Integrated sewage lifting pump station

The integrated sewage lifting pump station addresses the issue of preventing direct contact between the pump station body and the ground during installation by using a support column system with a buffer pad to improve the installation of the pump station body and the ground during the installation of the pump station body and reducing economic losses.

CN222295245UActive Publication Date: 2025-01-03CHONGQING ZHONGZHENG XINDA ENVIRONMENTAL PROTECTION ENG CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420949538.6
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-04-30
Publication Date
2025-01-03
Estimated Expiration
2034-04-30

AI Technical Summary

Technical Problem

Existing integrated sewage lifting pump stations suffer from direct contact between the pump station body and the ground during installation, leading to potential damage and economic losses.

Method used

The integrated sewage lifting pump station incorporates a support column system with a buffer pad, screw, support seat, and sleeve arrangement to elevate and protect the pump station body, allowing gradual descent and preventing direct ground contact.

Benefits of technology

The system effectively prevents damage to the pump station and ground by using a buffer pad to absorb the impact during installation, reducing economic losses and ensuring stable installation.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222295245U_ABST
    Figure CN222295245U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of sewage pump stations, in particular to an integrated sewage lifting pump station which can play a good role in protecting a pump station body and the ground in the pump station installation process and comprises the pump station body and a base arranged at the bottom, a connecting seat is arranged at the bottom of the base, a plurality of connecting holes are formed in the connecting seat, and the connecting holes are communicated with the pump station body. A plurality of through holes are formed in the side wall of the base, a plurality of sleeves in one-to-one correspondence with the through holes are fixedly arranged in the base, a supporting column is installed in each sleeve, one end of each supporting column is in threaded connection with a lead screw, the bottom end of each lead screw is rotationally connected with a supporting seat, and a rotating block is fixedly arranged at the top end of each lead screw. A buffer pad is arranged at the bottom end of each supporting seat, a supporting block is arranged between the top end of each sleeve and the bottom end of the pump station body, a limiting block is arranged on the supporting column, the interiors of the sleeves are matched with the supporting column, and the supporting column and the sleeves are connected in a pluggable mode.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of sewage pumping stations, in particular to an integrated sewage lifting pumping station. Background Art

[0002] As we all know, sewage pumping stations are engineering facilities used to pump and transport sewage in urban drainage projects. When sewage in sewage pipes cannot be transported or discharged by gravity, or when construction is difficult due to the deep burial of the general pipeline, or when it is at the end of the trunk pipe and needs to be pumped before entering the sewage treatment plant, sewage pumping stations must be set up. When designing sewage pumping stations, pollution to the environment should be minimized, and good management and maintenance conditions should be provided in the station.

[0003] The existing integrated sewage lifting pump station needs to be lifted during the installation process. When the pump station is lowered, the base of the pump station is in direct contact with the ground due to its heavy body, which can easily damage the ground or the base of the pump station, causing serious economic losses. Utility Model Content

[0004] 1. Technical issues to be solved

[0005] In view of the deficiencies in the prior art, the utility model provides an integrated sewage lifting pump station, which can play a good protective role on the pump station body and the ground during the installation of the pump station.

[0006] (II) Technical solution

[0007] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: an integrated sewage lifting pump station, comprising a pump station body and a base arranged at the bottom, a connecting seat is arranged at the bottom of the base, a plurality of connecting holes are arranged on the connecting seat, a plurality of through holes are arranged on the side wall of the base, a plurality of sleeves corresponding to the through holes are fixedly arranged inside the base, a support column is installed inside each of the sleeves, one end of each of the support columns is connected to a lead screw by a thread, the bottom end of each of the lead screws is rotatably connected to a support seat, a rotating block is fixedly arranged on the top of each of the lead screws, and a buffer pad is arranged at the bottom end of each of the support seats.

[0008] Furthermore, a support block is provided between the top end of each sleeve and the bottom end of the pump station body.

[0009] Furthermore, a limiting block is provided on the support column.

[0010] Furthermore, the interior of the sleeve matches the support column.

[0011] Furthermore, the support column and the sleeve are connected by plugging and unplugging.

[0012] (III) Beneficial effects

[0013] Compared with the prior art, the utility model provides an integrated sewage lifting pump station, which has the following beneficial effects:

[0014] This integrated sewage lifting pump station installs the support column inside the sleeve through the arrangement of a through hole, a sleeve, a support column, a screw, a support seat and a buffer pad, and utilizes the support column, the screw, the support seat and the buffer pad to support the pump station body. The buffer pad can play a good buffering role and can effectively prevent the base of the pump station body from directly contacting the ground, thereby being able to play a good protective role for the pump station body and the ground during the installation of the pump station body and reducing economic losses. BRIEF DESCRIPTION OF THE DRAWINGS

[0015] Figure 1 It is a three-dimensional structural schematic diagram of the utility model;

[0016] Figure 2 This is a schematic diagram of the three-dimensional structure of the utility model without installing the support column;

[0017] Figure 3 It is a schematic cross-sectional view of the structure of the utility model without installing the support column;

[0018] Figure 4 It is a three-dimensional structural schematic diagram of the support column of the utility model.

[0019] In the figure: 1. Pump station body; 2. Base; 3. Connecting seat; 4. Connecting hole; 5. Through hole; 6. Sleeve; 7. Support block; 8. Support column; 9. Screw; 10. Support seat; 11. Buffer pad; 12. Rotating block; 13. Limit block. DETAILED DESCRIPTION

[0020] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0021] See also Figure 1-4The utility model is an integrated sewage lifting pump station, comprising a pump station body 1 and a base 2 arranged at the bottom, a connecting seat 3 is arranged at the bottom of the base 2, a plurality of connecting holes 4 are arranged on the connecting seat 3, a plurality of through holes 5 are arranged on the side wall of the base 2, a supporting column 8 is inserted into the inside of the sleeve 6 from the inside of the through hole 5, a plurality of sleeves 6 corresponding to the through holes 5 are fixedly arranged inside the base 2, and the sleeve 6 improves the stability of the installation of the supporting column 8, a supporting column 8 is installed inside each sleeve 6, one end of each supporting column 8 is connected with a screw 9 by a thread, and the height of the base 2 can be adjusted by rotating the screw 9, and the bottom end of each screw 9 is rotatably connected with a supporting seat 10, and a rotating block 12 is fixedly arranged on the top of each screw 9 to facilitate the rotation of the screw 9, and a buffer pad 11 is arranged at the bottom end of each support seat 10, which plays a good buffering role and can play a good protective role for the pump station body 1 and the ground during the installation of the pump station body 1.

[0022] Among them, a support block 7 is arranged between the top end of each sleeve 6 and the bottom end of the pump station body 1 to improve the stability of the sleeve 6 and improve the supporting capacity of the sleeve 6.

[0023] Wherein, a limiting block 13 is provided on the support column 8 to limit the insertion depth of the support column 8 .

[0024] The interior of the sleeve 6 matches the support column 8 .

[0025] The support column 8 and the sleeve 6 are connected by plugging and unplugging, which facilitates the installation and removal of the support column 8, and the support column 8 can be reused.

[0026] To sum up, when this integrated sewage lifting pump station is in use, when the pump station body 1 is lifted, the support column 8 is inserted into the inside of the sleeve 6, and the screw 9 is rotated to adjust the support seat 10 to a suitable position so that the support seat 10 is lower than the base 2. When the pump station body 1 descends, the buffer pad 11 lands first. The buffer pad 11 plays a buffering role and can provide good protection for the pump station body 1 and the ground during the installation of the pump station body 1. Then several staff members rotate the screw 9 at the same time to make the base 2 land slowly. After the pump station body 1 lands, the support column 8 is pulled out and the support column 8 can be reused.

[0027] The technical terms or scientific terms used in the description of this application should be the common meanings understood by ordinary technicians in the field to which this application belongs. The words "upper", "lower", "left", "right", "center", "vertical", "horizontal", "inside", "outside" and other words indicating orientation used in the description of this application are only used to indicate relative directions or positional relationships, and do not imply that the device or element must have a specific orientation, be constructed and operated in a specific orientation. When the absolute position of the described object changes, its relative positional relationship may also change accordingly, so it cannot be understood as a limitation on this application. The "first", "second", "third" and similar terms used in the description of this application are only used for descriptive purposes to distinguish different components, and cannot be understood as indicating or implying relative importance.

[0028] The words "one", "an" or "the" and the like used in the description of this application should not be understood as an absolute limitation on quantity, but should be understood as the existence of at least one. The words "include" or "comprise" and the like used in the description of this application mean that the elements or objects appearing before the word include the elements or objects listed after the word and their equivalents, but do not exclude other elements or objects.

[0029] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. An integrated sewage lifting pump station, comprising a pump station body (1) and a base (2) arranged at the bottom, a connecting seat (3) is arranged at the bottom of the base (2), and a plurality of connecting holes (4) are arranged on the connecting seat (3), characterized in that: A plurality of through holes (5) are arranged on the side wall of the base (2); a plurality of sleeves (6) corresponding to the through holes (5) are fixedly arranged inside the base (2); a support column (8) is installed inside each of the sleeves (6); one end of each of the support columns (8) is connected to a lead screw (9) through a thread; the bottom end of each of the lead screws (9) is rotatably connected to a support seat (10); a rotating block (12) is fixedly arranged at the top end of each of the lead screws (9); and a buffer pad (11) is arranged at the bottom end of each of the support seats (10).

2. The integrated sewage lifting pump station according to claim 1, characterized in that: A support block (7) is provided between the top end of each sleeve (6) and the bottom end of the pump station body (1).

3. The integrated sewage lifting pump station according to claim 1 is characterized in that: A limiting block (13) is arranged on the support column (8).

4. The integrated sewage lifting pump station according to claim 1, characterized in that: The interior of the sleeve (6) matches the support column (8).

5. The integrated sewage lifting pump station according to claim 4 is characterized in that: The support column (8) and the sleeve (6) are connected by plugging and unplugging.