Fixing structure of fire-fighting pipeline
By using a fixed structure of clamps, connecting frames and buffer pads on the fire pipes, the loosening problem caused by vibration of fire pipes in high-rise buildings is solved, and higher installation stability and firmness are achieved.
Patent Information
- Application Number
- CN202421296653.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-06
- Publication Date
- 2025-01-14
- Estimated Expiration
- 2034-06-06
AI Technical Summary
The installation of existing fire-fighting pipes in high-rise buildings is loose and shaking due to insufficient vibration, and the firmness is insufficient.
Adopt a fixed structure including the first clamping sleeve, the second clamping sleeve, the connecting frame, the fixing seat and the buffer pad. The clamping sleeve is arranged outside the fire duct through the fastener clamping sleeve and is fixed to the floor and the wall to increase the contact area. and buffering effect to improve stability.
It significantly improves the installation firmness of the fire piping, reduces vibration, and ensures the stability and firmness of the fixed structure.
Smart Images

Figure CN222351622U_ABST
Abstract
Description
Technical Field
[0001] The utility model belongs to the technical field of fire-fighting pipelines and relates to a fixing structure of a fire-fighting pipeline. Background Art
[0002] Firefighting pipes are an important part of the firefighting system and are used for firefighting purposes. These pipes are responsible for transporting firefighting water, gas or other firefighting media to various firefighting equipment and devices, such as fire hydrants, automatic sprinkler systems, gas firefighting systems, etc., so that firefighting operations can be quickly implemented when a fire occurs.
[0003] For existing high-rise buildings, the fire-fighting pipes are very long and need to pass through the floors of each floor one by one, and then be fixed to the walls of each floor through U-shaped clamps. However, since the fire-fighting pipes are on standby all day, the impact of water flow inside the fire-fighting pipes generates vibrations. The existing fire-fighting pipes fixed by U-shaped clamps are not firmly fixed, causing the fire-fighting pipes to shake, resulting in loose installation of the fire-fighting pipes. Summary of the invention
[0004] The utility model aims to solve the above problems existing in the prior art and proposes a fire-fighting pipe fixing structure, which solves the technical problem of how to make the fire-fighting pipe installation more firm.
[0005] The purpose of the utility model can be achieved through the following technical solutions: a fixing structure of a fire-fighting pipe, characterized in that it includes a first ferrule, a second ferrule, a first connecting frame, a second connecting frame, a first fixing seat and a second fixing seat, the first ferrule and the second ferrule can be fixed to the outside of the fire-fighting pipe by clamping sleeves with fasteners, the upper part of the first connecting frame is welded and fixedly connected to the first ferrule, and the lower part is fixedly connected to the first fixing seat by fasteners, the upper part of the second connecting frame is welded and fixedly connected to the second ferrule, and the lower part is fixedly connected to the second fixing seat by fasteners, and the first fixing seat and the second fixing seat are both used to be fixedly connected to the floor.
[0006] When the fire pipeline passes through the floor surface, during installation, the first fixing seat and the second fixing seat are fixedly connected to the floor surface. Then, the first clamping sleeve is sleeved outside the fire pipeline, and the lower part of the first connecting frame is fixedly connected to the first fixing seat. Subsequently, the second clamping sleeve is sleeved outside the fire pipeline, and the lower part of the second connecting frame is fixedly connected to the second fixing seat. Finally, the first clamping sleeve and the second clamping sleeve are clamped and fixedly connected, so that the first clamping sleeve and the second clamping sleeve are clamped and sleeved outside the fire pipeline, and the fire pipeline can be fixedly connected to the floor surface. The setting of the first clamping sleeve and the second clamping sleeve increases the contact area between the fixing structure and the fire pipeline, thereby improving the stability of the fire pipeline and making the installation of the fire pipeline firm; at the same time, this fixing structure connects the fire pipeline to the floor surface, which can better reduce the vibration of the fire pipeline and make the installation of the fire pipeline firm.
[0007] In the above-mentioned fixing structure of a fire pipeline, the first clamping sleeve includes a first main body in an arc shape, and both sides of the first main body are provided with first convex ears protruding outward. The second clamping sleeve includes a second main body in an arc shape, and both sides of the second main body are provided with second convex ears protruding outward. The first convex ears and the second convex ears are fixedly connected by fasteners. This structure enables the first clamping sleeve and the second clamping sleeve to be better clamped and fixedly connected outside the fire pipeline.
[0008] In the above-mentioned fixing structure of a fire pipeline, the first connecting frame includes a first horizontal plate arranged in the horizontal direction and several first vertical plates arranged in the vertical direction. All the first vertical plates are arranged at intervals, and the upper parts of all the first vertical plates are fixedly connected to the first clamping sleeve by welding, and the lower parts are fixedly connected to the first horizontal plate by welding. This structure enables the first clamping sleeve to be better fixedly connected to the first fixing seat through the first connecting frame.
[0009] In the above-mentioned fixing structure of a fire pipeline, the second connecting frame includes a second horizontal plate arranged in the horizontal direction and several second vertical plates arranged in the vertical direction. All the second vertical plates are arranged at intervals, and the upper parts of all the second vertical plates are fixedly connected to the second clamping sleeve by welding, and the lower parts are fixedly connected to the second horizontal plate by welding. This structure enables the second clamping sleeve to be better fixedly connected to the second fixing seat through the second connecting frame.
[0010] In the above-mentioned fixing structure of a fire pipeline, the cross-sections of the first fixing seat and the second fixing seat are both in a C shape or both in an I shape.
[0011] In the above-mentioned fire-fighting pipe fixing structure, the fixing structure further includes a first buffer pad and a second buffer pad, wherein the first buffer pad is located between the first connecting frame and the first fixing seat, and the second buffer pad is located between the second connecting frame and the second fixing seat. The first buffer pad and the second buffer pad play a shock-absorbing role, which can reduce the vibration of the fire-fighting pipe, and at the same time can prevent the fixing structure from falling apart, improve the stability of the fixing structure, and thus improve the firmness of the fire-fighting pipe installation.
[0012] In the above-mentioned fire-fighting pipe fixing structure, the fixing structure further includes a third buffer pad, and the third buffer pad is located between the first clamp and the fire-fighting pipe and between the second clamp and the fire-fighting pipe. The third buffer pad plays a shock-absorbing role, which can reduce the vibration of the fire-fighting pipe, thereby improving the firmness of the fire-fighting pipe installation.
[0013] In the above-mentioned fire-fighting pipe fixing structure, the fixing structure further includes a U-shaped clamp and a third fixing seat, wherein the U-shaped clamp is sleeved outside the fire-fighting pipe, and the U-shaped clamp is fixedly connected to the third fixing seat by a fastener, and the third fixing seat is used to be fixedly connected to the wall. This structure enables the fire-fighting pipe to be fixedly connected to both the floor and the wall, further improving the firmness of the fire-fighting pipe installation.
[0014] Compared with the prior art, the fire protection pipe fixing structure provided by the utility model has the following advantages:
[0015] 1. The fixing structure increases the contact area with the fire-fighting pipe by means of the first clamping sleeve and the second clamping sleeve, thereby improving the stability of the fire-fighting pipe and making the fire-fighting pipe more firmly installed.
[0016] 2. This fixed structure plays a shock-absorbing role on the fire-fighting pipe by arranging the first buffer pad, the second buffer pad and the third buffer pad, thereby reducing the vibration of the fire-fighting pipe. At the same time, it can avoid the fixed structure from falling apart, improve the stability of the fixed structure, and thus improve the firmness of the fire-fighting pipe installation. BRIEF DESCRIPTION OF THE DRAWINGS
[0017] Figure 1 This is a schematic diagram of the fire protection pipeline after installation.
[0018] Figure 2 It is a structural schematic diagram of the first clamping sleeve and the second clamping sleeve of the fire protection pipeline.
[0019] Figure 3 It is a structural schematic diagram of the U-shaped clamp and the third fixing seat of the fire protection pipe.
[0020] In the figure, 1, first ferrule; 11, first main body; 12, first lug; 2, second ferrule; 21, second main body; 22, second lug; 3, first connecting frame; 31, first horizontal plate; 32, first vertical plate; 4, second connecting frame; 41, second horizontal plate; 42, second vertical plate; 5, first fixing seat; 6, second fixing seat; 7, first buffer pad; 8, second buffer pad; 9, third buffer pad; 10, U-shaped clamp; 13, third fixing seat; 14, fire-fighting pipe; 15, floor; 16, wall. DETAILED DESCRIPTION
[0021] The following are specific embodiments of the present invention and the accompanying drawings to further describe the technical solution of the present invention, but the present invention is not limited to these embodiments.
[0022] like Figure 1 As shown, the fixing structure of the fire protection pipe 14 includes a first clamp 1, a second clamp 2, a first connecting frame 3, a second connecting frame 4, a first fixing seat 5, a second fixing seat 6, a first buffer pad 7, a second buffer pad 8, a third buffer pad 9, a U-shaped clamp 10, and a third fixing seat 13. The first buffer pad 7, the second buffer pad 8 and the third buffer pad 9 are all made of rubber material.
[0023] like Figure 2 As shown, the first ferrule 1 includes a first main body 11 in an arc shape, and both sides of the first main body 11 have a first lug 12 protruding outwardly, and the second ferrule 2 includes a second main body 21 in an arc shape, and both sides of the second main body 21 have a second lug 22 protruding outwardly, and the first lug 12 and the second lug 22 are fixedly connected by a fastener, and the fastener is a combination of a bolt and a nut. The first ferrule 1 and the second ferrule 2 are clamped and fixed outside the fire pipe 14, and the third buffer pad 9 is located between the first ferrule 1 and the fire pipe 14 and between the second ferrule 2 and the fire pipe 14.
[0024] The first connecting frame 3 includes a first transverse plate 31 arranged in the horizontal direction and two first vertical plates 32 arranged in the vertical direction. All the first vertical plates 32 are arranged at intervals. The upper parts of all the first vertical plates 32 are welded and fixedly connected to the first ferrule 1, and the lower parts are welded and fixedly connected to the first transverse plate 31. The second connecting frame 4 includes a second transverse plate 41 arranged in the horizontal direction and two second vertical plates 42 arranged in the vertical direction. All the second vertical plates 42 are arranged at intervals. The upper parts of all the second vertical plates 42 are welded and fixedly connected to the second ferrule 2, and the lower parts are welded and fixedly connected to the second transverse plate 41.
[0025] Both the first fixing base 5 and the second fixing base 6 are fixedly connected to the floor surface 15 by expansion bolts. In this embodiment, the cross-sections of the first fixing base 5 and the second fixing base 6 are both in a C shape. In actual production, the cross-sections of the first fixing base 5 and the second fixing base 6 are both in an I shape. The first buffer pad 7 is located between the first connecting frame 3 and the first fixing base 5, and the first connecting frame 3 is fixedly connected to the first fixing base 5 through fasteners, and the fasteners are a combination of bolts and nuts. The second buffer pad 8 is located between the second connecting frame 4 and the second fixing base 6, and the second connecting frame 4 is fixedly connected to the second fixing base 6 through fasteners, and the fasteners are a combination of bolts and nuts.
[0026] As Figure 3 shown, the U-shaped clamp 10 is sleeved outside the fire-fighting pipeline 14, and the U-shaped clamp 10 is fixedly connected to the third fixing base 13 through fasteners, and the third fixing base 13 is used to be fixedly connected to the wall surface 16.
[0027] During installation, fix the first fixing base 5 and the second fixing base 6 on the floor surface 15, then sleeve the first ferrule 1 outside the fire-fighting pipeline 14, and fixedly connect the lower part of the first connecting frame 3 to the first fixing base 5. Subsequently, sleeve the second ferrule 2 outside the fire-fighting pipeline 14, and fixedly connect the lower part of the second connecting frame 4 to the second fixing base 6. Finally, clamp and fixedly connect the first ferrule 1 and the second ferrule 2 so that the first ferrule 1 and the second ferrule 2 are clamped and sleeved outside the fire-fighting pipeline 14, then the fire-fighting pipeline 14 can be fixedly connected to the floor surface 15.
[0028] The specific embodiments described herein are merely illustrative of the spirit of the present utility model. Those skilled in the technical field to which the present utility model belongs can make various modifications or supplements to the described specific embodiments or use similar ways to replace them, but will not deviate from the spirit of the present utility model or exceed the scope defined by the appended claims.
[0029] Although terms such as the first ferrule 1, the first main body 11, the first lug 12, the second ferrule 2, the second main body 21, the second lug 22, the first connecting frame 3, the first horizontal plate 31, the first vertical plate 32, the second connecting frame 4, the second horizontal plate 41, the second vertical plate 42, the first fixing base 5, the second fixing base 6, the first buffer pad 7, the second buffer pad 8, the third buffer pad 9, the U-shaped clamp 10, the third fixing base 13, the fire-fighting pipeline 14, the floor surface 15, the wall surface 16 are used more in this article, the possibility of using other terms is not excluded. Using these terms is only for more convenient description and explanation of the essence of the present utility model; interpreting them as any additional limitation is contrary to the spirit of the present utility model.
Claims
1. A fire protection pipe fixing structure, characterized in that: It includes a first ferrule (1), a second ferrule (2), a first connecting frame (3), a second connecting frame (4), a first fixing seat (5) and a second fixing seat (6). The first ferrule (1) and the second ferrule (2) can be clamped and sleeved outside the fire pipeline (14) through fasteners. The upper part of the first connecting frame (3) is welded and fixedly connected to the first ferrule (1), and the lower part is fixedly connected to the first fixing seat (5) through fasteners. The upper part of the second connecting frame (4) is welded and fixedly connected to the second ferrule (2), and the lower part is fixedly connected to the second fixing seat (6) through fasteners. Both the first fixing seat (5) and the second fixing seat (6) are used for being fixedly connected to the floor surface (15).
2. A fire protection pipe fixing structure according to claim 1, characterized in that: The first ferrule (1) includes a first main body (11) in an arc shape. Both sides of the first main body (11) are provided with first lugs (12) protruding outward. The second ferrule (2) includes a second main body (21) in an arc shape. Both sides of the second main body (21) are provided with second lugs (22) protruding outward. The first lugs (12) and the second lugs (22) are fixedly connected through fasteners.
3. A fire protection pipe fixing structure according to claim 1 or 2, characterized in that: The first connecting frame (3) includes a first horizontal plate (31) arranged in the horizontal direction and a plurality of first vertical plates (32) arranged in the vertical direction. All the first vertical plates (32) are arranged at intervals. The upper parts of all the first vertical plates (32) are welded and fixedly connected to the first ferrule (1), and the lower parts are welded and fixedly connected to the first horizontal plate (31).
4. A fire protection pipe fixing structure according to claim 1 or 2, characterized in that: The second connecting frame (4) includes a second horizontal plate (41) arranged in the horizontal direction and a plurality of second vertical plates (42) arranged in the vertical direction. All the second vertical plates (42) are arranged at intervals. The upper parts of all the second vertical plates (42) are welded and fixedly connected to the second ferrule (2), and the lower parts are welded and fixedly connected to the second horizontal plate (41).
5. A fire protection pipe fixing structure according to claim 1 or 2, characterized in that: The cross-sections of both the first fixing seat (5) and the second fixing seat (6) are in a C shape or in an I shape.
6. A fire protection pipe fixing structure according to claim 1 or 2, characterized in that: The fixing structure further includes a first buffer pad (7) and a second buffer pad (8). The first buffer pad (7) is located between the first connecting frame (3) and the first fixing seat (5). The second buffer pad (8) is located between the second connecting frame (4) and the second fixing seat (6).
7. A fire protection pipe fixing structure according to claim 1 or 2, characterized in that: The fixing structure further includes a third buffer pad (9). The third buffer pad (9) is located between the first ferrule (1) and the fire pipeline (14) and between the second ferrule (2) and the fire pipeline (14).
8. A fire protection pipe fixing structure according to claim 1 or 2, characterized in that: The fixing structure further includes a U-shaped clamp (10) and a third fixing seat (13). The U-shaped clamp (10) is sleeved outside the fire pipeline (14), and the U-shaped clamp (10) is fixedly connected to the third fixing seat (13) through fasteners. The third fixing seat (13) is used for being fixedly connected to the wall surface (16).