Platform and protection integrated construction elevator floor material conveying platform

By designing hinged baffles, handrails, buffer strips, gentle slopes and anti-slip marks on the construction elevator platform, the problems of cumbersome construction processes and dangerous high-altitude operations are solved, and safe and efficient installation of floor material transportation platforms is achieved, reducing the number of times of being accumulated. Material use and removal steps are carried out.

CN222293321UActive Publication Date: 2025-01-03CHINA HYDROPOWER ELEVENTH ENG BUREAU (ZHENGZHOU) CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420484881.8
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-03-13
Publication Date
2025-01-03
Estimated Expiration
2034-03-13

AI Technical Summary

Technical Problem

The construction process of the existing building elevator floor material transportation platform is complicated, the material occupies a lot, and the risk factor for high-altitude operations is high.

Method used

A platform including elevator floor, installation groove, rotation shaft, platform board, hinge hinge baffle, handrail, buffer bar, gentle slope and anti-slip mark is designed. The hinge hinge baffle covers the gap of the installation groove, sets handrails, and buffers. The integrated protection construction elevator floor material transportation platform is equipped with a strip that reduces impact, is gentle slope to facilitate carts entering the car, and is anti-slip and improves safety.

Benefits of technology

It effectively reduces the risk of high-altitude operations, reduces the use of turnover materials, and carries out construction without removing the elevator, improving the safety and efficiency of the material transport platform.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222293321U_ABST
    Figure CN222293321U_ABST
Patent Text Reader

Abstract

The utility model discloses a platform and protection integrated construction elevator floor material conveying platform, and belongs to the field of building construction equipment. Comprising an elevator floor; a mounting groove is formed in the elevator floor, a rotating shaft is arranged in the mounting groove, and a platform plate is arranged on the rotating shaft. The construction elevator floor material conveying platform has the advantages that the risk of high-altitude operation during building of the construction elevator floor material conveying platform is eradicated, meanwhile, turnover material input is reduced, and the construction elevator does not need to be independently dismantled when not used. A worker pushes a trolley filled with cement to pass through a platform plate, the cement in the trolley can be splashed into a mounting groove, and if the cement is not cleaned in time, the platform plate can not rotate; according to the device, the baffle is arranged through the hinge, when one end of the platform plate is placed on the building main body structure, the baffle can cover the gap between the mounting groove and the platform plate, and cement is prevented from being splashed into the mounting groove.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to a platform and protection integrated construction elevator floor material transporting platform, belonging to the field of building construction equipment. Background Art

[0002] At present, the floor material transportation platform of the construction engineering elevator consists of two parts: the material transportation platform and the support frame. The main keel of the material transportation platform is square wood, the platform surface is covered with wooden boards, and steel pipe protective railings are set on both sides. The support frame adopts steel pipe scaffolding, and steel pipe diagonal braces are set on both sides for reinforcement. The floor is equipped with embedded steel pipe wall parts to firmly connect the support frame with the main body. The existing technical construction process of the floor material transportation platform is cumbersome, occupies a lot of turnover materials, and involves a high risk factor of high-altitude operations. Utility Model Content

[0003] The purpose of the utility model is to provide a platform and protection integrated construction elevator floor material transport platform, which can effectively solve the above-mentioned problems.

[0004] In order to solve the above technical problems, the utility model is achieved through the following technical solutions:

[0005] It comprises an elevator floor; the elevator floor is provided with a mounting groove, a rotating shaft is provided in the mounting groove, and a platform plate is provided on the rotating shaft.

[0006] Further: a baffle is hinged on the platform board through a hinge, and the length of the baffle is greater than the width of the platform board.

[0007] Further: a handrail is provided on the upper surface of the platform plate.

[0008] Further: a buffer strip is provided on the lower end surface of the platform plate.

[0009] Further: the material of the buffer strip is one of rubber and plastic.

[0010] Further: a gentle slope is arranged at one end of the platform plate.

[0011] Furthermore: the upper surface of the platform is also provided with anti-slip grooves.

[0012] The beneficial effects are:

[0013] This utility model patent eliminates the risk of high-altitude operations when setting up a floor material transportation platform for a construction elevator, while reducing the investment in turnover materials. The construction elevator does not need to be dismantled separately when it is out of use.

[0014] When a worker pushes a trolley filled with cement across the platform board, the cement in the trolley may splash into the installation groove. If the cement is not cleaned up in time, the platform board may be unable to rotate. Therefore, the device is provided with a baffle through a hinge. When one end of the platform board is placed on the main structure of the building, the baffle will cover the gap between the installation groove and the platform board to prevent cement from splashing into the installation groove. BRIEF DESCRIPTION OF THE DRAWINGS

[0015] For ease of explanation, the present invention is described in detail by the following specific implementations and drawings.

[0016] Figure 1 It is a schematic diagram of the structure of the utility model;

[0017] Figure 2 It is a schematic diagram of the installation slot of the utility model;

[0018] Figure 3 It is a schematic diagram of the baffle of the utility model;

[0019] Figure 4 This is a state diagram of the platform plate of the utility model being stored in the elevator car.

[0020] Description of reference numerals:

[0021] 1. Elevator floor; 2. Mounting groove; 3. Rotating shaft; 4. Platform board; 5. Hinge; 6. Baffle; 7. Handrail; 8. Buffer strip; 9. Gentle slope. DETAILED DESCRIPTION

[0022] The embodiments of the present invention are described in detail below, and examples of the embodiments are shown in the accompanying drawings. The embodiments described below with reference to the accompanying drawings are exemplary and intended to be used to explain the present invention, but cannot be understood as limiting the present invention.

[0023] See also Figure 1-4 This is an embodiment of the utility model of a platform and protection integrated construction elevator floor material transportation platform.

[0024] The material transport platform plate 4 of the utility model patent is cut from a 2mm steel plate as a whole, and its width is slightly lower than the elevator floor 1 of the construction elevator car. The length of the platform plate 4 is the seam width between the car and the main structure + 40cm. The two sides of the platform plate 4 are made of L50×50 angle steel to make the retaining sill, which is firmly welded to the platform plate 4. The retaining plate 6 is integrally formed with a steel pipe and welded to the inner side of the retaining sill.

[0025] An installation groove 2 is provided on the elevator floor 1, and a platform plate 4 is rotatably arranged in the installation groove 2 via a rotating shaft 3.

[0026] The specific method of use is: after the construction elevator reaches the floor, the car protection door and the floor protection door are opened, and the floor material transportation platform plate 4 is turned over and placed flat on the main structure of the building, so that the workers and the carts can pass safely.

[0027] At the same time, a baffle plate 6 is hingedly connected to the platform plate 4 through a hinge 5 , and the length of the baffle plate 6 is greater than the width of the platform plate 4 .

[0028] The reason for such arrangement is that the device is provided with a mounting groove 2, and the platform plate 4 is rotatably arranged in the mounting groove 2. When the end of the platform plate 4 is placed on the main structure of the building, the staff pushes a trolley filled with cement through the platform plate 4, and the cement in the trolley may splash into the mounting groove 2. If the cement is not cleaned up in time, the platform plate 4 may be unable to rotate;

[0029] Therefore, the device is provided with a baffle 6 through the hinge 5. When one end of the platform plate 4 is placed on the main structure of the building, the baffle 6 will cover the gap between the installation groove 2 and the platform plate 4 to prevent cement from splashing into the installation groove 2. At the same time, the baffle 6 will not affect the movement of the trolley.

[0030] When the platform plate 4 is received in the elevator car, the baffle plate 6 can also be tilted against the elevator floor 1 to prevent debris from being kicked into the installation groove 2 by workers.

[0031] The upper end surface of the platform plate 4 is provided with a handrail 7; the handrail 7 can provide workers with safety protection for high-altitude operations.

[0032] A buffer strip 8 is provided on the lower end surface of the platform plate 4. Since the platform plate 4 needs to carry cargo for transportation, the structural strength must be high, and the material used is made of steel as a whole, which is very heavy; when such a heavy platform plate 4 falls on the main structure of the building, it may affect the main structure of the building; therefore, the buffer strip 8 can reduce the impact force on the main structure of the building and prevent the main structure of the building from being damaged.

[0033] The material of the buffer strip 8 is one of rubber and plastic. The buffer strip 8 of the device is made of rubber, which has low cost, good effect and long service life.

[0034] One end of the platform plate 4 is provided with a gentle slope 9. The effect of the gentle slope 9 is convenient for construction workers to push a trolley to enter the elevator car from the main structure of the building.

[0035] The upper surface of the platform is also provided with anti-skid patterns, which can provide stronger static friction for people or vehicles. Whether people or vehicles are walking on it, the anti-skid patterns will help people or vehicles to walk more stably.

[0036] The above description is only a specific embodiment of the present invention, but the technical features of the present invention are not limited thereto. Any changes or modifications made by any technician in the field of the present invention are included in the patent scope of the present invention.

Claims

1. A platform and protection integrated construction elevator floor material transport platform, characterized in that: The elevator floor (1) comprises an installation groove (2) provided on the elevator floor (1), a rotating shaft (3) provided in the installation groove (2), and a platform plate (4) provided on the rotating shaft (3); a baffle plate (6) is hingedly connected to the platform plate (4) via a hinge (5), and the length of the baffle plate (6) is greater than the width of the platform plate (4).

2. The platform and protection integrated construction elevator floor material transport platform according to claim 1, characterized in that: The upper end surface of the platform plate (4) is provided with a handrail (7).

3. The platform and protection integrated construction elevator floor material transport platform according to claim 1, characterized in that: A buffer strip (8) is provided on the lower end surface of the platform plate (4).

4. The platform and protection integrated construction elevator floor material transport platform according to claim 3 is characterized by: The material of the buffer strip is one of rubber and plastic.

5. The platform and protection integrated construction elevator floor material transport platform according to claim 1, characterized in that: A gentle slope (9) is provided at one end of the platform plate (4).

6. The platform and protection integrated construction elevator floor material transport platform according to claim 1, characterized in that: The upper surface of the platform is also provided with anti-slip grooves.