Bailey bridge and concrete road joint structure

By welding steel plates at the joints between Bere Bridge and concrete roads and installing concrete and rubber blocks to fill the blocks, the impact force problem at the joints is solved, and structural stability and driving stability are improved.

CN222332398UActive Publication Date: 2025-01-10SHANGHAI CONSTR NO 5 GRP CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420286076.4
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-02-06
Publication Date
2025-01-10
Estimated Expiration
2034-02-06

AI Technical Summary

Technical Problem

There are large gaps at the joint between the Bere Bridge and the concrete road, which causes heavy vehicles to produce a large impact force when passing through, affecting structural stability and stability.

Method used

The steel plate is welded at the joint between the Bere Bridge and the concrete road, and a filling block consisting of concrete blocks and rubber blocks are placed on it. The rubber blocks are located on one side of the concrete road to bear the transverse deformation. The body bears vertical load and reduces impact force.

Benefits of technology

It improves the reliability connection between the Bere Bridge and concrete roads, reduces the impact on heavy vehicle structures and cargo loaded in it, and improves driving stability and service life.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222332398U_ABST
    Figure CN222332398U_ABST
Patent Text Reader

Abstract

The utility model discloses a bailey bridge and concrete road joint structure which comprises a bailey bridge and a concrete road, and a steel plate which extends outwards and is not connected with the concrete road is welded below a bridge plate of the bailey bridge at the joint of the concrete road and the bailey bridge. A filling block body placed on the steel plate is arranged at the joint of the concrete road and the bailey bridge, the filling block body is of an integrated structure composed of a concrete block body and a rubber block body, and the rubber block body is located on one side of the concrete road. According to the utility model, the impact force on the construction gap when the heavy vehicle passes through can be reduced, the reliable connection between the bailey bridge and the concrete road is ensured, the impact force influence on the structure of the heavy vehicle and goods loaded in the heavy vehicle can be reduced, the running stability of the heavy vehicle can be improved, and the driving safety is ensured.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of construction engineering, in particular to a joint structure of a Bailey bridge and a concrete road. Background Art

[0002] When constructing concrete roads, in order to protect the rivers and pipelines in the regular gaps of the road, it is usually necessary to set up Bailey bridges above the rivers and pipelines. The Bailey bridges are usually placed on reinforced concrete beams, resulting in a large gap at the joint between the bridge deck of the Bailey bridge and the pavement of the reinforced concrete road. When heavy vehicles such as concrete vehicles pass through, the joints will cause the road surface and the bridge deck to bear a large impact force, resulting in unreliable connection, and also causing a large vibration effect on the driving of heavy vehicles, affecting the stability of the heavy vehicle's own structure and the cargo loaded inside. Utility Model Content

[0003] The purpose of the utility model is to provide a joint structure of a Bailey bridge and a concrete road, so as to solve the problem that when there is a large gap at the joint of the Bailey bridge and the concrete road, a large impact force is generated on the bridge and the road, affecting the structural stability, and the heavy vehicle passing by affects the stability of its own structure and the cargo loaded therein.

[0004] In order to solve the above technical problems, the utility model provides a joint structure of a bailey bridge and a concrete road, comprising a bailey bridge and a concrete road, wherein a steel plate extending outward and not connected to the concrete road is welded below the bridge deck of the bailey bridge at the joint between the concrete road and the bailey bridge, and a filling block placed on the steel plate is arranged at the joint between the concrete road and the bailey bridge, wherein the filling block is an integrated structure consisting of a concrete block and a rubber block, and the rubber block is located on one side of the concrete road.

[0005] Furthermore, in the joint structure of the Bailey bridge and the concrete road provided by the utility model, the rubber block is EVA rubber.

[0006] Furthermore, the utility model provides a joint structure between a Bailey bridge and a concrete road, wherein the concrete road is a cast-in-place concrete structure.

[0007] Furthermore, in the joint structure of the Bailey bridge and the concrete road provided by the utility model, the concrete block is slightly higher than the rubber block.

[0008] Furthermore, the utility model provides a joint structure between a Bailey bridge and a concrete road, wherein the Bailey bridge is arranged on a structural beam.

[0009] Furthermore, the utility model provides a joint structure between a Bailey bridge and a concrete road, wherein the structural beam is a reinforced concrete structure.

[0010] Compared with the prior art, the beneficial effects of the utility model are as follows:

[0011] The joint structure of the Bailey bridge and the concrete road provided by the embodiment of the utility model is arranged at the joint of the Bailey bridge and the concrete road, and is composed of a steel plate welded on the Bailey bridge and not connected to the concrete road, and a filling block thereon. When a heavy vehicle passes through, the vertical load is borne by the concrete block, and the lateral deformation is borne by the rubber block, which reduces the impact force on the construction gap when the heavy vehicle passes through, ensures the reliable connection between the Bailey bridge and the concrete road, reduces the impact force on the heavy vehicle's own structure and the cargo loaded therein, improves the stability of the heavy vehicle's driving, and ensures driving safety. BRIEF DESCRIPTION OF THE DRAWINGS

[0012] Figure 1 It is a schematic diagram of the elevation structure of the Bailey bridge and the concrete road;

[0013] Figure 2 yes Figure 1 A magnified view of the joint between the middle bailey bridge and the concrete road;

[0014] As shown in the figure:

[0015] 100. Concrete road, 200. Structural beam, 300. Bailey bridge, 400. Joint structure between Bailey bridge and concrete road, 410. Steel plate, 420. Filling block, 421. Concrete block, 422. Rubber block. DETAILED DESCRIPTION

[0016] The utility model is described in detail below in conjunction with the accompanying drawings: According to the following description, the advantages and features of the utility model will be more clearly understood. It should be noted that the accompanying drawings are all in a very simplified form and are not in precise proportions, and are only used to conveniently and clearly assist in explaining the purpose of the embodiments of the utility model.

[0017] Please refer to Figure 1 to Figure 2 The embodiment of the utility model provides a joint structure 400 of a bailey bridge and a concrete road, comprising a bailey bridge 300 and a concrete road 100, wherein a steel plate 410 extending outward and not connected to the concrete road 100 is welded below the bridge deck of the bailey bridge 300 at the joint between the concrete road 100 and the bailey bridge 300, and a filling block 420 placed on the steel plate 410 is arranged at the joint between the concrete road 100 and the bailey bridge 300, wherein the filling block 420 is an integrated structure consisting of a concrete block 421 and a rubber block 422, and the rubber block 403 is located on one side of the concrete road 100.

[0018] The joint structure 400 of the Bailey bridge and concrete road provided by the embodiment of the utility model is arranged at the joint of the Bailey bridge 300 and the concrete road 100, and is composed of a steel plate 410 welded on the Bailey bridge 300 and not connected to the concrete road 100, and a filling block 420 thereon. When a heavy vehicle passes by, the vertical load is borne by the concrete block 402, and the lateral deformation is borne by the rubber block 422, which reduces the impact force on the joint when the heavy vehicle passes by, ensures the reliable connection between the Bailey bridge 300 and the concrete road 100, reduces the impact force on the heavy vehicle's own structure and the cargo loaded therein, improves the stability of the heavy vehicle's driving, and ensures driving safety.

[0019] The rubber block 422 is located on one side of the concrete road 100 , and the concrete block 421 is located on one side of the Bailey bridge 300 . Since the main center of gravity of the filling block 42 is on the concrete block 421 , the positions of the rubber block 422 and the concrete block 421 are not interchangeable.

[0020] In order to improve the service life, the joint structure 400 of the Bailey bridge and concrete road provided by the embodiment of the utility model, the rubber block 422 can be EVA rubber. EVA rubber is a polymer material, which is copolymerized by ethylene (E) and vinyl acetate (VA), so that the joint has flexibility and elasticity, good weather resistance, aging resistance and corrosion resistance, and improves the service life of the joint. The thickness of the EVA rubber sheet must be calculated, and the thickness of the EVA rubber sheet that can be deformed is required to be slightly greater than the reasonable lateral deformation of the Bailey bridge.

[0021] In order to facilitate the construction of road development, the embodiment of the utility model provides a joint structure 400 of a Bailey bridge and a concrete road, wherein the concrete road 100 is a cast-in-place concrete structure.

[0022] In order to improve the structural stability of the Bailey bridge 300 and protect the rivers, pipelines, etc. below it, the embodiment of the utility model provides a Bailey bridge and concrete road joint structure 400, wherein the Bailey bridge 300 is arranged on a structural beam 200. In order to improve the supporting strength, the structural beam 200 may be a reinforced concrete structure.

[0023] In the joint structure 400 of the Bailey bridge and concrete road provided by the embodiment of the utility model, the concrete block 402 is slightly higher than the rubber block 422. The concrete block 402 is slightly higher than the rubber block 422, which can improve the structural strength of the joint and meet the bearing capacity requirements of vehicle traffic. At the same time, the rubber block 422 is not easily worn out by friction of heavy vehicles, thereby improving its service life.

[0024] The construction method of the Bailey bridge and concrete road joint structure 400 provided in the embodiment of the utility model may include the following steps:

[0025] The first step is to construct the access road according to the design requirements, including concrete road and Bailey bridge.

[0026] The second step is to measure the actual seam position, width, depth and other data.

[0027] The third step is to support the formwork of the concrete block and cover it with EVA rubber blocks to ensure that the concrete block has the appropriate width and depth to fit into the joint position, and that the EVA rubber block has sufficient width to allow the Bailey bridge to deform laterally.

[0028] The fourth step is to weld the steel plate 410 under the deck of the Bailey bridge for placing the concrete block 421 and the rubber block 422. The weld of the steel plate 410 is required to be continuous and full, and the weld strength must be calculated to be able to resist the impact of the vehicle.

[0029] The fifth step is to place the integrated structure composite plate composed of concrete blocks and rubber blocks manufactured in the third step on the steel plate 410 at the joint.

[0030] This construction method is based on the fact that Bailey bridges and concrete pavements are prone to have large joints, which affects vehicle traffic. After the bridge deck is installed, the joint structure 400 is constructed to fill the gap at the joint without destroying the freedom of the Bailey bridge. It has the advantages of simple operation, safety and reliability.

[0031] The present utility model is not limited to the above-mentioned specific implementation modes. Obviously, the above-mentioned embodiments are only some embodiments of the present utility model, but not all embodiments. All other embodiments obtained by ordinary technicians in this field based on the described embodiments of the present utility model belong to the scope of protection of the present utility model. Those skilled in the art can make other levels of modifications and changes to the present utility model. In this way, if these modifications and changes of the present utility model fall within the scope of the claims of the present utility model, the present utility model is also intended to include these changes and changes.

Claims

1. A joint structure between a Bailey bridge and a concrete road, characterized in that: The invention comprises a Bailey bridge and a concrete road, wherein a steel plate extending outward and not connected to the concrete road is welded below the bridge deck of the Bailey bridge at the joint between the concrete road and the Bailey bridge, and a filling block placed on the steel plate is arranged at the joint between the concrete road and the Bailey bridge, wherein the filling block is an integrated structure consisting of a concrete block and a rubber block, and the rubber block is located on one side of the concrete road.

2. The joint structure of Bailey bridge and concrete road according to claim 1, characterized in that: The rubber block is EVA rubber.

3. The joint structure of Bailey bridge and concrete road according to claim 1, characterized in that: The concrete road is a cast-in-place concrete structure.

4. The joint structure of Bailey bridge and concrete road according to claim 1, characterized in that: The concrete block is slightly higher than the rubber block.

5. The joint structure of Bailey bridge and concrete road according to claim 1, characterized in that: The Bailey bridge is arranged on the structural beam.

6. The joint structure of Bailey bridge and concrete road according to claim 5, characterized in that: The structural beam is a reinforced concrete structure.