Operating platform

By designing an operating platform for detachable connectors and slides, the continuity and efficiency of the photovoltaic flexible bracket when operating in the middle pile and the connecting beam is solved, and continuous operation between the middle pile and the connecting beam is achieved, improving the Construction efficiency.

CN222314539UActive Publication Date: 2025-01-07HEFEI SUNGROW RENEWABLE ENERGY SCI & TECH CO LTD
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202420873511.3
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-04-24
Publication Date
2025-01-07
Estimated Expiration
2034-04-24

AI Technical Summary

Technical Problem

The existing photovoltaic flexible bracket operating platform needs to be frequently removed and installed when working at the middle piles and connecting beams, and mechanical coordination is difficult during water surface construction, which reduces the continuity and efficiency of the operation.

Method used

An operating platform is designed, including a load-bearing assembly, a suspension assembly and a spare assembly. Through removable connectors and slides, the flexible coordination between the suspension assembly and cable steel strand can be achieved, which can be between the middle pile and the connecting beam. Continuous operation is carried out without mechanical assistance, ensuring the stability and efficiency of the operating platform.

Benefits of technology

Long-distance continuous operation between the middle pile and the connecting beam is achieved, which reduces working time, improves construction efficiency, avoids frequent disassembly and assembly operations, and enhances the continuity of the operation.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222314539U_ABST
    Figure CN222314539U_ABST
Patent Text Reader

Abstract

The utility model belongs to the field of photovoltaic technology, and discloses an operation platform. The operating platform comprises a bearing assembly, a suspension assembly and a standby assembly, the bearing assembly is used for bearing an operator and comprises two bearing parts and at least two first connecting parts, the two bearing parts are oppositely arranged in a spaced mode to form an avoiding channel, and each first connecting part can be switched between a connection state and a disconnection state; the first connecting piece in the connection state is connected with the two bearing pieces and closes part of the avoiding channels, and the first connecting piece in the disconnection state disconnects the two bearing pieces in the corresponding positions and opens part of the avoiding channels; the first end of the suspension assembly is connected with the bearing part, the second end of the suspension assembly is in sliding fit with the cable steel strand, and the second end and the cable steel strand are detachably arranged; one end of the standby assembly can be connected with the bearing part, and the other end is detachably arranged with the cable steel strand. The operation platform can stride over a middle pile to carry out long-distance continuous operation, and the operation continuity is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of photovoltaics, in particular to an operating platform. Background Art

[0002] In recent years, photovoltaic flexible brackets have been increasingly widely used due to their structural characteristics of "large span, high clearance, and long column spacing". Among them, the photovoltaic flexible bracket includes two cable steel strands arranged in parallel. Due to the long distance between the cable steel strands, several middle piles are usually used to support the cable steel strands, and the two adjacent middle piles are separated by a preset distance. It can be understood that a connecting beam is provided on the top of the middle pile, and the two ends of the connecting beam support the two cable steel strands respectively. In order to improve the overall stability of the flexible bracket and reduce the deflection of the cable steel strands, it is usually necessary to set multiple support structures in the longitudinal direction of the cable steel strands, which requires the operator to perform long-distance operations along the direction of the cable steel strands.

[0003] In the prior art, there is a suspended operating platform that can move back and forth on the cable. However, when encountering operations in the middle pile and connecting beams, large machinery is inevitably required to cooperate. The suspended operating platform must be removed, and large machinery is difficult to cooperate in construction on the water surface, which reduces the continuity and construction efficiency of long-distance operations on the cable strand.

[0004] Therefore, it is urgent to design an operating platform to solve the above problems. Utility Model Content

[0005] The utility model aims to provide an operating platform which can cross the middle pile for long-distance continuous operation without frequently dismantling and installing the operating platform during the operation and without mechanical assistance to pass the middle pile, thereby improving the continuity of the operation.

[0006] To achieve this purpose, the utility model adopts the following technical solutions:

[0007] Operating platform, including:

[0008] A carrying assembly, used for carrying an operator, the carrying assembly comprising two carrying members and at least two first connecting members, the two carrying members being arranged opposite to each other and spaced apart to form an avoidance passage, each of the first connecting members being switchable between a connected state and a disconnected state, the first connecting member in the connected state connecting the two carrying members and closing a portion of the avoidance passage, and the first connecting member in the disconnected state disconnecting the connection between the two carrying members at corresponding positions and opening a portion of the avoidance passage;

[0009] A suspension assembly, wherein the first end of the suspension assembly is connected to the bearing member, the second end of the suspension assembly is slidably matched with the cable steel strand, and the second end and the cable steel strand are detachably arranged;

[0010] A spare component has one end connected to the above-mentioned bearing member and the other end detachably arranged with the above-mentioned cable steel strand.

[0011] As an optional solution, the above-mentioned suspension components are arranged at the four corners of the above-mentioned bearing component, and each of the above-mentioned suspension components is correspondingly provided with the above-mentioned spare component.

[0012] As an optional solution, the suspension assembly and the spare assembly have the same structure, and the suspension assembly includes:

[0013] A sliding member, which is slidably matched with the cable steel strand and can be detachably arranged;

[0014] An elastic member has one end connected to the sliding member and the other end connected to the bearing member.

[0015] As an optional solution, the sliding member is provided with a first connecting ring, the bearing member is provided with a second connecting ring corresponding to each of the suspension components, and the suspension components further include:

[0016] A first pull ring, one side of which can be opened or closed and is provided with the first connecting ring, and one end of the elastic member can be sleeved from the opened first pull ring to the first pull ring;

[0017] A second pull ring, one side of which can be opened or closed and is passed through the second connecting ring, and the other end of the elastic member can be sleeved from the opened second pull ring to the second pull ring.

[0018] As an optional solution, the second connecting ring includes:

[0019] A ring portion is convexly disposed on the bearing member, and the second pull ring is sleeved on the ring portion;

[0020] A straight portion connected to the ring portion and fixedly connected to the bearing member;

[0021] The bent portion is connected to one end of the straight portion away from the ring portion, and the bent portion is located at the bottom side of the bearing component.

[0022] As an optional scheme, one side of the above-mentioned first connecting member is pivotally connected to one of the above-mentioned supporting members, and the other side of the above-mentioned first connecting member and one of the other above-mentioned supporting members are provided with a first positioning hole, and the other of the two is protruding with a first positioning pin. When the above-mentioned first connecting member closes part of the above-mentioned avoidance channel, the above-mentioned first positioning pin is inserted into the above-mentioned first positioning hole, and the above-mentioned first positioning pin has a first locking hole. The first locking member is inserted into the above-mentioned first locking hole along a direction set at an angle to the axial direction of the above-mentioned first positioning pin, and abuts against the above-mentioned first connecting member to lock the above-mentioned first connecting member with the other above-mentioned supporting member.

[0023] As an optional solution, the above-mentioned bearing member includes:

[0024] A bearing portion, wherein at least two of the first connecting members are disposed between the two bearing portions of the two bearing members;

[0025] The fence is vertically arranged on the side of the bearing portion other than the first connecting member, and the fence is a frame structure.

[0026] As an optional solution, two openings are formed between the two fences of the two supporting members, and a second connecting member is provided at each of the openings. The second connecting member is configured to open or cover a corresponding part of the opening.

[0027] As an optional scheme, one end of the second connecting member is pivotally connected to one of the fences, and a second positioning pin is provided on the other end of the second connecting member and one of the other fences, and a second positioning hole is provided on the other of the two. When the second connecting member closes the opening, the second positioning pin is inserted into the second positioning hole, and the second positioning pin defines a second locking hole. The second locking member is inserted into the second locking hole along a direction that is set at an angle to the axial direction of the second positioning pin, and abuts against the second connecting member to lock the second connecting member with the other fence.

[0028] As an optional solution, the first ends of all the suspension components are at the same level so that the bearing components can maintain a horizontal state.

[0029] The beneficial effects of the utility model are:

[0030] The utility model provides an operating platform, when performing installation work between two middle piles, after completing the installation of the previous supporting structure, the operator pulls the cable steel strand, so that the second end of the suspension component can slide relative to the cable steel strand to the installation position of the next supporting structure, and at least two first connecting members can be kept in a connected state at this time; when it is necessary to cross the middle pile for continuous operation, taking three first connecting members as an example, when moving to the side close to the middle pile, a spare component is connected near the suspension component closest to the connecting crossbeam, at this time, one end of the spare component crosses the connecting crossbeam and is connected between the bearing member and the cable steel strand, the second end of the suspension component is removed from the cable steel strand, and the remaining suspension components that need to cross the connecting crossbeam all perform the same At the same time, when crossing the column, the first connector closest to the column is switched from the connected state to the disconnected state, and the corresponding part of the avoidance channel is opened to form an avoidance with the column. As the crossing of the pile proceeds, the two first connectors are in the disconnected state, and the third first connector is in the connected state. The column continues to pass through the avoidance channel of another part. When the column passes through the second first connector, the first first connector is switched back to the connected state. As the operating platform moves forward, the third first connector is opened, and the column passes through. The suspension assembly and the spare assembly perform the same operations as above. Since then, the operating platform has completed the suspension assembly crossing the connecting beam while the column passes through the avoidance channel, and the operating platform continues to move forward. In other words, through the above-mentioned settings, the operating platform can not only perform suspension operations, free from the restrictions of the ground or water surface, but also cross the middle pile and the connecting beam for long-distance continuous operations. There is no need to frequently dismantle and install the operating platform during the operation process, and there is no need to pass the middle pile through mechanical assistance, which improves the continuity of the operation, greatly shortens the operation time, and improves the operation efficiency. BRIEF DESCRIPTION OF THE DRAWINGS

[0031] Figure 1 It is a structural schematic diagram of a center pile, cable steel strands, a supporting structure and an operating platform provided in an embodiment of the utility model;

[0032] Figure 2 It is a schematic diagram of the structure of the operating platform provided by the embodiment of the utility model when it is suspended;

[0033] Figure 3 This is a schematic diagram of the structure of the operating platform provided by the embodiment of the utility model when passing through the pile Figure 1 ;

[0034] Figure 4 This is a schematic diagram of the structure of the operating platform provided by the embodiment of the utility model when passing through the pile Figure 2 ;

[0035] Figure 5 This is a schematic diagram of the structure of the operating platform provided by the embodiment of the utility model when passing through the pile Figure 3 ;

[0036] Figure 6 This is a schematic diagram of the structure of the operating platform provided by the embodiment of the utility model when passing through the pile Figure 4 ;

[0037] Figure 7 This is a schematic diagram of the structure of the operating platform after passing the pile provided by the embodiment of the utility model;

[0038] Figure 8 yes Figure 2 The enlarged view of point A in the middle;

[0039] Fig. 9 yes Figure 2 Enlarged view of point B in the middle.

[0040] In the figure:

[0041] 100. Operation platform;

[0042] 10. bearing assembly; 11. bearing member; 111. bearing part; 1111. first reinforcing frame; 1112. first covering plate; 112. fence; 113. first positioning pin; 1131. first locking hole; 114. second positioning pin; 1141. second locking hole;

[0043] 12. first connecting member; 121. second reinforcing frame; 122. second covering plate; 123. first connecting protrusion; 13. avoidance passage; 14. first hinge; 15. opening; 16. second connecting member; 161. rod; 162. second connecting protrusion; 17. second hinge; 18. first locking member; 19. second locking member;

[0044] 20. Suspension assembly; 21. First end; 22. Second end; 23. Sliding member; 231. First connecting ring; 24. Elastic member; 241. Ring; 25. First pull ring; 251. U-shaped member; 252. Bolt; 26. Second pull ring;

[0045] 30. Spare components;

[0046] 40. second connecting ring; 41. ring portion; 42. straight portion; 43. bent portion;

[0047] 200, cable strand; 300, center pile; 310, column; 320, connecting beam; 400, supporting structure. DETAILED DESCRIPTION

[0048] The present invention is further described in detail below in conjunction with the accompanying drawings and embodiments. It is to be understood that the specific embodiments described herein are only used to explain the present invention, rather than to limit the present invention. It should also be noted that, for ease of description, only the parts related to the present invention, rather than all structures, are shown in the accompanying drawings.

[0049] In the description of the present invention, unless otherwise clearly specified and limited, the terms "connected", "connected", and "fixed" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium, it can be the internal connection of two elements or the interaction relationship between two elements. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0050] In the present utility model, unless otherwise clearly specified and limited, a first feature being "above" or "below" a second feature may include that the first and second features are in direct contact, or may include that the first and second features are not in direct contact but are in contact through another feature between them. Moreover, a first feature being "above", "above" and "above" a second feature includes that the first feature is directly above and obliquely above the second feature, or simply indicates that the first feature is higher in level than the second feature. A first feature being "below", "below" and "below" a second feature includes that the first feature is directly below and obliquely below the second feature, or simply indicates that the first feature is lower in level than the second feature.

[0051] In the description of this embodiment, the terms "upper", "lower", "left", "right" and other directions or positional relationships are based on the directions or positional relationships shown in the drawings, and are only for the convenience of description and simplified operation, rather than indicating or implying that the device or element referred to must have a specific direction, be constructed and operated in a specific direction, and therefore cannot be understood as a limitation of the present invention. In addition, the terms "first" and "second" are only used to distinguish in the description and have no special meaning.

[0052] like Figure 1As shown, the photovoltaic flexible support includes two cable steel strands 200 extending in a first direction (X direction in the figure) and arranged at intervals, and a plurality of center piles 300 for supporting the cable steel strands 200. The plurality of center piles 300 are arranged at intervals, and each center pile 300 is located between two cable steel strands 200. The center pile 300 includes a column 310 arranged in a vertical direction (Z direction in the figure, the Z direction is arranged at an angle with the X direction, and the two are arranged vertically in the figure as an example), and a connecting beam 320 arranged on the top of the column 310. The connecting beam 320 extends in a preset direction (the preset direction is arranged at an angle with the X direction and the Z direction respectively), and the two ends of the connecting beam 320 are fixed to the two cable steel strands 200 respectively. In order to prevent the cable steel strands 200 from shaking violently, a support structure 400 needs to be installed between the cable steel strands 200, which is generally a triangular support, and of course, it can also be a support structure 400 in other forms. The suspended operating platform in the prior art can move back and forth on the cable to achieve the sequential installation of multiple support structures 400. However, when encountering a center pile 300 and needing to cross the center pile 300 to perform operations, it is inevitable to remove the suspended operating platform, which reduces the continuity of long-distance operations on the cable strand 200.

[0053] In order to solve the above problems, Figure 2 and Figure 3 As shown, this embodiment provides an operating platform for supporting an operator so that the operator can perform installation work at the cable strand 200. The operating platform includes a bearing assembly 10, a suspension assembly 20 and a standby assembly 30, wherein the bearing assembly 10 is used to bear the operator, and the bearing assembly 10 includes two bearing members 11 and at least two first connecting members 12, and the two bearing members 11 are arranged oppositely and at intervals to form an avoidance channel 13 ( Figure 3 ), each first connecting member 12 can be switched between a connected state and a disconnected state, the first connecting member 12 in the connected state connects the two bearing members 11 and closes part of the avoidance channel 13, and the first connecting member 12 in the disconnected state disconnects the connection between the two bearing members 11 at corresponding positions and opens part of the avoidance channel 13; the suspension component 20 suspends the bearing component 10 on the cable steel strand 200 to achieve aerial installation operations away from the ground or water surface, wherein the first end 21 of the suspension component 20 is connected to the bearing member 11, the second end 22 of the suspension component 20 is slidably matched with the cable steel strand 200, and the second end 22 is detachably arranged with the cable steel strand 200; one end of the spare component 30 can be connected to the bearing member 11, and the other end is detachably arranged with the cable steel strand 200.

[0054] When the operating platform is installed between two middle piles 300, after the installation of the previous support structure 400 is completed, the operator pulls the cable strand 200 to make the second end 22 of the suspension assembly 20 slide relative to the cable strand 200 to the installation position of the next support structure 400. At this time, at least two first connecting members 12 are kept in a connected state; when it is necessary to cross the middle pile 300 for continuous operation, three first connecting members 12 are set for exemplary description, see Figure 3-Figure 7 When the suspension assembly 20 moves to the side close to the middle pile 300, the spare assembly 30 is connected near the suspension assembly 20 closest to the connecting beam 320 in the first direction. At this time, one end of the spare assembly 30 crosses the connecting beam 320 and is connected between the bearing member 11 and the cable strand 200. The second end 22 of the suspension assembly 20 is removed from the cable strand 200. The remaining suspension assemblies 20 need to cross the connecting beam 320 to perform the same operation. At the same time, when crossing the column 310, as shown in FIG. Figure 3 As shown, the first connecting member 12 closest to the column 310 is switched from the connected state to the disconnected state, and the corresponding part of the avoidance channel 13 is opened to avoid the column 310 (at this time, the other two first connecting members 12 remain connected). As the cross-pile progresses, as shown in FIG. Figure 4 As shown, two first connecting members 12 are in a disconnected state, and the third first connecting member 12 is in a connected state, and the column 310 continues to pass through another part of the avoidance channel 13, as shown in FIG. Figure 5 As shown, when the column 310 passes through the second first connecting member 12, the first first connecting member 12 is switched back to the connected state, and as the operating platform moves, as shown in FIG. Figure 6 As shown, the third first connecting member 12 is opened, the column 310 passes through, and the suspension assembly 20 and the spare assembly 30 perform the same operation as above. Since then, the operating platform has completed the suspension assembly 20 crossing the connecting beam 320 while the column 310 passes through the avoidance channel 13. Figure 7 That is to say, the operating platform can not only perform suspended operations and escape from the restrictions of the ground or water surface, but also cross the middle pile 300 and the connecting crossbeam 320 to perform long-distance continuous operations through the above-mentioned settings. There is no need to frequently dismantle and install the operating platform during the operation, and there is no need to use mechanical assistance to pass through the middle pile 300, which improves the continuity of the operation, greatly shortens the operation time, and improves the operation efficiency.

[0055] It should be noted that, during the process of passing the pile, it is necessary to ensure that at least one first connector 12 is in a connected state, thereby ensuring the integrity of the two bearing members 11 and the safety of the suspension operation. In another embodiment, the number of first connectors 12 can also be set to two, and the two first connectors 12 are arranged at intervals, and a gap for accommodating the column 310 is formed between the two first connectors 12, ensuring that during the process of the first connector 12 switching from the connected state to the disconnected state, one first connector 12 is in a connected state. In other embodiments, the number of first connectors 12 can also be set to four, five or more, which is not limited here.

[0056] In this embodiment, see Figure 3 The load-bearing component 10 is arranged in a rectangular shape, and the suspension components 20 are arranged at the four corners of the load-bearing component 10, and each suspension component 20 is correspondingly provided with a spare component 30. When the spare component 30 needs to be activated, the two suspension components 20 on the front side of the traveling direction need to be connected to the spare component 30 at the same time. The above arrangement ensures the stability of the load-bearing component 10 when it is suspended, and can avoid the excessive frequency of use of the spare component 30. Optionally, one end of the spare component 30 is kept in a normally connected state with the load-bearing component 10, so as to facilitate the use of the spare component 30 when each suspension component 20 is close to the connecting beam 320, and avoid the loss of the spare component 30. In other embodiments, the spare component 30 can also be placed only in the load-bearing component 10. When in use, its two ends are respectively connected to the load-bearing component 10 and the cable strand 200, which is not limited here.

[0057] In other embodiments, if the shape of the support component 10 is not fixed, so that the time for each suspension component 20 to activate the spare component 30 is staggered, a spare component 30 with both ends detachable is used to cooperate with multiple suspension components 20 in sequence, and multiple suspension components 20 can also cross the connecting beam 320 in sequence, which is not limited here.

[0058] Optionally, the suspension assembly 20 and the spare assembly 30 have the same structure, that is, the suspension assembly 20 and the spare assembly 30 can be used interchangeably, which increases the versatility of parts in the operating platform. That is, after the second end 22 of the suspension assembly 20 is removed, it can also be used as a spare assembly 30.

[0059] Combine the following Figure 8 The structure of the suspension assembly 20 is described below, and the structure of the backup assembly 30 is not described in detail. Figure 8 As shown, the suspension assembly 20 includes a sliding member 23 and an elastic member 24. The sliding member 23 is slidably matched with the cable strand 200 and is detachably arranged. One end of the elastic member 24 is connected to the sliding member 23, and the other end is connected to the bearing member 11. By setting the elastic member 24, Figure 3When it is necessary to cross the connecting beam 320, the suspension component 20 or the spare component 30 is stretched appropriately to ensure that the vertical position change of the bearing component 11 will not be too large, and the bearing component 11 as a whole will not be too deflected, thereby ensuring the stability of the operator in the bearing component 10.

[0060] Alternatively, if Figure 8 As shown, a first connecting ring 231 is provided on the sliding member 23, and a second connecting ring 40 is provided on the supporting member 11 corresponding to each suspension component 20. The suspension component 20 also includes a first pull ring 25 and a second pull ring 26. One side of the first pull ring 25 can be opened or closed and the first connecting ring 231 is passed through, and one end of the elastic member 24 can be sleeved from the opened first pull ring 25 to the first pull ring 25; a second connecting ring 40 is provided on the supporting member 11 corresponding to each suspension component 20, one side of the second pull ring 26 can be opened or closed and the second connecting ring 40 is passed through, and the other end of the elastic member 24 can be sleeved from the opened second pull ring 26 to the second pull ring 26. The above arrangement facilitates the installation of the elastic member 24, wherein the elastic member 24 is an elastic sling, and two loops 241 are formed at both ends of the elastic sling. The arrangement of the first pull ring 25 and the second pull ring 26 can not only realize the loop 241 being inserted into the corresponding pull ring, but also realize the first pull ring 25 being inserted into the first connecting ring 231, and the second pull ring 26 being inserted into the second connecting ring 40. The first pull ring 25 and the second pull ring 26 have the same structure, and the structure of the first pull ring 25 is used as an example for illustration, as shown in FIG. Figure 8 As shown, the first pull ring 25 includes a U-shaped member 251 and a bolt 252. The bolt 252 is threadedly connected to the two free ends of the U-shaped member 251. When the bolt 252 is loosened, the ring 241 can be inserted from the opening of the U-shaped member 251 and sleeved on the U-shaped member 251. Then, after the bolt 252 is inserted through the first connecting ring 231 and connected to the free end of the U-shaped member 251, the opening of the U-shaped member 251 is blocked.

[0061] It should be noted that the structure of the sliding member 23 is relatively common in the prior art. Its built-in pulley can reduce the friction between it and the cable steel strand 200, making sliding more labor-saving. It only needs to select any detachable structure as needed, which will not be elaborated here.

[0062] Alternatively, if Figure 2 and Fig. 9As shown, one side of the first connecting member 12 is pivotally connected to one of the supporting members 11, and the other side of the first connecting member 12 and one of the other supporting members 11 are provided with a first positioning hole, and the other of the two is protruding with a first positioning pin 113. When the first connecting member 12 closes part of the avoidance channel 13, the first positioning pin 113 is inserted into the first positioning hole, and the first positioning pin 113 is provided with a first locking hole 1131. The first locking member 18 is inserted into the first locking hole 1131 along a direction set at an angle to the axial direction of the first positioning pin 113, and abuts against the first connecting member 12 to lock the first connecting member 12 with the other supporting member 11. Through the above arrangement, when the first connecting member 12 needs to be switched from the connected state to the disconnected state, the first locking member 18 is pulled out from the first locking hole 1131, and then the first connecting member 12 is rotated so that the first positioning pin 113 and the first positioning hole are disengaged. When the first connecting member 12 needs to be switched back to the connected state, the first connecting member 12 is rotated back so that the first positioning hole is sleeved outside the first positioning pin 113, and the first locking member 18 is inserted. The first locking member 18 presses the first connecting member 12 against another supporting member 11.

[0063] Specifically, the pivot connection between the first connecting member 12 and the supporting member 11 is achieved through the first hinge 14 .

[0064] In other embodiments, the first connecting member 12 may also be detachably connected to the two supporting members 11, which can also achieve both the connection of the two supporting members 11 and the closing or opening of part of the avoidance channel 13, which is not limited here.

[0065] Optionally, the first connecting member 12 includes a second reinforcing frame 121, a second covering plate 122 and a first connecting protrusion 123. The second reinforcing frame 121 is arranged in a rectangular shape, and the frame structure can increase the strength of the first connecting member 12. The second covering plate 122 is fitted on one side of the second reinforcing frame 121 to ensure the overall flatness of the first connecting member 12 and to ensure that the area stepped on by the operator is not empty. The first connecting protrusion 123 is plate-shaped and protrudes on the side of the second reinforcing frame 121 away from the first hinge 14. The first positioning hole is opened on the first connecting protrusion 123. The plate-shaped arrangement of the first connecting protrusion 123 can ensure that during the rotation process, the first positioning hole can be sleeved outside the first positioning pin 113 when the aperture diameter of the first positioning hole is almost the same as that of the first positioning pin 113, thereby ensuring that the first connecting member 12 has a small movement amplitude after being connected.

[0066] Optionally, the first locking member 18 is an insert that is trapezoidally shaped. After being inserted by the operator, it can be well stuck in the first locking hole 1131. When the first locking member 18 needs to be removed, a tool can be used to knock the small end of the insert.

[0067] Alternatively, if Figure 2 and Fig. 9 As shown, the carrier 11 includes a carrier portion 111 and a fence 112. At least two first connecting members 12 are arranged between the two carrier portions 111 of the two carriers 11. The side of the carrier portion 111 other than the first connecting member 12 is vertically provided with a fence 112, and the fence 112 is a frame structure. Through the above arrangement, the carrier 11 has a certain height, and the fence 112 can be used as a handrail when the operator stands on the carrier 11, ensuring the safety of the operator.

[0068] Alternatively, if Fig. 9 As shown, the bearing part 111 also includes a first reinforcement frame 1111 and a first cover plate 1112. The first reinforcement frame 1111 is a frame structure. The fence 112 is connected to the first reinforcement frame 1111. The frame structure can increase the strength of the bearing part 11. The first cover plate 1112 is overlapped with the first reinforcement frame 1111. Each corresponding beam of the first cover plate 1112 and the first reinforcement frame 1111 is fixed by a locking member to ensure the overall flatness of the bearing part 111 and to ensure that the part stepped on by the operator is not empty. Specifically, the locking member is a screw. In addition, the second reinforcement frame 121 and the second cover plate 122 can also be fixed by screws.

[0069] It should be noted that during the manufacturing process of the bearing member 11 , since both the first reinforcement frame 1111 and the fence 112 are frame structures, the two are first welded into one body, and then the first cover plate 1112 is installed on the first reinforcement frame 1111 .

[0070] Optionally, two openings 15 are formed between the two fences 112 of the two bearing members 11, and the bearing assembly 10 further includes a second connecting member 16, each of the openings 15 is provided with a second connecting member 16, and the second connecting member 16 is configured to open or cover a corresponding part of the opening 15. The above arrangement ensures that the center pile 300 can smoothly pass through the opening 15 when the second connecting member 16 is opened.

[0071] Alternatively, if Figure 2 and Fig. 9As shown, one end of the second connecting member 16 is pivotally connected to one of the fences 112, and a second positioning pin 114 is set on the other end of the second connecting member 16 and one of the other fences 112, and a second positioning hole is set on the other of the two. When the second connecting member 16 closes the opening 15, the second positioning pin 114 is inserted into the second positioning hole, and the second positioning pin 114 opens a second locking hole 1141. The second locking member 19 is inserted into the second locking hole 1141 along a direction set at an angle to the axial direction of the second positioning pin 114, and abuts against the second connecting member 16 to lock the second connecting member 16 with the other fence 112. Through the above arrangement, when it is necessary to open the opening 15, the second locking member 19 is pulled out from the second locking hole 1141, and then the second connecting member 16 is rotated so that the second positioning pin 114 and the second positioning hole are disengaged. When it is necessary to block the opening 15, the second connecting member 16 is turned back so that the second positioning hole is sleeved outside the second positioning pin 114, and the second locking member 19 is inserted. The second locking member 19 presses the second connecting member 16 against another fence 112.

[0072] The second connecting member 16 and one of the fences 112 are pivotally connected via a second hinge 17. The second connecting member 16 includes a rod 161 and a second connecting protrusion 162, the rod 161 and one of the fences 111 are pivotally connected, the second connecting protrusion 162 is connected to the other end of the rod 161, the second connecting protrusion 162 is plate-shaped, and the second positioning hole is provided on the second connecting protrusion 162. The plate-shaped arrangement of the second connecting protrusion 162 can ensure that during the rotation process, the second positioning hole can be sleeved outside the second positioning pin 114 when the aperture is not much different from the second positioning pin 114, thereby ensuring that after the second connecting member 16 is connected, the movement amplitude is small.

[0073] In other embodiments, both ends of the second connecting member 16 may be detachably connected to the two fences 112 respectively, which is not limited here.

[0074] Optionally, in this embodiment, in the vertical direction, each opening 15 is provided with two second connecting members 16, ensuring that the opening 15 is more shielded and the connection stability therein is more balanced in the vertical direction. In other embodiments, three, four or more second connecting members 16 may be provided, which is not limited here.

[0075] Alternatively, if Fig. 9As shown, the second connecting ring 40 is connected to the first reinforcing frame 1111 and the fence 112. Specifically, the second connecting ring 40 includes a ring portion 41, a straight portion 42 and a bent portion 43. The ring portion 41 is convexly arranged on the carrier 11, and the second pull ring 26 is sleeved on the ring portion 41; the straight portion 42 is connected to the ring portion 41 and fixedly connected to the carrier 11; the bent portion 43 is connected to the end of the straight portion 42 away from the ring portion 41, and the bent portion 43 is located on the bottom side of the carrier 11. This arrangement improves the structural strength of the ring portion 41, and the bent portion 43 can play a certain supporting role, reducing the force at the connection position between the straight portion 42 and the carrier 44. Optionally, the straight portion 42 and the carrier 11 are connected by welding, and the bent portion 43 and the carrier 11 can be welded, or can be simply supported on the bottom side of the carrier 11, which is not limited here.

[0076] Optionally, the straight portion 42 is connected to the fence 112 and the bearing portion 111, which can increase the connection position of the second connecting ring 40 and the bearing member 11 and increase the connection stability of the second connecting ring 40. Optionally, the straight portion 42 is connected to the corresponding position of the bearing member 11 by welding, bolt connection or by a fastener, which is not limited here.

[0077] During the laying of the cable steel strands 200, in order to ensure that the angle of the photovoltaic module has a certain inclination, the adjacent cable steel strands 200 have a height difference, resulting in poor levelness of the operating platform suspended on the two cable steel strands 200. In order to solve the above problem, in this embodiment, the first ends 21 of all suspension components 20 are at the same level so that the bearing component 10 remains horizontal. Optionally, the length of the suspension component 20 connected to one of the bearings 11 is different from that of the suspension component 20 connected to the other bearing 11. In other words, see Figure 2 The lengths of the two suspension assemblies 20 corresponding to the lower cable strands 200 are set shorter so that the entire load-bearing assembly 10 is close to being horizontal, thereby improving the stability of the operator in the operating platform.

[0078] Obviously, the above embodiments of the present invention are merely examples for the purpose of clearly illustrating the present invention, and are not intended to limit the implementation methods of the present invention. For those skilled in the art, various obvious changes, readjustments and substitutions can be made without departing from the scope of protection of the present invention. It is not necessary and impossible to list all implementation methods here. Any modifications, equivalent substitutions and improvements made within the spirit and principles of the present invention shall be included in the scope of protection of the claims of the present invention.

Claims

1. Operating platform, characterized in that: include: A carrying assembly (10) for carrying an operator, the carrying assembly (10) comprising two carrying members (11) and at least two first connecting members (12), the two carrying members (11) being arranged opposite to each other and spaced apart to form an avoidance channel (13), each of the first connecting members (12) being switchable between a connected state and a disconnected state, the first connecting member (12) in the connected state connecting the two carrying members (11) and closing a portion of the avoidance channel (13), and the first connecting member (12) in the disconnected state disconnecting the connection between the two carrying members (11) at corresponding positions and opening a portion of the avoidance channel (13); A suspension component (20), wherein a first end (21) of the suspension component (20) is connected to the bearing member (11), a second end (22) of the suspension component (20) is slidably matched with the cable steel strand (200), and the second end (22) and the cable steel strand (200) are detachably arranged; A spare component (30) has one end connected to the bearing member (11) and the other end detachably connected to the cable steel strand (200).

2. The operating platform according to claim 1, characterized in that: The suspension components (20) are arranged at the four corners of the bearing component (10), and each of the suspension components (20) is correspondingly provided with the spare component (30).

3. The operating platform according to claim 1, characterized in that: The suspension assembly (20) and the backup assembly (30) have the same structure. The suspension assembly (20) comprises: A sliding member (23) is slidably matched with the cable steel strand (200) and is detachably arranged; An elastic member (24) has one end connected to the sliding member (23) and the other end connected to the bearing member (11).

4. The operating platform according to claim 3, characterized in that: The sliding member (23) is provided with a first connecting ring (231), and the bearing member (11) is provided with a second connecting ring (40) corresponding to each of the suspension components (20), and the suspension components (20) further include: A first pull ring (25), one side of which can be opened or closed and is provided with the first connecting ring (231), and one end of the elastic member (24) can be sleeved from the opened first pull ring (25) to the first pull ring (25); A second pull ring (26), one side of which can be opened or closed and is provided with the second connecting ring (40), and the other end of the elastic member (24) can be sleeved from the opened second pull ring (26) to the second pull ring (26).

5. The operating platform according to claim 4, characterized in that: The second connecting ring (40) comprises: A ring portion (41) is protrudingly disposed on the carrier (11), and the second pull ring (26) is sleeved on the ring portion (41); A straight portion (42) connected to the ring portion (41) and fixedly connected to the bearing member (11); The bent portion (43) is connected to an end of the straight portion (42) that is away from the ring portion (41), and the bent portion (43) is located on the bottom side of the supporting member (11).

6. The operating platform according to any one of claims 1 to 5, characterized in that: One side of the first connecting member (12) is pivotally connected to one of the supporting members (11); the other side of the first connecting member (12) and one of the other supporting members (11) are provided with a first positioning hole; the other of the two is provided with a first positioning pin (113); when the first connecting member (12) closes part of the avoidance channel (13), the first positioning pin (113) is inserted into the first positioning hole; the first positioning pin (113) is provided with a first locking hole (1131); the first locking member (18) is inserted into the first locking hole (1131) along a direction which is set at an angle to the axial direction of the first positioning pin (113) and abuts against the first connecting member (12) so that the first connecting member (12) is locked with the other supporting member (11).

7. The operating platform according to any one of claims 1 to 5, characterized in that: The carrier (11) comprises: A bearing portion (111), wherein at least two of the first connecting members (12) are arranged between the two bearing portions (111) of the two bearing members (11); A fence (112), wherein the side of the bearing portion (111) other than the first connecting member (12) is vertically provided with the fence (112), and the fence (112) is a frame structure.

8. The operating platform according to claim 7, characterized in that: Two openings (15) are formed between the two fences (112) of the two carriers (11), and a second connecting member (16) is provided at each of the openings (15). The second connecting member (16) is configured to open or cover a corresponding part of the opening (15).

9. The operating platform according to claim 8, characterized in that: One end of the second connecting member (16) is pivotally connected to one of the fences (112); a second positioning pin (114) is provided on the other end of the second connecting member (16) and one of the other fences (112); a second positioning hole is provided on the other end of the second connecting member (16); when the second connecting member (16) closes the opening (15), the second positioning pin (114) is inserted into the second positioning hole; the second positioning pin (114) defines a second locking hole (1141); a second locking member (19) is inserted into the second locking hole (1141) along a direction that is set at an angle to the axial direction of the second positioning pin (114) and abuts against the second connecting member (16) so that the second connecting member (16) is locked with the other fence (112).

10. The operating platform according to any one of claims 1 to 5, characterized in that: The first ends (21) of all the suspension components (20) are at the same level so that the bearing component (10) remains in a horizontal state.