Handrail for municipal pipeline construction groove

By designing a railing for municipal pipeline construction and using a combination of movable rods and clamping blocks, the problem of inconvenient installation of railings in the existing technology is solved, a fast and convenient installation process is achieved, and construction efficiency is improved.

CN222376163UActive Publication Date: 2025-01-21HUBEI ZHONGRONG LIQING CONSTR ENG CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420913407.2
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-04-28
Publication Date
2025-01-21
Estimated Expiration
2034-04-28

AI Technical Summary

Technical Problem

In the prior art, the process of fixing the railing with screws during municipal pipelines is inconvenient, and it is necessary to hold the railing by hand and align it with circular holes, which is long and laborious.

Method used

A railing for municipal pipeline construction trenches is designed. Through the combination of the movable rod, the first connecting rod, the spring and the clip, the railing body is clamped on the top of the Larson steel sheet pile through the clamping block, which reduces the need for hand support and The installation process of the railing is simplified by the locking of the first nut and the first bolt.

Benefits of technology

It realizes the convenient installation of railings, reduces installation time and labor, and improves construction efficiency. At the same time, the design of sliding rods and vertical poles facilitates the disassembly and maintenance of the fence.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222376163U_ABST
    Figure CN222376163U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of municipal pipeline construction, in particular to a handrail for a municipal pipeline construction groove, which comprises a handrail body, Larsen steel sheet piles are fixedly mounted at the bottom of the handrail body, a fence net is fixedly mounted on the side edge of the handrail body, and a clamping block is fixedly connected to the bottom of the handrail body. And a movable rod is slidably connected to the surface of the clamping block. Through the movable rods, the first connecting rods, the springs and the clamping pieces, when the handrail body is installed on the Larsen steel sheet pile, the handrail body can be clamped to the top of the Larsen steel sheet pile through the clamping blocks, the handrail body does not need to be held by hands, and the position of the Larsen steel sheet pile is limited by the clamping blocks; the positions of the first nuts and the first bolts on the Larsen steel sheet piles are locked, and the first bolts rotate on the first nuts and can penetrate through the mounting holes of the Larsen steel sheet piles, so that the handrail body is mounted at the tops of the Larsen steel sheet piles through the clamping blocks, mounting is convenient, and time and labor are saved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of municipal pipeline construction, in particular to a handrail for a municipal pipeline construction groove. Background Art

[0002] The construction of municipal pipelines such as drainage pipes, water supply pipes, and communication cable pipes is generally carried out on the sidewalks of roads. Generally, trenches with a width of several meters, such as within 3 meters, and a depth of several meters, such as within 2.5 meters, need to be dug for construction, and each construction period is generally long, such as more than ten days or dozens of days. The trench support of the prior art generally uses Larsen steel sheet piles close to the two trench walls. The Larsen steel sheet piles on the trench walls on both sides extend along the length of the trench, and the Larsen steel sheet piles on the same side are connected to each other. The height of the Larsen steel sheet piles is generally flush with the ground, or slightly higher than the ground. In the early period, the Larsen steel sheet piles did not have railings, so there were safety hazards.

[0003] In recent years, some technicians have begun to add railings, fixing each railing on the Larsen steel sheet piles by continuously drilling holes and using screws. However, in the process of fixing the railings with screws, it is necessary to hold the railings for installation, and the screws need to be aligned with the circular holes. The installation process is very inconvenient, time-consuming and labor-intensive. Utility Model Content

[0004] The purpose of the utility model is to provide a handrail for municipal pipeline construction trenches to solve the problem proposed in the above-mentioned background technology that in the process of fixing the handrail with screws, the handrail needs to be held for installation, and the screws need to be aligned with the circular holes, which makes the installation process very inconvenient, time-consuming and labor-intensive.

[0005] To achieve the above-mentioned purpose, the utility model provides the following technical solutions, a railing for municipal pipeline construction trench: comprising a railing body, a Larsen steel sheet pile is fixedly installed on the bottom of the railing body, a fence net is fixedly installed on the side of the railing body, a clamping block is fixedly connected to the bottom of the railing body, a movable rod is slidably connected to the surface of the clamping block, a first connecting rod is fixedly connected to the surface of the movable rod, a spring is fixedly connected to the surface of the clamping block, a clip is fixedly connected to the surface of the movable rod, one end of the spring away from the clamping block is fixedly connected to the clip, a first nut is fixedly connected to the surface of the clip, a first nut is fixedly connected to the surface of the clamping block, and a first bolt is threadedly connected to the surface of the first nut.

[0006] Preferably, a sliding rod is slidably connected to the surface of the railing body, a vertical pole is fixedly connected to the surface of the sliding rod, the fence is fixedly connected to the surface of the vertical pole, a second bolt is through-hole connected to the surface of the railing body, the second bolt is fixedly connected to the second connecting rod, and a second nut is threadedly connected to the surface of the second bolt.

[0007] Preferably, a slot is provided at the bottom of the clamp block, and the Larsen steel sheet pile is snap-connected to the slot at the bottom of the clamp block, and the slot of the clamp block limits the position of the clamp block at the top of the Larsen steel sheet pile.

[0008] Preferably, rectangular grooves are provided on both sides of the clamping block slot, and the movable rod slides on the surface of the clamping block, and the movable rod drives the clamping piece to move on the clamping block slot and the rectangular groove.

[0009] Preferably, a plurality of groups of convex strips are provided on the surface of the clip, a guide hole is provided on the surface of the clamp block, a first nut is fixedly connected to the guide hole of the clamp block, and the first bolt passes through the guide hole of the clamp block through the first nut.

[0010] Preferably, trapezoidal grooves are provided on both sides of the railing body, the sliding rod is in a trapezoidal shape, and the vertical rod slides onto the surface of the railing body through the sliding rod.

[0011] Preferably, a circular hole is opened on the surface of the railing body, the circular hole of the railing body is connected to the trapezoidal groove of the railing body, the second bolt passes through the circular hole of the railing body, and the second bolt limits the position of the sliding rod on the trapezoidal groove of the railing body.

[0012] Compared with the prior art, the beneficial effects of the utility model are:

[0013] 1. Through the movable rod, the first connecting rod, the spring and the clip, when the railing body is installed on the Larsen steel sheet pile, the railing body will be clamped on the top of the Larsen steel sheet pile through the clamp block, the railing body does not need to be supported by hand, and the position of the Larsen steel sheet pile is limited by the clamp block, the position of the first nut and the first bolt on the Larsen steel sheet pile is locked, and the first bolt can be rotated on the first nut to pass through the installation hole of the Larsen steel sheet pile, so that the railing body is installed on the top of the Larsen steel sheet pile through the clamp block, which is convenient to install and saves time and effort.

[0014] 2. Slide the slide bar onto the trapezoidal groove of the railing body so that the vertical pole is moved to the surface of the railing body. At this time, the second connecting rod is used to make the two sets of second bolts pass through the circular holes of the railing body. The second nut rotates on the second bolt to fix the second bolt and the second connecting rod to the railing body. At this time, the second bolt limits the position of the slide bar at the top of the slide bar, so that the vertical pole and the fence are fixed on the surface of the railing body, which is convenient for disassembly of the fence on the railing body and also ensures that there is no fence weight passing through the slide bar, vertical pole, second connecting rod and second bolt during the installation of the railing body. BRIEF DESCRIPTION OF THE DRAWINGS

[0015] Figure 1 It is a front view stereoscopic schematic diagram of the structure of the utility model;

[0016] Figure 2 It is a front view, sectional, and exploded perspective diagram of the bottom structure of the railing body of the utility model;

[0017] Figure 3 It is a side view and a three-dimensional schematic diagram of the bottom structure of the railing body of the utility model;

[0018] Figure 4 It is a side perspective schematic diagram of the structure of the movable rod connection of the utility model;

[0019] Figure 5 For this utility model Figure 1 A schematic diagram of the enlarged structure at A in the middle;

[0020] Figure 6 It is a top view and cross-sectional schematic diagram of the top structure of the handrail body of the utility model.

[0021] In the figure: 1. railing body; 11. Larsen steel sheet pile; 12. fence; 2. clamping block; 21. movable rod; 22. first connecting rod; 23. spring; 24. clip; 25. first nut; 26. first bolt; 3. sliding rod; 31. vertical rod; 32. second connecting rod; 33. second bolt; 34. second nut. DETAILED DESCRIPTION

[0022] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0023] See also Figure 1-6 , an embodiment provided by the utility model:

[0024] A railing for a municipal pipeline construction trench: comprising a railing body 1, a Larsen steel sheet pile 11 is fixedly installed at the bottom of the railing body 1, a fence net 12 is fixedly installed at the side of the railing body 1, a clamping block 2 is fixedly connected to the bottom of the railing body 1, a movable rod 21 is slidably connected to the surface of the clamping block 2, a first connecting rod 22 is fixedly connected to the surface of the movable rod 21, a spring 23 is fixedly connected to the surface of the clamping block 2, a clamping piece 24 is fixedly connected to the surface of the movable rod 21, an end of the spring 23 away from the clamping block 2 is fixedly connected to the clamping piece 24, a first nut 25 is fixedly connected to the surface of the clamping piece 24, and the clamping block 2 is fixedly connected to the surface of the railing body 1 with a first nut 25, and the surface of the first nut 25 is threadedly connected to the first bolt 26. During the process of installing the Larsen steel sheet pile 11 on the surface of the railing body 1, there is no need to hold the Larsen steel sheet pile 11 by hand. It is only necessary to clamp the clamp block 2 on the top of the Larsen steel sheet pile 11 to continue to complete the installation of the railing body 1 on the Larsen steel sheet pile 11, and fix it with the first bolt 26. The position of the first bolt 26 is locked on the Larsen steel sheet pile 11 by the clamp block 2, so there is no need to position the first bolt 26, making the installation of the Larsen steel sheet pile 11 convenient and efficient.

[0025] Furthermore, a sliding rod 3 is slidably connected to the surface of the railing body 1, and a vertical rod 31 is fixedly connected to the surface of the sliding rod 3. The fence net 12 is fixedly connected to the surface of the vertical rod 31. A second bolt 33 is perforated and connected to the surface of the railing body 1, and a second connecting rod 32 is fixedly connected to the second bolt 33. A second nut 34 is threadedly connected to the surface of the second bolt 33. The sliding rod 3 and the vertical rod 31 allow the fence net 12 and the clamping block 2 to be disassembled, and then the sliding rod 3 can be fixedly installed on the railing body 1 through the second connecting rod 32, the second bolt 33 and the second nut 34, thereby achieving fixed installation of the fence net 12 on the railing body 1. When the fence net 12 is damaged, the fence net 12 can be replaced and maintained, and the weight of the fence net 12 is reduced during the installation of the railing body 1 to the Larsen steel sheet pile 11, making the installation more convenient.

[0026] Furthermore, a slot is provided at the bottom of the clamp block 2, and the Larsen steel sheet pile 11 is snap-connected to the slot at the bottom of the clamp block 2. The slot of the clamp block 2 limits the position of the clamp block 2 at the top of the Larsen steel sheet pile 11. There are multiple sets of inclined surfaces on the surface of the Larsen steel sheet pile 11, and the two ends of the clamp block 2 are restricted by the inclined surfaces, so that the clamp block 2 cannot slide on the top of the Larsen steel sheet pile 11 through the slot. At this time, the positions of the first nut 25 and the first bolt 26 on the clamp block 2 just correspond to the installation holes opened in the Larsen steel sheet pile 11.

[0027] Furthermore, rectangular grooves are provided on both sides of the clamping block 2 slot, and the movable rod 21 slides on the surface of the clamping block 2. The movable rod 21 drives the clamping piece 24 to move on the clamping block 2 slot and the rectangular groove, and the elastic force of the spring 23 acts on the movable rod 21 through the clamping piece 24. Two groups of movable rods 21 are fixedly connected to a group of first connecting rods 22. The movable rod 21 can slide on the clamping block 2 to the clamping block 2 slot and the rectangular groove, and the clamping pieces 24 are symmetrically distributed on the surface of the clamping block 2.

[0028] Furthermore, a plurality of groups of convex strips are provided on the surface of the clamp 24, and the convex strips are arranged linearly and uniformly. The convex strips increase the clamping force of the clamp 24 on the Larsen steel sheet pile 11, thereby ensuring that the position of the clamp block 2 will not move. A guide hole is provided on the surface of the clamp block 2, and a first nut 25 is fixedly connected to the guide hole of the clamp block 2. The first bolt 26 passes through the guide hole of the clamp block 2 through the first nut 25. The first bolt 26 can slide to the slot and the rectangular slot of the clamp block 2. The first bolt 26 passes through the installation hole of the railing body 1. The first bolt 26 limits the position of the clamp block 2 on the Larsen steel sheet pile 11, thereby fixing the railing body 1 on the top of the Larsen steel sheet pile 11.

[0029] Furthermore, trapezoidal grooves are provided on both sides of the railing body 1, and the sliding rod 3 is in a trapezoidal shape. The vertical rod 31 slides onto the surface of the railing body 1 through the sliding rod 3. The sliding rod 3 limits the position of the vertical rod 31 on the railing body 1, thereby limiting the position of the fence 12 on the railing body 1. At this time, the sliding rod 3 and the vertical rod 31 can only slide upward on the railing body 1.

[0030] Furthermore, a circular hole is opened on the surface of the railing body 1, and the circular hole of the railing body 1 is connected to the trapezoidal groove of the railing body 1. The second bolt 33 passes through the circular hole of the railing body 1, and the side of the second bolt 33 is abutted and connected to the top of the vertical rod 31. The second bolt 33 limits the position of the sliding rod 3 on the trapezoidal groove of the railing body 1, and the second nut 34 fixes the second bolt 33 to the top of the railing body 1. The second connecting rod 32 is simultaneously connected to two groups of second bolts 33, which improves the efficiency of installing the second bolts 33.

[0031] Working principle: make installation holes on the top of the Larsen steel sheet pile 11, pull the first connecting rods 22 on both sides of the clamping block 2, so that the movable rod 21 drives the clip 24 to move on the clamping block 2, so that when the clip 24 moves to the rectangular groove of the clamping block 2, the card slot at the bottom of the clamping block 2 is engaged and connected to the top of the Larsen steel sheet pile 11, and the first connecting rod 22 is released. The elastic force of the spring 23 will make the clip 24 clamp the Larsen steel sheet pile 11. With the support of the convex strip of the clip 24, the position of the clamping block 2 is limited to the top of the Larsen steel sheet pile 11, and the railing body 1 does not need to be installed by hand. Since the position of the clamping block 2 is fixed, the positions of the first nut 25 and the first bolt 26 on the Larsen steel sheet pile 11 are locked, and the first bolt 26 rotates on the first nut 25 to pass through the installation hole of the Larsen steel sheet pile 11, so that the railing body 1 is installed on the top of the Larsen steel sheet pile 11 through the clamping block 2.

[0032] The slide bar 3 is slid onto the trapezoidal groove of the railing body 1, so that the vertical rod 31 is moved to the surface of the railing body 1. At this time, the two sets of second bolts 33 are passed through the circular hole of the railing body 1 through the second connecting rod 32. The second nut 34 rotates on the second bolt 33 to fix the second bolt 33 and the second connecting rod 32 to the railing body 1. At this time, the second bolt 33 limits the position of the slide bar 3 at the top of the slide bar 3, so that the vertical rod 31 and the fence 12 are fixed on the surface of the railing body 1, which is convenient for disassembly of the fence 12 on the railing body 1 and also makes the railing body 1 not have the weight of the fence 12 during the installation process.

[0033] It is obvious to those skilled in the art that the present invention is not limited to the details of the exemplary embodiments described above, and that the present invention can be implemented in other specific forms without departing from the spirit or essential features of the present invention. Therefore, the embodiments should be regarded as exemplary and non-restrictive from any point of view, and the scope of the present invention is defined by the appended claims rather than the above description, and it is intended that all changes falling within the meaning and scope of the equivalent elements of the claims be included in the present invention. Any reference numeral in a claim should not be regarded as limiting the claim to which it relates.

Claims

1. A railing for a municipal pipeline construction trench, characterized in that: The invention comprises a railing body (1), wherein a Larsen steel sheet pile (11) is fixedly installed at the bottom of the railing body (1), a fence net (12) is fixedly installed at the side of the railing body (1), a clamping block (2) is fixedly connected to the bottom of the railing body (1), a movable rod (21) is slidably connected to the surface of the clamping block (2), a first connecting rod (22) is fixedly connected to the surface of the movable rod (21), a spring (23) is fixedly connected to the surface of the clamping block (2), a clamping piece (24) is fixedly connected to the surface of the movable rod (21), one end of the spring (23) away from the clamping block (2) is fixedly connected to the clamping piece (24), a first nut (25) is fixedly connected to the surface of the clamping piece (24), a first nut (25) is fixedly connected to the surface of the clamping block (2), and a first bolt (26) is threadedly connected to the surface of the first nut (25).

2. A municipal pipeline construction trench guardrail according to claim 1, characterized in that: A sliding rod (3) is slidably connected to the surface of the railing body (1), a vertical rod (31) is fixedly connected to the surface of the sliding rod (3), the fence (12) is fixedly connected to the surface of the vertical rod (31), a second bolt (33) is perforated and connected to the surface of the railing body (1), the second bolt (33) is fixedly connected to the second connecting rod (32), and a second nut (34) is threadedly connected to the surface of the second bolt (33).

3. A municipal pipeline construction trench guardrail according to claim 1, characterized in that: A slot is provided at the bottom of the clamp block (2), and the Larsen steel sheet pile (11) is snap-connected to the slot at the bottom of the clamp block (2). The slot of the clamp block (2) limits the position of the clamp block (2) at the top of the Larsen steel sheet pile (11).

4. A municipal pipeline construction trench guardrail according to claim 3, characterized in that: Rectangular grooves are provided on both sides of the clamping block (2) slot, and the movable rod (21) slides on the surface of the clamping block (2), and the movable rod (21) drives the clamping piece (24) to move on the clamping block (2) slot and the rectangular groove.

5. A municipal pipeline construction trench guardrail according to claim 4, characterized in that: A plurality of groups of convex strips are provided on the surface of the clamping piece (24), a guide hole is provided on the surface of the clamping block (2), a first nut (25) is fixedly connected to the guide hole of the clamping block (2), and the first bolt (26) passes through the guide hole of the clamping block (2) through the first nut (25).

6. A municipal pipeline construction trench guardrail according to claim 2, characterized in that: Trapezoidal grooves are provided on both sides of the railing body (1); the sliding rod (3) is in a trapezoidal shape; and the vertical rod (31) slides onto the surface of the railing body (1) through the sliding rod (3).

7. A municipal pipeline construction trench guardrail according to claim 6, characterized in that: A circular hole is provided on the surface of the railing body (1), the circular hole of the railing body (1) is connected to the trapezoidal groove of the railing body (1), the second bolt (33) passes through the circular hole of the railing body (1), and the second bolt (33) limits the position of the sliding rod (3) on the trapezoidal groove of the railing body (1).