Lift for building construction

By setting up protective mechanisms such as guardrails, buffer springs and airbags on the elevators for construction, the problem of lack of safety protection on the top of the elevator is solved, and the safety protection and practicality of workers are improved.

CN222274063UActive Publication Date: 2024-12-31中铁吉林投资建设有限公司 +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420794664.9
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-04-17
Publication Date
2024-12-31
Estimated Expiration
2034-04-17

AI Technical Summary

Technical Problem

The elevators built in existing buildings lack top safety protection structures, which leads workers to face major safety hazards when using them.

Method used

A protective mechanism including a guardrail stand, a buffer spring, a buffer plate, a pressure sensor, an airbag, a storage box and a solenoid valve are designed. The buffer spring provides elasticity. The pressure sensor controls the solenoid valve to open and fill nitrogen into the airbag, and expands rapidly. Provides safety protection.

Benefits of technology

It effectively reduces the safety risks of workers when working on the lift and increases the practicality and safety of the device.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222274063U_ABST
    Figure CN222274063U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of elevators, and discloses an elevator for building construction, which comprises an elevator main body, and a protection mechanism is arranged above the elevator main body; the protection mechanism comprises a guardrail frame, two sets of buffer springs are fixedly installed on the upper surface of the guardrail frame, a buffer plate is fixedly installed at the top ends of the two sets of buffer springs jointly, a connecting column is fixedly installed on the bottom face of the buffer plate, a pressure sensor and an air bag are fixedly installed on the upper surface of the guardrail frame, and a storage box is fixedly installed on the inner top wall of the guardrail frame. The front face of the storage box fixedly communicates with a conveying pipe, an electromagnetic valve is fixedly installed on the outer surface of the conveying pipe, and the pressure sensor is electrically connected with the electromagnetic valve through a wire. According to the elevator for building construction, the guardrail frame, the buffer spring, the buffer plate, the connecting column, the pressure sensor, the air bag, the material storage box, the conveying pipe and the electromagnetic valve are arranged, so that the purpose of preventing materials falling from the upper portion of a building from injuring workers as much as possible is achieved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of elevators, in particular to an elevator used for building construction. Background Art

[0002] Lift, lifting work platform is a multifunctional lifting mechanical equipment, which can be divided into fixed and mobile, scissors type and loading and unloading platforms, etc. It can be widely used in equipment maintenance, stations, docks, bridges and building maintenance. In construction projects, workers often need to use scissors-type lifting platforms to carry out construction at high places.

[0003] The utility model with the existing authorization announcement number CN218620237U discloses a safety elevator for house construction, including an elevator body, a climbing ladder is provided on the side of the elevator body, an operating platform is provided at the upper end of the elevator body, and columns are fixedly connected to the four corners of the operating platform.

[0004] By adopting the above technical solution, the opening can be sealed to ensure the safety of the operating platform. However, when the device is in use, due to the lack of a safety protection structure above the device, when construction materials accidentally fall from above the building, it is easy to cause a major safety hazard to the personal safety of the workers on the elevator, thereby reducing the practicability of the device.

[0005] Therefore, those skilled in the art provide a lift for building construction to solve the problems raised in the above background technology. Utility Model Content

[0006] The utility model aims to provide a lift for building construction, so as to solve the problem that the top of the lift proposed in the above background technology does not have a safety protection function.

[0007] In order to achieve the above purpose, the utility model provides the following technical solutions:

[0008] A lift for building construction, comprising a lift body, wherein a protective mechanism is arranged above the lift body;

[0009] The protection mechanism includes a guardrail frame, the bottom surface of the guardrail frame is fixedly connected to the upper surface of the elevator body, two groups of buffer springs are fixedly installed on the upper surface of the guardrail frame, a buffer plate is fixedly installed on the top ends of the two groups of buffer springs, a connecting column is fixedly installed on the bottom surface of the buffer plate, a pressure sensor and an airbag are respectively fixedly installed on the upper surface of the guardrail frame, a material storage box is fixedly installed on the inner top wall of the guardrail frame, a conveying pipe is fixedly connected to the front of the material storage box, an end of the conveying pipe away from the material storage box passes through the airbag and extends to the interior of the airbag, an electromagnetic valve is fixedly installed on the outer surface of the conveying pipe, and the pressure sensor is electrically connected to the electromagnetic valve through a wire.

[0010] As a further solution of the utility model: a concave frame is fixedly installed on the front side of the guardrail frame, and a winding roller is rotatably connected inside the concave frame. A rotating motor is arranged on the left side of the concave frame. The output end of the rotating motor power passes through the concave frame and is fixedly connected to the left end of the winding roller. The outer surface of the winding roller is covered with a nylon rope.

[0011] As a further solution of the utility model: a support platform is fixedly installed on the bottom surface of the rotating motor, and the right side surface of the support platform is fixedly connected to the left side surface of the concave frame.

[0012] As a further solution of the utility model: two groups of telescopic rods are fixedly installed on the upper surface of the guardrail frame, and the telescopic end of each telescopic rod is fixedly connected to the bottom surface of the buffer plate.

[0013] As a further solution of the utility model: a locking block and a locking frame are respectively fixedly installed on the left side of the guardrail frame, and the locking block is clamped in the interior of the locking frame.

[0014] As a further solution of the utility model: the right side surface of the material storage box is fixedly connected with a feed pipe, and the outer surface of the feed pipe is fixedly installed with a valve.

[0015] As a further solution of the utility model: a battery is fixedly installed on the inner top wall of the guardrail frame, and the battery is electrically connected to the pressure sensor and the solenoid valve respectively through wires.

[0016] Compared with the prior art, the beneficial effects of the utility model are:

[0017] The utility model is provided with a guardrail frame, a buffer spring and a buffer plate, so that when building materials fall from the top of the building and the buffer plate is subjected to a small impact force, the elastic force provided by the buffer spring is utilized to reduce the impact force on the guardrail frame; and by providing a connecting column, a pressure sensor, an airbag, a material storage box, a conveying pipe and a solenoid valve, when the buffer plate is subjected to a large impact force, the connecting column generates an extrusion force on the pressure sensor, so that the sensor controls the solenoid valve to open, and then the high-pressure nitrogen filled in the material storage box is rushed into the interior of the airbag, so that the airbag expands rapidly, and further provides safety protection for the guardrail frame, thereby reducing the potential safety hazards of workers working on the device, and thus increasing the practicality of the device. BRIEF DESCRIPTION OF THE DRAWINGS

[0018] Figure 1 It is a structural schematic diagram of a lift used in building construction;

[0019] Figure 2 It is a schematic diagram of the three-dimensional structure of a guardrail frame in a lift used in building construction;

[0020] Figure 3 It is a schematic diagram of a three-dimensional structure of a guardrail frame in a lift used in construction, viewed from above and in cross section;

[0021] Figure 4 The present invention is a schematic diagram of the three-dimensional structure of a concave frame in a lift used in building construction.

[0022] In the figure: 1. elevator body; 2. protection mechanism; 201. guardrail frame; 202. buffer spring; 203. buffer plate; 204. connecting column; 205. pressure sensor; 206. air bag; 207. storage box; 208. conveying pipe; 209. solenoid valve; 3. concave frame; 4. winding roller; 5. rotating motor; 6. nylon rope; 7. support table; 8. telescopic rod; 9. locking block; 10. locking frame; 11. feeding pipe; 12. valve; 13. battery. DETAILED DESCRIPTION

[0023] See also Figure 1-4 , a lift for building construction, comprising a lift body 1, a protective mechanism 2 is arranged above the lift body 1;

[0024] The protection mechanism 2 includes a guardrail frame 201, the bottom surface of the guardrail frame 201 is fixedly connected to the upper surface of the elevator body 1, two groups of buffer springs 202 are fixedly installed on the upper surface of the guardrail frame 201, the tops of the two groups of buffer springs 202 are commonly fixedly installed with a buffer plate 203, the bottom surface of the buffer plate 203 is fixedly installed with a connecting column 204, the upper surface of the guardrail frame 201 is respectively fixedly installed with a pressure sensor 205 and an airbag 206, and the inner top wall of the guardrail frame 201 is fixedly installed with a storage box 207, and the storage box The front of 207 is fixedly connected with a delivery pipe 208, and one end of the delivery pipe 208 away from the storage box 207 passes through the airbag 206 and extends to the inside of the airbag 206. The outer surface of the delivery pipe 208 is fixedly installed with a solenoid valve 209. The pressure sensor 205 is electrically connected to the solenoid valve 209 through a wire. The model of the pressure sensor 205 is MS54XX, and the worker fills the interior of the storage box 207 with nitrogen through high-pressure inflation, so that the nitrogen is compressed inside the storage box 207.

[0025] Specifically, a concave frame 3 is fixedly installed on the front of the guardrail frame 201, and a winding roller 4 is rotatably connected inside the concave frame 3. A rotating motor 5 is arranged on the left side of the concave frame 3. The output end of the power of the rotating motor 5 passes through the concave frame 3 and is fixedly connected to the left end of the winding roller 4. The outer surface of the winding roller 4 is covered with a nylon rope 6.

[0026] Through the above technical scheme, by providing a concave frame 3, a winding roller 4, a rotating motor 5 and a nylon rope 6, the power provided by the rotating motor 5 is used in conjunction with the winding roller 4 to drive the nylon rope 6 to be reeled, thereby facilitating workers to pull objects on the ground to a high place, thereby eliminating the need for workers to frequently lift the elevator body 1, thereby increasing the practicality of the device.

[0027] Specifically, a support platform 7 is fixedly installed on the bottom surface of the rotating motor 5 , and the right side surface of the support platform 7 is fixedly connected to the left side surface of the concave frame 3 .

[0028] Through the above technical solution, by providing the support platform 7, the rotating motor 5 is fixed, so as to avoid the rotating motor 5 from rotating during operation as much as possible, thereby ensuring the working stability of the rotating motor 5.

[0029] Specifically, two groups of telescopic rods 8 are fixedly installed on the upper surface of the guardrail frame 201 , and the telescopic end of each telescopic rod 8 is fixedly connected to the bottom surface of the buffer plate 203 .

[0030] Through the above technical solution, by providing the telescopic rod 8, the moving trajectory of the buffer plate 203 is limited, so as to avoid the buffer plate 203 deviating from the moving trajectory when moving, thereby ensuring the stability of the movement of the buffer plate 203.

[0031] Specifically, a locking block 9 and a locking frame 10 are fixedly mounted on the left side of the guardrail frame 201 , and the locking block 9 is clamped inside the locking frame 10 .

[0032] Through the above technical solution, by providing the locking block 9 and the locking frame 10, the guardrail frame 201 is locked, thereby avoiding the guardrail frame 201 from opening by itself as much as possible, thereby ensuring the stability of the guardrail frame 201.

[0033] Specifically, the right side surface of the material storage box 207 is fixedly connected with a feed pipe 11 , and a valve 12 is fixedly installed on the outer surface of the feed pipe 11 .

[0034] Through the above technical solution, by providing the feed pipe 11 and the valve 12, it is convenient for workers to fill the interior of the storage box 207 with nitrogen, thereby facilitating the recycling of the device.

[0035] Specifically, a battery 13 is fixedly mounted on the inner top wall of the guardrail frame 201 , and the battery 13 is electrically connected to the pressure sensor 205 , the solenoid valve 209 and the rotating motor 5 through wires.

[0036] Through the above technical solution, by providing the storage battery 13, electric energy can be provided to the electrical equipment of the device, so that the device is not limited by the length of the wire, and the practicality of the device is further increased.

[0037] The working principle of the utility model is as follows: when in use, the worker first moves the device to the position where construction is required, then the worker climbs to the top of the elevator body 1, and then the worker clamps the lock frame 10 on the lock block 9, thereby locking the guardrail frame 201, and then the worker controls the elevator body 1 to rise through the external controller, so as to facilitate the construction of high-rise buildings, and at the same time uses the power provided by the rotating motor 5 to drive the winding roller 4 to rotate, thereby lowering the nylon rope 6 to the ground, and then the worker fixes the items required for construction on the nylon rope 6, and uses the power provided by the rotating motor 5 to lift the items to a high place, thereby eliminating the need for workers to frequently lift the elevator body 1, thereby increasing the practicality of the device. When high-rise buildings are constructed, When the material on the object accidentally falls onto the buffer plate 203 and the connecting column 204 is not in contact with the pressure sensor 205, the elastic force provided by the buffer spring 202 is used to reduce the impact force on the guardrail frame 201, thereby providing a certain safety protection for the workers inside the guardrail frame 201. When the material on the high building accidentally falls onto the buffer plate 203 and the connecting column 204 is in contact with the pressure sensor 205, the pressure sensor 205 controls the solenoid valve 209 to open through the wire, so that the compressed nitrogen inside the storage box 207 enters the interior of the airbag 206 through the delivery pipe 208, thereby causing the airbag 206 to expand rapidly, thereby further providing safety protection for the workers inside the guardrail frame 201.

[0038] What is described above is only a preferred specific implementation manner of the present invention, but the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can make equivalent replacements or changes within the technical scope disclosed by the present invention according to the technical scheme and the utility model concept of the present invention, which should be covered by the protection scope of the present invention.

Claims

1. A lift for construction, comprising a lift body (1), characterized in that: A protection mechanism (2) is provided above the elevator body (1); The protection mechanism (2) comprises a guardrail frame (201), the bottom surface of the guardrail frame (201) is fixedly connected to the upper surface of the elevator body (1), two groups of buffer springs (202) are fixedly installed on the upper surface of the guardrail frame (201), a buffer plate (203) is fixedly installed on the top of the two groups of buffer springs (202), a connecting column (204) is fixedly installed on the bottom surface of the buffer plate (203), and pressure sensors (20 5) and an airbag (206), a storage box (207) is fixedly installed on the inner top wall of the guardrail frame (201), a delivery pipe (208) is fixedly connected to the front of the storage box (207), an end of the delivery pipe (208) away from the storage box (207) passes through the airbag (206) and extends to the inside of the airbag (206), an electromagnetic valve (209) is fixedly installed on the outer surface of the delivery pipe (208), and the pressure sensor (205) is electrically connected to the electromagnetic valve (209) through a wire.

2. A lift for construction according to claim 1, characterized in that: A concave frame (3) is fixedly installed on the front of the guardrail frame (201), and a winding roller (4) is rotatably connected inside the concave frame (3). A rotating motor (5) is arranged on the left side of the concave frame (3). The output end of the power of the rotating motor (5) passes through the concave frame (3) and is fixedly connected to the left end of the winding roller (4). The outer surface of the winding roller (4) is covered with a nylon rope (6).

3. A lift for construction according to claim 2, characterized in that: A support platform (7) is fixedly mounted on the bottom surface of the rotating motor (5), and the right side surface of the support platform (7) is fixedly connected to the left side surface of the concave frame (3).

4. A lift for construction according to claim 1, characterized in that: Two groups of telescopic rods (8) are fixedly mounted on the upper surface of the guardrail frame (201), and the telescopic end of each telescopic rod (8) is fixedly connected to the bottom surface of the buffer plate (203).

5. The elevator for construction according to claim 1, characterized in that: A locking block (9) and a locking frame (10) are respectively fixedly mounted on the left side of the guardrail frame (201), and the locking block (9) is clamped inside the locking frame (10).

6. A lift for construction according to claim 1, characterized in that: The right side surface of the material storage box (207) is fixedly connected to a feed pipe (11), and a valve (12) is fixedly installed on the outer surface of the feed pipe (11).

7. The elevator for construction according to claim 1, characterized in that: A storage battery (13) is fixedly mounted on the inner top wall of the guardrail frame (201), and the storage battery (13) is electrically connected to a pressure sensor (205) and a solenoid valve (209) respectively through wires.