Underground structure joint position waterproof structure
By using a combined structure of concrete grouting layer and side wall at the intersection of underground structures, combined with water barrier and grouting components, the problems of construction difficulties and inconvenience in repair in the existing technology are solved, and more efficient waterproofing effect and convenient repair are achieved. Improve the practicality of the waterproof structure at the intersection of underground structures.
Patent Information
- Application Number
- CN202421102466.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-05-20
- Publication Date
- 2024-12-31
- Estimated Expiration
- 2034-05-20
AI Technical Summary
The waterproof structure at the junction position of the existing underground structure is difficult to construct in unconventional structures, and the water stops cannot be reserved or effectively protected, resulting in the risk of water leakage and seepage, and inconvenient repair, which reduces the practicality of the waterproof structure.
The concrete grouting layer, side wall, guardrail assembly, waterproof structure and reinforcement assembly are adopted, including waterproof components, grouting components and reinforcement components. The waterproofing layer and buffer layer are installed through the combination of concrete grouting layer and side wall. Waterproof plates and steel bars for compact construction joints and convenient repair.
It effectively avoids the risk of water leakage and seepage at the junction positions of unconventional structures, improves the compactness of construction joints, and makes the repair of water seepage easier, and improves the practicality of waterproof structure at the junction positions of underground structures.
Smart Images

Figure CN222275577U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of underground structure construction, in particular to a waterproof structure at a junction of underground structures. Background Art
[0002] Underground structures are divided into arch structures, circular and rectangular tubular structures, frame structures, thin shell structures, and special-shaped structures according to their structural forms. The loads borne by underground structures are divided into the following three categories according to their functional characteristics and possible situations that may occur during use: permanent (main) loads, variable (additional) loads, and accidental (special) loads. The characteristics are permanent, variable, and accidental loads, and the joints of underground structures generally require waterproofing.
[0003] The existing underground structure joints are generally constructed by using water-swelling waterstop glue and embedded rubber waterstop. In actual use, when unconventional structure joints appear, such as the joints between the open-cut end wall of a subway and the top of a concealed tunnel, the construction process will be more difficult, and the waterstop cannot be reserved. Even if it can be reserved, it cannot be effectively protected and the waterproof effect cannot be ensured. There is a risk of leakage and seepage. When leakage and seepage occur, it is inconvenient to handle and repair, which reduces the practicality of the existing waterproof structure at the joints of underground structures. Utility Model Content
[0004] In response to the shortcomings of the prior art, the present application provides a waterproof structure for the intersection of underground structures, which has the advantages of making the construction joints more compact and less prone to leakage and easy to repair when leakage occurs, thereby solving the problem of low practicality of existing waterproof structures for the intersection of underground structures.
[0005] In order to achieve the above-mentioned purpose of making the construction joint position more compact and less prone to leakage and easy to repair when leakage occurs, the present application provides the following technical solutions: a waterproof structure at the junction of underground structures, including a concrete grouting layer, a side wall fixed to the left side of the concrete grouting layer, a guardrail assembly installed on the top of the concrete grouting layer, a waterproof structure installed inside the concrete grouting layer to prevent water leakage and seepage, and a reinforcement assembly installed between the concrete grouting layer and the side wall;
[0006] The waterproof structure comprises a water-proof component installed on the top of the concrete grouting layer for isolating water, and a grouting component installed on the concrete grouting layer for grouting the intersection position of the underground structure.
[0007] By adopting the above technical solution, the construction joint position can be made more compact and less prone to leakage.
[0008] Furthermore, the guardrail assembly includes a support fixed to the top of the concrete grouting layer and a safety guardrail fixed to the top of the concrete grouting layer.
[0009] By adopting the above technical solution, the safety of the surrounding area during the construction of underground structures is ensured.
[0010] Furthermore, the waterproof assembly includes a waterproof layer fixed on the top of the concrete grouting layer, a buffer layer fixed on the top of the waterproof layer, a waterproof board fixed on the top of the buffer layer, and a waterproof layer fixed on the right side of the side wall.
[0011] By adopting the above technical solution, water can be effectively isolated to achieve the effect of waterproofing the intersection of underground structures.
[0012] Furthermore, the grouting assembly includes two expansion water-stop adhesives fixed inside the concrete grouting layer, two steel pads respectively fixed on opposite sides of the two expansion water-stop adhesives, an embedded pipe fixed inside the concrete grouting layer, and a grouting conduit fixed at the bottom of the embedded pipe.
[0013] By adopting the above technical solution, the construction joint position can be made more compact and less prone to leakage, and it is also easy to repair when leakage occurs.
[0014] Furthermore, the reinforcement assembly includes a plurality of first transverse steel bars fixed between the concrete grouting layer and the inside of the side wall, a plurality of second transverse steel bars fixed to the concrete grouting layer and the inside of the side wall respectively, and a plurality of longitudinal steel bars fixed to the inside of the side wall.
[0015] By adopting the above technical solution, the strength of the overall structure is effectively improved.
[0016] Furthermore, the left side of the safety guardrail is fixed to the right side of the side wall, and the left side of the support is fixed to the right side of the side wall.
[0017] By adopting the above technical solutions, it is ensured that the safety guardrails and supports can achieve the expected protective effect.
[0018] Furthermore, the left side of the waterproof board is fixed to the right side of the waterproof layer, and the left sides of the buffer layer and the waterproof layer are both fixed to the right side of the side wall.
[0019] By adopting the above technical solution, it is ensured that the waterproof board, buffer layer and waterproof layer can achieve the expected waterproof effect.
[0020] Furthermore, the bottom of the support sequentially penetrates the waterproof board, the buffer layer and the waterproof layer and extends to the bottom of the waterproof layer and is fixed to the top of the concrete grouting layer.
[0021] By adopting the above technical solution, it is ensured that the support can be effectively fixed so as to achieve the expected protective effect.
[0022] Compared with the prior art, the present invention provides a waterproof structure at the junction of underground structures, which has the following beneficial effects:
[0023] The waterproof structure at the junction of underground structures is achieved through the coordinated use of concrete grouting layers, side walls, guardrail components, waterproof structures and reinforcement components. In actual use, when unconventional structural junctions occur, grouting pipes are easier to set up and construct than waterstops, and there is no risk of being unable to protect or being easily damaged, thereby effectively avoiding the occurrence of leakage and seepage due to ineffective protection. After the subsequent grouting construction, the construction joint position can be effectively guaranteed to be relatively dense, and even if water seepage occurs, it is easy to repair, thereby improving the practicability of the waterproof structure at the junction of underground structures. BRIEF DESCRIPTION OF THE DRAWINGS
[0024] Figure 1 This is a schematic diagram of the structure of this application;
[0025] Figure 2 It is a partial enlarged schematic diagram of the A part in the structure of the utility model;
[0026] Figure 3 It is a three-dimensional schematic diagram of the buffer layer connection structure in the structure of the utility model.
[0027] In the figure: 1. Concrete grouting layer; 2. Side wall; 200. Guardrail assembly; 201. Support; 202. Safety guardrail; 300. Waterproof structure; 301. Waterproof assembly; 3011. Waterproof layer; 3012. Buffer layer; 3013. Waterproof board; 3014. Waterproof layer; 302. Grouting assembly; 3021. Expansive water stop glue; 3022. Steel pad; 3023. Embedded pipe; 3024. Grouting duct; 400. Reinforcement assembly; 401. First transverse steel bar; 402. Second transverse steel bar; 403. Longitudinal steel bar. DETAILED DESCRIPTION
[0028] The technical solutions in the embodiments of the present application will be clearly and completely described below in conjunction with the drawings in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, rather than all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without making creative work are within the scope of protection of the present application.
[0029] See also Figure 1-3The utility model provides a technical solution: a waterproof structure at the junction of underground structures, comprising a concrete grouting layer 1, a side wall 2 fixed to the left side of the concrete grouting layer 1, a guardrail assembly 200 installed on the top of the concrete grouting layer 1, a waterproof structure 300 installed inside the concrete grouting layer 1 to prevent water leakage and seepage, and a reinforcing assembly 400 installed between the concrete grouting layer 1 and the side wall 2;
[0030] Through the coordinated use of the concrete grouting layer 1, the side wall 2, the guardrail assembly 200, the waterproof structure 300 and the reinforcement assembly 400, in actual use, when an unconventional structural junction occurs, the grouting pipe is easier to set up and construct than the waterstop, and there is no risk of being unable to protect or being easily damaged, thereby effectively avoiding the occurrence of leakage and seepage due to ineffective protection, and after the subsequent grouting construction, it can effectively ensure that the construction joint position is relatively dense, even if water seepage occurs, it is easy to repair, thereby improving the practicality of the waterproof structure at the junction of the underground structure.
[0031] In this embodiment, the guardrail structure 200 is a structure that plays a protective role on the construction site.
[0032] like Figure 1 As shown, the guardrail assembly 200 includes a support 201 fixed to the top of the concrete grouting layer 1 and a safety guardrail 202 fixed to the top of the concrete grouting layer 1 .
[0033] It should be noted that the left side of the safety guardrail 202 is fixed to the right side of the side wall 2, and the left side of the support 201 is fixed to the right side of the side wall 2, ensuring that the safety guardrail 202 and the support 201 can achieve the expected protective effect.
[0034] In this embodiment, the waterproof structure 300 is a structure for achieving a waterproof effect.
[0035] like Figure 1 , Figure 2 and Figure 3 As shown, the waterproof structure 300 includes a waterproof component 301 installed on the top of the concrete grouting layer 1 for isolating water, and a grouting component 302 installed on the concrete grouting layer 1 for grouting the intersection of the underground structure.
[0036] In this embodiment, the water-isolating component 301 is a structure that has a water-isolating effect.
[0037] like Figure 1 , Figure 2 and Figure 3 As shown, the waterproof assembly 301 includes a waterproof layer 3011 fixed on the top of the concrete grouting layer 1, a buffer layer 3012 fixed on the top of the waterproof layer 3011, a waterproof board 3013 fixed on the top of the buffer layer 3012, and a waterproof layer 3014 fixed on the right side of the side wall 2.
[0038] It should be noted that the left side of the waterproof board 3013 is fixed to the right side of the waterproof layer 3014, and the left sides of the buffer layer 3012 and the waterproof layer 3011 are fixed to the right side of the side wall 2, ensuring that the waterproof board 3013, the buffer layer 3012 and the waterproof layer 3011 can achieve the expected waterproof effect.
[0039] In addition, the bottom of the support 201 passes through the waterproof board 3013, the buffer layer 3012 and the waterproof layer 3011 in sequence and extends to the bottom of the waterproof layer 3011 and is fixed to the top of the concrete grouting layer 1, ensuring that the support 201 can be effectively fixed to achieve the expected protective effect.
[0040] In addition, the waterproof layer 3011 is a geotextile layer, the waterproof board 3013 is a plastic board, the buffer layer 3012 is a rubber layer, and the waterproof layer 3014 is a waterproof roll material layer, and the waterproof effect is achieved through their mutual cooperation.
[0041] In this embodiment, the grouting assembly 302 is a structure that makes the construction joint position more compact and less prone to leakage.
[0042] like Figure 1 and Figure 2 As shown, the grouting assembly 302 includes two expansion water-stop adhesives 3021 fixed inside the concrete grouting layer 1, two steel pads 3022 respectively fixed on the opposite sides of the two expansion water-stop adhesives 3021, an embedded pipe 3023 fixed inside the concrete grouting layer 1, and a grouting conduit 3024 fixed at the bottom of the embedded pipe 3023.
[0043] In this embodiment, the reinforcing component 400 is a structure that makes the overall structure more stable.
[0044] like Figure 1 and Figure 2 As shown, the reinforcement assembly 400 includes a plurality of first transverse steel bars 401 fixed between the concrete grouting layer 1 and the inside of the side wall 2, a plurality of second transverse steel bars 402 fixed to the inside of the concrete grouting layer 1 and the side wall 2 respectively, and a plurality of longitudinal steel bars 403 fixed to the inside of the side wall 2.
[0045] The working principle of the above embodiment is:
[0046] During use, after the concrete grouting layer 1 is poured, the expansion water-stop glue 3021 and the steel pad 3022 are applied on the concrete grouting layer 1, and the embedded pipe 3023 is embedded in the concrete grouting layer 1, and then the waterproof layer 3011, the buffer layer 3012 and the waterproof board 3013 are laid on the top of the concrete grouting layer 1, and the waterproof layer 3014 is set on the side wall 2, so as to achieve a waterproof effect, and then, the underground structure intersection position is grouted through the grouting conduit 3024 and the embedded pipe 3023, so that the underground structure intersection position is more compact, and when water seepage occurs, it only needs to be grouted again through the grouting conduit 3024 and the embedded pipe 3023, which is more convenient to operate, and the first transverse steel bar 401, the second transverse steel bar 402 and the longitudinal steel bar 403 make the concrete grouting layer 1 and the side wall 2 more stable.
[0047] Compared with the prior art, the waterproof structure at the junction of underground structures uses the concrete grouting layer 1, the side wall 2, the guardrail assembly 200, the waterproof structure 300 and the reinforcement assembly 400 in coordination. In actual use, when an unconventional structural junction occurs, the grouting pipe is easier to set up and construct than the water stop belt, and there is no risk of being unable to protect or being easily damaged, thereby effectively avoiding the occurrence of leakage and seepage due to ineffective protection. After the subsequent grouting construction, the construction joint position can be effectively guaranteed to be relatively dense, and even if seepage occurs, it is easy to repair, thereby improving the practicability of the waterproof structure at the junction of underground structures and solving the problem of low practicability of the existing waterproof structure at the junction of underground structures.
Claims
1. A waterproof structure at the junction of underground structures, characterized by: It comprises a concrete grouting layer (1), a side wall (2) fixed to the left side of the concrete grouting layer (1), a guardrail assembly (200) installed on the top of the concrete grouting layer (1), a waterproof structure (300) installed inside the concrete grouting layer (1) to prevent water leakage and seepage, and a reinforcement assembly (400) installed between the concrete grouting layer (1) and the side wall (2); The waterproof structure (300) comprises a water-isolating component (301) installed on the top of the concrete grouting layer (1) for isolating water, and a grouting component (302) installed on the concrete grouting layer (1) for grouting the junction position of the underground structure.
2. The waterproof structure at the junction of underground structures according to claim 1, characterized in that: The guardrail assembly (200) comprises a support (201) fixed to the top of a concrete grouting layer (1), and a safety guardrail (202) fixed to the top of the concrete grouting layer (1).
3. The waterproof structure at the junction of underground structures according to claim 2, characterized in that: The waterproof component (301) comprises a waterproof layer (3011) fixed to the top of the concrete grouting layer (1), a buffer layer (3012) fixed to the top of the waterproof layer (3011), a waterproof board (3013) fixed to the top of the buffer layer (3012), and a waterproof layer (3014) fixed to the right side of the side wall (2).
4. The waterproof structure at the junction of underground structures according to claim 1, characterized in that: The grouting assembly (302) comprises two expansion water-stopping adhesives (3021) fixed inside the concrete grouting layer (1), two steel pads (3022) respectively fixed on opposite sides of the two expansion water-stopping adhesives (3021), a pre-buried pipe (3023) fixed inside the concrete grouting layer (1), and a grouting conduit (3024) fixed at the bottom of the pre-buried pipe (3023).
5. The waterproof structure at the junction of underground structures according to claim 1, characterized in that: The reinforcement assembly (400) comprises a plurality of first transverse steel bars (401) fixed between a concrete grouting layer (1) and the inside of a side wall (2), a plurality of second transverse steel bars (402) respectively fixed inside the concrete grouting layer (1) and the inside of the side wall (2), and a plurality of longitudinal steel bars (403) fixed inside the side wall (2).
6. The waterproof structure at the junction of underground structures according to claim 2, characterized in that: The left side of the safety guardrail (202) is fixed to the right side of the side wall (2), and the left side of the support (201) is fixed to the right side of the side wall (2).
7. The waterproof structure at the junction of underground structures according to claim 3, characterized in that: The left side of the waterproof board (3013) is fixed to the right side of the waterproof layer (3014), and the left sides of the buffer layer (3012) and the waterproof layer (3011) are both fixed to the right side of the side wall (2).
8. The waterproof structure at the junction of underground structures according to claim 3, characterized in that: The bottom of the support (201) sequentially penetrates the waterproof board (3013), the buffer layer (3012) and the waterproof layer (3011) and extends to the bottom of the waterproof layer (3011) and is fixed to the top of the concrete grouting layer (1).