Cable material preparation reaction kettle
By introducing the design of drive motor and mixing components into the cable material preparation reactor, the mixing problems are solved, the working efficiency is improved, and data recording and wireless transmission are achieved through the flow monitoring components.
Patent Information
- Application Number
- CN202323484378.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2023-12-20
- Publication Date
- 2025-01-07
- Estimated Expiration
- 2033-12-20
AI Technical Summary
The existing cable material preparation reactors are unevenly mixed and easily bonded to the inner wall of the kettle body, resulting in low working efficiency.
A cable material preparation reactor including a driving motor, a mixing assembly and a flow monitoring assembly was designed. The mixing and mixing was achieved through a combination structure of columns, lower bearings, connecting shafts, twisters and paddles to avoid bonding, and through electrical control Valves, power connection boxes and display tables enable wireless data transmission and flow control.
It realizes a more uniform mixing of cable materials, avoids bonding to the inner wall of the kettle body, improves working efficiency, and facilitates cleaning and data recording.
Smart Images

Figure CN222305820U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of cable material preparation, in particular to a cable material preparation reaction kettle. Background Art
[0002] Plastics used for insulation and sheathing of wires and cables are commonly known as cable materials, which include rubber, plastic, nylon and other varieties. Cable material manufacturers use cable manufacturers as users. As long as there is demand for wires and cables, there will be a market for cable materials. Except for bare wire products such as steel core aluminum stranded wire and magnet wire, almost all wire and cable products require an insulation layer.
[0003] However, the existing cable material preparation reactor does not mix the cable material uniformly during the preparation process, and the cable material is easily adhered to the inner wall of the reactor body, which is difficult to clean, reduces work efficiency, and thus cannot achieve the best use effect. Utility Model Content
[0004] 1. Technical issues to be resolved
[0005] In view of the deficiencies in the prior art, the utility model provides a cable material preparation reactor, which solves the problem that the cable material preparation reactor proposed in the above background technology is not evenly mixed during the preparation process of the cable material, and is easily adhered to the inner wall of the reactor body, which is difficult to clean, reduces work efficiency, and thus cannot achieve the best use effect.
[0006] (II) Technical solution
[0007] To achieve the above objectives, the utility model is implemented through the following technical solutions: a cable material preparation reactor, comprising a reactor body, a driving motor is fixedly installed on the top of the reactor body, and an upper hopper is arranged on one side of the upper surface of the reactor body, a pressure gauge is fixedly installed on one side of the driving motor and located at the top of the reactor body, a mixing assembly is rotatably installed on the inner wall of the reactor body, and a bottom cover is fixedly installed on the bottom end of the reactor body, a flow monitoring assembly is arranged on the outer wall of the bottom end of the bottom cover, and brackets are fixedly connected around the bottom end of the bottom cover, and a base is fixedly connected to the bottom end of the bracket.
[0008] Furthermore, the mixing assembly includes a column, the bottom end of the column is rotatably connected to a lower bearing, and the top end of the column is fixedly connected to a connecting shaft, the outer wall of the connecting shaft is provided with a fixing sleeve, and the outer wall of the fixing sleeve is fixedly connected to a cross bar on both sides, the outer wall of the cross bar is fixedly connected to a positioning seat, and the bottom end of the positioning seat is fixedly connected to an auger, and the two ends of the cross bar are fixedly connected to paddles.
[0009] Furthermore, the lower bearing is fixedly mounted on the bottom end of the inner wall of the bottom cover, and the lower bearing is made of stainless steel.
[0010] Furthermore, the top end of the connecting shaft passes through the kettle body and is rotatably connected to the output end of the driving motor, and an O-ring is fitted at the connection point between the connecting shaft and the kettle body.
[0011] Furthermore, the top end of the auger is fixedly connected to the crossbar via a positioning seat, and the auger is a spiral aluminum alloy component.
[0012] Furthermore, the flow monitoring component includes an electrically controlled valve, the top of one end of the electrically controlled valve is electrically connected to an electrical box, and a chuck is fixedly installed at one end of the electrically controlled valve, a connecting disk is fixedly installed at the other end of the electrically controlled valve, and a wire tube is passed through the top of the electrically controlled valve, a display meter is fixedly connected to the top of the wire tube, and an antenna is electrically connected to the outer wall of the display meter.
[0013] Furthermore, one end of the electric control valve is fixedly mounted on the outer wall of the bottom end of the bottom cover through a chuck.
[0014] (III) Beneficial effects
[0015] The utility model provides a cable material preparation reactor, which has the following beneficial effects:
[0016] Through the arrangement of the column, the lower bearing, the connecting shaft, the fixed sleeve, the cross bar, the positioning seat, the auger and the paddle, the connecting shaft is rotatably connected to the output end of the driving motor, and the connecting shaft is driven to rotate when the driving motor is running. The lower bearing is installed at the bottom end of the inner wall of the bottom cover, so that the column can rotate with the connecting shaft when the connecting shaft rotates, and the cross bar, the auger and the paddle are driven to rotate when the connecting shaft rotates. The auger stirs and mixes the cable material in the kettle body when it rotates, and the paddle abuts against the two sides of the inner wall of the kettle body when it rotates to avoid the cable material from sticking to the inner wall of the kettle body. During the preparation process of the cable material, the mixing is more uniform and it is avoided to stick to the surrounding inner wall of the kettle body, which is convenient for cleaning and improves work efficiency.
[0017] Through the arrangement of the electric control valve, the electrical box, the chuck, the connecting plate, the wire tube, the display meter and the antenna, one end of the electric control valve is fixedly installed on the outer wall of the bottom cover by using the chuck, and the pipeline is connected through the connecting plate to facilitate the discharge of the cable material. The electric control valve is used to control the discharge speed of the cable material, and the flow rate of the cable material in the electric control valve is displayed and recorded by the display meter. The display meter is wirelessly connected to the mobile device by using the antenna to facilitate data transmission. BRIEF DESCRIPTION OF THE DRAWINGS
[0018] Figure 1 It is a schematic diagram of the structure of the utility model;
[0019] Figure 2 It is a schematic diagram of the structure of the mixing component in the utility model;
[0020] Figure 3 It is a structural schematic diagram of the flow monitoring component in the utility model.
[0021] In the figure: 1. kettle body; 2. driving motor; 3. upper hopper; 4. pressure gauge; 5. mixing assembly; 51. column; 52. lower bearing; 53. connecting shaft; 54. fixing sleeve; 55. cross bar; 56. positioning seat; 57. auger; 58. paddle; 6. bottom cover; 7. flow monitoring assembly; 71. electric control valve; 72. electrical box; 73. chuck; 74. connecting plate; 75. wire tube; 76. display meter; 77. antenna; 8. bracket; 9. base. DETAILED DESCRIPTION
[0022] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0023] See also Figures 1 to 3 The utility model provides a technical solution: a cable material preparation reactor, comprising a reactor body 1, a driving motor 2 is fixedly installed on the top of the reactor body 1, and an upper hopper 3 is arranged on one side of the upper surface of the reactor body 1, the cable material is introduced into the reactor body 1 through the upper hopper 3 for reaction, a pressure gauge 4 is fixedly installed on one side of the driving motor 2 and located on the top of the reactor body 1, the pressure data in the reactor body 1 is checked by the pressure gauge 4, a mixing component 5 is rotatably installed on the inner wall of the reactor body 1, and a bottom cover 6 is fixedly installed on the bottom end of the reactor body 1, a flow monitoring component 7 is arranged on the outer wall of the bottom end of the bottom cover 6, and brackets 8 are fixedly connected around the bottom end of the bottom cover 6, and a base 9 is fixedly connected to the bottom end of the bracket 8.
[0024] The mixing assembly 5 includes a column 51, the bottom end of the column 51 is rotatably connected to a lower bearing 52, and the top of the column 51 is fixedly connected to a connecting shaft 53, the outer wall of the connecting shaft 53 is sleeved with a fixing sleeve 54, and the outer walls of the fixing sleeve 54 are fixedly connected to cross bars 55 on both sides, the outer wall of the cross bar 55 is fixedly connected to a positioning seat 56, and the bottom end of the positioning seat 56 is fixedly connected to a screw dragon 57, and the two ends of the cross bar 55 are fixedly connected to paddles 58, which are rotatably connected to the output end of the driving motor 2 through the connecting shaft 53, and the connecting shaft 53 is driven to rotate when the driving motor 2 is running. The lower bearing 52 is installed on the bottom end of the inner wall of the bottom cover 6, so that when the connecting shaft 53 rotates, the column 51 is easy to follow the rotation, and when the connecting shaft 53 rotates, it drives The cross bar 55, the auger 57 and the paddle 58 rotate, and the auger 57 stirs and mixes the cable material in the kettle body 1 when rotating. The paddle 58 abuts against the inner wall of the kettle body 1 on both sides when rotating to prevent the cable material from sticking to the inner wall of the kettle body 1. The lower bearing 52 is fixedly installed on the bottom end of the inner wall of the bottom cover 6, and the lower bearing 52 is made of stainless steel to prevent rust and rotate more flexibly. The top end of the connecting shaft 53 passes through the kettle body 1 and is rotatably connected to the output end of the drive motor 2, and the connecting shaft 53 and the kettle body 1 are connected at the connection to reduce wear and improve work efficiency. The top end of the auger 57 is fixedly connected to the cross bar 55 through the positioning seat 56, and the auger 57 is made of a spiral aluminum alloy component, which is corrosion-resistant and has a longer service life.
[0025] The flow monitoring component 7 includes an electric control valve 71, the top of one end of the electric control valve 71 is electrically connected to an electrical connection box 72, and a chuck 73 is fixedly installed on one end of the electric control valve 71, a connecting plate 74 is fixedly installed on the other end of the electric control valve 71, and a wire tube 75 is passed through the top of the electric control valve 71, a display meter 76 is fixedly connected to the top of the wire tube 75, and an antenna 77 is electrically connected to the outer wall of the display meter 76. The chuck 73 is used to fix one end of the electric control valve 71 on the outer wall of the bottom cover 6, and the pipeline is connected through the connecting plate 74 to facilitate the feeding of cable materials. The electric control valve 71 is used to control the feeding speed of the cable material, and the display meter 76 is used to display and record the flow rate of the cable material in the electric control valve 71. The antenna 77 is used to wirelessly connect the display meter 76 to the mobile device for data transmission. One end of the electric control valve 71 is fixedly installed on the outer wall of the bottom end of the bottom cover 6 through the chuck 73.
[0026] The specific implementation methods disclosed in the present invention omit detailed descriptions of known functions and known components. To ensure the compatibility of the equipment, the operating methods adopted are consistent with the parameters of commercially available equipment.
[0027] In summary, the operating steps of the cable material preparation reactor are as follows:
[0028] When in use, the cable material is introduced into the kettle body 1 through the upper hopper 3 for reaction work, and the pressure data in the kettle body 1 is checked by the pressure gauge 4. The connecting shaft 53 is rotatably connected to the output end of the driving motor 2. When the driving motor 2 is running, the connecting shaft 53 is driven to rotate. The lower bearing 52 is installed on the bottom end of the inner wall of the bottom cover 6. When the connecting shaft 53 rotates, it is convenient for the column 51 to follow the rotation. When the connecting shaft 53 rotates, it drives the cross bar 55, the auger 57 and the paddle 58 to rotate. The auger 57 rotates to the kettle body. The cable material in the kettle body 1 is stirred and mixed, and the paddle 58 abuts against the two sides of the inner wall of the kettle body 1 when rotating to prevent the cable material from sticking to the inner wall of the kettle body 1. The chuck 73 is used to fix one end of the electric control valve 71 on the outer wall of the bottom cover 6, and the pipeline is connected through the connecting disk 74 to facilitate the discharge of the cable material. The electric control valve 71 is used to control the discharge speed of the cable material, and the display meter 76 is used to display and record the flow of the cable material in the electric control valve 71. The antenna 77 is used to wirelessly connect the display meter 76 with the mobile device to facilitate data transmission.
[0029] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. A cable material preparation reactor, comprising a reactor body (1), characterized in that: A driving motor (2) is fixedly mounted on the top of the kettle body (1), and an upper hopper (3) is arranged on one side of the upper surface of the kettle body (1); a pressure gauge (4) is fixedly mounted on one side of the driving motor (2) and located at the top of the kettle body (1); a mixing assembly (5) is rotatably mounted on the inner wall of the kettle body (1), and a bottom cover (6) is fixedly mounted on the bottom end of the kettle body (1); a flow monitoring assembly (7) is arranged on the outer wall of the bottom end of the bottom cover (6), and brackets (8) are fixedly connected around the bottom end of the bottom cover (6); and a base (9) is fixedly connected to the bottom end of the bracket (8).
2. A cable material preparation reactor according to claim 1, characterized in that: The mixing assembly (5) comprises a column (51), the bottom end of the column (51) is rotatably connected to a lower bearing (52), and the top end of the column (51) is fixedly connected to a connecting shaft (53), the outer wall of the connecting shaft (53) is sleeved with a fixing sleeve (54), and the outer walls of the fixing sleeve (54) are fixedly connected to cross bars (55), the outer wall of the cross bar (55) is fixedly connected to a positioning seat (56), and the bottom end of the positioning seat (56) is fixedly connected to an auger (57), and both ends of the cross bar (55) are fixedly connected to paddles (58).
3. A cable material preparation reactor according to claim 2, characterized in that: The lower bearing (52) is fixedly mounted on the bottom end of the inner wall of the bottom cover (6), and the lower bearing (52) is made of stainless steel.
4. A cable material preparation reactor according to claim 2, characterized in that: The top end of the connecting shaft (53) passes through the kettle body (1) and is rotatably connected to the output end of the driving motor (2), and an O-ring is fitted at the connection point between the connecting shaft (53) and the kettle body (1).
5. A cable material preparation reactor according to claim 2, characterized in that: The top end of the auger (57) is fixedly connected to the crossbar (55) via a positioning seat (56), and the auger (57) is a spiral aluminum alloy component.
6. A cable material preparation reactor according to claim 1, characterized in that: The flow monitoring component (7) comprises an electric control valve (71), the top of one end of the electric control valve (71) is electrically connected to an electrical connection box (72), and a chuck (73) is fixedly installed on one end of the electric control valve (71), a connection plate (74) is fixedly installed on the other end of the electric control valve (71), and a wire tube (75) is passed through the top end of the electric control valve (71), a display meter (76) is fixedly connected to the top end of the wire tube (75), and an antenna (77) is electrically connected to the outer wall of the display meter (76).
7. A cable material preparation reactor according to claim 6, characterized in that: One end of the electric control valve (71) is fixedly mounted on the outer wall of the bottom end of the bottom cover (6) via a chuck (73).