Emergency temporary dam for hydraulic engineering

By adopting the emergency temporary dam structure for water conservancy projects using support components, separation frames and water-absorbent expansion bags, the problems of long and labor-intensive construction in the existing technology are solved, rapid erection and heightening are achieved, and emergency flood control efficiency is improved.

CN222390368UActive Publication Date: 2025-01-24HUBEI XINDASHENG CONSTR CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202421123609.3
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-05-22
Publication Date
2025-01-24
Estimated Expiration
2034-05-22

AI Technical Summary

Technical Problem

The existing technology takes a long time to build temporary dams, which affects emergency flood control and rescue, and sandbags or clay stacking is time-consuming and labor-intensive.

Method used

The water conservancy projects including fixed components, blocking parts, support components, separators, and water conservancy projects for water conservancy bags are used for emergency temporary dam structures. The support component is connected to the fixed component and blocking parts.

Benefits of technology

This temporary dyke can be quickly erected and heightened, reducing the occupation of transportation space and improving the efficiency of emergency flood control.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222390368U_ABST
    Figure CN222390368U_ABST
Patent Text Reader

Abstract

The emergency temporary dam for the water conservancy project comprises a fixing assembly, a blocking piece, at least one supporting assembly, a separation frame and multiple sets of water absorption expansion bags, the supporting assembly is connected with the fixing assembly and the blocking piece, and the supporting assembly is used for supporting the blocking piece above the fixing assembly; an opening communicated with an inner cavity of the blocking piece is formed in the front face of the blocking piece, the separation frame is fixedly connected in the inner cavity of the blocking piece and divides the inner cavity of the blocking piece into a plurality of sets of independent cavities, and a set of water absorption expansion bags is placed in each set of cavities. The device has the advantages that the device can be conveniently and rapidly erected on the dam to assist in heightening the dam for flood fighting, the occupied space during transportation can be reduced, and the device can be conveniently transported to the dam needing flood fighting.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of water conservancy projects, and in particular to an emergency temporary dam for water conservancy projects. Background Art

[0002] When a dam breaks upstream or there is heavy rainfall, the flood will easily cause terrible damage to the surrounding environment downstream. In order to reduce the impact of the flood on the downstream when the dam breaks, building temporary dams has become a countermeasure to reduce such damage.

[0003] At present, when raising dams to prevent floods, the common means is to use sandbags to raise the dams or to temporarily use clay to raise the dams. The above methods of raising dams to prevent floods all have the problem of long construction time, and when using sandbags or clay to build temporary dams, it will also take the workers a lot of time to stack the sandbags or solidify the clay, which will affect emergency flood relief. Utility Model Content

[0004] In order to improve the time-consuming and labor-intensive problem of building temporary dams using sandbags or clay, the present application provides an emergency temporary dam for water conservancy projects.

[0005] The present application provides an emergency temporary dam for water conservancy projects using the following technical solution:

[0006] A temporary emergency dam for a water conservancy project comprises a fixing assembly, a blocking member, at least one group of supporting assemblies, a partition frame and a plurality of groups of water-absorbing expansion bags, wherein the supporting assembly is respectively connected to the fixing assembly and the blocking member, and the supporting assembly is used to support the blocking member above the fixing assembly, an opening communicating with the inner cavity of the blocking member is formed on the front surface of the blocking member, the partition frame is fixedly connected to the inner cavity of the blocking member and divides the inner cavity of the blocking member into a plurality of groups of independent cavities, and a group of water-absorbing expansion bags is placed in each group of cavities.

[0007] Wherein, the support assembly includes a connecting frame, a ring, a support tube and an extension rod. The connecting frame is fixedly connected to the back side of the blocking member and is pivotally connected to the fixed assembly. The ring is pivotally connected in the middle gap of the connecting frame. The support tube is fixedly connected to the outer wall of the ring, and a threaded chamber is formed at one end of the support tube facing away from the ring. One end of the extension rod is screwed into the threaded chamber by a threaded connection, and the other end of the extension rod protrudes to the outside of the support tube, so that the bottom end of the extension rod can be inserted into or removed from the fixed assembly.

[0008] Furthermore, the number of the support components is set to two groups, and the two groups of support components are symmetrically installed at two ends of the back side of the blocking member along the length direction of the blocking member.

[0009] Furthermore, the fixing assembly includes a base, the top of which is fixedly connected with positioning brackets of a number equal to the number of supporting components, each group of the positioning brackets is pivotally connected to the bottom end of an adjacent connecting frame, an upwardly protruding supporting step is formed on the side of the top of the base away from the positioning bracket, and the top of the supporting step is arranged to be a plane parallel to the horizontal plane, a placement groove is also formed on the base, and several groups of the water-absorbing expansion bags can be taken out and stored in the placement groove, the top of the placement groove is hinged with a cover plate covering the placement groove, and a plurality of groups of fixing holes are also formed on the base, and the plurality of groups of the fixing holes penetrate the base longitudinally.

[0010] Furthermore, the partition frame includes several groups of mutually parallel horizontal plates and several groups of mutually parallel vertical plates, and the several groups of the horizontal plates and the several groups of the vertical plates are fixedly connected to form a grid structure. The length and width of each group of cavities in the blocking member formed by the partition frame are respectively adapted to the length and width of the water-absorbing expansion bag, and the depth of each group of cavities in the blocking member is greater than the thickness of the water-absorbing expansion bag after swelling.

[0011] The beneficial technical effects of the present application are as follows: the blocking member can be supported above the fixed component through the partition frame, and multiple groups of water-absorbing expansion bags are placed in the blocking member, so that the emergency temporary dam for water conservancy projects can be erected on the dam more conveniently and quickly to assist in raising the dam for flood control; the partition frame can be folded and the blocking member can be placed flat on the top of the fixed component for support, so that the emergency temporary dam for water conservancy projects can reduce the space occupied during transportation, and multiple groups of such emergency temporary dams for water conservancy projects can be transported to the dam required for flood control. BRIEF DESCRIPTION OF THE DRAWINGS

[0012] Figure 1 It is a structural schematic diagram of the installation and use of an emergency temporary dam for a water conservancy project according to an embodiment of the present application;

[0013] Figure 2 It is a structural schematic diagram of the emergency temporary dam for water conservancy projects during transportation according to an embodiment of the present application;

[0014] Figure 3 is a schematic structural diagram of a support assembly and a blocking member in an embodiment of the present application;

[0015] Figure 4 It is a schematic diagram of the structure of the fixing component in the embodiment of the present application.

[0016] Figure numerals: 10, fixing assembly; 11, base; 12, positioning bracket; 13, placement groove; 14, cover plate; 15, fixing hole; 16, supporting step; 20, blocking member; 30, supporting assembly; 31, connecting frame; 32, ring; 33, supporting tube; 34, extension rod; 40, partition frame; 50, water absorption expansion bag. DETAILED DESCRIPTION

[0017] The technical solution of the present application will be described clearly and completely below in conjunction with the accompanying drawings. Obviously, the described embodiments are part of the embodiments of the present application, rather than all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present application.

[0018] The present application embodiment discloses an emergency temporary dam for water conservancy projects. Figure 1 and Figure 2 The emergency temporary dam for water conservancy projects includes a fixing assembly 10, a blocking member 20, at least one group of supporting assemblies 30, a partition frame 40 and a plurality of groups of water-absorbing expansion bags 50.

[0019] The supporting assembly 30 is connected to the fixing assembly 10 and the blocking member 20 respectively, and the position state between the fixing assembly 10 and the blocking member 20 can be changed by using the supporting assembly 30 .

[0020] During flood control, the support assembly 30 can support the blocking member 20 above the fixing assembly 10. The front of the blocking member 20 is formed with an opening communicating with its inner cavity, and the partition frame 40 is fixedly connected to the inner cavity of the blocking member 20 and divides the inner cavity of the blocking member 20 into a plurality of independent cavities, and a group of water-absorbing expansion bags 50 are placed in each group of cavities during flood control, so that the water-absorbing expansion bags 50 absorb water and expand to assist in flood control and water blocking.

[0021] During transportation, the support assembly 30 can support the blocking member 20 to be laid flat on the fixing assembly 10, and the water-absorbing expansion bags 50 can also be stacked and stored in the fixing assembly 10, so that the overall device can reduce the occupied space.

[0022] See also Figure 4The fixing assembly 10 includes a base 11, and the top of the base 11 is fixedly connected with a number of positioning brackets 12 equal to the number of support assemblies 30, and each group of positioning brackets 12 is pivotally connected to the bottom end of the connecting bracket 31 in the adjacent support assembly 30, so that the support assembly 30 can deflect and adjust its position state above the base 11. A supporting step 16 protruding upward is formed on the side of the top of the base 11 away from the positioning bracket 12, and the top of the supporting step 16 is set to be a plane parallel to the horizontal plane, so that the supporting step 16 can be used to assist in supporting and placing the support assembly 30 and the blocking member 20 during transportation. A placement groove 13 is also formed on the base 11, and several groups of water-absorbing expansion bags 50 can be stored in the placement groove 13 when not in use, and the placement groove 13 is covered and pressed by a cover plate 14 hinged on the top of the placement groove 13. A plurality of fixing holes 15 are formed on the base 11 , and the plurality of fixing holes 15 penetrate the base 11 longitudinally, so that when reinforcing the dam, workers can use fixing nails to pass through the fixing holes 15 and insert them into the ground to fix the base 11 .

[0023] In this embodiment, the length of the blocking member 20 is equal to the length of the base 11, so that when multiple groups of emergency temporary embankments for water conservancy projects are installed and used continuously, the blocking members 20 in each group of emergency temporary embankments for water conservancy projects can form a continuous blocking structure. Figure 1 When used for flood prevention, the bottom edge line is coplanar with the bottom plane of the base 11, so that the inclined blocking member 20 can block the water body when used for flood prevention.

[0024] See also Figure 3, the number of support assemblies 30 is set to two groups, and the two groups of support assemblies 30 are symmetrically installed at the two ends of the back of the blocking member 20 along the length direction of the blocking member 20, so that each group of support assemblies 30 can evenly bear the gravity at the blocking member 20 and the pressure of the water body during flood control. The support assembly 30 may include a connecting frame 31, a collar 32, a support pipe 33 and an extension rod 34. The connecting frame 31 is fixedly connected to the back of the blocking member 20 and is pivotally connected to the fixing assembly 10, so that it can drive the blocking member 20 to deflect and adjust its position state. The collar 32 is pivotally connected to the middle gap of the connecting frame 31, and the support pipe 33 is fixedly connected to the outer wall of the collar 32, so that the support pipe 33 can be deflected and placed in the middle gap of the connecting frame 31; the support pipe 33 can also be moved out of the middle gap of the connecting frame 31 and used to support the connecting frame 31. A threaded chamber is formed at one end of the support tube 33 facing away from the collar 32, and one end of the extension rod 34 is screwed into the threaded chamber by means of a threaded connection, and the other end of the extension rod 34 protrudes out of the support tube 33. When the staff screws the extension rod 34 toward the base 11, it can be inserted into the base 11, so that the support assembly 30 and the fixing assembly 10 cooperate with the blocking member 20 to form a triangular support structure. When the staff screws the extension rod 34 away from the base 11, it can be moved out of the base 11, so that the support tube 33 and the extension rod 34 can be moved into the middle gap of the connecting frame 31 for placement.

[0025] In this embodiment, the partition frame 40 includes a plurality of groups of mutually parallel horizontal plates and a plurality of groups of mutually parallel vertical plates, which are fixedly connected to form a grid structure, and the partition frame 40 divides the inner cavity of the blocking member 20 into cavities that match the size of the water-absorbing expansion bag 50. The length and width of each group of cavities in the blocking member 20 are respectively matched with the length and width of the water-absorbing expansion bag 50, and the depth of each group of cavities in the blocking member 20 is greater than the thickness of the water-absorbing expansion bag 50 after absorbing water, so that when used for flood control, a group of water-absorbing expansion bags 50 can be placed in each group of cavities, and the water-absorbing expansion bag 50 can be prevented from falling from the cavity after absorbing water and expanding.

[0026] In this embodiment, the outer skin of the water-absorbing expansion bag 50 is formed by sewing a sack with good water permeability, and the inner bag is made of a water-absorbing material. For example, the inner bag of the common water-absorbing expansion bag 50 is made of super absorbent polymer (SAP), which can quickly expand 80 to 100 times after absorbing water. The water-absorbing expansion bag is a prior art and will not be described in detail here.

[0027] The above are all preferred embodiments of the present application, and the protection scope of the present application is not limited thereto. Therefore, any equivalent changes made according to the structure, shape, and principle of the present application should be included in the protection scope of the present application.

Claims

1. An emergency temporary dam for water conservancy projects, characterized in that: The invention comprises a fixing assembly (10), a blocking member (20), at least one group of supporting assemblies (30), a partition frame (40), and a plurality of groups of water-absorbing expansion bags (50), wherein the supporting assembly (30) is connected to the fixing assembly (10) and the blocking member (20) respectively, and the supporting assembly (30) is used to support the blocking member (20) above the fixing assembly (10), an opening communicating with an inner cavity of the blocking member (20) is formed on the front surface of the blocking member (20), and the partition frame (40) is fixedly connected to the inner cavity of the blocking member (20) and divides the inner cavity of the blocking member (20) into a plurality of groups of independent cavities, and a group of water-absorbing expansion bags (50) is placed in each group of cavities. The support assembly (30) comprises a connecting frame (31), a collar (32), a supporting tube (33) and an extension rod (34); the connecting frame (31) is fixedly connected to the back of the blocking member (20) and is pivotally connected to the fixing assembly (10); the collar (32) is pivotally connected to a central gap of the connecting frame (31); the supporting tube (33) is fixedly connected to an outer wall of the collar (32); and a threaded chamber is formed at one end of the supporting tube (33) facing away from the collar (32); one end of the extension rod (34) is screwed into the threaded chamber by means of a threaded connection, and the other end of the extension rod (34) protrudes to the outside of the support tube (33), so that the bottom end of the extension rod (34) can be inserted into or removed from the fixing assembly (10).

2. The emergency temporary dam for water conservancy project according to claim 1, characterized in that: The number of the support assemblies (30) is set to two groups, and the two groups of the support assemblies (30) are symmetrically installed at two ends of the back side of the blocking member (20) along the length direction of the blocking member (20).

3. An emergency temporary dam for water conservancy projects according to claim 1 or 2, characterized in that: The fixing assembly (10) comprises a base (11), the top of which is fixedly connected with positioning brackets (12) whose number is equal to the number of supporting assemblies (30), and each group of positioning brackets (12) is pivotally connected to the bottom end of an adjacent connecting frame (31).

4. The emergency temporary dam for water conservancy project according to claim 3, characterized in that: A supporting step (16) protruding upward is formed on a side of the top of the base (11) away from the positioning bracket (12), and the top of the supporting step (16) is arranged as a plane parallel to the horizontal plane.

5. The emergency temporary dam for water conservancy project according to claim 4, characterized in that: A placement groove (13) is also formed on the base (11), and a plurality of groups of the water-absorbing expansion bags (50) can be taken out and stored in the placement groove (13). A cover plate (14) is hinged at the top of the placement groove (13) for covering the placement groove (13).

6. The emergency temporary dam for water conservancy project according to claim 5, characterized in that: A plurality of groups of fixing holes (15) are also formed on the base (11), and the plurality of groups of fixing holes (15) penetrate the base (11) longitudinally.

7. The emergency temporary dam for water conservancy project according to claim 1, characterized in that: The partition frame (40) comprises a plurality of groups of mutually parallel transverse plates and a plurality of groups of mutually parallel vertical plates, wherein the plurality of groups of transverse plates and the plurality of groups of vertical plates are fixedly connected to form a grid structure.

8. The emergency temporary dam for water conservancy project according to claim 7, characterized in that: The length and width of each group of cavities in the blocking member (20) are respectively matched to the length and width of the water absorption expansion bag (50), and the depth of each group of cavities in the blocking member (20) is greater than the thickness of the water absorption expansion bag (50) after swelling due to water absorption.