Platform for boiler and protective barrier connecting structure
Through the combination of locking components and channel steel frame design, the problems of on-site welding flue gas pollution and structural looseness are solved, the stability and safety of railings without welding are achieved, and the reliability and durability of the overall structure are improved.
Patent Information
- Application Number
- CN202421209608.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-05-29
- Publication Date
- 2025-01-17
- Estimated Expiration
- 2034-05-29
AI Technical Summary
Due to the lack of effective protective measures during welding installation, the flue gas generated by welding pollutes the environment, and the existing platform fence connection structure is prone to loosening or deforming.
The locking assembly includes a locking ring, a semi-cylindrical cross nut and a semi-circular cross bolt. The locking column and support rod are threaded, combined with the design of the channel steel frame and grid plate, and the structure is reinforced by U-bolts and internal wire nuts. Avoid welding and ensure the stability and safety of the railings.
The stability and safety of railings without welding are achieved, flue gas pollution and structure loosening or deformation are avoided, and the reliability and durability of the overall structure are improved.
Smart Images

Figure CN222363240U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of guardrails, in particular to a boiler platform and a guardrail connecting structure. Background Art
[0002] The boiler platform is a platform structure made of steel fences welded on a channel steel frame, with a fence welded on one side for safety. It is widely used on ships, boilers and other mechanical equipment, providing a stable and safe working platform. Made of steel, the steel platform has excellent corrosion resistance and durability, and can withstand the weight and pressure of mechanical equipment. At the same time, the welded fence can effectively prevent people and objects from accidentally falling off the platform, ensuring work safety. The design of the steel platform can also be customized according to specific needs to meet the use requirements of different places.
[0003] At present, most of the platform fences on the market are made of welded steel pipes (railing columns, railings, etc.), and then steel elements (thin steel pipes) are inserted in the middle or a flat iron is welded to form two railings. During on-site installation and welding, since effective protective measures cannot be taken on site, the fume generated by welding may pollute the environment; therefore, it does not meet the existing needs. In this regard, we propose a boiler platform and protective railing connection structure. Utility Model Content
[0004] The utility model provides a boiler platform and protective railing connection structure, wherein the railings on the platform do not require welding and can ensure the beneficial effects of stability and safety, thereby solving the problem mentioned in the above background technology that during on-site installation and welding, the smoke generated by welding may pollute the environment due to the inability to take effective protective measures on site.
[0005] The utility model provides the following technical solutions: a boiler platform and guardrail connection structure, comprising a boiler body, a platform, a guardrail and an escalator, wherein the platform is located at the side of the boiler body, the guardrail is installed on the outside of the platform and the outside of the escalator, the platform is composed of a channel steel frame and a grid plate, the grid plate is installed on the channel steel frame, the guardrail comprises a column, a handrail and a second rod, the handrail is installed on the upper part of the column, the second rod is arranged in the middle of the column, and a locking assembly is arranged between the handrail, the column and the second rod;
[0006] The locking assembly includes a locking ring sleeved on the outside of the handrail, and a locking hole opened in the column, the bottom end of the locking ring is inserted in the locking hole, a semi-cylindrical cross nut is inserted in the locking ring, a semi-circular head cross bolt corresponding to the semi-cylindrical cross nut is inserted in the locking hole, and the front end of the semi-cylindrical cross nut is threadedly inserted in the semi-circular head cross bolt.
[0007] As an optional solution for the boiler platform and guardrail connection structure described in the utility model, the locking ring is configured as a U-shaped flat steel ring, and the diameter of the upper end of the locking ring corresponds to the diameter of the handrail.
[0008] As an optional solution for the boiler platform and guardrail connection structure described in the utility model, the semi-circular head cross bolt is threadedly matched with the semi-cylindrical cross nut, and the two rods are configured as angle iron rods.
[0009] As an optional solution for a boiler platform and guardrail connection structure described in the utility model, wherein: the other of the two rod outer shells is provided with a first U-shaped bolt for fixing, the first U-shaped bolt is set as a U-shaped stud bolt, the first U-shaped bolt is located on one side of the column, and a long internal thread nut corresponding to the first U-shaped bolt is inserted on the other side of the column, and the long internal thread nut (520) is threadedly inserted with the end of the first U-shaped bolt.
[0010] As an optional scheme for the connection structure of a boiler platform and guardrail described in the utility model, a footboard is installed at the lower part of the side of the column, the footboard is located at the bottom of the two rods, and a second U-shaped bolt for fixing the footboard is clamped on the outside of the footboard, and a second long internal thread nut is inserted at the end of the second U-shaped bolt.
[0011] As an optional scheme for the connection structure of a boiler platform and guardrail described in the utility model, wherein: a mounting plate is fixedly installed on the grid plate, the mounting plate is configured as an M-shaped plate, fixing grooves are provided in the mounting plate and the channel steel frame, fixing bolts corresponding to the fixing grooves and nuts corresponding to the fixing bolts are inserted into the fixing grooves, and the grid plate is fixedly installed on the channel steel frame by means of the fixing bolts, the fixing grooves and the nuts.
[0012] As an optional solution for the connection structure of a boiler platform and a guardrail described in the utility model, one side of the channel steel frame is drilled with a hole, and the drill hole, the channel steel frame and the upper and lower outer sides of the column are plugged with horizontally arranged third U-shaped bolts, and the end of the third U-shaped bolt is installed with a corresponding first U-shaped bolt, and the corresponding first U-shaped bolt is located on the inner side of the channel steel frame.
[0013] As an optional solution for the boiler platform and guardrail connection structure described in the utility model, a groove corresponding to the handrail is opened on the column, and the handrail is transversely installed on the column through the groove.
[0014] The utility model has the following beneficial effects:
[0015] 1. The boiler platform and guardrail connection structure, the locking ring is fixedly inserted outside the semicircular head cross bolt, so that as the semicircular head cross nut moves, the locking ring will be gathered together, thereby locking and fixing the column and the handrail. In this way, the railing on the platform does not need to be welded to ensure stability and safety, and there will be no looseness or instability during the work process. The staff can avoid the problem of on-site installation and welding, which may cause the fume generated by welding to pollute the environment due to the inability to take effective protective measures on site.
[0016] 2. The boiler platform and guardrail connection structure, the channel steel frame is connected with a third U-bolt and a reinforcing nut through drilling holes and plugging the outside of the column. The inner diameter of the third U-bolt matches the outer diameter of the column, so that the third U-bolt is wrapped around the outer diameter of the column on three sides, which helps to maintain the integrity and stability of the structure, thereby effectively preventing the structure from deformation or loosening during use, and improving the reliability and durability of the overall structure. BRIEF DESCRIPTION OF THE DRAWINGS
[0017] Figure 1 It is a schematic diagram of the main three-dimensional structure of the utility model.
[0018] Figure 2 It is a partial side cutaway structural schematic diagram of the utility model.
[0019] Figure 3 This is a schematic diagram of other cutaway structures of the present invention.
[0020] Figure 4 It is a partial top view structural schematic diagram of the utility model.
[0021] In the figure: 100, boiler body; 200, platform; 210, channel steel frame; 211, drilling; 213, third U-bolt; 220, grid plate; 221, mounting plate; 222, fixing groove; 223, fixing bolt; 224, nut; 300, railing; 310, column; 311, groove; 320, handrail; 330, second rod; 400, escalator; 500, locking assembly; 510, locking ring; 511, locking hole; 512, first half-length internal thread semicircular head cross nut; 513, semicircular head cross bolt; 514, adjustment groove; 520, second long internal thread nut; 521, first U-bolt; 531, second U-bolt; 532, third long internal thread nut; 530, footboard. DETAILED DESCRIPTION
[0022] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0023] Embodiment 1: This embodiment is intended to help solve the problem that when welding is installed on site, due to the inability to take effective protective measures on site, the fume generated by welding may pollute the environment. Please refer to Figure 1 - Figure 4 A boiler platform and guardrail connection structure, comprising a boiler body 100, a platform 200, a guardrail 300 and an escalator 400, wherein the platform 200 is located at the side of the boiler body 100, the guardrail 300 is installed on the outside of the platform 200 and the outside of the escalator 300, and the escalator 400 is installed at the side of the platform 200, the platform 200 is composed of a channel steel frame 210 and a grid plate 220, and the grid plate 220 is installed on the channel steel frame 210, the guardrail 300 comprises a column 310, a handrail 320 and a second rod 330, the handrail 320 is installed on the upper part of the column 310, the second rod 330 is arranged in the middle of the column 310, and a locking assembly 500 is arranged between the handrail 320, the column 310 and the second rod 330;
[0024] The locking assembly 500 includes a locking ring 510 sleeved on the outside of the handrail 320, and a locking hole 511 opened in the column 310. The bottom end of the locking ring 510 is inserted into the locking groove 511. A semi-cylindrical cross nut 512 is inserted in the locking ring 510. A semi-circular head cross bolt 513 corresponding to the semi-cylindrical cross nut 512 is inserted in the locking groove 511. The front end of the semi-cylindrical cross nut 512 is threadedly inserted in the semi-circular head cross bolt 513.
[0025] The semicircular cross bolt 513 is threadedly matched with the semi-cylindrical cross nut 512, and the second rod 330 is set as an angle iron rod. The outer sleeve of the other second rod 330 is provided with a first U-shaped bolt 521 for fixing, and the first U-shaped bolt 521 is set as a U-shaped stud bolt. The first U-shaped bolt 521 is located on one side of the column 310, and the other side of the column 310 is plugged with a second long internal thread nut 520 corresponding to the first U-shaped bolt 520, and the second long internal thread nut 520 is threadedly plugged with the end of the first U-shaped bolt 521. A footboard 530 is installed on the side of the column 310, and the footboard 530 is located at the bottom of the second rod 330. The footboard 530 is clamped with a second U-shaped bolt 531 for fixing the footboard 530, and the end of the second U-shaped bolt 531 is plugged with a third long internal thread nut 532.
[0026] The semicircular cross bolt 513 is threadedly matched with the first long internal thread nut 512 through the adjustment slot 511, so that the long internal thread nut 512 can move in the adjustment hole 511. The stability and firmness of the connection are increased. The first U-shaped bolt 521 is located on one side of the column 310. This design ensures the positioning and locking of the second rod 330.
[0027] The footboard 530 is installed at the bottom of the second rod 330, and the second U-shaped bolt 531 is located outside the footboard 530 to fix the footboard 530. The end of the second U-shaped bolt 531 is plugged with a third long inner thread nut 532, in this way, the footboard 530 can be firmly fixed on the column 310.
[0028] During installation, the existing column 310 is changed into a square tube, and the handrail 320 is firmly installed by means of a semicircular cross bolt 513 and a second long internal thread nut 520, and then the semicircular cross bolt 513 is rotated clockwise so that the semicircular cross bolt 513 is threadedly matched with the adjustment groove 514 in the first half-length internal thread semicircular cross nut 512. As the semicircular cross bolt 513 moves, the locking ring 510 fixedly installed on the semicircular cross bolt 513 is driven to gather close to the first half-length internal thread semicircular cross nut 512, thereby locking the column 310 and the handrail 320.
[0029] In this embodiment: the locking ring 510 is fixedly inserted on the outside of the semi-circular head cross bolt 513, so that as the first half-length inner thread semi-circular head cross nut 512 moves, the locking ring 510 will be gathered together, thereby locking and fixing the column 310 and the handrail 320. In this way, the handrail 300 on the platform 200 does not need to be welded to ensure stability and safety, and there will be no looseness or instability during the work process. The staff can avoid the problem of on-site installation welding, which may cause the fume generated by welding to pollute the environment due to the inability to take effective protective measures on site.
[0030] Embodiment 2: This embodiment is intended to help solve the problem of deformation or looseness that may occur during use. This embodiment is an improvement made on the basis of Embodiment 1. For details, please refer to Figure 1 - Figure 4 .
[0031] The grid plate 220 is fixedly mounted with a mounting plate 221, which is set as an M-shaped plate. The mounting plate 221 and the channel steel frame 210 are both provided with fixing grooves 222, and the fixing grooves 222 are plugged with fixing bolts 223 corresponding to the fixing grooves 222. The grid plate 220 is fixedly mounted on the channel steel frame 210 by the fixing bolts 223 and nuts 224 corresponding to the fixing grooves 222. An integral platform is formed. The nuts 224 firmly mount the grid plate, ensuring a firm connection between the various components, thereby improving the bearing capacity and stability of the overall structure.
[0032] A drilling groove 211 is drilled on one side of the channel steel frame 210, and two third U-shaped bolts 213 are plugged outside the drilling groove 211, the channel steel frame 210 and the column 310. A reinforcing nut 521 is installed at the end of the third U-shaped bolt 213, and the reinforcing nut 521 is located inside the drilling groove 211. A groove 311 corresponding to the handrail 320 is provided on the column 310, and the handrail 320 is installed on the column 310 through the groove 311. By providing the groove 311 on the column 310 and allowing the handrail 320 to be horizontally installed on the column 310 through the groove 311, the problem of loose connection or easy looseness that may exist in the original structure is effectively solved. This design ensures a tight connection between the handrail 320 and the column 310, and improves the safety of the overall structure.
[0033] In the present embodiment, the use of the third U-bolt 213 and the reinforcement nut 521 inserted into the drilling groove 211, the channel steel frame 210 and the column 310 helps to maintain the integrity and stability of the structure, thereby effectively preventing the structure from being deformed or loosened during use, thereby improving the reliability and durability of the overall structure.
[0034] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device.
[0035] The above is only a preferred embodiment of the present invention. It should be pointed out that for ordinary technicians in this technical field, several improvements and modifications can be made without departing from the technical principle of the present invention. These improvements and modifications should also be regarded as the protection scope of the present invention.
Claims
1. A boiler platform and guardrail connection structure, comprising a boiler body (100), a platform (200), a guardrail (300) and an escalator (400), characterized in that: The platform (200) is located at the side of the boiler body (100), the handrail (300) is installed on the outside of the platform (200) and the outside of the escalator (400), the escalator (400) is installed on the side of the platform (200), the platform (200) is composed of a channel steel frame (210) and a grid plate (220), the grid plate (220) is installed on the channel steel frame (210), the handrail (300) includes a column (310), a handrail (320) and a second rod (330), the handrail (320) is installed on the upper part of the column (310), the second rod (330) is arranged in the middle part of the column (310), and a locking assembly (500) is arranged between the handrail (320), the column (310) and the second rod (330); The locking assembly (500) comprises a locking ring (510) sleeved on the outside of the support rod (320), and a locking hole (511) provided in the column (310); the bottom end of the locking ring (510) is inserted into the locking hole (511); a semi-cylindrical cross nut (512) is inserted into the locking ring (510); a semi-circular cross bolt (513) corresponding to the semi-cylindrical cross nut (512) is inserted into the locking hole (511); and the front end of the semi-cylindrical cross nut (512) is threadedly inserted into the semi-circular cross bolt (513).
2. A boiler platform and guardrail connection structure according to claim 1, characterized in that: The locking ring (510) is configured as a U-shaped flat steel ring, and the diameter of the upper end of the locking ring (510) corresponds to the diameter of the support rod (320).
3. A boiler platform and guardrail connection structure according to claim 1, characterized in that: The semicircular head cross bolt (513) is threadedly matched with the semi-cylindrical cross nut (512), and the two rods (330) are configured as angle iron rods.
4. A boiler platform and guardrail connection structure according to claim 3, characterized in that: The outer sleeve of the other second rod (330) is provided with a first U-shaped bolt (521) for fixing, and the first U-shaped bolt (521) is set as a U-shaped stud bolt. The first U-shaped bolt (521) is located on one side of the column (310), and a long internal thread nut (520) corresponding to the first U-shaped bolt (521) is inserted on the other side of the column (310), and the long internal thread nut (520) is threadedly inserted with the end of the first U-shaped bolt (521).
5. The boiler platform and guardrail connection structure according to claim 1, characterized in that: A foot plate (530) is installed on the lower side of the column (310), and the foot plate (530) is located at the bottom of the two rods (330). A second U-shaped bolt (531) for fixing the foot plate (530) is clamped on the outside of the foot plate (530), and a second long inner thread nut (532) is inserted at the end of the second U-shaped bolt (531).
6. A boiler platform and guardrail connection structure according to claim 1, characterized in that: A mounting plate (221) is fixedly mounted on the grid plate (220), the mounting plate (221) being configured as an M-shaped plate, a fixing groove (222) is provided in both the mounting plate (221) and the channel steel frame (210), a fixing bolt (223) corresponding to the fixing groove (222) and a nut (224) corresponding to the fixing bolt (223) are inserted into the fixing groove (222), and the grid plate (220) is fixedly mounted on the channel steel frame (210) via the fixing bolt (223), the fixing groove (222) and the nut (224).
7. The boiler platform and guardrail connection structure according to claim 1, characterized in that: A hole (211) is drilled on one side of the channel steel frame (210), and a third U-shaped bolt (213) is horizontally inserted in two rows on the upper and lower sides of the outer sides of the hole (211), the channel steel frame (210) and the column (310). A first U-shaped bolt (521) is installed at the end of the third U-shaped bolt (213), and the first U-shaped bolt (521) is located inside the channel steel frame (210).
8. The boiler platform and guardrail connection structure according to claim 1, characterized in that: The column (310) is provided with a groove (311) corresponding to the support rod (320), and the support rod (320) is transversely mounted on the column (310) through the groove (311).