Large flat plate type gate inflation water stop efficient replacement device

By designing a multi-layer working platform and steel basket structure device, the problems of construction complexity and inconvenience in lifting during the replacement of large flat-panel gate inflatable water stopping devices of ship machinery are solved, and a more efficient replacement process and safety are achieved Sex.

CN222313957UActive Publication Date: 2025-01-07CHINA THREE GORGES CORPORATION +1
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202420332559.3
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-02-22
Publication Date
2025-01-07
Estimated Expiration
2034-02-22

AI Technical Summary

Technical Problem

In the prior art, during the replacement of the inflatable water stop device for the large flat-panel gate of vertically lifted ship machinery, the construction platform is complicated to be equipped with a long construction period, high cost, high safety risks, and inconvenient lifting.

Method used

A device including a left and right symmetrical side water stop replacement platform and bottom water stop replacement platform is designed. The side water stop replacement platform is equipped with multiple working platforms in the steel structure of the working frame, extending the platform to facilitate personnel installation and lifting, bottom water stop The replacement platform uses a steel basket structure to provide movable space, making it more convenient to lift and charge the water-stop rubber.

Benefits of technology

The disassembly and installation process of the inflatable water stop device is simplified, the construction complexity and cost are reduced, the safety is improved, and the lifting is more convenient.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222313957U_ABST
    Figure CN222313957U_ABST
Patent Text Reader

Abstract

A large flat plate type gate inflation water stop efficient replacement device comprises a left side water stop replacement platform, a right side water stop replacement platform and a bottom water stop replacement platform located below a flat plate gate, each side water stop replacement platform comprises a channel frame steel framework and an operation frame steel structure, and each operation frame steel structure is fixedly connected to one side of the corresponding channel frame steel framework. A plurality of operation platforms are arranged in the operation frame steel structure at intervals up and down, and extending platforms are movably installed at the ends, close to the pressurizing side water stoppers, of the operation platforms. The multiple operation platforms are arranged in the operation frame steel structure at intervals up and down, the extending platforms are movably installed at the ends, close to the pressurizing side water stop, of the operation platforms, when the pressurizing side water stop needs to be disassembled and installed, the extending platforms extend out, and personnel can stand on the extending platforms to install the pressurizing side water stop. When the pressurized water stop side water stop needs to be hoisted, the extending platform is folded, and hoisting is more convenient.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of vertical lifting ship machinery, in particular to a large-scale flat-plate gate inflation and water-stopping efficient replacement device. Background Art

[0002] An inflatable water-stop device is arranged on the water-facing surface downstream of the Three Gorges Shiplift Flat Gate. When the water-stop rubber in the inflatable water-stop device reaches its service life or is damaged and leaking, the gate needs to be lifted out of the gate slot to the locking position and locked for water-stop replacement. At this time, the gate is in a suspended parking state, with the bottom water-stop range completely suspended and the side water-stop range suspended within 10m above the ground.

[0003] Affected by the structural size and weight of the inflatable waterstop itself, its conventional replacement methods are mainly the following: Replacement method 1: Use the full-chamber rack construction from the bottom plate of the channel at the bottom of the portal body. This method has the outstanding characteristics of large construction platform construction volume, long construction period, high cost, and high safety risk. Replacement method 2: The bottom waterstop replacement adopts the welding arrangement of the bracket construction platform at the bottom of the portal body, and the side waterstop adopts the single-row rack construction method. In this way, the construction platform of the bottom waterstop requires 2 cranes to cooperate with the platform welding and disassembly on the portal body. Due to space constraints, the side waterstop can only be built with a single row of racks. The layout process involves welding and cutting of the portal structure and the cooperation of double cranes. The construction platform has the outstanding characteristics of complex construction, long construction period, high cost, and high safety risk.

[0004] Chinese patent document CN112030926A, publication / announcement date: 2020.12.04, discloses an efficient disassembly and assembly device for pressurized water-stop of large flat gate of vertical ship lift, in which the pressurized water-stop side water-stop 3 on the flat working gate 1 is disassembled and installed through the pressurized water-stop side water-stop replacement platform 5. During operation, in order to facilitate the disassembly and installation of the pressurized water-stop side water-stop 3, the pressurized water-stop side water-stop replacement platform 5 is arranged in front of the pressurized water-stop side water-stop 3. When the pressurized water-stop side water-stop 3 is removed and hoisted out, or the new pressurized water-stop side water-stop 3 is hoisted, the pressurized water-stop side water-stop 3 can only pass through the gap between the pressurized water-stop side water-stop replacement platform 5 and the flat working gate 1, which is inconvenient to lift. Utility Model Content

[0005] The technical problem to be solved by the utility model is: to solve the problems existing in the above-mentioned background technology, and to provide a high-efficiency replacement device for a large flat-plate gate pneumatic water-stop, by arranging a plurality of working platforms at upper and lower intervals in the steel structure of the working frame, and an extending platform is movably installed at one end of the working platform close to the pressurized side water-stop, when it is necessary to disassemble and install the pressurized water-stop side water-stop, the extending platform is extended, and personnel can stand on the extending platform to install the pressurized water-stop side water-stop, and when it is necessary to lift the pressurized water-stop side water-stop, the extending platform is folded, and lifting is more convenient.

[0006] In order to solve the above technical problems, the technical solution adopted by the utility model is: a high-efficiency replacement device for large-scale flat-plate gate inflatable water-stop, comprising two sets of left and right side water-stop replacement platforms respectively used to replace the pressurized side water-stops on both sides of the flat-plate gate, and a bottom water-stop replacement platform located below the flat-plate gate for replacing the pressurized bottom water-stop. The left and right sets of side water-stop replacement platforms are left-right symmetrical structures, and the side water-stop replacement platforms include a channel frame steel structure and an operating frame steel structure. The operating frame steel structure is fixedly connected to one side of the channel frame steel structure, and a plurality of operating platforms are arranged at upper and lower intervals in the operating frame steel structure. The operating platform is movably installed with an extending platform at one end close to the pressurized side water-stop.

[0007] The channel frame steel structure includes side frames and cross bars on both sides. The front and rear sides of the side frames on both sides are connected into a whole by multiple cross bars. A channel for people to climb up and down is formed between the left and right side frames and the front and rear cross bars. The channel for people to climb up and down is connected to the working platform.

[0008] At least two connecting rods are fixedly connected to the top of the side water stop replacement platform on the side close to the flat gate.

[0009] Two handrails are fixedly connected to the left and right sides of the top of the channel frame steel structure.

[0010] The working frame steel structure is provided with two hinge shafts on the side close to the pressurizing side water stop and above the working platform. One end of the extended platform is hinged on the two hinge shafts, so that the extended platform can be folded onto the working platform or flipped over.

[0011] The bottom water-stop replacement platform includes a top steel frame and a lower steel basket, wherein the lower steel basket is fixedly connected to the lower side of the top steel frame, and the length of the lower steel basket is smaller than that of the top steel frame, so that the two ends of the top steel frame form protruding ears.

[0012] A hot vulcanizer bearing base is arranged in the middle of the lower steel structure basket.

[0013] The top steel structure frame is provided with a placement platform on one side close to the flat gate.

[0014] The utility model has the following beneficial effects:

[0015] 1. The utility model arranges a plurality of working platforms at intervals in the upper and lower parts of the working frame steel structure. An extending platform is movably installed at one end of the working platform close to the pressurized side water stop. When it is necessary to disassemble and install the pressurized side water stop, the extending platform is extended, and personnel can stand on the extending platform to install the pressurized side water stop. When it is necessary to lift the pressurized side water stop, the extending platform is folded up, and lifting is more convenient.

[0016] 2. The ears on both sides of the bottom water stop replacement platform of the utility model are placed on the concrete base on both sides below the flat gate. The steel basket is similar to the hanging basket structure. People stand in the lower steel basket, which provides sufficient space for workers to replace the water stop. BRIEF DESCRIPTION OF THE DRAWINGS

[0017] The utility model is further described below in conjunction with the accompanying drawings and embodiments.

[0018] Figure 1 This is a schematic diagram of the state of the utility model when in use.

[0019] Figure 2 It is a schematic diagram of the main structure of the side water stop replacement platform of the utility model.

[0020] Figure 3 It is a side view schematic diagram of the side water stop replacement platform of the utility model.

[0021] Figure 4 for Figure 2 Middle AA section, schematic diagram of the structure with the extended platform folded onto the working platform.

[0022] Figure 5 for Figure 2 Middle AA section, schematic diagram of the structure of the extension platform and the flip extension work platform.

[0023] Figure 6 for Figure 4 Enlarged schematic diagram of point B in the middle.

[0024] Figure 7 This is a schematic diagram of the main structure of the bottom water stop replacement platform of the utility model.

[0025] Figure 8 for Figure 7 Schematic diagram of the CC cross-section structure.

[0026] In the figure, a flat gate 1, a gate body locking support beam 2, a pressurizing side water stop 3, a pressurizing side water stop 3, a pressurizing bottom water stop 4, a side water stop replacement platform 5, a channel frame steel structure 51, a side frame 511, a cross bar 512, an operating frame steel structure 52, an operating platform 53, an extension platform 54, a hinge shaft 55, a handrail 56, a connecting rod 57, a bottom water stop replacement platform 6, a top steel structure frame 61, a lower steel structure basket 62, ears 63, a hot vulcanizer bearing base 64, a placement platform 65, and a concrete base 7. DETAILED DESCRIPTION

[0027] See also Figure 1-8 A high-efficiency replacement device for a large flat-plate gate inflatable water-stop, comprising two sets of side water-stop replacement platforms 5 for replacing the pressurized side water-stops 3 on both sides of the flat-plate gate 1, and a bottom water-stop replacement platform 6 located below the flat-plate gate 1 for replacing the pressurized bottom water-stop 4. The two sets of side water-stop replacement platforms 5 are left-right symmetrical structures. The side water-stop replacement platforms 5 include a channel frame steel structure 51 and an operating frame steel structure 52. The operating frame steel structure 52 is fixedly connected to one side of the channel frame steel structure 51. A plurality of operating platforms 53 are arranged at intervals in the upper and lower parts of the operating frame steel structure 52. The operating platform 53 is movably installed with a protruding platform 54 at one end close to the pressurized side water-stop 3.

[0028] By arranging multiple working platforms 53 at upper and lower intervals in the working frame steel structure 52, an extension platform 54 is movably installed at one end of the working platform 53 close to the pressurized side water-stop 3. When the pressurized side water-stop 3 needs to be disassembled and installed, the extension platform 54 is extended, and personnel can stand on the extension platform 54 to install the pressurized side water-stop 3. When the pressurized side water-stop 3 needs to be lifted, the extension platform 54 is folded, and the lifting is more convenient.

[0029] For details, see Figure 2-5 The channel frame steel structure 51 includes side frames 511 and cross bars 512 on both sides. The front and rear sides of the side frames 511 on both sides are connected as a whole by multiple cross bars 512. A channel for people to climb up and down is formed between the side frames 511 on the left and right sides and the cross bars 512 on the front and rear sides. The channel for people to climb up and down is connected to the working platform 53. Through the above structure, multiple cross bars 512 form a ladder structure, which is convenient for workers to enter the working platform 53 through the frame steel structure 51.

[0030] See also Figure 3 At least two connecting rods 57 are fixedly connected to the top of the side water stop replacement platform 5 on the side close to the flat gate 1. It is convenient for the side water stop replacement platform 5 to be installed and fixed with the flat gate 1. When in use, the connecting rod 57 is installed on the top of the flat gate 1 by bolts.

[0031] Further, referring to Figures 2 and 3, two handrails 56 are fixedly connected to the left and right sides of the top of the channel frame steel structure 51. The handrails 56 are formed by bending round tubes and welded to the left and right sides of the top of the channel frame steel structure 51 to facilitate operators to enter the channel of the frame steel structure 51.

[0032] In a preferred embodiment, see Figure 4-6 , the working frame steel structure 52 is provided with two hinge shafts 55 on the side close to the pressurized side water stop 3 and above the working platform 53, and one end of the extension platform 54 is hinged on the two hinge shafts 55, so that the extension platform 54 can be folded onto the working platform 53, or turned over and extended from the working platform 53. The extension platform 54 is hinged to the working frame steel structure 52 through the two hinge shafts 55. When the pressurized side water stop 3 needs to be disassembled and installed, the extension platform 54 is turned over and extended, and personnel can stand on the extension platform 54 to install the pressurized side water stop 3. When the pressurized side water stop 3 needs to be hoisted, the extension platform 54 is turned over and folded onto the working platform 53.

[0033] For clarification, see Figure 6 In order to limit the position of the extension platform 54 when it is turned over and extended, the hinge shaft 55 needs to be as far away from the right edge of the working frame steel structure 52 as possible. In this way, when the extension platform 54 is turned over and extended, the extension platform 54 can be limited by the hinge shaft 55 and the right edge of the working platform 53. More specifically, combined with Figure 5 When the extension platform 54 is unfolded, the left end of the extension platform 54 is limited by the hinge shaft 55, and the lower side of the extension platform 54 abuts against the right edge of the working platform 53, so that the extension platform 54 will not rotate further downward. In order to facilitate the rotation of the extension platform 54, a fillet centered on the hinge shaft 55 is set at one end of the extension platform 54 connected to the hinge shaft 55.

[0034] In addition, in addition to the above-mentioned structure, the extension platform 54 can also be extended by setting two horizontal slide grooves on the upper side of the working platform 53 in the working frame steel structure 52, and the extension platform 54 can be translated, slid and retracted through the slide grooves on the left and right sides.

[0035] See also Figure 1 , 7 8. The bottom water stop replacement platform 6 includes a top steel frame 61 and a lower steel basket 62. The lower steel basket 62 is fixedly connected to the lower side of the top steel frame 61, and the length of the lower steel basket 62 is less than the length of the top steel frame 61, so that the two ends of the top steel frame 61 form extended ears 63. Through the above structure, when in use, the ears 63 on both sides are placed on the concrete base 7 on both sides below the flat gate 1. The steel basket is similar to a hanging basket structure, and personnel stand in the lower steel basket 62, which provides sufficient activity space for operators to replace water stops.

[0036] Furthermore, a hot vulcanizer bearing base 64 is provided in the middle of the lower steel structure basket 62, and the hot vulcanizer bearing base 64 is used to place the hot vulcanizer. The water-stop rubber has a joint in the middle of the lower side of the flat gate 1, and the two sections of the water-stop rubber are vulcanized and connected into a whole by the hot vulcanizer.

[0037] Furthermore, the top steel frame 61 is provided with a placement platform 65 on one side close to the flat gate 1. Specifically, the placement platform 65 is a long strip of steel plate welded on the top steel frame 61 for spreading and placing the bottom water stop and the pressure plate.

[0038] The working principle or use process of the utility model is as follows:

[0039] See also Figure 1 When replacing the water stop, lift the flat gate 1 out of the gate slot to the top of the gate body locking support beam 2. Then hoist the bottom water stop replacement platform 6 to the bottom of the flat gate 1, and the ears 63 on both sides of the bottom water stop replacement platform 6 are placed on the concrete base 7 on both sides below the flat gate 1. When placing the bottom water stop replacement platform 6, the bottom water stop replacement platform 6 is close to the flat gate 1, which is convenient for disassembly and installation operations.

[0040] Then, the side water-stop replacement platforms 5 on both sides are hoisted in sequence. First, the side water-stop replacement platform 5 is hoisted against the flat gate 1, and then the connecting rod 57 is installed on the top of the flat gate 1 by bolts, so as to stabilize the side water-stop replacement platform 5. In this way, the pressurized side water-stop 3 is replaced by the side water-stop replacement platform 5, and the pressurized bottom water-stop 4 is replaced by the bottom water-stop replacement platform 6. When the pressurized water-stop side water-stop 3 needs to be disassembled and installed, the extension platform 54 is extended, and personnel can stand on the extension platform 54 to install the pressurized water-stop side water-stop 3. When the pressurized water-stop side water-stop 3 needs to be hoisted, the extension platform 54 is retracted.

Claims

1. A high-efficiency replacement device for a large-scale flat gate inflatable water stop, comprising two sets of left and right side water stop replacement platforms (5) for replacing the pressurized side water stops (3) on both sides of the flat gate (1), and a bottom water stop replacement platform (6) located below the flat gate (1) for replacing the pressurized bottom water stop (4), characterized in that: The left and right sets of the side water-stop replacement platforms (5) are symmetrical structures. The side water-stop replacement platforms (5) include a channel frame steel structure (51) and an operation frame steel structure (52). The operation frame steel structure (52) is fixedly connected to one side of the channel frame steel structure (51). A plurality of operation platforms (53) are arranged at intervals in the upper and lower parts of the operation frame steel structure (52). The operation platform (53) is movably provided with a protruding platform (54) at one end close to the pressurized side water-stop (3).

2. According to claim 1, a large-scale flat gate inflation water-stopping high-efficiency replacement device is characterized by: The channel frame steel structure (51) comprises side frames (511) and cross bars (512) on both sides, the front and rear sides of the side frames (511) on both sides are connected as a whole by a plurality of cross bars (512), a channel for people to climb up and down is formed between the left and right side frames (511) and the front and rear cross bars (512), and the channel for people to climb up and down is connected to the working platform (53).

3. A large-scale flat gate air-stopping high-efficiency replacement device according to claim 1 or 2, characterized in that: At least two connecting rods (57) are fixedly connected to the top of the side water stop replacement platform (5) on the side close to the flat gate (1).

4. A large-scale flat-plate gate inflation and water-stopping high-efficiency replacement device according to claim 1 or 2, characterized in that: Two handrails (56) are fixedly connected to the left and right sides of the top of the channel frame steel structure (51).

5. According to claim 1, a large-scale flat gate inflation water-stopping high-efficiency replacement device is characterized by: The working frame steel structure (52) is provided with two hinge shafts (55) on the side close to the pressure-charging side water stop (3) and above the working platform (53). One end of the extension platform (54) is hinged on the two hinge shafts (55), so that the extension platform (54) can be folded onto the working platform (53) or flipped over to extend the working platform (53).

6. A large-scale flat-plate gate inflation and water-stopping high-efficiency replacement device according to claim 1, characterized in that: The bottom water-stop replacement platform (6) comprises a top steel structure frame (61) and a lower steel structure basket (62), wherein the lower steel structure basket (62) is fixedly connected to the lower side of the top steel structure frame (61), and the length of the lower steel structure basket (62) is smaller than the length of the top steel structure frame (61), so that protruding ears (63) are formed at both ends of the top steel structure frame (61).

7. A large-scale flat-plate gate air-stopping high-efficiency replacement device according to claim 6, characterized in that: A hot vulcanizer bearing base (64) is provided in the middle of the lower steel structure basket (62).

8. According to claim 6, a large-scale flat gate air-filled water-stopping high-efficiency replacement device is characterized by: The top steel structure frame (61) is provided with a placement platform (65) on one side close to the flat gate (1).

Citation Information

Patent Citations

  • Pressurizing water-stop efficient dismounting device and method for large-scale plane gate of vertical ship lift

    CN112030926A