Chilling device for roasting industrial solid waste

By designing the dredging structure and pressure regulating structure in industrial solid waste baking equipment, the problem of blockage of the cooling device is solved, and the normal cooling and settlement of the solid waste slag is achieved, ensuring the continuity and efficiency of the baking process.

CN222364399UActive Publication Date: 2025-01-17NANYANG RENCHUANG SAND TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202421208839.X
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-05-29
Publication Date
2025-01-17
Estimated Expiration
2034-05-29

AI Technical Summary

Technical Problem

The cooling device in existing industrial solid waste baking equipment is prone to blockage when guiding solid waste slag, resulting in the solid waste slag being unable to cool and settle normally.

Method used

A cooling device including a dredging structure and a pressure regulating structure is designed. The dredging structure consists of a slide barrel, a dredging member and a spring. The air pressure is adjusted through the air pump and the air ring, and the dredging member moves to the center of the slag discharge pipe to avoid blockage; the pressure regulating structure Control the air pressure through the air pump inflation and exhaust pipe to ensure that the dredging parts are back to prevent blockage.

Benefits of technology

It effectively prevents the blockage of the slag discharge pipe, ensures the normal cooling and settlement of the solid waste slag, and improves the continuity and efficiency of the roasting process.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222364399U_ABST
    Figure CN222364399U_ABST
Patent Text Reader

Abstract

The utility model relates to a chilling device for roasting industrial solid waste, which comprises a chilling chamber, a chilling ring arranged on the chilling chamber and a slag discharge pipe arranged at the bottom of the chilling ring, and further comprises a dredging structure arranged in the chilling chamber and comprising a sliding cylinder, a dredging piece and a spring, the pressure regulating structure comprises an air pump and an air ring, the air pump and the sliding cylinder are both communicated with the air ring, an exhaust pipe communicated with the outside is arranged on the air ring, and the exhaust pipe is provided with a valve body for controlling the exhaust pipe to be opened and closed. According to the chilling device for industrial solid waste roasting, when the air pump inflates the air ring, the dredging piece moves and dredges the slag discharging pipe, after air supplementing is finished, the valve body is opened, extra air in the sliding barrel and the air ring flows out, the air pressure in the sliding barrel and the air ring is recovered, the dredging piece also returns, and the circulation is conducted, so that the blockage phenomenon is effectively prevented.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of industrial solid waste treatment, in particular to a quenching device for roasting industrial solid waste. Background Art

[0002] Industrial solid waste treatment requires roasting to allow the material to undergo decomposition reactions at high temperatures, remove CO2 and bound water, and decompose certain components of the material.

[0003] Existing roasting equipment usually has a combustion chamber (roasting) and a quenching chamber (to cool the slag and let it settle to its bottom), wherein a quenching ring is provided between the combustion chamber and the quenching chamber, and the bottom of the quenching ring is connected to the quenching chamber through a pipe, that is, the quenching chamber, the quenching ring and the pipe constitute the quenching device of the prior art.

[0004] In the existing quenching device, the pipe is used as a guide component to guide the solid waste slag from the combustion chamber to the quenching chamber. However, the pipe is limited by its cross-sectional area, and the solid waste slag will inevitably come into contact with the pipe. Thus, in the process of continuously guiding the solid waste slag to the quenching chamber, the solid waste slag will block the pipe. Therefore, a quenching device for industrial solid waste roasting is proposed. Utility Model Content

[0005] Based on the above description, the utility model provides a quenching device for industrial solid waste roasting, which solves the technical problem that the existing quenching device will be blocked in the pipeline when introducing solid waste slag.

[0006] The utility model solves the above technical problems with the following technical solutions: A quenching device for roasting industrial solid waste, comprising a quenching chamber, a quenching ring is arranged on the quenching chamber, a slag discharge pipe is arranged at the bottom of the quenching ring, and further comprising:

[0007] The dredging structure is arranged in the quenching chamber and comprises a slide cylinder, a dredging member and a spring, wherein the dredging member is slidably connected in the slide cylinder through the spring;

[0008] The pressure regulating structure includes an air pump and an air ring, wherein the air pump and the slide cylinder are both connected to the air ring, an exhaust pipe connected to the outside is arranged on the air ring, and the exhaust pipe has a valve body for controlling its opening and closing. When the air pump inflates the air ring, the clearing piece moves toward the center of the slag discharge pipe to prevent the slag discharge pipe from being blocked.

[0009] On the basis of the above technical solution, the present invention can also be improved as follows.

[0010] Furthermore, the number of the slide cylinders is not less than one group, and the slide cylinders are arranged at an angle.

[0011] Furthermore, the side of the slide tube away from the slag discharge pipe is arranged to be inclined upward to clear the inside of the slag discharge pipe.

[0012] Furthermore, the side of the slide cylinder away from the slag discharge pipe is tilted downward to clear the inner side of the quench ring and the inner side of the slag discharge pipe.

[0013] Furthermore, the number of the slide cylinders is four groups, and the four groups of slide cylinders are distributed in a circular array.

[0014] Furthermore, the air pump is arranged outside the quenching chamber, a connecting pipe is arranged between the air pump and the air ring, and a connecting pipe is arranged between the air ring and the slide cylinder.

[0015] Furthermore, the valve body is a solenoid valve.

[0016] Furthermore, a trumpet-shaped discharge port is provided at the bottom of the slag discharge pipe, and the discharge port is narrow at the top and wide at the bottom.

[0017] Compared with the prior art, the technical solution of this application has the following beneficial technical effects:

[0018] In the quenching device for roasting industrial solid waste, when the air pump inflates the air ring, the clearing piece moves and clears the slag discharge pipe. After the air replenishment is completed, the valve body is opened to allow the extra gas in the slide cylinder and the air ring to flow out, the air pressure can be restored, and the clearing piece will return to its position, thus repeating the cycle and effectively preventing blockage. BRIEF DESCRIPTION OF THE DRAWINGS

[0019] Figure 1 A schematic diagram of the structure of a quenching device for roasting industrial solid waste provided in an embodiment of the utility model;

[0020] Figure 2 for Figure 1 A schematic diagram of the structure when half-sectioned;

[0021] Figure 3 It is a structural schematic diagram of a slag discharge pipe, a dredging structure and a pressure regulating structure in an embodiment of the utility model;

[0022] Figure 4 for Figure 2 A partial enlarged schematic diagram of the middle A area;

[0023] Figure 5 It is a schematic structural diagram of an embodiment of the utility model when the side of the slide cylinder away from the slag discharge pipe is tilted downward.

[0024] In the accompanying drawings, the components represented by the reference numerals are listed as follows:

[0025] 1. Quenching chamber; 2. Quenching ring; 3. Slag discharge pipe; 4. Clearing structure; 41. Slide; 42. Clearing piece; 43. Spring; 5. Pressure regulating structure; 51. Air pump; 52. Air ring; 53. Exhaust pipe; 54. Connecting pipe; 55. Connecting pipe. DETAILED DESCRIPTION

[0026] The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the accompanying drawings in the embodiments of the present invention.

[0027] like Figure 1 and Figure 2 As shown, a quenching device for industrial solid waste roasting in this embodiment is used to collect and cool the industrial solid waste slag in the combustion chamber of the existing roasting device. The quenching device is arranged at the discharge port of the combustion chamber of the roasting device. The industrial solid waste roasting device includes a quenching chamber 1, a quenching ring 2, a slag discharge pipe 3, a dredging structure 4 and a pressure regulating structure 5, wherein the quenching ring 2 is fixed to the quenching chamber 1 by bolts and connected to the combustion chamber of the existing roasting device, and the slag discharge pipe 3 is welded and arranged at the bottom of the quenching ring 2. In this way, when the solid waste slag passes through the inside of the quenching ring 2, the quenching ring 2 sprays quenching water to the inner wall of the slag discharge pipe 3, so that the quenching water is evenly distributed on the inner wall of the slag discharge pipe 3, thereby forming a liquid film. Under the influence of the liquid film, the solid waste slag can be cooled and the slag discharge pipe 3 is protected. The dredging structure 4 is located in the quenching chamber 1.

[0028] As for the dredging structure 4 and the pressure regulating structure 5 as the focus of this application, first of all, Figure 3 and 4 As shown, the dredging structure 4 includes a slide 41, a dredging piece 42 and a spring 43, wherein the slide 41 is welded to the outside of the slag discharge pipe 3, and the dredging piece 42 is slidably connected to the slide 41 through the spring 43, and one side of the spring 43 is fixed to the inner wall of the slide 41. In the design, the spring 43 is used to prevent the dredging piece 42 from completely falling out of the slide 41 and to allow the dredging piece 42 to be reset. The length of the dredging piece 42 is preferably equal to the diameter of the slag discharge pipe 3.

[0029] Secondly, the pressure regulating structure 5 is used to adjust the internal air pressure in the slide cylinder 41 to change the position of the dredging member 42, so that the dredging member 42 can complete the dredging work. Figure 3The pressure regulating structure 5 specifically includes an air pump 51, an air ring 52 and an exhaust pipe 53, wherein the air pump 51 is preferably fixed to the outside of the quenching chamber 1 by bolts. For example, a machine base is welded on the outside of the quenching chamber 1, and the air pump 51 is fixed to the machine base by bolts. The air ring 52 is fixed to the inner wall of the quenching chamber 1, and the air pump 51 and the slide 41 are both connected to the air ring 52. In this way, when the air pump 51 inflates the air ring 52, the inflated gas can enter the slide 41, thereby changing the air pressure in the slide 41, and under the influence of the air pressure, the clearing piece 42 in the slide 41 can move toward the center of the slag discharge pipe 3. In addition, the exhaust pipe 53 is welded on the air ring 52. It should be noted that this exhaust pipe 53 is connected to the outside world, and the exhaust pipe 53 has a valve body for controlling its opening and closing, and the valve body is preferably a solenoid valve.

[0030] It should be noted that a connecting pipe 54 is fixedly provided between the air pump 51 and the air ring 52 for completing the connection between the air pump 51 and the air ring 52, and a connecting pipe 55 is fixedly provided between the air ring 52 and the slide cylinder 41 for completing the connection between the air ring 52 and the slide cylinder 41. In addition, a trumpet-shaped discharge port is provided at the bottom of the slag discharge pipe 3, which is narrow at the top and wide at the bottom, so that the outlet of the slag discharge pipe 3 can be discharged more easily.

[0031] In this way, after the air pump 51 finishes inflating the air ring 52, the valve body is opened. According to the law of air pressure balance, part of the gas in the slide cylinder 41 and the air ring 52 will flow out from the exhaust pipe 53, and the air pressure in the slide cylinder 41 and the air ring 52 will also be restored, and the spring 43 will allow the clearing piece 42 to move back to its original position. In the process of cyclically starting and stopping the air pump 51 and switching the valve body, the clearing piece 42 will cyclically move back and forth to ensure that the slag discharge pipe 3 is not blocked, thereby ensuring that the quenching chamber 1 can normally receive the solid waste slag flowing out of the combustion chamber.

[0032] In order to speed up the dredging, the number of the slide cylinders 41 is not less than one group, and the slide cylinders 41 are arranged obliquely. Different oblique directions of the slide cylinders 41 will produce different dredging effects.

[0033] For example, in one embodiment, Figure 2 and 3 As shown, the side of the slide tube 41 away from the slag discharge pipe 3 is tilted upward. At this time, the clearing member 42 will move away from the quenching ring 2 during the displacement. In this way, the clearing member 42 will only clear the inner side of the slag discharge pipe 3.

[0034] In another embodiment, if Figure 5 As shown, the side of the slide 41 away from the slag discharge pipe 3 is tilted downward. At this time, the clearing member 42 will move close to the quenching ring 2, so that the clearing member 42 can clear the inner side of the quenching ring 2 and the inner side of the slag discharge pipe 3 at the same time.

[0035] It should be noted that, although the inclination directions of the slide cylinders 41 are designed differently, in the above two embodiments, there are four groups of slide cylinders 41 , and the four groups of slide cylinders 41 are distributed in a circular array and surround the outer side of the slag discharge pipe 3 .

[0036] Working principle:

[0037] When the air pump 51 is started to inflate, the air will be guided through the connecting pipe 54, and the air ring 52 will obtain additional gas. After being guided through the connecting pipe 55, the additional gas will flow out of each slide 41. In this way, the air pressure in the slide 41 will be changed. When the air pressure in the slide 41 changes, the clearing piece 42 in the slide 41 will be able to move toward the center of the slag discharge pipe 3 under the influence of the air pressure. After the air pump 51 is inflated, the valve body is opened, and part of the gas in the slide 41 and the air ring 52 will flow out from the exhaust pipe 53. The air pressure in the slide 41 and the air ring 52 will also be restored, and the spring 43 will allow the clearing piece 42 to move back to its original position. In the process of cyclically starting and stopping the air pump 51 and switching the valve body, the clearing piece 42 will cyclically move back and forth to ensure that the slag discharge pipe 3 is not blocked, thereby ensuring that the quenching chamber 1 can normally receive the solid waste slag flowing out of the combustion chamber.

[0038] The above are only preferred specific implementation methods of the utility model, but the protection scope of the utility model is not limited to this. Any technician familiar with the technical field within the technical scope disclosed by the utility model, who makes equivalent replacements or changes based on the technical scheme and utility model concept of the utility model, should be covered by the protection scope of the utility model.

Claims

1. A quenching device for roasting industrial solid waste, comprising a quenching chamber (1), a quenching ring (2) is arranged on the quenching chamber (1), and a slag discharge pipe (3) is arranged at the bottom of the quenching ring (2), characterized in that: Also includes: A dredging structure (4) is arranged in the quenching chamber (1) and comprises a slide cylinder (41), a dredging member (42) and a spring (43), wherein the dredging member (42) is slidably connected to the slide cylinder (41) via the spring (43); The pressure regulating structure (5) comprises an air pump (51) and an air ring (52), wherein the air pump (51) and the slide cylinder (41) are both connected to the air ring (52), an exhaust pipe (53) connected to the outside is arranged on the air ring (52), and the exhaust pipe (53) has a valve body for controlling its opening and closing. When the air pump (51) inflates the air ring (52), the clearing member (42) moves toward the center of the slag discharge pipe (3) so that the slag discharge pipe (3) will not be blocked.

2. The quenching device for industrial solid waste roasting according to claim 1, characterized in that: The number of the slide cylinders (41) is not less than one group, and the slide cylinders (41) are arranged obliquely.

3. The quenching device for industrial solid waste roasting according to claim 2, characterized in that: The side of the slide cylinder (41) away from the slag discharge pipe (3) is arranged to be inclined upward to clear the inside of the slag discharge pipe (3).

4. The quenching device for industrial solid waste roasting according to claim 2, characterized in that: The side of the slide cylinder (41) away from the slag discharge pipe (3) is tilted downward to clear the inner side of the quenching ring (2) and the inner side of the slag discharge pipe (3).

5. A quenching device for roasting industrial solid waste according to any one of claims 2 to 4, characterized in that: The number of the slide cylinders (41) is four groups, and the four groups of slide cylinders (41) are distributed in a circular array.

6. The quenching device for industrial solid waste roasting according to claim 5, characterized in that: The air pump (51) is arranged outside the quenching chamber (1), a connecting pipe (54) is arranged between the air pump (51) and the air ring (52), and a connecting pipe (55) is arranged between the air ring (52) and the slide cylinder (41).

7. The quenching device for industrial solid waste roasting according to claim 1, characterized in that: The valve body is a solenoid valve.

8. The quenching device for industrial solid waste roasting according to claim 1, characterized in that: The bottom of the slag discharge pipe (3) is provided with a trumpet-shaped discharge port, which is narrow at the top and wide at the bottom.