Adjustable prefabricated box girder pedestal
By designing an adjustable prefabricated box girder pedestal, using the combination of lifting mechanism and support mechanism, the problems of large workload and easy damage during the removal of existing pedestals and box girders are solved, and the stable installation and efficient removal of the pedestals are achieved, improving the Construction efficiency.
Patent Information
- Application Number
- CN202420831991.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-22
- Publication Date
- 2024-12-13
- Estimated Expiration
- 2034-04-22
AI Technical Summary
The existing prefabricated box girder mounts have problems such as large workload and easy damage during the removal and box girder lifting, which affects the construction progress and efficiency.
An adjustable prefabricated box girder pedestal is designed, with a limiting slot and a lifting mechanism inside the base. The support mechanism includes a motor-driven thread sleeve and support block. By cooperating with the installation plate and the installation groove, the length and stability of the pedestal can be adjusted. Easy to remove and reuse, and prevent box beam from tilting through sliding grooves and slider mechanisms.
It realizes stable installation and convenient dismantling of the pedestal, preventing damage to the box girder during lifting, and improving construction efficiency and work safety.
Smart Images

Figure CN222156021U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of prefabricated box beam pedestals, in particular to an adjustable prefabricated box beam pedestal. Background Art
[0002] Prefabricated box girders are bending members that are prefabricated by tensioning prestressed steel bars and then transported to the construction site for installation. The prefabricated box girder pedestal is the basic platform in the production process of prefabricated box girders. It is used to support the entire weight of the unformed box girder and ensure that the box girder is in a horizontal position during the forming process, so that the box girder has uniform mechanical strength after forming. The top surface and both sides of the pedestal must be flat and smooth to ensure the installation of the side formwork and the flatness of the bottom of the box girder, and to avoid water seepage into the base of the pedestal during construction, causing the pedestal to sink and crack.
[0003] At present, prefabricated box girder pedestals are usually made of reinforced concrete pedestals. Since the concrete pedestals need to be dismantled after use, the workload increases. When lifting the box girder, one end of the box girder needs to be lifted first, and then the other end contacts the pedestal, which can easily damage the box girder, thereby affecting the construction progress and reducing work efficiency. Therefore, an adjustable prefabricated box girder pedestal is urgently needed to improve the above problems. Utility Model Content
[0004] The purpose of the present invention is to solve at least one of the above technical deficiencies.
[0005] To this end, one purpose of the utility model is to provide an adjustable prefabricated box beam pedestal to solve the problems mentioned in the background technology and overcome the deficiencies in the prior art.
[0006] In order to achieve the above-mentioned purpose, an embodiment of the utility model on one hand provides an adjustable prefabricated box girder pedestal, including a base, a limiting groove is provided inside the base, a lifting mechanism is arranged inside the base, a supporting mechanism is fixedly connected to the top of the base, a first steel plate is fixedly connected to the top of the supporting mechanism, second steel plates are provided on both sides of the first steel plate, a third steel plate is provided on the side of the second steel plate away from the first steel plate, side edges are provided on both sides of the first steel plate, a sliding bar is provided on one side of the side edge, a groove is provided inside the side edge, and sliding grooves are provided on both sides of the first steel plate, the second steel plate and the third steel plate.
[0007] The utility model is further configured as follows: the lifting mechanism comprises a motor, the output shaft of the motor is fixedly connected with a threaded rod, the outer surface of the threaded rod is provided with a threaded sleeve, and the bottom of the threaded sleeve is provided with a support block.
[0008] By adopting the above technical solution, the pedestal can be made more stable after installation.
[0009] The utility model is further configured as follows: a sliding block is provided on the outer surface of the threaded sleeve, the sliding block is matched with the limiting groove, and the sliding block is slidably connected with the limiting groove.
[0010] By adopting the above technical solution, the threaded sleeve can be moved up and down.
[0011] The utility model is further configured as follows: the support mechanism includes an I-beam, one side of the I-beam is fixedly connected to a mounting plate, a threaded hole is provided inside the mounting plate, one side of the I-beam is provided with a mounting groove, and one side of the I-beam is fixedly connected to a nut.
[0012] By adopting the above technical solution, the pedestal can be connected.
[0013] The utility model is further configured as follows: the mounting plate is matched with the mounting groove, the threaded hole is coaxial with the nut, and the mounting plate is connected to the I-beam by screws.
[0014] By adopting the above technical solution, the installation and connection of the pedestal can be facilitated.
[0015] The utility model is further configured as follows: a handle is provided on one side of the second steel plate, sliders are provided on both sides of the second steel plate, and sliding grooves are provided on both sides of the first steel plate and one side of the third steel plate.
[0016] By adopting the above technical solution, the second steel plate can be easily pulled out.
[0017] The utility model is further configured as follows: the slider is adapted to the slide groove, the slider is slidably connected to the slide groove, the groove is adapted to the slider, spring locks are provided on both sides of the first steel plate, and a spring lock is provided on one side of the third steel plate.
[0018] By adopting the above technical solution, the second steel plate can be moved forward and backward, and the second steel plate can be fixed.
[0019] In summary, the beneficial technical effects of the utility model are:
[0020] 1. The adjustable prefabricated box beam pedestal is provided with a supporting mechanism. The pedestal can be connected by the mounting plate and the mounting groove, so that the length of the pedestal can be adjusted to meet different length requirements, and the pedestal can be easily dismantled and reused. The pedestal can be stably lifted by pulling out the second steel plate to prevent the box beam from being damaged due to the tilt of the pedestal during lifting, thereby improving work efficiency;
[0021] 2. The adjustable prefabricated box girder pedestal is provided with a lifting mechanism. The rotation of the motor can drive the threaded sleeve to move up and down, and then the support block can move up and down, which can make the installation of the pedestal on an uneven ground more stable, thereby preventing damage to the box girder caused by an unstable pedestal, thereby improving work efficiency.
[0022] Additional aspects and advantages of the present invention will be given in part in the following description and in part will become apparent from the following description or will be learned through the practice of the present invention. BRIEF DESCRIPTION OF THE DRAWINGS
[0023] The above and / or additional aspects and advantages of the present invention will become apparent and easily understood from the description of the embodiments in conjunction with the following drawings, in which:
[0024] Figure 1 It is a structural schematic diagram of the utility model;
[0025] Figure 2 It is a structural schematic diagram of the base of the utility model;
[0026] Figure 3 It is a structural schematic diagram of the side of the utility model;
[0027] Figure 4 It is a structural schematic diagram of the lifting mechanism of the utility model;
[0028] Figure 5 It is a structural schematic diagram of the support mechanism of the utility model;
[0029] Figure 6 It is a structural schematic diagram of the second steel plate of the utility model;
[0030] Figure 7 It is a structural schematic diagram of the first steel plate of the utility model;
[0031] Figure 8 It is a structural schematic diagram of the third steel plate of the utility model.
[0032] In the figure: 1. base; 2. limit groove; 3. lifting mechanism; 4. supporting mechanism; 5. first steel plate; 6. sliding groove; 7. second steel plate; 8. third steel plate; 9. side; 10. sliding bar; 11. groove; 12. motor; 13. threaded rod; 14. threaded sleeve; 15. supporting block; 16. sliding block; 17. I-beam; 18. mounting plate; 19. threaded hole; 20. mounting groove; 21. nut; 22. handle; 23. slider; 24. slide groove; 25. spring lock. DETAILED DESCRIPTION
[0033] The technical solutions in the embodiments of the utility model will be clearly and completely described below in conjunction with the drawings in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, rather than all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without making creative work are within the scope of protection of the utility model.
[0034] Embodiment 1
[0035] Reference Figures 1 to 3 , is an adjustable prefabricated box beam pedestal disclosed by the utility model, including a base 1, a limiting groove 2 is provided inside the base 1, which can limit the threaded sleeve 14, a lifting mechanism 3 is arranged inside the base 1, which can make the pedestal stably installed on an uneven ground, a supporting mechanism 4 is fixedly connected to the top of the base 1, which can make the pedestal connected and installed, so as to adjust the length of the pedestal, a first steel plate 5 is fixedly connected to the top of the supporting mechanism 4, a second steel plate 7 is provided on both sides of the first steel plate 5, a third steel plate 8 is provided on the side of the second steel plate 7 away from the first steel plate 5, side edges 9 are provided on both sides of the first steel plate 5, the second steel plate 7 and the third steel plate 8, which can prevent leakage of slurry, a sliding bar 10 is provided on one side of the side edge 9, a groove 11 is provided inside the side edge 9, which can make the second steel plate 7 be pulled out, and sliding grooves 6 are provided on both sides of the first steel plate 5, the second steel plate 7 and the third steel plate 8, which can make the sliding bar 10 move.
[0036] Reference Figure 1 , Figure 2 and Figure 4 The lifting mechanism 3 includes a motor 12, and the output shaft of the motor 12 is fixedly connected to a threaded rod 13. The outer surface of the threaded rod 13 is provided with a threaded sleeve 14, which can move up and down. The bottom of the threaded sleeve 14 is provided with a support block 15, which can make the pedestal more stable after installation, thereby preventing the box beam from being damaged. The outer surface of the threaded sleeve 14 is provided with a sliding block 16, which is adapted to the limiting groove 2, and the sliding block 16 is slidably connected to the limiting groove 2, so that the threaded sleeve 14 can move up and down, and then the support block 15 can move up and down, so that the pedestal can be stably installed on an uneven ground, thereby preventing the box beam from being damaged, thereby improving work efficiency.
[0037] Reference Figure 5The support mechanism 4 includes an I-beam 17, and one side of the I-beam 17 is fixedly connected to a mounting plate 18, the mounting plate 18 is integrated with the I-beam 17, and a threaded hole 19 is provided inside the mounting plate 18, which enables the pedestal to be connected. A mounting groove 20 is provided on one side of the I-beam 17, and a nut 21 is fixedly connected to one side of the I-beam 17, which enables the pedestal to be connected, and then the length of the pedestal can be adjusted, so as to adapt to the production of box beams of different sizes. The mounting plate 18 is adapted to the mounting groove 20, the threaded hole 19 is coaxial with the nut 21, and the mounting plate 18 is connected to the I-beam 17 by screws, which can facilitate the installation and connection of the pedestal, and then the pedestal can be connected.
[0038] Reference Figures 6 to 8 A handle 22 is provided on one side of the second steel plate 7 to facilitate the pulling out of the second steel plate 7. Slide blocks 23 are provided on both sides of the second steel plate 7 to enable the pulling out of the second steel plate 7. Slide grooves 24 are provided on both sides of the first steel plate 5 and on one side of the third steel plate 8 to facilitate the pulling out of the second steel plate 7, thereby enabling the lifting of the box beam to be more stable and thus preventing the box beam from being damaged. The slide block 23 is adapted to the slide groove 24, the slide block 23 is slidably connected to the slide groove 24, the groove 11 is adapted to the slide block 23, spring locks 25 are provided on both sides of the first steel plate 5, and a spring lock 25 is provided on one side of the third steel plate 8, which enables the second steel plate 7 to move forward and backward and can fix the second steel plate 7, thereby preventing the box beam from tilting and being damaged during lifting, thereby improving work efficiency.
[0039] The implementation principle of this embodiment is:
[0040] The adjustable prefabricated box girder pedestal is provided with a supporting mechanism 4. When the adjustable prefabricated box girder pedestal is needed, the staff just moves the adjustable prefabricated box girder pedestal to a suitable position and puts it down. When the length of the pedestal is not enough, the staff takes out another pedestal. The adjustable prefabricated box girder pedestal is provided with a mounting plate 18. The staff moves another pedestal to insert the mounting plate 18 into the interior of the mounting groove 20. Then the staff connects the mounting plate 18 with the mounting groove 20 by screws, which can be adjusted according to the required length. After the adjustment is completed, the staff starts the motor 12 according to the ground conditions, and the output shaft of the motor 12 rotates. The rotation of the output shaft of the motor 12 can drive the threaded rod 13 to rotate. The rotation of the threaded rod 13 can drive the threaded sleeve 14 to move up and down. The up and down movement of the threaded sleeve 14 can drive the support block 15 to rotate, so that the support block 15 can be extended to contact the ground, so that the installation of the pedestal can be more stable, thereby preventing the pedestal from being damaged due to unstable installation.
[0041] When the use of the pedestal is over, the staff pulls the side 9, and the side 9 can move left and right. The left and right movement of the side 9 can drive the sliding bar 10 to move left and right, so that the side 9 can be pulled out. Then the staff opens the spring lock 25. Then, the staff holds the handle 22 and pulls the second steel plate 7. At this time, the second steel plate 7 can move forward. The forward movement of the second steel plate 7 can drive the slider 23 to move forward inside the slide groove 24, so that the second steel plate 7 can be pulled out. Then, the staff passes the lifting rope through the position of the second steel plate 7, and then the pedestal can be lifted, which can prevent the box girder from tilting during lifting, thereby preventing the box girder from being damaged, thereby improving work efficiency.
[0042] Compared with the prior art, the present invention has the following beneficial effects:
[0043] 1. The adjustable prefabricated box beam pedestal is provided with a supporting mechanism 4. The pedestal can be connected by the mounting plate 18 and the mounting groove 20, so that the length of the pedestal can be adjusted to meet different length requirements. The pedestal can be stably lifted by pulling out the second steel plate 7 to prevent the box beam from being damaged due to the tilt of the pedestal during lifting, thereby improving work efficiency;
[0044] 2. The adjustable prefabricated box girder pedestal is provided with a lifting mechanism 3. The rotation of the motor 12 can drive the threaded sleeve 14 to move up and down, and then the support block 15 can move up and down, which can make the installation of the pedestal on an uneven ground more stable, thereby preventing damage to the box girder due to an unstable pedestal, and thus improving work efficiency.
[0045] The embodiments of this specific implementation method are all preferred embodiments of the utility model, and are not intended to limit the protection scope of the utility model. Therefore, all equivalent changes made based on the structure, shape, and principle of the utility model should be included in the protection scope of the utility model.
Claims
1. An adjustable prefabricated box beam pedestal, characterized in that: The invention comprises a base (1), wherein a limiting groove (2) is provided inside the base (1), a lifting mechanism (3) is arranged inside the base (1), a supporting mechanism (4) is fixedly connected to the top of the base (1), a first steel plate (5) is fixedly connected to the top of the supporting mechanism (4), second steel plates (7) are arranged on both sides of the first steel plate (5), a third steel plate (8) is arranged on the side of the second steel plate (7) away from the first steel plate (5), side edges (9) are arranged on both sides of the first steel plate (5), a sliding bar (10) is arranged on one side of the side edge (9), a groove (11) is arranged inside the side edge (9), and sliding grooves (6) are arranged on both sides of the first steel plate (5), the second steel plate (7) and the third steel plate (8).
2. The adjustable prefabricated box beam pedestal according to claim 1, characterized in that: The lifting mechanism (3) comprises a motor (12), the output shaft of the motor (12) is fixedly connected to a threaded rod (13), the outer surface of the threaded rod (13) is provided with a threaded sleeve (14), and the bottom of the threaded sleeve (14) is provided with a support block (15).
3. The adjustable prefabricated box beam pedestal according to claim 2, characterized in that: The outer surface of the threaded sleeve (14) is provided with a sliding block (16), the sliding block (16) is adapted to the limiting groove (2), and the sliding block (16) is slidably connected to the limiting groove (2).
4. The adjustable prefabricated box beam pedestal according to claim 1, characterized in that: The support mechanism (4) comprises an I-beam (17), one side of the I-beam (17) is fixedly connected to a mounting plate (18), a threaded hole (19) is provided inside the mounting plate (18), one side of the I-beam (17) is provided with a mounting groove (20), and one side of the I-beam (17) is fixedly connected to a nut (21).
5. The adjustable prefabricated box beam pedestal according to claim 4, characterized in that: The mounting plate (18) is matched with the mounting groove (20), the threaded hole (19) is coaxial with the nut (21), and the mounting plate (18) is connected with the I-beam (17) by screws.
6. The adjustable prefabricated box beam pedestal according to claim 1, characterized in that: A handle (22) is provided on one side of the second steel plate (7), sliding blocks (23) are provided on both sides of the second steel plate (7), and sliding grooves (24) are provided on both sides of the first steel plate (5) and one side of the third steel plate (8).
7. The adjustable prefabricated box beam pedestal according to claim 6, characterized in that: The slider (23) is matched with the slide groove (24), the slider (23) is slidably connected with the slide groove (24), the groove (11) is matched with the slider (23), both sides of the first steel plate (5) are provided with spring locks (25), and one side of the third steel plate (8) is provided with a spring lock (25).
Citation Information
Cited By
Adjustable prefabricated box girder pedestal
CN224675196U