Rapid guiding and hole aligning device for relieving shaking of tower drum
By using the guidance device of the winch and wire rope during the installation of the wind power tower, the problems of low construction efficiency and large shaking during the installation of the tower are solved, and the tower is quickly and safely connected and installed, reducing construction risks.
Patent Information
- Application Number
- CN202420413549.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-04
- Publication Date
- 2025-01-10
- Estimated Expiration
- 2034-03-04
AI Technical Summary
During the installation of wind power towers, there are problems such as low construction efficiency, high crane driver operation requirements, and extended docking time of tower bolt holes and increased risks under gust conditions.
A quick hole-rejuvenation device is designed to reduce the shaking of the tower. The upper and lower towers are fixed by fasteners and wire ropes. The crane lifts the upper and lower towers. The hoist rotates and recycles the steel wire ropes to guide the lower tower, which reduces shaking and improves Alignment efficiency.
It improves the tower installation efficiency, reduces construction risks, reduces tower shaking under gust conditions, simplifies the cooperation requirements of signal workers and crane drivers, and ensures the safety and accuracy of construction.
Smart Images

Figure CN222331421U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the field of wind power tower construction, in particular to a device for reducing tower shaking and guiding rapid hole alignment. Background Art
[0002] The statements in this section merely provide background technical information related to the present invention and do not necessarily constitute prior art.
[0003] Wind turbine installation is the most risky construction content in wind farm construction. Wind turbines include multiple tower sections. The installation of two adjacent tower sections needs to be aligned and bolted. At present, when installing the tower, the signalman needs to use a walkie-talkie to command the crane driver, and the two people need to cooperate to achieve alignment. At the same time, when the crane is lifting the tower, the tower needs to be rotated manually to ensure that the bolt holes of the two tower sections can be smoothly connected. The inventor found that the following problems exist in the current tower installation process:
[0004] 1) The signalman and the crane driver cooperated to install the tower, which resulted in low construction efficiency;
[0005] 2) During the hoisting process, there are high requirements for the coordination ability of the signalman and the crane driver, and the operation level of the crane driver;
[0006] 3) If there are gusts of wind during the hoisting process, the time required to connect the tower bolt holes will be extended, and the hoisting risk will increase. Any carelessness will cause damage to the crane, equipment, and even casualties. Utility Model Content
[0007] In view of the deficiencies in the prior art, the purpose of the utility model is to provide a device for reducing tower sway and guiding quick hole alignment, which can effectively guide the tower during the installation of tower sections, reduce the sway of the tower in the air, and improve the installation efficiency of the tower.
[0008] In order to achieve the above purpose, the utility model is implemented through the following technical solutions:
[0009] A device for reducing tower shaking and guiding quick hole alignment comprises a winch, which is fixed to a wind turbine foundation platform and located in the bottom section of the tower. A steel wire rope is wound around the winch, one end of the steel wire rope can sequentially pass through a first opening at the top of the first section of the tower and a second opening at the bottom of the second section of the tower and then be fixed by a first fastener, and the other end of the steel wire rope can sequentially pass through a third opening at the top of the second section of the tower and a fourth opening at the bottom of the second section of the tower and then be fixed by a second fastener.
[0010] In the hole-aligning device as described above, the wire rope is wound around the winch, and both ends of the wire rope pass through the upper and lower adjacent tower sections and are fixed by the first fastener or the second fastener. The crane hangs the upper tower section, and the winch rotates to recycle the wire rope, which effectively guides the second tower section and can reduce the shaking of the second tower section in the air. At the same time, the corresponding openings of the upper and lower tower sections can be aligned, thereby improving the installation efficiency of the tower.
[0011] As described above, a device for reducing tower shaking and guiding quick hole alignment, the two ends of the wire rope are connected after passing through the second opening and the fourth opening at the bottom of the second section of the tower respectively, and are connected as a whole through the first fastener or the second fastener, so that the two ends of the wire rope are connected as a whole at the bottom of the second section of the tower.
[0012] In the above-mentioned device for reducing tower sway and guiding quick hole alignment, the first fastener and the second fastener have the same or different structures;
[0013] The first fastener and the second fastener are detachably fixed to the ends of the steel wire rope, so that after the second section of the tower is hoisted into place, the first fastener and the second fastener can be removed, and the steel wire rope can be released from the corresponding opening, making it easy for the bolts to pass through the corresponding openings to achieve a complete connection between the two adjacent sections of the tower.
[0014] In the above-mentioned device for reducing tower sway and guiding quick hole alignment, the first fastener and the second fastener are respectively wire rope buckles;
[0015] There are a plurality of the first fasteners and the second fasteners respectively, and the provision of the plurality of first fasteners and the second fasteners ensures that the end of the wire rope is stably fixed.
[0016] As described above, in a device for reducing tower shaking and guiding quick hole alignment, the two ends of the wire rope are folded in half and passed through the first fastener or the second fastener, and the outer diameter of the first fastener and the second fastener is larger than the inner diameter of the first opening or the second opening or the third opening or the fourth opening, so as to prevent the first fastener or the second fastener from falling out of the corresponding opening.
[0017] As described above, a device for reducing tower shaking and guiding quick hole alignment has a hook on the inner wall of the second tower section, and the folded end of the wire rope can be hung on the hook, which can further ensure that the end of the wire rope is stably fixed, which is beneficial to the quick and accurate lifting of the upper tower section.
[0018] The device for reducing tower sway and guiding quick hole alignment as described above, wherein the hook is detachably installed in the second section of the tower;
[0019] The hook portion of the hook is arranged upward, which is conducive to the stable fixation of the end of the wire rope.
[0020] As described above, the device for reducing tower shaking and guiding quick hole alignment has the winch which can be detachably installed on the wind turbine foundation platform. After the tower is installed, the staff can enter the tower to dismantle the winch.
[0021] As described above, in a device for reducing tower shaking and guiding quick hole alignment, the winch is provided with at least two hooks. With the assistance of staff, the crane is connected to the winch through the hooks, and the crane can lift the winch out of the tower.
[0022] The device for reducing tower sway and guiding rapid hole alignment as described above, wherein the hoist is connected to a controller;
[0023] The controller has a control button, and the controller is located on the outside of the bottom section of the tower, so that the staff can control the winch on the outside of the tower; or, the controller is wirelessly connected to the remote control, and the controller is located on the winch housing. The staff can control the movement of the winch through the remote control according to the connection status of the two adjacent tower sections.
[0024] The beneficial effects of the above utility model are as follows:
[0025] 1) The steel wire rope of the utility model is wound around the winch, and both ends of the steel wire rope pass through the upper and lower adjacent tower sections and are fixed by the first fastener or the second fastener. The crane hoists the upper tower section, and the winch rotates to recycle the steel wire rope, which effectively guides the second tower section, can reduce the shaking of the tower in the air, improve the efficiency of the wind turbine tower installation, and reduce the duration of the risk of wind turbine tower hoisting.
[0026] 2) Through the setting of the entire device, the utility model does not have high requirements on the coordination ability of the signalman and the crane driver, and the operating level of the crane driver. It only needs to be able to lift. Moreover, even if strong gusts of wind are encountered during the lifting process, the connection of the wire rope can effectively avoid the large shaking of the second section of the tower, which is beneficial to the safe and smooth construction of the tower and reduces construction risks.
[0027] 3) In the utility model, the end of the wire rope can be detachably fixed by the wire rope buckle to prevent the end of the wire rope from falling out of the second opening or the fourth opening; a hook is arranged in the second section of the tower, that is, the upper section of the tower, so that the end of the wire rope after being folded in half can be hung on the hook to ensure that the end of the wire rope is stably fixed to prevent it from falling out, which is conducive to the rapid and accurate lifting of the upper section of the tower.
[0028] 4) The winch in the utility model can be installed detachably, so it can be removed after the tower is installed, and can be recycled after removal; the winch is provided with a hook to facilitate the connection with the crane, so as to lift the winch at the bottom of the tower. BRIEF DESCRIPTION OF THE DRAWINGS
[0029] The drawings in the specification, which constitute a part of the present invention, are used to provide a further understanding of the present invention. The illustrative embodiments of the present invention and their descriptions are used to explain the present invention and do not constitute an improper limitation on the present invention.
[0030] Figure 1 It is a front view of a device for reducing tower sway and guiding rapid hole alignment according to one or more embodiments of the utility model.
[0031] Figure 2 It is a top view of the lower flange of the second section of the tower in a device for reducing tower shaking and guiding quick hole alignment according to one or more embodiments of the utility model.
[0032] In the figure: the distances or sizes between parts are exaggerated to show the positions of various parts, and the schematic diagram is for reference only.
[0033] Among them: 1. Wind turbine foundation platform, 2. Winch, 3. First section of tower, 4. Wire rope, 5. Second section of tower, 6. Lower flange, 7. Bolt holes. DETAILED DESCRIPTION
[0034] It should be noted that the following detailed descriptions are all illustrative and are intended to provide further explanation of the present invention. Unless otherwise specified, all technical and scientific terms used in the present invention have the same meanings as those commonly understood by those skilled in the art to which the present invention belongs.
[0035] It should be noted that the terms used herein are only for describing specific embodiments and are not intended to limit the exemplary embodiments according to the present invention. As used herein, unless otherwise explicitly stated in the present invention, the singular form is also intended to include the plural form. In addition, it should be understood that when the terms "include" and / or "include" are used in this specification, it indicates the presence of features, steps, operations, devices, components and / or their combinations;
[0036] As introduced in the background technology, in the prior art, there is a problem that the wind turbine tower shakes greatly during the hoisting process. In order to solve the above technical problem, the utility model proposes a device for reducing the shaking of the tower and guiding quick hole alignment.
[0037] Embodiment 1
[0038] In a typical implementation of the present invention, reference is made to Figure 1As shown, a device for reducing tower shaking and guiding quick hole alignment includes a winch 2, which is fixed to a wind turbine foundation platform 1, and is located in the bottom section of the tower. A wire rope 4 is wound around the winch 2, and one end of the wire rope 4 can pass through a first opening at the top of a first section of the tower 3 and a second opening at the bottom of a second section of the tower 5 in sequence, and then be fixed by a first fastener. The other end of the wire rope 4 can pass through a third opening at the top of the second section of the tower 5 and a fourth opening at the bottom of the second section of the tower 5 in sequence, and then be fixed by a second fastener.
[0039] It needs to be explained that the first section of the tower 3 is located at the bottom of the second section of the tower 5, and the first section of the tower 3 and the second section of the tower 5 are arranged in sequence from bottom to top; it needs to be explained here that the first section of the tower 3 can be the bottom section of the tower, or it can be other non-top section of the tower, and the second section of the tower is above and adjacent to the first section of the tower. After the installation of a section of the tower above the bottom section of the tower is completed, the wire rope can be passed through the top opening of this section of the tower and the opening at the bottom of the upper tower layer and fixed, and then the upper tower layer can be installed, and the installation is completed until the installation of the top section of the tower is completed.
[0040] Among them, the first opening and the third opening are two of the multiple bolt holes on the flange of the first section of the tower, and the first opening and the third opening are located in the same plane; the second opening and the fourth opening are two of the multiple bolt holes on the flange 6 of the second section of the tower, and the second opening and the fourth opening are located in the same plane; the second opening and the first opening are the upper and lower bolt holes corresponding to each other after the tower is aligned, and the fourth opening and the third opening are the upper and lower bolt holes corresponding to each other after the upper and lower sections of the tower are aligned.
[0041] In this embodiment, reference Figure 2 As shown, the two ends of the steel wire rope 4 are connected as a whole through one or more first fasteners or second fasteners after passing through the second opening and the fourth opening of the lower flange 6 of the second section tower 5 respectively;
[0042] The first fastener or the second fastener is detachably connected to the two ends of the wire rope. The first fastener or the second fastener is specifically a wire rope buckle. The two ends of the wire rope are respectively passed through the wire rope buckle and locked by the bolts and nuts corresponding to the wire rope buckle. After the bolts are installed at the bolt holes 7 at the non-wire rope positions at the flanges of the two sections of the tower, the wire rope buckle and the wire rope are removed, and the bolts at the first opening and the second opening are installed.
[0043] In addition, the winch 2 can be detachably installed on the wind turbine foundation platform 1. Specifically, the bottom of the winch 2 is installed on the wind turbine foundation platform 1 by a plurality of bolts. After the tower is installed, the staff can enter the tower to dismantle the winch.
[0044] In order to facilitate the removal of the winch from the tower after dismantling, the winch 2 is provided with at least two hooks, and multiple hooks are arranged around the winch 2. With the assistance of the staff, the crane is connected to the winch through the hooks, and the crane can lift the winch out of the tower.
[0045] In this embodiment, the winch 2 is connected to the controller, which is a PLC controller or other types of controllers; the controller has a control button, and the controller is located on the outside of the bottom section of the tower, and the bottom section of the tower is provided with an opening, and the winch wire passes through the opening and is connected to the controller, and the controller may not be fixed to the bottom end of the tower, so that the staff can control the winch on the outside of the tower;
[0046] Alternatively, the controller is connected to the remote control through existing radio signals. The controller is located at the winch housing. The staff controls the movement of the winch through the remote control at the top of the second tower section 5 according to the connection status of the two adjacent tower sections.
[0047] The hole-aligning device provided in this embodiment has a steel wire rope 4 wound around the winch 2. Both ends of the steel wire rope pass through corresponding bolt holes at flanges of upper and lower adjacent tower sections and are connected as a whole through a first fastener or a second fastener, which greatly facilitates the stability of the second tower section during the hoisting process. The crane hoists the second tower section, and controls the winch 2 to rotate and recycle the steel wire rope 4 through a controller. The steel wire rope 4 connects the upper and lower adjacent tower sections, effectively guiding the second tower section, reducing the shaking of the second tower section 5 in the air, and at the same time aligning the corresponding bolt holes of the upper and lower tower sections, thereby improving the installation efficiency of the tower.
[0048] Embodiment 2
[0049] The difference between this embodiment and the first embodiment is that the first fastener and the second fastener respectively fix the two ends of the steel wire rope 4. It is easy to understand that the structures of the first fastener and the second fastener are the same or different. The first fastener and the second fastener are detachably fixed to the ends of the steel wire rope 4. In this way, after the second section of the tower 5 is hoisted into place, bolts at other positions are installed first, and then the first fastener and the second fastener are removed, and the steel wire rope is released from the corresponding opening, which facilitates the bolts to pass through the corresponding bolt holes to achieve a stable connection between the two adjacent sections of the tower.
[0050] Specifically, the first fastener and the second fastener are respectively a wire rope buckle, and the wire rope buckle is specifically an existing wire rope buckle, and the wire rope buckle can pass through the wire rope end after being looped, and is locked by the bolt and nut of the wire rope buckle, and after the second section of the tower is hoisted in place, the nut can be loosened relative to the bolt, so that the first fastener and the second fastener are loosened;
[0051] There are multiple first fasteners and second fasteners respectively, the spacing between two adjacent first fasteners at one end of the wire rope 4 is set, and the spacing between two adjacent second fasteners at the other end of the wire rope 4 is set. The setting of multiple first fasteners and second fasteners ensures that the end of the wire rope is stably fixed.
[0052] Thus, the two ends of the wire rope 4 are folded in half and passed through the wire rope buckle. The outer diameter of the wire rope buckle is larger than the inner diameter of the first opening, the second opening, the third opening or the fourth opening, so as to prevent the first fastener or the second fastener from coming out of the corresponding bolt hole.
[0053] In addition, a hook is provided on the inner wall of the second tower section 5, and the folded end of the wire rope can be hung on the hook, which can further ensure that the end of the wire rope is stably fixed, which is conducive to the rapid and accurate lifting of the upper tower section.
[0054] It should be noted that the hook can be detachably installed in the second section tower 5. Specifically, a threaded hole is arranged in the second section tower 5 near the bottom of the first section tower 3. The detachable hook is installed in the second section tower 5 through a threaded structure. In this way, after the second section tower 5 and the first section tower 3 are installed, the hook can be removed by rotation. The hook part of the hook is arranged upward, that is, the short side of the hook part is arranged above the hook body, which is conducive to the stable fixation of the end of the wire rope.
[0055] In the hole alignment device provided in this embodiment, the wire rope 4 is wound around the hoist 2, and the two ends of the wire rope 4 pass through the upper and lower adjacent tower sections and are fixed by the first fastener or the second fastener. The crane hoists the upper tower section, and the hoist 2 is controlled by the controller to rotate and recycle the wire rope 4. At the beginning, the recovery speed of the wire rope 4 should be controlled to avoid excessive force. When the second tower section 5 is hoisted to the set height and its position is basically aligned with the position of the first tower section 3, the hoist 2 is controlled to increase the traction force on the wire rope 4, so that the lower flange of the second tower section 5 is aligned with the upper flange 6 of the first tower section 3, and then the bolts (a plurality of bolt holes are arranged in one circle) at the other bolt holes 7 (the bolt holes in the upper flange of the first tower section excluding the first opening and the third opening) at the flanges of the two tower sections are installed. After the bolts at the other bolt holes 7 are installed, the first fastener and the second fastener are removed, and the bolts at the corresponding positions are installed, and the installation work of the upper tower section above the second tower section is continued according to the above steps.
[0056] The above description is only the preferred embodiment of the utility model, and is not intended to limit the utility model. For those skilled in the art, the utility model can have various modifications and changes. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the utility model shall be included in the protection scope of the utility model.
Claims
1. A device for reducing tower sway and guiding rapid hole alignment, characterized in that: It includes a winch, which is fixed to the wind turbine foundation platform. The winch is located in the bottom section of the tower. A steel wire rope is wound around the winch. One end of the steel wire rope can pass through a first opening at the top of the first section of the tower and a second opening at the bottom of the second section of the tower in sequence, and then be fixed by a first fastener. The other end of the steel wire rope can pass through a third opening at the top of the second section of the tower and a fourth opening at the bottom of the second section of the tower in sequence, and then be fixed by a second fastener.
2. The device for reducing tower sway and guiding rapid hole alignment according to claim 1 is characterized in that: The two ends of the steel wire rope are connected after passing through the second opening and the fourth opening at the bottom of the second section tower respectively, and are connected as a whole through the first fastener or the second fastener.
3. A device for reducing tower sway and guiding rapid hole alignment according to claim 1 or 2, characterized in that: The first fastener and the second fastener have the same or different structures; The first fastener and the second fastener are detachably fixed to the ends of the steel wire rope.
4. A device for reducing tower sway and guiding rapid hole alignment according to claim 1 or 2, characterized in that: The first fastener and the second fastener are respectively wire rope buckles; A plurality of the first fasteners and a plurality of the second fasteners are provided respectively.
5. The device for reducing tower sway and guiding rapid hole alignment according to claim 1 is characterized in that: The two ends of the steel wire rope are folded in half and passed through the first fastener or the second fastener. The outer diameter of the first fastener or the second fastener is larger than the inner diameter of the first opening or the second opening or the third opening or the fourth opening.
6. The device for reducing tower sway and guiding rapid hole alignment according to claim 5, characterized in that: A hook is arranged on the inner wall of the second section of the tower, and the folded end of the steel wire rope can be hung on the hook.
7. The device for reducing tower sway and guiding rapid hole alignment according to claim 6 is characterized in that: The hook is detachably installed in the second section of the tower; The hook portion of the hook is arranged upward.
8. The device for reducing tower sway and guiding rapid hole alignment according to claim 1 is characterized in that: The winch can be detachably mounted on the fan foundation platform.
9. The device for reducing tower sway and guiding rapid hole alignment according to claim 1, characterized in that: The hoist is provided with at least two hooks.
10. The device for reducing tower sway and guiding rapid hole alignment according to claim 1, characterized in that: The winch is connected to the controller; The controller has a control button, and the controller is located on the outside of the bottommost tower section; or, the controller is wirelessly connected to the remote controller, and the controller is located at the winch housing.