Auxiliary device for mountain photovoltaic pile foundation pouring

By using the auxiliary device that can be used for lift and vibration motors and vibration heads during the pouring process of photovoltaic piles in the mountains, solve the problem of frequent movement and repeated lifting concrete vibration rods, realize the efficient vibration and automation of concrete, improve the construction of construction Efficiency and equipment life.

CN222413031UActive Publication Date: 2025-01-28THE FIRST CONSTR ENG COMPANY LTD OF CHINA CONSTR SECOND ENG BUREAU
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202421211336.8
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-05-30
Publication Date
2025-01-28
Estimated Expiration
2034-05-30

AI Technical Summary

Technical Problem

During the pouring of mountain photovoltaic pile foundations, due to the rugged terrain and the dispersed pile foundations, people need to frequently move and repeatedly lift the concrete vibrator, resulting in high labor intensity and low working efficiency.

Method used

Design a auxiliary device including lifting motors and vibration heads, which uses electric strand and twisted rope to achieve accurate lifting of the vibration motor, and is equipped with a washing mechanism and a bracket to improve stability and safety.

Benefits of technology

The automation of concrete vibration has been achieved, the vibration efficiency and quality are improved, the labor intensity of personnel is reduced, the efficiency of work is improved, and the service life of the equipment is extended.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222413031U_ABST
    Figure CN222413031U_ABST
Patent Text Reader

Abstract

The utility model provides an auxiliary device for mountain photovoltaic pile foundation pouring. The auxiliary device for mountainous region photovoltaic pile foundation pouring comprises a mounting shell, a lifting vibration motor is arranged in the mounting shell, a vibrating head is arranged at the output end of the vibration motor, and the vibration motor and the vibrating head are used for assisting constructors in vibrating concrete poured in a mountainous region photovoltaic pile foundation; the handle is used for operating and grasping and is fixedly mounted on the mounting shell; and the mounting frame is fixedly mounted in the mounting shell, an electric capstan used for regulating and controlling the vibration motor to ascend and descend is arranged on the mounting frame, and a twisted rope is arranged on the electric capstan. The auxiliary device for mountainous region photovoltaic pile foundation pouring solves the problems that in the mountainous region photovoltaic pile foundation pouring process, due to the fact that the terrain is rugged, the positions of the pile foundations are scattered, workers need to frequently move and repeatedly lift the concrete vibrating bar, labor intensity is large, and working efficiency is low.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of photovoltaic engineering, in particular to an auxiliary device for pouring photovoltaic pile foundations in mountainous areas. Background Art

[0002] With the continuous development of renewable energy technology, photovoltaic power generation has been widely used as a clean and renewable energy form. In mountainous environments, due to the complex terrain and variable soil conditions, the pouring of photovoltaic pile foundations is particularly critical. During the pouring process, the density and uniformity of concrete have an important impact on the quality and stability of the pile foundation.

[0003] At present, in the process of pouring photovoltaic pile foundations in mountainous areas, concrete vibrators are usually used to assist in vibrating the concrete in the pile foundation pit to ensure that the concrete can be fully compacted and remove the bubbles in it. However, in mountainous environments, due to the rugged terrain and scattered pile foundation locations, workers need to frequently move and repeatedly lift the concrete vibrator, which not only increases labor intensity but also reduces work efficiency.

[0004] Therefore, it is necessary to provide an auxiliary device for pouring mountain photovoltaic pile foundations to solve the above technical problems. Utility Model Content

[0005] The utility model provides an auxiliary device for pouring photovoltaic pile foundations in mountainous areas, aiming to solve the problems of high labor intensity and low work efficiency caused by the need for personnel to frequently move and repeatedly lift concrete vibrating rods during the pouring of photovoltaic pile foundations in mountainous areas due to the rugged terrain and scattered pile foundation locations.

[0006] The auxiliary device for pouring mountain photovoltaic pile foundation provided by the utility model comprises: a mounting shell, a liftable vibration motor is arranged in the mounting shell, a vibrating head is arranged on the output end of the vibration motor, the vibration motor and the vibrating head are used to assist construction personnel in vibrating concrete poured in the mountain photovoltaic pile foundation; a handle for operating the grip, the handle is fixedly mounted on the mounting shell; a mounting frame, the mounting frame is fixedly mounted in the mounting shell, an electric winch for regulating the lifting and lowering of the vibration motor is arranged on the mounting frame, and a twisting rope is arranged on the electric winch; a hanger, the hanger is fixedly mounted on the bottom end of the twisting rope, a hook is symmetrically fixedly mounted on the hanger, a lifting ring is arranged on the hook, and the lifting ring is fixedly connected to the vibration motor; a flushing mechanism for cleaning the vibrating head, the flushing mechanism is arranged in the mounting shell.

[0007] Preferably, the flushing mechanism includes: an annular flushing pipe fixedly installed in the mounting shell for spraying water to flush the vibrating head; a water tank fixedly installed on one side of the mounting shell for holding water for flushing; a water pump fixedly installed on one side of the mounting shell for pumping water; a water suction pipe fixed on the water inlet end of the water pump, the water inlet end of the water suction pipe being fixedly connected to the water tank; a water outlet pipe fixedly installed on the water outlet end of the water pump, the water outlet end of the water outlet pipe being fixedly connected to the annular flushing pipe.

[0008] Preferably, a bracket seat is fixedly mounted on the mounting shell, and a pointed cone rod for breaking the ground and limiting the position is symmetrically fixedly mounted on the bottom of the bracket seat.

[0009] Preferably, guide rods are symmetrically fixedly mounted on the inner wall of the mounting shell, sleeve blocks are sleeved on the guide rods, and the sleeve blocks are fixedly connected to the vibration motor.

[0010] Preferably, an inspection opening is provided on one side of the installation shell, an openable and closable baffle is provided in the inspection opening, a hinge and a door lock are provided on the baffle, and the hinge is fixedly connected to the installation shell.

[0011] Preferably, a water inlet is provided on the top of the water tank, a cover plate is provided on the water inlet, and a handle for grasping is fixedly mounted on the top of the cover plate.

[0012] Preferably, a through opening for the vibrating head to enter and exit is provided at the bottom of the mounting shell, and a limit block is fixedly installed at the top end of the guide rod.

[0013] Compared with the related art, the auxiliary device for pouring mountain photovoltaic pile foundation provided by the utility model has the following beneficial effects:

[0014] The utility model provides an auxiliary device for pouring photovoltaic pile foundation in mountainous areas:

[0015] 1. Through the design of the vibration motor and the vibrating head, the automation of concrete vibration is realized, and the vibration efficiency and quality are improved. The lifting characteristics of the vibration motor enable the vibrating head to adapt to pile foundation pits of different depths, ensuring the uniformity and density of the concrete; the handle design facilitates the operation and movement of construction workers and improves work efficiency; the combination of the electric winch and the rope makes the lifting of the vibration motor more precise and controllable, and easy to operate;

[0016] 2. The flushing mechanism includes an annular flushing pipe, a water tank and a water pump, which can clean the vibrating head in time after the vibration operation to prevent concrete solidification and blockage, thereby extending the service life of the equipment. The design of the bracket seat and the pointed cone rod increases the stability of the device on uneven mountainous areas, ensuring safety during the construction process. BRIEF DESCRIPTION OF THE DRAWINGS

[0017] Figure 1 A schematic diagram of the main structure of a preferred embodiment of the auxiliary device for pouring mountain photovoltaic pile foundation provided by the utility model;

[0018] Figure 2 This is a schematic diagram of the main cross-sectional structure of the utility model;

[0019] Figure 3 for Figure 2 An enlarged structural diagram of part A shown in FIG.

[0020] Figure 4 for Figure 2 Schematic diagram of the enlarged structure of part B shown in FIG.

[0021] Numbers in the figure: 1. Mounting shell; 2. Vibration motor; 3. Vibrating head; 4. Handle; 5. Mounting frame; 6. Electric winch; 7. Twist rope; 8. Hanger; 9. Hook; 10. Lifting ring; 11. Annular flushing pipe; 12. Water tank; 13. Water pump; 14. Suction pipe; 15. Water outlet pipe; 16. Bracket seat; 17. Tapered rod; 18. Block; 19. Guide rod. DETAILED DESCRIPTION

[0022] The utility model is further described below in conjunction with the accompanying drawings and implementation modes.

[0023] Please refer to Figure 1-Figure 4 ,in, Figure 1 A schematic diagram of the main structure of a preferred embodiment of the auxiliary device for pouring mountain photovoltaic pile foundation provided by the utility model; Figure 2 This is a schematic diagram of the main cross-sectional structure of the utility model; Figure 3 for Figure 2 An enlarged structural diagram of part A shown in FIG. Figure 4 for Figure 2 Schematic diagram of the enlarged structure of part B shown in FIG.

[0024] The auxiliary device for pouring mountain photovoltaic pile foundation includes: a mounting shell 1, in which a lifting vibration motor 2 is arranged, and a vibrating head 3 is arranged on the output end of the vibration motor 2, and the vibration motor 2 and the vibrating head 3 are used to assist construction personnel to vibrate the concrete poured in the mountain photovoltaic pile foundation; a handle 4 for operating the grip, and the handle 4 is fixedly installed on the mounting shell 1; a mounting frame 5, the mounting frame 5 is fixedly installed in the mounting shell 1, and an electric winch 6 for regulating the lifting of the vibration motor 2 is arranged on the mounting frame 5, and a rope 7 is arranged on the electric winch 6; a hanger 8, the hanger 8 is fixedly installed on the bottom end of the rope 7, and the hanger 8 is fixedly installed on the bottom end of the rope 7. A hook 9 is symmetrically fixedly installed on the frame 8, and a lifting ring 10 is arranged on the hook 9, and the lifting ring 10 is fixedly connected to the vibration motor 2; a flushing mechanism for cleaning the vibrating head 3 is arranged in the mounting shell 1. Through the design of the vibration motor 2 and the vibrating head 3, the automation of concrete vibration is realized, and the vibration efficiency and quality are improved. The lifting and lowering characteristics of the vibration motor 2 enable the vibrating head 3 to adapt to pile foundation pits of different depths, ensuring the uniformity and density of the concrete; the design of the handle 4 facilitates the operation and movement of the construction personnel and improves the work efficiency; the combination of the electric winch 6 and the rope 7 makes the lifting and lowering of the vibration motor 2 more precise and controllable, and the operation is simple.

[0025] The flushing mechanism includes: an annular flushing pipe 11 fixedly installed in the installation shell 1 for spraying water to flush the vibrating head 3; a water tank 12 fixedly installed on one side of the installation shell 1 for containing flushing water; a water pump 13 fixedly installed on one side of the installation shell 1 for pumping water; a water suction pipe 14 fixed on the water inlet end of the water pump 13, the water inlet end of the water suction pipe 14 is fixedly connected to the water tank 12; a water outlet pipe 15 fixedly installed on the water outlet end of the water pump 13, the water outlet end of the water outlet pipe 15 is fixedly connected to the annular flushing pipe 11. Through the flushing mechanism including the annular flushing pipe 11, the water tank 12 and the water pump 13, the vibrating head 3 can be cleaned in time after the vibration operation to prevent concrete solidification and blockage, thereby extending the service life of the equipment.

[0026] A bracket seat 16 is fixedly mounted on the mounting shell 1, and a pointed cone rod 17 for breaking ground and limiting the position is symmetrically fixedly mounted on the bottom of the bracket seat 16. The design of the bracket seat 16 and the pointed cone rod 17 increases the stability of the device on uneven mountainous terrain, ensuring safety during the construction process.

[0027] A guide rod 19 is symmetrically fixedly mounted on the inner wall of the mounting shell 1, and a sleeve block 18 is sleeved on the guide rod 19. The sleeve block 18 is fixedly connected to the vibration motor 2. The vibration motor 2 can be limited and guided by the provided guide rod 19 and the sleeve block 18, so as to ensure the stability of its lifting and lowering.

[0028] An inspection port is provided on one side of the installation shell 1 , and an openable and closable baffle is provided in the inspection port. A hinge and a door lock are provided on the baffle, and the hinge is fixedly connected to the installation shell 1 .

[0029] The top of the water tank 12 is provided with a water inlet, a cover plate is provided on the water inlet, and a handle for grasping is fixedly installed on the top of the cover plate.

[0030] A through opening is provided at the bottom of the installation shell 1 for the vibrating head 3 to enter and exit, and a limit block is fixedly installed at the top of the guide rod 19 .

[0031] It is worth noting that the circuits, electronic components and modules involved in the present utility model are all prior art and can be fully implemented by those skilled in the art. Needless to say, the content protected by the present utility model does not involve improvements to software and methods.

[0032] The working principle of the auxiliary device for pouring mountain photovoltaic pile foundation provided by the utility model is as follows:

[0033] This solution also has an electric control switch, which is set on the equipment. When in use, each electrical device can be started to run through the electric control switch. The power connection method of each electrical device is an existing mature technology, which is a well-known technology for people in this field and will not be described in detail here.

[0034] When in use, first, ensure that there is enough flushing water in the water tank 12, and refill it through the water inlet (located at the top of the water tank 12), check the electric control switch, and ensure that the wiring of each electrical device is correct; place the installation shell 1 at a position close to the photovoltaic pile foundation pit (such as Figure 2 As shown in ), the pointed cone rod 17 at the bottom of the bracket seat 16 is inserted into the ground to stabilize the device. Ensure that the vibrating head 3 can smoothly enter the pile foundation pit; start the vibration motor 2 through the electric control switch, the vibration motor 2 starts to work, and the vibration force is transmitted to the concrete through the vibrating head 3 to achieve the purpose of compaction and removal of bubbles; use the electric winch 6 to control the lifting and lowering of the vibration motor 2, and through the cooperation of the hook 9 and the ring 10 on the twisted rope 7 and the hanger 8, the vibrating head 3 can be moved up and down in the concrete to adapt to pile foundation pits of different depths; Vibration operation: The construction personnel operate the device through the handle 4 to push the vibrating head 3 deep into the concrete for vibration. During the vibration process, the height and vibration time of the vibration motor 2 can be adjusted as needed to achieve the best vibration effect;

[0035] After the vibration operation is completed, start the water pump 13, draw water from the water tank 12 through the pumping pipe 14, and transport it to the annular flushing pipe 11 through the outlet pipe 15 to clean the vibration head 3 to prevent the concrete from solidifying on the vibration head 3. In summary, the mountain photovoltaic pile foundation casting auxiliary device of the present technical solution effectively solves the problem of vibration operation in mountainous environment, reduces the labor intensity of personnel, and is conducive to improving the casting construction efficiency.

[0036] Compared with the related art, the auxiliary device for pouring mountain photovoltaic pile foundation provided by the utility model has the following beneficial effects:

[0037] The utility model provides an auxiliary device for pouring photovoltaic pile foundation in mountainous areas. Through the design of a vibration motor 2 and a vibrating head 3, the automation of concrete vibration is realized, and the vibration efficiency and quality are improved. The liftable characteristic of the vibration motor 2 enables the vibrating head 3 to adapt to pile foundation pits of different depths, thereby ensuring the uniformity and density of concrete. The design of the handle 4 facilitates the operation and movement of construction personnel, thereby improving work efficiency. The combination of the electric winch 6 and the twisting rope 7 makes the lifting of the vibration motor 2 more accurate and controllable, and the operation is simple. Through the flushing mechanism including the annular flushing pipe 11, the water tank 12 and the water pump 13, the vibrating head 3 can be cleaned in time after the vibration operation, thereby preventing concrete from solidifying on the vibrating head 3, thereby extending the service life of the equipment. Through the design of the bracket seat 16 and the pointed cone rod 17, the stability of the device on uneven mountainous areas is increased, thereby ensuring the safety during the construction process.

[0038] It should be noted that the equipment structure and drawings of the utility model mainly describe the principle of the utility model. In terms of the technology of the design principle, the settings of the power mechanism, power supply system and control system of the device are not fully described. However, on the premise that technical personnel in this field understand the principle of the above-mentioned utility model, they can clearly know the details of its power mechanism, power supply system and control system.

[0039] The above description is only an embodiment of the present invention, and does not limit the patent scope of the present invention. Any equivalent structure or equivalent process transformation made by using the contents of the specification and drawings of the present invention, or directly or indirectly applied in other related technical fields, are also included in the patent protection scope of the present invention.

Claims

1. An auxiliary device for pouring photovoltaic pile foundation in mountainous areas, characterized in that: include: An installation shell, wherein a liftable vibration motor is arranged in the installation shell, and a vibrating head is arranged on the output end of the vibration motor, and the vibration motor and the vibrating head are used to assist construction personnel in vibrating concrete poured in a mountain photovoltaic pile foundation; A handle for operating and grasping, wherein the handle is fixedly mounted on the mounting shell; A mounting frame, the mounting frame is fixedly mounted in the mounting shell, the mounting frame is provided with an electric winch for regulating the lifting and lowering of the vibration motor, and the electric winch is provided with a winch rope; A hanger, the hanger is fixedly mounted on the bottom end of the twisted rope, a hook is symmetrically fixedly mounted on the hanger, a lifting ring is provided on the hook, and the lifting ring is fixedly connected to the vibration motor; A flushing mechanism for cleaning the vibrating head is provided in the mounting shell.

2. The auxiliary device for pouring mountain photovoltaic pile foundation according to claim 1, characterized in that: The flushing mechanism comprises: An annular flushing pipe fixedly mounted in the mounting shell and used for spraying water to flush the vibrating head; A water tank fixedly mounted on one side of the mounting shell for holding flushing water; A water pump fixedly mounted on one side of the mounting shell for pumping water; A water pumping pipe fixed on the water inlet end of the water pump, wherein the water inlet end of the water pumping pipe is fixedly connected to the water tank; A water outlet pipe is fixedly mounted on the water outlet end of the water pump, and the water outlet end of the water outlet pipe is fixedly connected to the annular flushing pipe.

3. The auxiliary device for pouring mountain photovoltaic pile foundation according to claim 1, characterized in that: A bracket seat is fixedly mounted on the mounting shell, and a pointed cone rod for ground breaking and limiting is symmetrically fixedly mounted on the bottom of the bracket seat.

4. The auxiliary device for pouring mountain photovoltaic pile foundation according to claim 1, characterized in that: The inner wall of the installation shell is symmetrically fixedly installed with guide rods, and the guide rods are sleeved with sleeve blocks, and the sleeve blocks are fixedly connected to the vibration motor.

5. The auxiliary device for pouring mountain photovoltaic pile foundation according to claim 1, characterized in that: An inspection port is arranged on one side of the installation shell, an openable and closable baffle is arranged in the inspection port, a hinge and a door lock are arranged on the baffle, and the hinge is fixedly connected to the installation shell.

6. The auxiliary device for pouring mountain photovoltaic pile foundation according to claim 2, characterized in that: A water inlet is arranged on the top of the water tank, a cover plate is arranged on the water inlet, and a handle for grasping is fixedly installed on the top of the cover plate.

7. The auxiliary device for pouring mountain photovoltaic pile foundation according to claim 4, characterized in that: A through opening is provided at the bottom of the installation shell for the vibrating head to enter and exit, and a limit block is fixedly installed at the top end of the guide rod.