Material conveying equipment for building construction

By designing material conveying equipment for building construction, including material boxes, mixing tanks and adjustable conveying pipe systems, the problem that existing equipment can only be conveyed on a single floor is solved, and materials are conveyed on multiple floors at the same time are realized, and construction efficiency is improved.

CN222184141UActive Publication Date: 2024-12-17TIANJIN YUHUA ENGINEERING TECHNOLOGY CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420667428.0
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-04-02
Publication Date
2024-12-17
Estimated Expiration
2034-04-02

AI Technical Summary

Technical Problem

Existing construction equipment can only convey materials on a single floor, and is inefficient and cannot be constructed on multiple floors at the same time.

Method used

A material conveying equipment for construction construction was designed, including material boxes, mixing tanks, aggregate cement pumps and canvas hose main conveying pipes. The materials are stirred on site through the mixing tank, and multiple adjustments are achieved using an adjustable three-way valve and butterfly valve system. Floor conveyance.

Benefits of technology

It realizes the simultaneous conveying of materials on multiple floors, improves construction efficiency and flexibility, and meets the needs of large-scale construction.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222184141U_ABST
    Figure CN222184141U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of building construction equipment, in particular to material conveying equipment for building construction, which comprises a base, a collecting pier is fixedly welded at the right end of the top surface of the base, and an aggregate cement pump is fixedly arranged at the left end of the base through a bolt; a material box is arranged at the top of the aggregate cement pump, and a stirring tank is arranged at the top of the material box; the bottom of the right end of the aggregate cement pump communicates with a main conveying pipe, and the main conveying pipe is a canvas hose. According to the material conveying equipment for building construction, materials such as cement aggregate needed by construction are loaded through the material box and can be directly poured into existing materials or stirred and synthesized on site through the stirring tank, and the third butterfly valve at the tail end of the main conveying pipe is in butt joint with the highest layer of a construction floor according to the situation; the other floors are in butt joint with one conveying branch pipe and a third butterfly valve respectively, building aggregate cement and other materials can be conveyed in cooperation with an aggregate cement pump, simultaneous supply and conveying of multiple floors are achieved, and the conveying and building construction efficiency is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of building construction equipment, in particular to a material conveying equipment for building construction. Background Art

[0002] Construction engineering refers to the planning, investigation, design, construction, completion and other technical work and completed engineering entities for the construction, reconstruction or expansion of buildings and ancillary structures and facilities, as well as modern building construction projects and the installation of supporting lines, pipelines and equipment; that is, the design and construction process of various houses and buildings. Large-scale construction often requires a lot of manpower and material resources. Cement aggregates and other materials are the main core materials of most buildings and are the main body of the building. A large amount of cement concrete and other materials are needed in the construction of each floor of the building. Therefore, its transportation work is also an integral part of the construction project.

[0003] Most of the existing material conveying equipment can only carry out material conveying work, has a single function, and can basically only convey to a single floor, which is inefficient, resulting in the inability to carry out construction links that require a large amount of materials on multiple floors at the same time.

[0004] In order to solve the above problems, we have made improvements and proposed a material conveying equipment for construction. Utility Model Content

[0005] In order to solve the above technical problems, the utility model provides the following technical solutions:

[0006] The utility model provides a material conveying equipment for construction, comprising a base, a convergence pier is fixedly welded on the right end of the top surface of the base, an aggregate cement pump is fixedly arranged on the left end of the base by bolts; a material box is arranged on the top of the aggregate cement pump, and a mixing tank is arranged on the top of the material box; a main conveying pipe is connected to the bottom of the right end of the aggregate cement pump, and the main conveying pipe adopts a canvas hose.

[0007] As a preferred technical solution of the utility model, a first bracket is fixedly welded to the left end of the top surface of the base, and the first bracket is higher than the aggregate cement pump; the bottom surface of the material box is fixedly connected to the top surface of the first bracket by bolts.

[0008] As a preferred technical solution of the utility model, a second bracket is fixedly welded to the middle of the top surface of the first bracket, the material box passes through the middle of the bottom end of the second bracket, and the bottom end of the outer wall of the mixing tank is fixedly connected to the second bracket by screws.

[0009] As a preferred technical solution of the utility model, a first butterfly valve is provided in the middle of the bottom surface of the mixing tank, the bottom end of the first butterfly valve is aligned with the middle of the top surface of the material box, a motor is fixed with bolts in the middle of the top surface of the mixing tank, a feed port is provided at the left end of the top surface of the mixing tank, and a sealing cover is rotatably provided at the top of the feed port.

[0010] As a preferred technical solution of the utility model, a rotating rod is rotatably provided on the top surface of the inner wall of the stirring tank, and the top of the rotating rod passes through the top surface of the stirring tank and rotates coaxially with the rotating shaft of the motor; stirring paddles are fixedly welded at equal intervals on the side surface of the rotating rod.

[0011] As a preferred technical solution of the utility model, an inclined bucket groove is fixedly welded to the bottom end of the inner wall of the material box, a discharge port is opened in the middle of the bottom end of the inclined bucket groove, and a second butterfly valve is fixedly installed in the middle of the bottom surface of the outer wall of the material box, the top of the second butterfly valve is connected to the discharge port, and the bottom of the second butterfly valve is connected to the aggregate cement pump.

[0012] As a preferred technical solution of the utility model, the left end of the main conveying pipe is wrapped around the gathering pier, and a plurality of three-way valves are arranged in series at equal intervals on the right end of the main conveying pipe. The right end of the three-way valve is connected to a conveying branch pipe, and the conveying branch pipe adopts a canvas hose. The end of the right end of the conveying branch pipe and the end of the right end of the main conveying pipe are both connected to a third butterfly valve.

[0013] The beneficial effects of the utility model are as follows: the material conveying equipment for construction can load cement aggregate and other materials required for construction through the material box, directly pour into the existing materials, or add the raw materials into the mixing tank, mix and synthesize on site, realize the conveying of materials and the production of materials on site at the same time, untie the main conveying pipe from the convergence pier and connect the third butterfly valve at the end of the main conveying pipe to the highest floor of the construction floor according to the situation, and connect the remaining floors to a conveying branch pipe and the third butterfly valve respectively in conjunction with the aggregate cement pump to start conveying construction aggregate cement and other materials, realize the supply and conveyance of multiple floors at the same time, be flexible and convenient, and improve the efficiency of conveying and construction. BRIEF DESCRIPTION OF THE DRAWINGS

[0014] The accompanying drawings are used to provide a further understanding of the present invention and constitute a part of the specification. Together with the embodiments of the present invention, they are used to explain the present invention and do not constitute a limitation of the present invention. In the accompanying drawings:

[0015] Figure 1 This is a structural schematic diagram of a material conveying device for construction of the utility model;

[0016] Figure 2 This is a schematic diagram of the cross-sectional structure of a mixing tank of a material conveying equipment for construction of the utility model;

[0017] Figure 3 This is a schematic diagram of the cross-sectional structure of a material box of a material conveying device for construction of the utility model;

[0018] In the figure: 1. base; 2. convergence pier; 3. aggregate cement pump; 4. material box; 5. mixing tank; 6. first bracket; 7. second bracket; 8. first butterfly valve; 9. motor; 10. feed inlet; 11. rotating rod; 12. stirring paddle; 13. inclined hopper; 14. second butterfly valve; 15. main conveying pipe; 16. three-way valve; 17. conveying branch pipe; 18. third butterfly valve. DETAILED DESCRIPTION

[0019] The preferred embodiments of the present invention are described below in conjunction with the accompanying drawings. It should be understood that the preferred embodiments described herein are only used to illustrate and explain the present invention, and are not used to limit the present invention.

[0020] Example: Figure 1-3 As shown, a material conveying equipment for construction includes a base 1, a convergence pier 2 is fixedly welded to the right end of the top surface of the base 1, an aggregate cement pump 3 is fixedly provided at the left end of the base 1 by bolts; a material box 4 is provided on the top of the aggregate cement pump 3, and a mixing tank 5 is provided on the top of the material box 4; a main conveying pipe 15 is connected to the bottom of the right end of the aggregate cement pump 3, and the main conveying pipe 15 adopts a canvas hose.

[0021] A first bracket 6 is fixedly welded to the left end of the top surface of the base 1 , and the first bracket 6 is higher than the aggregate cement pump 3 ; the bottom surface of the material box 4 is fixedly connected to the top surface of the first bracket 6 by bolts.

[0022] A second bracket 7 is fixedly welded to the middle of the top surface of the first bracket 6, the material box 4 passes through the middle of the bottom end of the second bracket 7, and the bottom end of the outer wall of the mixing tank 5 is fixedly connected to the second bracket 7 by screws.

[0023] A first butterfly valve 8 is provided in the middle of the bottom surface of the mixing tank 5, and the bottom end of the first butterfly valve 8 is aligned with the middle of the top surface of the material box 4. A motor 9 is fixed by bolts in the middle of the top surface of the mixing tank 5. A feed port 10 is provided at the left end of the top surface of the mixing tank 5, and a sealing cover is rotatably provided on the top of the feed port 10.

[0024] A rotating rod 11 is rotatably provided on the top surface of the inner wall of the stirring tank 5, and the top of the rotating rod 11 passes through the top surface of the stirring tank 5 and rotates coaxially with the rotating shaft of the motor 9; stirring paddles 12 are fixedly welded at equal intervals on the side surface of the rotating rod 11.

[0025] An inclined bucket groove 13 is fixedly welded to the bottom end of the inner wall of the material box 4, and a discharge port is opened in the middle of the bottom end of the inclined bucket groove 13. A second butterfly valve 14 is fixedly arranged in the middle of the bottom surface of the outer wall of the material box 4. The top of the second butterfly valve 14 is connected to the discharge port, and the bottom of the second butterfly valve 14 is connected to the aggregate cement pump 3.

[0026] The left end of the main delivery pipe 15 is wound around the gathering pier 2, and a plurality of three-way valves 16 are arranged in series at equal intervals on the right end of the main delivery pipe 15. The right end of the three-way valve 16 is connected to a delivery branch pipe 17, and the delivery branch pipe 17 adopts a canvas hose. The right end of the delivery branch pipe 17 and the right end of the main delivery pipe 15 are both connected to a third butterfly valve 18.

[0027] Working principle: When using this type of material conveying equipment for construction, the existing cement or aggregate to be conveyed is poured into the material box 4, or the raw materials are added into the mixing tank 5 for on-site mixing. After the mixing is completed, the first butterfly valve 8 is opened to discharge the cement or aggregate into the material box 4 for accumulation. Then the main conveying pipe 15 is untied from the convergence pier 2 and the third butterfly valve 18 is fixed to the construction floor where cement aggregate materials are needed according to the situation. For multi-story construction, the third butterfly valve 18 at the end of the main conveying pipe 15 is connected to the highest floor of the construction floor, and the remaining floors are connected to a conveying branch pipe 17 and the third butterfly valve 18 respectively, and the three-way valve 16 is adjusted. Then the second butterfly valve 14 is opened and the aggregate cement pump 3 is started to start conveying construction materials.

[0028] Finally, it should be noted that the above description is only a preferred embodiment of the utility model and is not intended to limit the utility model. Although the utility model is described in detail with reference to the above embodiments, those skilled in the art can still modify the technical solutions recorded in the above embodiments or replace some of the technical features therein with equivalents. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the utility model shall be included in the protection scope of the utility model.

Claims

1. A material conveying device for construction, comprising a base (1), It is characterized in that A converging pier (2) is fixedly welded to the right end of the top surface of the base (1), and an aggregate cement pump (3) is fixedly arranged on the left end of the base (1) by means of bolts; a material box (4) is arranged on the top of the aggregate cement pump (3), and a mixing tank (5) is arranged on the top of the material box (4); a main conveying pipe (15) is arranged at the bottom of the right end of the aggregate cement pump (3), and the main conveying pipe (15) is a canvas hose.

2. A material conveying equipment for construction according to claim 1, It is characterized in that A first bracket (6) is fixedly welded to the left end of the top surface of the base (1), and the first bracket (6) is higher than the aggregate cement pump (3); the bottom surface of the material box (4) and the top surface of the first bracket (6) are fixedly connected by bolts.

3. A material conveying equipment for construction according to claim 2, It is characterized in that A second bracket (7) is fixedly welded to the middle of the top surface of the first bracket (6), the material box (4) passes through the middle of the bottom end of the second bracket (7), and the bottom end of the outer wall of the mixing tank (5) is fixedly connected to the second bracket (7) by screws.

4. A material conveying equipment for construction according to claim 1, It is characterized in that A first butterfly valve (8) is provided in the middle of the bottom surface of the mixing tank (5), and the bottom end of the first butterfly valve (8) is aligned with the middle of the top surface of the material box (4). A motor (9) is fixed by bolts in the middle of the top surface of the mixing tank (5). A feed port (10) is provided at the left end of the top surface of the mixing tank (5), and a sealing cover is rotatably provided at the top of the feed port (10).

5. A material conveying equipment for construction according to claim 4, It is characterized in that A rotating rod (11) is rotatably provided on the top surface of the inner wall of the stirring tank (5); the top of the rotating rod (11) passes through the top surface of the stirring tank (5) and rotates coaxially with the rotating shaft of the motor (9); stirring paddles (12) are fixedly welded at equal intervals on the side surface of the rotating rod (11).

6. A material conveying equipment for construction according to claim 1, It is characterized in that An inclined bucket groove (13) is fixedly welded to the bottom end of the inner wall of the material box (4), and a discharge port is opened in the middle of the bottom end of the inclined bucket groove (13). A second butterfly valve (14) is fixedly arranged in the middle of the bottom surface of the outer wall of the material box (4), and the top of the second butterfly valve (14) is connected to the discharge port, and the bottom of the second butterfly valve (14) is connected to the aggregate cement pump (3).

7. A material conveying equipment for construction according to claim 1, It is characterized in that The left end of the main delivery pipe (15) is wound around the gathering pier (2), and a plurality of three-way valves (16) are arranged in series at equal intervals on the right end of the main delivery pipe (15). The right end of the three-way valve (16) is connected to a delivery branch pipe (17), and the delivery branch pipe (17) is made of a canvas hose. The end of the right end of the delivery branch pipe (17) and the end of the right end of the main delivery pipe (15) are both connected to a third butterfly valve (18).