pipe 33 is further included. The third water pipe 33 is parallel to the first water pipe 31 and is located between the first water pipe 31 and the second water pipe 32. The third water pipe 33 is connected to the second water pipe 32 through a vertical pipe 6. A spray port is provided on the third water pipe 33. The spray port on the third water pipe 33 is set as a spray hole 5 with a diameter of 2-3 mm provided on the first water pipe 31. In this embodiment, Figure 2 As shown, the vertical pipeline 6 is also provided with a spray hole 5 .

[0041] In this embodiment, a third water pipe 33 is further provided. The third water pipe 33 is arranged between the first water pipe 31 and the second water pipe 32. Like the first water pipe 31, the third water pipe 33 uses the spray hole 5 as a spray port to reduce costs and improve dust reduction effects.

[0042] In this embodiment, the first water pipe 31 and the third water pipe 33 have the same length, and their vertical projections overlap. In the vertical direction, the spray ports on the first water pipe 31 and the third water pipe 33 are staggered. Preferably, the first water pipe 31 and the third water pipe 33 have the same length, and their vertical projections overlap, so as to facilitate implementation; in the vertical direction, the spray ports on the first water pipe 31 and the third water pipe 33 are staggered to further improve the dust reduction effect.

[0043] In this embodiment, each section of the first water pipe 31 is 9-12m long, and spray ports are provided every 1-3m in the first water pipe 31 and the third water pipe 33. In practice, the horizontal length of the enclosure 7 is usually 2.5-3.5m, and here the first water pipe 31 is preferably 9-12m long, and every 3-5 enclosures 7 correspond to a section of the first water pipe 31, so as to facilitate the fixed installation of the first water pipe 31; spray ports are provided every 1-3m to effectively reduce dust.

[0044] In some embodiments, the vertical pipe is connected to the middle of the first water pipe 31 and the third water pipe 33 to make the overall force more uniform, facilitate installation, and avoid deformation or displacement of the branch pipe during operation.

[0045] In this embodiment, the water pipe adopts PE water pipe, which can withstand the pressure generated by flushing and dust reduction. It is a common material on construction sites and can be connected by hot melt. It is simple to maintain in daily use, and it is easy to replace the water pipe when it is damaged. In this embodiment, the second water pipe 32 has a specification of BN50-DN75, and the first water pipe 31 and the third water pipe 33 have a specification of DN20-DN32.

[0046] In some embodiments, a valve is also provided to control the on / off.

[0047] In this embodiment, the second water pipe 32 is arranged above the lower end surface of the enclosure 7, and the second water pipe 32 is 20-50 mm away from the lower end surface of the enclosure 7, so as to wash away floating dust, soil and other debris on the construction road surface 8.

[0048] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions and improvements made within the spirit and principles of the present invention should be included in the protection scope of the present invention.

Claims

1. A construction channel dust suppression device, comprising a fence (7), a water pump (2) and a water pipe, wherein the water pipe is detachably connected to the fence (7), the water pump (2) is used to transport water to the water pipe, the water pipe comprises a first water pipe (31) fixed to the upper end of the fence (7), the extension direction of the first water pipe (31) is consistent with the extension direction of the fence (7), and a spray port is provided on the first water pipe (31). Its characteristics are: The water pipe also includes a second water pipe (32) fixed at the lower end of the enclosure (7); the second water pipe (32) is arranged parallel to the first water pipe (31); and a spray port is provided on the second water pipe (32).

2. The construction channel dust suppression device according to claim 1, Its characteristics are: A high-pressure flushing flat nozzle (4) is provided on the spray port of the second water delivery pipe (32).

3. The construction channel dust suppression device according to claim 2, Its characteristics are: The spray port on the first water delivery pipe (31) is configured as a spray hole (5) with a diameter of 2-3 mm opened on the first water delivery pipe (31).

4. The construction channel dust suppression device according to claim 3, Its characteristics are: The first water pipe (31) is divided into a plurality of independent sections, and each section of the first water pipe (31) is connected to the second water pipe (32) via a vertical pipeline (6).

5. The construction channel dust suppression device according to claim 4, Its characteristics are: The invention also comprises a third water pipe (33), the third water pipe (33) is parallel to the first water pipe (31), and is located between the first water pipe (31) and the second water pipe (32), the third water pipe (33) is connected to the second water pipe (32) via a vertical pipeline (6), a spray port is provided on the third water pipe (33), and the spray port on the third water pipe (33) is configured as a spray hole (5) with a diameter of 2-3 mm provided on the first water pipe (31).

6. The construction channel dust suppression device according to claim 5, Its characteristics are: The first water pipe (31) and the third water pipe (33) have the same length, their vertical projections overlap, and in the vertical direction, the spray ports on the first water pipe (31) and the third water pipe (33) are staggered.

7. The construction channel dust suppression device according to claim 6, Its characteristics are: Each section of the first water pipe (31) is 9-12 m long, and spray ports are provided in the first water pipe (31) and the third water pipe (33) every 1-3 m.

8. The construction channel dust suppression device according to claim 5, Its characteristics are: The vertical pipeline is connected to the middle parts of the first water delivery pipe (31) and the third water delivery pipe (33).

9. The construction channel dust suppression device according to claim 1, Its characteristics are: The water supply pipe adopts PE water supply pipe.

10. The construction channel dust suppression device according to claim 1, Its characteristics are: The second water delivery pipe (32) is arranged above the lower end surface of the enclosure (7), and the second water delivery pipe (32) is 20-50 mm away from the lower end surface of the enclosure (7).