Hydraulic creeping formwork and construction elevator connecting platform for high pier bridge construction
By designing a hydraulic climbing mold and construction elevator connection platform including rectangular frame and electrical interlocking device, the cross-conflict problem of construction elevator and hydraulic climbing mold operation platform is solved, and the safe and fast arrival and work efficiency of construction personnel are achieved. Improvement reduces construction risks.
Patent Information
- Application Number
- CN202420414988.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-05
- Publication Date
- 2025-01-17
- Estimated Expiration
- 2034-03-05
AI Technical Summary
During the construction of high piers on the bridge, there is a cross-conflict between the construction elevator cage and the operating platform equipped with hydraulic climbing mold in the plane position, resulting in the inability of construction personnel to reach the high piers on safely and quickly. The existing solutions have great safety risks and work Inefficiency problem.
Design a hydraulic climbing mold connecting platform for high pier bridge construction and construction elevator, including rectangular frame, movable door, electrical interlocking device, ladder and dense safety protection net, which is fixed with the hydraulic climbing mold frame body through the connection hole, electrical appliances The interlocking device controls the construction elevator to automatically cut off power to ensure safe and fast arrival of construction personnel.
It realizes a safe and fast connection between the construction elevator and the hydraulic climbing mold, reduces construction risks, improves work efficiency, avoids the difficulty and waste of welding steel ladders in advance, and facilitates installation and disassembly.
Smart Images

Figure CN222362372U_ABST
Abstract
Description
Technical Field
[0001] The utility model belongs to the technical field of high pier construction of bridges, and in particular relates to a hydraulic climbing formwork and a construction elevator connecting platform for high pier bridge construction. Background Art
[0002] For high bridge piers with a height of ≥40m, hydraulic climbing formwork and construction elevators are currently commonly used to ensure construction quality and safety for construction workers to go up and down the high bridge piers. However, the installation of construction elevators has strict regulations on the angle and length of attachment, and the hydraulic climbing formwork has its own operating platform, and its width setting is mainly based on the length requirement of the backward sliding track during the demoulding process. The higher the bridge pier is and the larger the cross-sectional size of the pier body is, the wider the required operating platform width is. Therefore, the above method has the following defects in the actual construction process: there is a cross-conflict between the position of the construction elevator cage and the operating platform of the hydraulic climbing formwork in the plane position, and the construction personnel cannot reach the bottom operating platform of the hydraulic climbing formwork through the construction elevator. In actual construction, the conventional way to solve this problem is to set a corresponding limit device for the construction elevator so that the top reaches a certain distance from the bottom of the hydraulic climbing formwork operating platform and stops. The construction personnel go up and down the high piers of the bridge by the simple steel ladder welded in advance on the hydraulic climbing formwork frame. However, this approach has great safety risks. The higher the pier is, the greater the risk is. In addition, the simple steel ladder needs to be welded on the hydraulic climbing formwork frame in advance, which is difficult to weld and install, has a long disassembly cycle, and has low work efficiency. It cannot be circulated after the construction is completed, resulting in waste. Summary of the invention
[0003] The utility model aims to solve the deficiencies of the prior art and provide a hydraulic climbing formwork and a construction elevator connecting platform for high pier bridge construction, thereby solving the cross-conflict between the construction elevator cage and the operating platform of the hydraulic climbing formwork in the plane position. Construction personnel can quickly and safely reach the high pier bridge for construction, thereby reducing operation risks and improving work efficiency.
[0004] The technical solution adopted by the utility model is as follows:
[0005] A hydraulic climbing formwork and a construction elevator connecting platform are used for high pier bridge construction. The connecting platform includes a platform bottom surface, a rectangular frame surrounded by a plurality of horizontal bars and a plurality of vertical bars, a movable door arranged on one side of the rectangular frame, an electrical interlocking device installed on the movable door, and a ladder arranged in the rectangular frame; the bottom edge of the rectangular frame is fixedly connected to the bottom surface of the platform, a connecting hole is provided on the top edge of the rectangular frame, and the top of the rectangular frame is connected to the hydraulic climbing formwork frame through the connecting hole and high-strength bolts, and the electrical interlocking device controls the construction elevator to automatically cut off power and stop running when the movable door is opened.
[0006] Furthermore, a dense safety net is arranged on the side of the rectangular frame.
[0007] Furthermore, skirting boards are arranged around the connection between the rectangular frame and the bottom of the platform.
[0008] Furthermore, the bottom surface of the platform is a 5mm closed patterned steel plate, and the plurality of cross bars and the plurality of vertical bars are galvanized steel pipes.
[0009] Beneficial effects of the utility model:
[0010] The utility model discloses to connect the hydraulic climbing formwork frame with the construction elevator, avoids welding the steel ladder on the hydraulic climbing formwork frame in advance, only needs to fix the connection platform, and the installation is convenient and fast; it solves the intersection conflict in the plane position between the existing construction elevator cage and the operating platform of the hydraulic climbing formwork, ensures that the construction personnel can reach the high pier bridge safely and quickly for construction, reduces the construction risk and improves the work efficiency. BRIEF DESCRIPTION OF THE DRAWINGS
[0011] Figure 1 It is a schematic diagram of the structure of the utility model;
[0012] Figure 2 for Figure 1 A-direction view;
[0013] Figure 3 It is a schematic diagram of the utility model during construction and use. DETAILED DESCRIPTION
[0014] The content of the utility model is further described below in conjunction with the accompanying drawings and embodiments of the specification.
[0015] like Figure 1 , Figure 2 As shown, a hydraulic climbing formwork for high pier bridge construction is connected to a construction elevator platform, the connecting platform includes a platform bottom surface 1, the platform bottom surface can be a 5mm closed patterned steel plate, which is lighter and is a rectangular frame surrounded by a plurality of cross bars 2 and a plurality of vertical bars 3, the plurality of cross bars and the plurality of vertical bars can be galvanized steel pipes welded into a rectangular frame, a movable door 4 is arranged on one side of the rectangular frame, an electrical interlocking device 5 is installed on the movable door, the electrical interlocking device can be purchased on the market, and a ladder 6 is arranged in the rectangular frame; the bottom side of the rectangular frame is fixedly connected to the bottom surface of the platform, and a connecting hole 7 is provided on the top side of the rectangular frame. The top of the rectangular frame is connected to the hydraulic climbing formwork frame through the connecting hole and high-strength bolts, and the electrical interlocking device controls the construction elevator to automatically cut off the power and stop running when it reaches the position of the connecting platform. After the movable door is opened, the construction personnel directly enter the connecting platform from the construction elevator.
[0016] In order to make the connection platform safer, a dense safety net 8 is set on the side of the rectangular frame, skirting boards 9 are set around the connection between the rectangular frame and the bottom of the platform, and connecting holes 7 are opened on the top edge of the rectangular frame. The top of the rectangular frame is connected to the hydraulic climbing formwork frame with high-strength bolts through the connecting holes, which is convenient for installation and disassembly and easy for turnover and use.
[0017] like Figure 3 As shown, when the utility model is used, the top of the utility model is first fixed to the hydraulic climbing formwork frame B with high-strength bolts, and the construction workers take the construction elevator C. When the movable door is opened through the electrical interlocking device, the construction elevator automatically cuts off the power and stops running. The construction workers directly enter the connecting platform from the construction elevator and construct the high pier bridge A by climbing up and down the ladder. After the construction is completed, the utility model is disassembled for turnover.
[0018] The embodiments described above are only descriptions of the preferred methods of the present invention, and are not intended to limit the scope of the present invention. Without departing from the design spirit of the present invention, various modifications and improvements made to the technical solutions of the present invention by ordinary technicians in this field should fall within the protection scope determined by the claims of the present invention.
Claims
1. A hydraulic climbing formwork and a construction elevator connection platform for high pier bridge construction, characterized in that: The connecting platform comprises a platform bottom surface (1), a rectangular enclosure surrounded by a plurality of horizontal bars (2) and a plurality of vertical bars (3), a movable door (4) arranged on a side surface of the rectangular enclosure, an electrical interlocking device (5) installed on the movable door, and a ladder (6) arranged in the rectangular enclosure; the bottom edge of the rectangular enclosure is fixedly connected to the bottom surface of the platform, a connecting hole (7) is provided on the top edge of the rectangular enclosure, the top end of the rectangular enclosure is connected to the hydraulic climbing formwork frame through the connecting hole and high-strength bolts, and the electrical interlocking device controls the construction elevator to automatically cut off power and stop running when the movable door is opened.
2. The hydraulic climbing formwork and construction elevator connection platform for high pier bridge construction according to claim 1 is characterized in that: A dense safety protection net (8) is arranged on the side of the rectangular frame.
3. The hydraulic climbing formwork and construction elevator connection platform for high pier bridge construction according to claim 1 is characterized in that: Skirting boards (9) are arranged around the connection between the rectangular frame and the bottom of the platform.
4. The hydraulic climbing formwork and construction elevator connection platform for high pier bridge construction according to claim 1 is characterized in that: The bottom surface of the platform is a 5mm closed patterned steel plate, and the plurality of horizontal bars and the plurality of vertical bars are galvanized steel pipes.