Building ash shoveling equipment

By setting angle adjustment grooves and counterweights in the ash shovel equipment to adjust the angle and depth of the scraper, the problem of decreasing the efficiency of the ash shovel after the blade is worn is solved, and the efficient ash shovel and flatness is improved, reducing replacement or Repairing needs.

CN222295792UActive Publication Date: 2025-01-03SHENZHEN HENGHE DECORATION DESIGN ENG CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202421096684.5
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-05-20
Publication Date
2025-01-03
Estimated Expiration
2034-05-20

AI Technical Summary

Technical Problem

In the ash shovel operation, the ash shovel efficiency decreases after the blade is worn, and the blade needs to be replaced or polished, resulting in inconvenience.

Method used

A construction dust shovel equipment was designed, including angle adjustment grooves, positioning connection blocks, scrapers, counterweight blocks and bolts. By adjusting the scraper angle and depth, the dust shovel efficiency can be quickly restored and avoiding stuck or bumping the knife. .

Benefits of technology

By adjusting the angle and depth of the scraper, the efficiency of the scraper is improved, the cost of use is reduced, and the wall flatness is improved, avoiding the efficiency reduction after scraper wear.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222295792U_ABST
    Figure CN222295792U_ABST
Patent Text Reader

Abstract

The utility model discloses a building ash shoveling device which comprises an outer cover, a driving motor and a main shaft, the main shaft is rotatably installed in the outer cover, the driving motor is fixedly installed on one side of the outer cover, and the driving motor is in transmission connection with the main shaft; an angle adjusting groove is formed in the circumferential face of the main shaft in the axial direction, a positioning connecting block is installed in the angle adjusting groove, a scraping plate is installed on the positioning connecting block, the end of the scraping plate penetrates out of the positioning connecting block and protrudes out of the main shaft, and the end of the scraping plate is attached to the wall face. The angle adjusting groove is formed in the main shaft and matched with the positioning connecting block capable of adjusting the angle of the scraping plate, after the scraping plate is abraded, the angle of the scraping plate can be adjusted, the position, with the corner angle, of the scraping plate makes contact with the wall face to conduct ash shoveling operation, and therefore the ash shoveling efficiency is rapidly improved, manual grinding or cutter replacing is not needed, and the labor intensity of workers is relieved. The working efficiency is improved; and the use cost is reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of building surface construction, in particular to a shoveling device for construction. Background Art

[0002] Plastering refers to the removal of the original white material on the wall to facilitate subsequent construction. When plastering the wall, the scraper, driven by manpower or electric tools, rubs and scrapes against the wall. However, as the working time increases, the degree of wear of the working part of the scraper that contacts the wall continues to increase, resulting in a decrease in the efficiency of plastering. The scraper needs to be replaced or sharpened to restore the working efficiency, which is inconvenient. Utility Model Content

[0003] Therefore, the technical problem to be solved by the utility model is to provide a construction shoveling device which can quickly improve the shoveling efficiency after the shovel blade is worn.

[0004] In order to solve the above technical problems, the utility model provides the following technical solutions: a kind of construction plaster scraping equipment, comprising an outer cover, a driving motor and a main shaft, the main shaft is rotatably installed in the outer cover, the driving motor is fixedly installed on one side of the outer cover, and the driving motor is drivingly connected to the main shaft; an angle adjustment groove is opened on the circumferential surface of the main shaft along the axial direction, a positioning connecting block is installed in the angle adjustment groove, a scraper is installed on the positioning connecting block, the end of the scraper passes through the positioning connecting block and protrudes from the main shaft, and the end of the scraper is in contact with the wall surface; a positioning groove is opened on the inner wall of the angle adjustment groove, a positioning protrusion is fixedly installed on the side wall of the positioning connecting block, and the positioning protrusion fits in the positioning groove.

[0005] In the above-mentioned construction plaster scraping equipment, a sliding cavity is provided in the positioning connection block, a counterweight block is slidably installed in the sliding cavity, one end of the scraper penetrates into the sliding cavity and is connected to the counterweight block, and the other end of the scraper penetrates out of the connection block.

[0006] In the above-mentioned construction plaster scraping equipment, a spring is installed in the sliding cavity, one end of the spring abuts against the inner wall surface of the sliding cavity away from the main shaft axis, and the other end of the spring abuts against the side wall of the counterweight block.

[0007] In the above-mentioned construction plaster scraping equipment, a dovetail groove is provided on the side wall surface where the counterweight block is connected to the scraper, a dovetail block is fixedly connected to the end of the scraper, and the dovetail block is connected in the dovetail groove.

[0008] In the above-mentioned construction plaster scraping equipment, more than two positioning grooves are provided at equal intervals along the circumference of the angle adjustment groove, and the positioning grooves are arranged along the axial direction of the main shaft. At least one positioning protrusion is fixedly installed on the side wall of the positioning connecting block, and the positioning protrusion is arranged along the axial direction of the main shaft.

[0009] In the above-mentioned construction plaster-shoveling equipment, end plates are fixedly connected to both ends of the main shaft, and the end portions at both ends of the main shaft are rotatably connected to the two ends of the outer cover respectively.

[0010] The above-mentioned construction plaster scraping equipment has an axial hole coaxially opened in the main shaft, and a connecting hole coaxially opened on the end plate with the axial hole, a bolt is inserted into the connecting hole of the first end plate, and the bolt passes through the first end plate, the axial hole and the second end plate in sequence, the bolt head of the bolt is pressed on the first end plate, and a transmission sleeve is threaded on the tail end of the bolt, and the transmission sleeve is pressed on the second end plate, and a hexagonal hole is arranged in the bolt head.

[0011] In the above-mentioned construction plaster-shoveling equipment, a first bearing is installed on the first end of the outer cover through a bearing seat, the transmission sleeve is installed in the first bearing, a threaded connection hole is coaxially opened in the transmission sleeve, and the tail end of the bolt is threadedly connected in the threaded connection hole; gears are installed on the power output shaft of the drive motor and the transmission sleeve, and the two gears are meshed with each other; a second bearing is installed on the second end of the outer cover through a bearing seat, and the bolt head of the bolt is coaxially inserted into the inner ring of the second bearing.

[0012] In the above-mentioned construction plaster-shoveling equipment, a main handle is fixedly installed on one side of the outer cover, and an auxiliary handle is fixedly installed on the top of the outer cover, and the auxiliary handle is arranged perpendicular to the main handle.

[0013] The above-mentioned construction plaster scraping equipment has a sliding sleeve fixedly installed on the side wall of the outer cover, a sliding rod slidably connected in the sliding sleeve, a roller installed on the bottom of the sliding rod, an adjusting screw rotatably connected to the top of the sliding rod, a screw sleeve threadedly connected to the adjusting screw, the screw sleeve is fixedly installed on the side wall of the outer cover, and the screw sleeve is located directly above the sliding sleeve.

[0014] The technical solution of the utility model has achieved the following beneficial technical effects:

[0015] 1. The utility model provides an angle adjustment groove on the main shaft and cooperates with a positioning connection block that can adjust the angle of the scraper. After the scraper is worn, the angle of the scraper can be adjusted so that the angular position of the scraper contacts the wall surface for scraping, thereby quickly improving the scraping efficiency without manual grinding or replacement of the tool, which is beneficial to improving work efficiency and reducing use costs.

[0016] 2. The utility model provides a counterweight block, so that when the driving motor drives the scraper to rotate rapidly, the counterweight block can apply thrust to the scraper so that the scraper fits the wall surface. When encountering protrusions on the wall surface, the protruding parts can be gradually scraped to improve the flatness of the wall surface after the plastering operation, and it can avoid the situation where the scraper contacts the protrusions too strongly when encountering protrusions, resulting in jamming or collision.

[0017] 3. The utility model can realize the rapid disassembly and assembly of the main shaft and the rapid adjustment of the angle of the scraper by setting bolts; and can control and adjust the scraping depth of the wall by setting rollers and adjusting screws. BRIEF DESCRIPTION OF THE DRAWINGS

[0018] Figure 1 A schematic diagram of the front cross-sectional structure of the utility model;

[0019] Figure 2 A side structural schematic diagram of the utility model;

[0020] Figure 3 A schematic diagram of the cross-sectional structure of the main shaft of the utility model;

[0021] Figure 4 A schematic diagram of the structure in which the positioning connection block of the utility model is installed on the main shaft;

[0022] Figure 5 A schematic diagram of the structure of the utility model positioning connection block which is installed on the main shaft after rotating to one side;

[0023] Figure 6 A structural schematic diagram of the utility model in which a positioning connection block is installed on a main shaft after rotating to the other side.

[0024] The reference numerals in the figure are represented as follows: 1-outer cover; 2-drive motor; 3-main shaft; 4-angle adjustment groove; 5-positioning connection block; 6-sliding chamber; 7-counterweight block; 8-scraper; 9-spring; 10-positioning groove; 11-positioning protrusion; 12-axial hole; 13-end plate; 14-bolt; 15-threaded connection hole; 16-transmission sleeve; 17-first bearing; 18-bolt head; 19-second bearing; 20-retaining ring; 21-auxiliary handle; 22-main handle; 23-sleeve; 24-sliding rod; 25-roller; 26-screw sleeve; 27-adjusting screw; 28-wear area. DETAILED DESCRIPTION

[0025] A kind of construction shoveling equipment in this embodiment, such as Figure 1 , Figure 4 As shown, it includes an outer cover 1, a drive motor 2 and a main shaft 3, wherein the main shaft 3 is rotatably installed in the outer cover 1, the drive motor 2 is fixedly installed on one side of the outer cover 1, and the drive motor 2 is transmission-connected with the main shaft 3; an angle adjustment groove 4 is provided on the circumferential surface of the main shaft 3 along the axial direction, a positioning connection block 5 is installed in the angle adjustment groove 4, a scraper 8 is installed on the positioning connection block 5, an end of the scraper 8 passes through the positioning connection block 5 and protrudes from the main shaft 3, and the end of the scraper 8 is in contact with the wall surface; the angle adjustment groove A positioning groove 10 is provided on the inner wall of 4, and a positioning protrusion 11 is fixedly installed on the side wall of the positioning connection block 5, and the positioning protrusion 11 is matched in the positioning groove 10. By setting the angle adjustment groove 4 on the main shaft 3 and matching the positioning connection block 5 that can adjust the angle of the scraper 8, after the scraper 8 is worn, the angle of the scraper 8 can be adjusted so that the scraper 8 has an angular position in contact with the wall surface for shoveling operation, thereby quickly improving the shoveling efficiency without manual grinding or replacement of the tool, which is beneficial to improving work efficiency and reducing use costs.

[0026] In actual use, Figure 4 As shown, in the initial state, the scraper 8 is arranged along the radial direction of the main shaft 3, and the working end of the scraper 8 has an original blade. As the main shaft 3 rotates, the blade of the scraper 8 contacts and wears the wall surface. The wear area 28 of the scraper 8 at the initial angle is as shown in FIG. Figure 4 As shown, after wear, the contact area between the scraper 8 and the wall surface becomes larger, and the scraping efficiency decreases; Figure 5 As shown, the positioning connection block 5 is removed from the angle adjustment slot 4, and the angle is adjusted to the left and then reinstalled into the angle adjustment slot 4. At this time, the scraper 8 contacts the wall surface again at the side edges and corners after being worn at the initial angle, and the surface contact is changed to line contact, thereby improving the working efficiency. At this angle, the scraper 8 wear area 28 is as shown in FIG. Figure 5 As shown, after the scraper 8 is worn again, the edges and corners are generated again; Figure 6 As shown, after the scraper 8 is adjusted again, the worn edges generated at the previous working angle are brought into contact with the wall surface, and the worn area 28 at the second angle is as shown in FIG. Figure 6 As shown, after this wear, the working portion of the scraper 8 can be restored to an angle similar to the original blade portion, and so on, the angle of the scraper 8 is adjusted to continuously restore the scraping efficiency.

[0027] like Figure 3-4As shown, a sliding cavity 6 is opened in the positioning connection block 5, and a counterweight block 7 is slidably installed in the sliding cavity 6. One end of the scraper 8 penetrates into the sliding cavity 6 and is connected to the counterweight block 7, and the other end of the scraper 8 penetrates out of the connection block 5.

[0028] like Figure 4 As shown, a spring 9 is installed in the sliding cavity 6, one end of the spring 9 presses against the inner wall surface of the sliding cavity 6 away from the axis of the main shaft 3, and the other end of the spring 9 presses against the side wall of the counterweight 7; a dovetail groove is provided on the side wall surface where the counterweight 7 is connected to the scraper 8, and a dovetail block is fixedly connected to the end of the scraper 8, and the dovetail block is connected in the dovetail groove. By setting the counterweight 7, when the driving motor 2 drives the scraper 8 to rotate rapidly, the counterweight 7 can apply a thrust to the scraper 8 to make the scraper 8 fit against the wall surface. When encountering protrusions on the wall surface, the protruding parts can be gradually scraped to improve the flatness of the wall surface after the plastering operation, and it can avoid the situation where the scraper 8 contacts the protrusion too strongly when encountering the protrusion, resulting in jamming or collision with the knife.

[0029] like Figure 3-4 As shown, five positioning grooves 10 are opened in the angle adjustment groove 4 at equal intervals along its circumference, and the positioning grooves 10 are arranged along the axial direction of the main shaft 3. At least three positioning protrusions 11 are fixedly installed on the side wall of the positioning connecting block 5, and the positioning protrusions 11 are arranged along the axial direction of the main shaft 3.

[0030] like Figure 1 , Figure 3 As shown, both ends of the main shaft 3 are fixedly connected with end plates 13, and the ends at both ends of the main shaft 3 are rotatably connected with the two ends of the outer cover 1 respectively; an axial hole 12 is coaxially opened in the main shaft 3, and a connecting hole is coaxially opened on the end plate 13 with the axial hole 12, and a bolt 14 is inserted into the connecting hole of the first end plate 13, and the bolt 14 passes through the first end plate 13, the axial hole 12 and the second end plate 13 in sequence, and the bolt head 18 of the bolt 14 is pressed on the first end plate 13, and a transmission sleeve 16 is threadedly connected to the tail end of the bolt 14, and the transmission sleeve 16 is pressed on the second end plate 13, and a hexagonal hole is arranged in the bolt head 18.

[0031] like Figure 1As shown, a first bearing 17 is installed on the first end of the outer cover 1 through a bearing seat, and the transmission sleeve 16 is installed in the first bearing 17. A threaded connection hole 15 is coaxially opened in the transmission sleeve 16, and the tail end of the bolt 14 is threadedly connected to the threaded connection hole 15; gears are installed on the power output shaft of the drive motor 2 and the transmission sleeve 16, and the two gears are meshed with each other; a second bearing 19 is installed on the second end of the outer cover 1 through a bearing seat, and the bolt head 18 of the bolt 14 is coaxially inserted into the inner ring of the second bearing 19. By arranging the bolt 14, the main shaft 3 can be quickly disassembled and assembled and the angle of the scraper 8 can be quickly adjusted; by arranging the roller 25 and the adjusting screw 27, the scraping depth of the wall can be controlled and adjusted.

[0032] like Figure 1-2 As shown, a main handle 22 is fixedly mounted on one side of the outer cover 1, and an auxiliary handle 21 is fixedly mounted on the top of the outer cover 1, and the auxiliary handle 21 is arranged perpendicular to the main handle 22. By providing two vertically arranged handles, the stability during hand-held use can be improved.

[0033] like Figure 2 As shown, a sliding sleeve 23 is fixedly installed on the side wall of the outer cover 1, a sliding rod 24 is slidably connected in the sliding sleeve 23, a roller 25 is installed on the bottom of the sliding rod 24, an adjusting screw 27 is rotatably connected to the top of the sliding rod 24, a screw sleeve 26 is threadedly connected to the adjusting screw 27, the screw sleeve 26 is fixedly installed on the side wall of the outer cover 1, and the screw sleeve 26 is located directly above the sliding sleeve 23. By setting the adjusting screw 27 and the roller 25, the extension distance of the roller 25 can be adjusted, and the depth of the wall scraping can be controlled.

[0034] Working process: After starting the driving motor 2, the driving motor 2 drives the main shaft 3 to rotate through the gear transmission, and the initial angle of the scraper 8 is as follows: Figure 4 As shown, the main shaft 3 drives the positioning connection block 5 and the scraper 8 to rotate, and the scraper 8 is in contact with the wall surface to perform scraping operations. Under the action of rotation, the counterweight block 7 pushes the scraper 8 to continuously extend to increase the scraping depth;

[0035] When the angle of the scraper 8 needs to be adjusted, insert a tool into the bolt head 18, loosen the bolt 14, and completely pull out the bolt 14. At this time, the transmission sleeve 16, the end plate 13 and the main shaft 3 are separated, the main shaft 3 is taken out, and then the positioning connection block 5 is pulled out to one end, and after the angle is changed, it is installed in the angle adjustment groove 4, and the corresponding parts are reinstalled.

[0036] Obviously, the above embodiments are merely examples for the purpose of clear explanation, and are not intended to limit the implementation methods. For those skilled in the art, other different forms of changes or modifications can be made based on the above description. It is not necessary and impossible to list all the implementation methods here. The obvious changes or modifications derived therefrom are still within the scope of protection of the claims of this patent application.

Claims

1. A construction shoveling device, characterized in that: The invention comprises an outer cover (1), a driving motor (2) and a main shaft (3), wherein the main shaft (3) is rotatably mounted in the outer cover (1), the driving motor (2) is fixedly mounted on one side of the outer cover (1), and the driving motor (2) is drivingly connected to the main shaft (3); an angle adjustment groove (4) is provided on the circumferential surface of the main shaft (3) along the axial direction, a positioning connection block (5) is installed in the angle adjustment groove (4), a scraper (8) is installed on the positioning connection block (5), the end of the scraper (8) passes through the positioning connection block (5) and protrudes from the main shaft (3), and the end of the scraper (8) is in contact with the wall surface; a positioning groove (10) is provided on the inner wall of the angle adjustment groove (4), a positioning protrusion (11) is fixedly mounted on the side wall of the positioning connection block (5), and the positioning protrusion (11) is fitted in the positioning groove (10).

2. A construction plastering equipment according to claim 1, characterized in that: A sliding cavity (6) is provided in the positioning connection block (5), a counterweight block (7) is slidably installed in the sliding cavity (6), one end of the scraper (8) penetrates into the sliding cavity (6) and is connected to the counterweight block (7), and the other end of the scraper (8) penetrates out of the connection block (5).

3. A construction plastering equipment according to claim 2, characterized in that: A spring (9) is installed in the sliding cavity (6), one end of the spring (9) abuts against the inner wall surface of the sliding cavity (6) away from the axis of the main shaft (3), and the other end of the spring (9) abuts against the side wall of the counterweight (7).

4. A construction plastering equipment according to claim 2, characterized in that: A dovetail groove is provided on the side wall surface where the counterweight block (7) is connected to the scraper (8), and a dovetail block is fixedly connected to the end of the scraper (8), and the dovetail block is connected in the dovetail groove.

5. A construction plastering equipment according to claim 1, characterized in that: The angle adjustment groove (4) has two or more positioning grooves (10) arranged at equal intervals along its circumference, and the positioning grooves (10) are arranged along the axial direction of the main shaft (3). At least one positioning protrusion (11) is fixedly mounted on the side wall of the positioning connection block (5), and the positioning protrusion (11) is arranged along the axial direction of the main shaft (3).

6. A construction plastering equipment according to claim 1, characterized in that: End plates (13) are fixedly connected to both ends of the main shaft (3), and the end portions at both ends of the main shaft (3) are rotatably connected to the two ends of the outer cover (1) respectively.

7. A construction plastering equipment according to claim 6, characterized in that: An axial hole (12) is coaxially opened in the main shaft (3), and a connecting hole is coaxially opened on the end plate (13) with the axial hole (12). A bolt (14) is inserted into the connecting hole of the first end plate (13), and the bolt (14) passes through the first end plate (13), the axial hole (12) and the second end plate (13) in sequence. The bolt head (18) of the bolt (14) is pressed against the first end plate (13), and a transmission sleeve (16) is threadedly connected to the rear end of the bolt (14), and the transmission sleeve (16) is pressed against the second end plate (13). A hexagonal hole is arranged in the bolt head (18).

8. A construction plastering equipment according to claim 7, characterized in that: A first bearing (17) is mounted on the first end of the outer cover (1) through a bearing seat, the transmission sleeve (16) is mounted in the first bearing (17), a threaded connection hole (15) is coaxially opened in the transmission sleeve (16), and the tail end of the bolt (14) is threadedly connected in the threaded connection hole (15); gears are mounted on the power output shaft of the drive motor (2) and the transmission sleeve (16), and the two gears are meshed with each other; a second bearing (19) is mounted on the second end of the outer cover (1) through a bearing seat, and the bolt head (18) of the bolt (14) is coaxially inserted into the inner ring of the second bearing (19).

9. A construction plaster scraping equipment according to claim 1, characterized in that: A main handle (22) is fixedly mounted on one side of the outer cover (1), and an auxiliary handle (21) is fixedly mounted on the top of the outer cover (1), wherein the auxiliary handle (21) is arranged perpendicular to the main handle (22).

10. The construction plastering equipment according to claim 1, characterized in that: A sliding sleeve (23) is fixedly mounted on the side wall of the outer cover (1), a sliding rod (24) is slidably connected inside the sliding sleeve (23), a roller (25) is mounted on the bottom of the sliding rod (24), an adjusting screw (27) is rotatably connected to the top of the sliding rod (24), a screw sleeve (26) is threadedly connected to the adjusting screw (27), the screw sleeve (26) is fixedly mounted on the side wall of the outer cover (1), and the screw sleeve (26) is located directly above the sliding sleeve (23).