Shale gas exploration sampling pretreatment device
By designing the device of hydraulic cylinder, motor and electric push rod with buffer unit and horizontal adjustment unit, the poor stability of the shale gas exploration and sampling pre-treatment device on uneven ground is solved, and higher construction safety and stability are achieved sex.
Patent Information
- Application Number
- CN202420843914.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-23
- Publication Date
- 2025-01-17
- Estimated Expiration
- 2034-04-23
AI Technical Summary
When the shale gas exploration and sampling pretreatment device is used on uneven ground, the equipment has poor stability and safety hazards, which increases the construction difficulty and the probability of accidents.
A device including hydraulic cylinder, motor, top plate, bottom plate, support rod, lift plate, drill bit, guide rod, roller, electric push rod and buffer unit is designed. The electric push rod is combined with the buffer unit and uses telescopic rod and spring. The deformation force increases the ground friction force, and the 360° rotation and horizontal adjustment of the block are achieved through the horizontal adjustment unit and the ball hinge, enhancing the stability of the device.
It effectively avoids the poor stability of the equipment on uneven ground, increases the safety and stability of construction, reduces the difficulty of construction, and extends the service life of the equipment.
Smart Images

Figure CN222363696U_ABST
Abstract
Description
Technical Field
[0001] The utility model belongs to the technical field of shale gas exploration, and particularly relates to a shale gas exploration sampling pre-processing device. Background Art
[0002] Shale gas is an unconventional natural gas that exists in organic-rich mudstone and its interlayers. It mainly exists in adsorption and free states. It is mainly composed of methane. It is a clean and efficient energy resource and chemical raw material. It is mainly used for residential gas, urban heating, power generation, automobile fuel and chemical production, etc. It has a wide range of uses. Shale gas production generally does not require drainage, has a long production cycle of generally 30 to 50 years, has a high success rate in exploration and development, and has high industrial and economic value.
[0003] Before shale gas is officially mined, it is necessary to conduct surveys and sampling, and then analyze the samples in the laboratory to determine the distribution, reserves and geological characteristics of shale gas resources. Since it is not always possible to find a relatively flat ground to place the shale gas exploration sampling equipment during shale gas exploration sampling, the uneven ground during sampling will lead to poor equipment stability during construction, posing certain safety hazards, increasing the difficulty of construction and the probability of accidents.
[0004] Therefore, a shale gas exploration sampling pre-processing device is needed. Utility Model Content
[0005] The purpose of the utility model is to provide a shale gas exploration sampling pre-treatment device, so as to solve the problem that the existing shale gas exploration sampling pre-treatment device encounters uneven ground, which will lead to poor equipment stability during construction, pose certain safety hazards, increase construction difficulty and the probability of accidents. The specific technical solution is as follows:
[0006] A shale gas exploration sampling pre-processing device, comprising a hydraulic cylinder, a motor, a top plate, a bottom plate, a support rod, a lifting plate, a drill bit, a guide rod and a roller, wherein rollers are installed at the bottom corners of the bottom plate, support rods are vertically installed at the top corners of the bottom plate, the top plate is installed together with one end of the support rod away from the bottom plate, a through hole is opened in the middle of the bottom plate, the hydraulic cylinder is installed on the top of the top plate and is located directly above the through hole, the output end of the hydraulic cylinder passes through the top plate, the lifting plate is installed on the output end of the hydraulic cylinder, the motor is installed on the side of the lifting plate away from the hydraulic cylinder, the output end of the motor is installed with a drill bit, guide holes are provided at both ends of the lifting plate, and guide rods matching the guide holes are installed between the top plate and the bottom plate;
[0007] It also includes an electric push rod and a pressure block. A plurality of the electric push rods are vertically installed at the corners of the top plate, and the output ends of the electric push rods are oriented vertically downward. The pressure block is installed on the output ends of the electric push rods.
[0008] Preferably, a buffer unit is also included, which includes a spring, a pre-tightening sleeve, a baffle and a telescopic rod. A movable groove is opened on the output end of the electric push rod, the pre-tightening sleeve is installed in the movable groove through a threaded connection, the telescopic rod is slidably installed in the pre-tightening sleeve, one end of the telescopic rod away from the movable groove is connected to the pressure block, and a baffle is installed at the other end of the telescopic rod, the diameter of the baffle is equal to the outer diameter of the pre-tightening sleeve, the spring is installed in the movable groove, and the two ends of the spring are elastically abutted against the bottom of the movable groove and the baffle respectively.
[0009] Preferably, the telescopic rod and the pressing block are connected by a ball joint.
[0010] Preferably, an anti-skid pad for increasing friction is installed on the side of the pressing block away from the electric push rod.
[0011] Preferably, a folding handle for facilitating the rotation of the preload sleeve is installed at one end of the preload sleeve away from the spring.
[0012] Preferably, it also includes a horizontal adjustment unit, which includes a shell, a cross bar, a screw and a rotating handle. The shell is horizontally installed at the top corner of the top plate, and the long side of the shell is parallel to the long side of the top plate. The shell is provided with an opening at one end away from the hydraulic cylinder, and a rotating mounting hole is provided at the other end of the shell. The cross bar is slidably installed in the shell, and the end of the cross bar away from the rotating mounting hole is connected to the electric push rod, and a threaded hole is provided at the other end of the cross bar. The screw is rotatably installed in the rotating mounting hole, and the screw and the threaded hole cooperate with each other. A rotating handle is installed at one end of the screw away from the cross bar.
[0013] Compared with the existing technology, the utility model has the following beneficial effects:
[0014] 1. The utility model uses an electric push rod in conjunction with a buffer unit. The output end of the electric push rod pushes the telescopic rod to move closer to the ground. When the pressure block contacts the ground, the four pressure blocks form an auxiliary support for the shale gas exploration sampling pre-processing device, thereby avoiding the problem of poor stability of the shale gas exploration sampling pre-processing device when working on uneven ground. If the pressure on the telescopic rod is greater than the deformation force of the spring, the telescopic rod will squeeze the spring to deform, eliminating the need for precise control by the operator, while increasing the friction between the pressure block and the ground, further increasing stability.
[0015] 2. The utility model adjusts the horizontal position of the electric push rod and the pressure block through the horizontal adjustment unit, so that the pressure block can be moved to a more suitable ground for support, increasing the practicality of the shale gas exploration sampling pre-treatment device. At the same time, the utility model connects the pressure block and the telescopic device through a ball joint, so the pressure block can rotate 360 degrees, so that the pressure block can fit the ground as much as possible, increase the contact area with the ground, and further increase the stability of the shale gas exploration sampling pre-treatment device. BRIEF DESCRIPTION OF THE DRAWINGS
[0016] In order to more clearly illustrate the technical solution of the embodiment of the utility model, the following will briefly introduce the drawings required for the description of the embodiment. In all the drawings, similar elements or parts are generally identified by similar reference numerals. In the drawings, each element or part is not necessarily drawn according to the actual scale.
[0017] Figure 1 It is a schematic diagram of the overall structure of the utility model;
[0018] Figure 2 It is a front view and sectional view of the utility model;
[0019] Figure 3 yes Figure 2 A partial enlarged view of point A in the middle.
[0020] Description of main reference numerals:
[0021] 1. Hydraulic cylinder; 2. Motor; 3. Top plate; 4. Bottom plate; 5. Support rod; 6. Lifting plate; 7. Guide rod; 8. Roller; 9. Through hole; 10. Electric push rod; 11. Pressure block; 12. Spring; 13. Preload sleeve; 14. Baffle; 15. Telescopic rod; 16. Movable groove; 17. Ball joint; 18. Shell; 19. Cross bar; 20. Screw; 21. Turning handle; 22. Opening; 23. Drill bit. DETAILED DESCRIPTION
[0022] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0023] refer to Figures 1 to 3, rollers 8 are installed at the bottom corners of the bottom plate 4 by bolts, support rods 5 are vertically installed at the top corners of the bottom plate 4 by bolts, and the ends of the support rods 5 away from the bottom plate 4 are commonly installed with the top plate 3 by bolts. A through hole 9 is opened in the middle of the bottom plate 4, the hydraulic cylinder 1 is installed on the top of the top plate 3 by bolts, and is located directly above the through hole 9, the output end of the hydraulic cylinder 1 passes through the top plate 3, the lifting plate 6 is installed on the output end of the hydraulic cylinder 1 by bolts, the motor 2 is installed on the side of the lifting plate 6 away from the hydraulic cylinder 1 by bolts, and a drill bit 23 is installed on the output end of the motor 2, guide holes are provided at both ends of the lifting plate 6, and guide rods 7 matching the guide holes are installed between the top plate 3 and the bottom plate 4 by bolts.
[0024] The top corners of the top plate 3 are horizontally welded with a shell 18, the long side of the shell 18 is parallel to the long side of the top plate 3, the end of the shell 18 away from the hydraulic cylinder 1 is provided with an opening 22, the other end of the shell 18 is provided with a rotating mounting hole, the cross bar 19 is slidably installed in the shell 18, the bottom of the end of the cross bar 19 away from the rotating mounting hole is connected to the electric push rod 10 by bolts, the output end of the electric push rod 10 is facing vertically downward, the other end of the cross bar 19 is provided with a threaded hole, the lead screw 20 is rotatably installed in the rotating mounting hole, and the lead screw 20 and the threaded hole cooperate with each other, and the end of the lead screw 20 away from the cross bar 19 is provided with a rotating handle 21. Rotating the rotating handle 21 can adjust the extension length of the cross bar 19, thereby adjusting the pressure block 11 to move to a more suitable ground for support, thereby increasing the practicality of the shale gas exploration sampling pre-treatment device.
[0025] An active groove 16 is provided on the output end of the electric push rod 10, and the pre-tightening sleeve 13 is installed in the active groove 16 through a threaded connection, and the telescopic rod 15 is slidably installed in the pre-tightening sleeve 13. The end of the telescopic rod 15 away from the activity is connected to the pressure block 11 through a ball joint 17, so the pressure block 11 can rotate 360 degrees, so that the pressure block 11 can fit the ground as closely as possible, increase the contact area with the ground, and further increase the stability of the shale gas exploration sampling pre-treatment device. A baffle 14 is welded to the other end of the telescopic rod 15, and the diameter of the baffle 14 is equal to the outer diameter of the pre-tightening sleeve 13, so the baffle 14 cannot pass through the pre-tightening sleeve 13, and can only be abutted or separated from the pre-tightening sleeve 13. The spring 12 is installed in the active groove 16, and the two ends of the spring 12 are elastically abutted against the bottom of the active groove 16 and the baffle 14 respectively. A folding handle for facilitating the rotation of the pre-tightening sleeve 13 is installed at one end of the pre-tightening sleeve 13 away from the spring 12. The operator can rotate the pre-tightening sleeve 13 through the folding handle to squeeze the spring 12, giving the spring 12 a certain initial deformation force. If the pressure on the telescopic rod 15 is greater than the deformation force of the spring 12, the telescopic rod 15 will squeeze the spring 12 to deform, so that the operator does not need to perform precise control, eliminates the impact force on the electric push rod 10 when the pressure block 11 contacts the ground, and extends the service life of the electric push rod 10. At the same time, the friction between the pressure block 11 and the ground is increased, further increasing stability. An anti-skid pad for increasing friction is installed on the side of the pressure block 11 away from the electric push rod 10, which can further improve the stability of the shale gas exploration sampling pre-treatment device during operation.
[0026] In summary, after the operator moves the shale gas exploration sampling pre-treatment device to the destination, he turns the rotary handle to adjust the horizontal position of the electric push rod 10, and then starts the electric push rod 10 to make the pressure block 11 contact the ground, thereby supporting the entire shale gas exploration sampling pre-treatment device and ensuring the stability of the shale gas exploration sampling pre-treatment device during operation.
[0027] The foregoing descriptions of specific exemplary embodiments of the present invention are for the purpose of explanation and illustration. These descriptions are not intended to limit the present invention to the precise form disclosed, and it is obvious that many changes and variations can be made based on the above teachings. Although an embodiment of the present invention has been shown and described, this specific embodiment is merely an explanation of the present invention and is not a limitation of the present invention. The specific features, structures, materials or characteristics described may be combined in a suitable manner in any one or more embodiments or examples. The purpose of selecting and describing the exemplary embodiments is to explain the specific principles of the present invention and its practical application, so that those skilled in the art can make modifications, substitutions, variations and various selections and changes to the embodiments without creative contribution as needed after reading this specification without departing from the principles and purpose of the present invention, but they are protected by patent law as long as they are within the scope of the claims of the present invention.
Claims
1. A shale gas exploration sampling pre-processing device, comprising a hydraulic cylinder (1), a motor (2), a top plate (3), a bottom plate (4), a support rod (5), a lifting plate (6), a drill bit (23), a guide rod (7) and a roller (8), wherein the bottom corners of the bottom plate (4) are all provided with rollers (8), the top corners of the bottom plate (4) are all provided with support rods (5) vertically, the ends of the support rods (5) away from the bottom plate (4) are jointly provided with the top plate (3), the middle of the bottom plate (4) is provided with a through hole (9), and the rollers (8) are provided with rollers (8) at the bottom corners of the bottom plate (4). The hydraulic cylinder (1) is mounted on the top of the top plate (3) and is located directly above the through hole (9); the output end of the hydraulic cylinder (1) passes through the top plate (3); the lifting plate (6) is mounted on the output end of the hydraulic cylinder (1); the motor (2) is mounted on a side of the lifting plate (6) away from the hydraulic cylinder (1); a drill bit (23) is mounted on the output end of the motor (2); guide holes are provided at both ends of the lifting plate (6); and a guide rod (7) matched with the guide hole is installed between the top plate (3) and the bottom plate (4); It is characterized in that It also includes an electric push rod (10) and a pressure block (11), wherein a plurality of the electric push rods (10) are respectively vertically mounted at the corners of the top plate (3), and the output ends of the electric push rods (10) are oriented vertically downward, and the pressure block (11) is mounted on the output ends of the electric push rods (10).
2. A shale gas exploration sampling pre-processing device according to claim 1, characterized in that: The utility model also comprises a buffer unit, wherein the buffer unit comprises a spring (12), a pre-tightening sleeve (13), a baffle (14) and a telescopic rod (15); an active groove (16) is provided on the output end of the electric push rod (10); the pre-tightening sleeve (13) is installed in the active groove (16) by threaded connection; the telescopic rod (15) is slidably installed in the pre-tightening sleeve (13); one end of the telescopic rod (15) away from the active groove (16) is connected to the pressing block (11); a baffle (14) is installed at the other end of the telescopic rod (15); the diameter of the baffle (14) is equal to the outer diameter of the pre-tightening sleeve (13); the spring (12) is installed in the active groove (16), and the two ends of the spring (12) are elastically supported against the bottom of the active groove (16) and the baffle (14) respectively.
3. A shale gas exploration sampling pre-processing device according to claim 2, characterized in that: The telescopic rod (15) and the pressing block (11) are connected by a ball joint (17).
4. A shale gas exploration sampling pre-processing device according to claim 1, characterized in that: An anti-skid pad for increasing friction is installed on the side of the pressing block (11) away from the electric push rod (10).
5. A shale gas exploration sampling pre-processing device according to claim 2, characterized in that: A folding handle for facilitating the rotation of the preload sleeve (13) is installed at one end of the preload sleeve (13) away from the spring (12).
6. A shale gas exploration sampling pre-processing device according to claim 1, characterized in that: The horizontal adjustment unit also includes a housing (18), a cross bar (19), a lead screw (20) and a rotating handle (21). The housing (18) is horizontally installed at the top corner of the top plate (3). The long side of the housing (18) is parallel to the long side of the top plate (3). An opening (22) is provided at one end of the housing (18) away from the hydraulic cylinder (1). A rotating mounting hole is provided at the other end of the housing (18). The cross bar (19) is slidably installed in the housing (18). The end of the cross bar (19) away from the rotating mounting hole is connected to the electric push rod (10). The other end of the cross bar (19) is provided with a threaded hole. The lead screw (20) is rotatably installed in the rotating mounting hole, and the lead screw (20) and the threaded hole cooperate with each other. A rotating handle (21) is installed at one end of the lead screw (20) away from the cross bar (19).