Blockage removing device suitable for pressure guide pipe of pressure gauge

By designing a blocking device including a dredging rod, a shunt interface and an adapter, the problems of blockage and dirty sputtering of the pressure gauge pressure tube are solved, and a fast and safe cleaning effect is achieved.

CN222428789UActive Publication Date: 2025-02-07WUJIANG CSG GLASS CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420924370.3
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-04-30
Publication Date
2025-02-07
Estimated Expiration
2034-04-30

AI Technical Summary

Technical Problem

In industrial sites, the pressure gauge pressure pipe is prone to clogging and lacks a special quick cleaning device, which leads to the risk of dirty sputtering, especially for toxic or high-temperature media.

Method used

A clearing device is designed, including a clearing rod, a diversion interface and an adapter. The first pipe is connected to the pressure lead pipe through the adapter, and the clearing rod is inserted into the pressure lead pipe and rotates it, and the blockage is discharged by medium pressure. It is discharged outward from the second pipe through the first pipe.

Benefits of technology

It quickly and effectively cleans up blockages in the pressure induced pipe, prevents dirty sputtering, and reduces safety threats to operators.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222428789U_ABST
    Figure CN222428789U_ABST
Patent Text Reader

Abstract

The utility model discloses an unclogging device suitable for pressure gauge pressure guide pipe, including dredging rod, shunt interface piece and adapter, shunt interface piece includes ferrule joint and intercommunication first pipeline and second pipeline, the first pipeline is parallel to the dredging rod, one end of the first pipeline is connected with the adapter, and the other end of the first pipeline is connected with the adapter. The adapter is used for communicating the first pipeline with a pressure guiding pipe, the other end of the first pipeline is fixedly connected with the clamping sleeve connector, and the clamping sleeve connector is used for sealing the end, away from the adapter, of the first pipeline. The dredging rod penetrates through the end, away from the adapter, of the clamping sleeve connector and the end, away from the clamping sleeve connector, of the first pipeline. According to the blockage clearing device, blockage in the pressure guide pipe can be quickly and effectively cleared, and the situation that dirt in the pressure guide pipe is splashed to a worker and hurt the worker can be prevented.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model belongs to the technical field of pressure-leading pipes, and in particular relates to a blockage-clearing device suitable for a pressure-leading pipe of a pressure gauge. Background Art

[0002] At present, the pressure gauge lead pipe is often blocked in some industrial sites, but there is no special tool to quickly clean the blockage. If the blockage in the lead pipe is not cleaned in time, the dirt in the lead pipe is likely to splash onto the operator. If the dirty medium is toxic or high temperature, it will cause harm to the personnel, posing a great threat to personal safety. Utility Model Content

[0003] In view of this, in order to solve the problems of the prior art, the utility model provides a blockage clearing device suitable for a pressure gauge pressure pipe, which can quickly and effectively clear the blockage in the pressure gauge pressure pipe and prevent the dirt in the pressure pipe from splashing onto the staff.

[0004] In order to achieve the above purpose, the utility model adopts the following technical solutions:

[0005] A blockage clearing device suitable for a pressure gauge pressure pipe comprises a clearing rod, a shunt interface and an adapter, the shunt interface comprising a ferrule joint and a first pipe and a second pipe connected to each other, the first pipe is parallel to the clearing rod, one end of the first pipe is connected to the adapter, the adapter is used to connect the first pipe with the pressure pipe, the other end of the first pipe is fixedly connected to the ferrule joint, the ferrule joint is used to seal the end of the first pipe away from the adapter, the clearing rod passes through the end of the ferrule joint away from the adapter and the end of the first pipe away from the ferrule joint.

[0006] After the first pipeline is connected to the pressure-guiding pipe through the adapter, a clearing rod is inserted into the pressure-guiding pipe and rotated to drill through the pressure-guiding pipe. At the same time, the pressure of the medium in the pressure-guiding pipe is used to discharge the blockage in the pressure-guiding pipe, and the blockage is discharged to the outside through the second pipeline through the first pipeline, thereby quickly and effectively clearing the blockage in the pressure-guiding pipe.

[0007] According to a preferred implementation aspect of the utility model, the first pipeline is fixedly connected to the second pipeline, and the first pipeline is perpendicular to the second pipeline. The second pipeline is used to discharge the blockage flowing from the pressure-inducing pipe to the first pipeline.

[0008] According to a preferred implementation aspect of the utility model, the dredging rod includes a first rod portion and a second rod portion that are fixedly connected, the first rod portion is perpendicular to the second rod portion, and the first rod portion is parallel to the first pipe. In some embodiments of the utility model, the first rod portion is used to pass into the pressure-inducing pipe, and the second rod portion is used as a rotating handle to drive the first rod portion to rotate in the pressure-inducing pipe.

[0009] According to a preferred embodiment of the present invention, the first rod portion passes through an end of the ferrule joint away from the adapter and an end of the first pipe away from the ferrule joint, and the inner diameter of the first pipe is larger than the outer diameter of the first rod portion. The inner diameter of the first pipe is larger than the outer diameter of the first rod portion to ensure that the obstruction flowing out of the pressure-inducing pipe can flow into the first pipe.

[0010] According to a preferred implementation aspect of the utility model, the ratio of the outer diameter of the first rod portion to the inner diameter of the first pipe is 1:2.9-3.8.

[0011] According to a preferred embodiment of the present invention, the length of the first rod is greater than the sum of the lengths of the ferrule joint, the first pipe and the adapter, ensuring that the end of the first rod away from the second rod can extend outside the adapter, thereby ensuring that the first rod can enter the pressure-inducing pipe when the second rod is rotated.

[0012] According to a preferred implementation aspect of the present utility model, the length of the first rod portion is greater than the length of the second rod portion.

[0013] According to a preferred implementation aspect of the utility model, an insertion tip is provided at one end of the first rod portion away from the second rod portion, and the insertion tip is used to insert the first rod portion into the pressure-inducing tube.

[0014] According to a preferred implementation aspect of the utility model, the central axis of the ferrule joint and the central axis of the first pipe are located in the same horizontal direction, and the inner wall of the ferrule joint fits the outer wall of the first rod portion, thereby ensuring that the ferrule joint effectively seals the end of the first pipe away from the pressure-inducing pipe, thereby preventing the blockage from leaking directly out of the first pipe.

[0015] According to a preferred embodiment of the present invention, the volume of the cavity in the second pipe is greater than or equal to the volume of the cavity in the first pipe, thereby ensuring that the blockage entering the first pipe from the pressure-inducing pipe can enter the second pipe in a timely and rapid manner and be discharged from the second pipe, thereby preventing the blockage from accumulating inside the first pipe.

[0016] Compared with the prior art, the utility model is advantageous in that: the utility model is a blockage clearing device suitable for a pressure gauge pressure pipe. After the first pipe is connected to the pressure pipe through an adapter, a clearing rod is inserted into the pressure pipe and rotated to drill through the pressure pipe. At the same time, the pressure of the medium in the pressure pipe is used to discharge the blockage in the pressure pipe, which is discharged from the second pipe through the first pipe, thereby quickly and effectively clearing the blockage in the pressure pipe, and preventing the dirt in the pressure pipe from splashing onto the staff and causing harm to the staff. BRIEF DESCRIPTION OF THE DRAWINGS

[0017] In order to more clearly illustrate the technical solutions in the embodiments of the present invention, the drawings required for use in the description of the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work.

[0018] Figure 1 It is a schematic cross-sectional view of the blockage clearing device in a preferred embodiment of the utility model;

[0019] Among them, the figure markings are: clearing rod-1, first rod part-11, insertion tip-111, second rod part-12, diversion interface part-2, ferrule joint-21, first pipe-22, second pipe-23, adapter-3. DETAILED DESCRIPTION

[0020] In order to enable those skilled in the art to better understand the technical solution of the present invention, the following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solution in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work should fall within the scope of protection of the present invention.

[0021] Reference Figure 1 The present embodiment is a clearing device for a pressure gauge pressure pipe, comprising a clearing rod 1, a flow diversion interface 2 and an adapter 3. The clearing device in the present embodiment is made of stainless steel as a whole.

[0022] Further, the flow diversion interface 2 of this embodiment includes a ferrule joint 21 and a first pipe 22 and a second pipe 23 that are interconnected. The first pipe 22 is fixedly connected to the second pipe 23 and the first pipe 22 is perpendicular to the second pipe 23. One end of the first pipe 22 is connected to one end of the adapter 3, and the other end of the adapter 3 is connected to the pressure-inducing pipe to connect the first pipe 22 and the pressure-inducing pipe. Specifically, in this embodiment, the inner wall of the first pipe 22 is provided with an internal thread (not shown), and the outer wall of the adapter 3 is provided with an external thread (not shown), and the first pipe 22 is threadedly connected to the adapter 3 and the pressure-inducing pipe.

[0023] The other end of the first pipe 22 is fixedly connected to the ferrule joint 21, the central axis of the ferrule joint 21 and the central axis of the first pipe 22 are located in the same horizontal direction, and the inner wall of the ferrule joint 21 fits the outer wall of the first rod 11, ensuring that the ferrule joint 21 effectively seals the end of the first pipe 22 away from the pressure-inducing pipe, and preventing the blockage from leaking directly outward from the first pipe 22. The second pipe 23 is used to discharge the blockage flowing from the pressure-inducing pipe to the first pipe 22, and the volume of the cavity in the second pipe 23 is set to be greater than or equal to the volume of the cavity in the first pipe 22, ensuring that the blockage entering the first pipe 22 from the pressure-inducing pipe can enter the second pipe 23 in a timely and rapid manner and be discharged outward from the second pipe 23, avoiding the accumulation of blockage inside the first pipe 22.

[0024] Furthermore, the dredging rod 1 includes a first rod portion 11 and a second rod portion 12 that are fixedly connected, the first rod portion 11 is perpendicular to the second rod portion 12, and the first rod portion 11 is parallel to the first pipe 22. The first rod portion 11 passes through the end of the ferrule joint 21 away from the adapter 3 and the end of the first pipe 22 away from the ferrule joint 21, and the end of the first rod portion 11 away from the second rod portion 12 is also provided with an insertion tip 111, which is convenient for the first rod portion 11 to be inserted into the pressure-inducing pipe. The length of the first rod portion 11 is greater than the length of the second rod portion 12, and the second rod portion 12 serves as a rotating handle to drive the first rod portion 11 to rotate in the pressure-inducing pipe. In addition, the length of the first rod portion 11 is greater than the sum of the lengths of the ferrule joint 21, the first pipe 22 and the adapter 3, so as to ensure that the end of the first rod portion 11 away from the second rod portion 12 can extend outside the adapter 3, thereby ensuring that the first rod portion 11 can enter the pressure-inducing pipe when the second rod portion 12 is rotated.

[0025] The inner diameter of the first pipe 22 is larger than the outer diameter of the first rod 11, and the ratio of the outer diameter of the first rod 11 to the inner diameter of the first pipe 22 is 1:2.9-3.8. In this embodiment, the outer diameter of the first rod 11 is 6 mm, and the inner diameter of the first pipe 22 is 19 mm, so as to avoid the inner wall of the first pipe 22 from fitting with the outer wall of the first rod 11, and ensure that there is enough space between the inner wall of the first pipe 22 and the outer wall of the first rod 11, so that the blockage flowing out of the pressure-inducing pipe can flow smoothly into the first pipe 22, and then enter the second pipe 23 from the first pipe 22, and be discharged outward from the second pipe 23.

[0026] The working process of the blockage clearing device of this embodiment is as follows:

[0027] Close the ball valve of the pressure gauge's pressure pipe and disassemble the pressure gauge. Thread the first pipe 22 of the clearing device to the adapter 3, and then connect the other end of the adapter 3 to one end of the pressure gauge's pressure pipe. Insert the insertion tip 111 of the first rod 11 into one end of the pressure pipe, and rotate the second rod 12 so that the second rod 12 gradually enters and penetrates the pressure pipe. At the same time, use the medium (water) pressure in the pressure pipe to make the blockage in the pressure pipe enter the first pipe 22 and the second pipe 23, and then be discharged outward. Finally, rotate the second rod 12 to slowly pull out a part of the first rod 11 outward, close the ball valve of the pressure pipe, and after there is no leakage in the second pipe 23, completely remove the clearing device from the pressure pipe, reinstall the pressure gauge, open the ball valve, and restore the measurement state.

[0028] The blockage clearing device of the utility model can realize rapid and effective clearing of blockage in the pressure-inducing pipe, and can also prevent dirt in the pressure-inducing pipe from splashing onto workers and causing harm to the workers.

[0029] The above embodiments are only for illustrating the technical concept and features of the utility model, and their purpose is to enable people familiar with this technology to understand the content of the utility model and implement it accordingly. They cannot be used to limit the protection scope of the utility model. All equivalent changes or modifications made according to the spirit of the utility model should be included in the protection scope of the utility model.

Claims

1. A device for clearing blockage of a pressure gauge pressure pipe, characterized in that: It includes a dredging rod, a shunt interface and an adapter, the shunt interface includes a ferrule joint and a first pipe and a second pipe that are interconnected, the first pipe is parallel to the dredging rod, one end of the first pipe is connected to the adapter, the adapter is used to connect the first pipe with a pressure-leading pipe, the other end of the first pipe is fixedly connected to the ferrule joint, the ferrule joint is used to seal the end of the first pipe away from the adapter, the dredging rod passes through one end of the ferrule joint away from the adapter and one end of the first pipe away from the ferrule joint.

2. The blockage clearing device according to claim 1, characterized in that: The first pipeline is fixedly connected to the second pipeline, and the first pipeline is perpendicular to the second pipeline.

3. The blockage clearing device according to claim 1, characterized in that: The dredging rod comprises a first rod portion and a second rod portion which are fixedly connected, wherein the first rod portion is perpendicular to the second rod portion, and the first rod portion is parallel to the first pipe.

4. The blockage clearing device according to claim 3, characterized in that: The first rod portion passes through one end of the ferrule joint away from the adapter and one end of the first pipe away from the ferrule joint, and the inner diameter of the first pipe is greater than the outer diameter of the first rod portion.

5. The blockage clearing device according to claim 4, characterized in that: The ratio of the outer diameter of the first rod portion to the inner diameter of the first pipe is 1:2.9-3.

8.

6. The blockage clearing device according to claim 3, characterized in that: The length of the first rod portion is greater than the sum of the lengths of the ferrule joint, the first pipe and the adapter.

7. The blockage clearing device according to claim 3, characterized in that: The length of the first rod portion is greater than the length of the second rod portion.

8. The blockage clearing device according to claim 3, characterized in that: An insertion tip is provided at one end of the first rod portion away from the second rod portion, and the insertion tip is used to insert the first rod portion into the pressure-inducing tube.

9. The blockage clearing device according to claim 3, characterized in that: The central axis of the ferrule joint and the central axis of the first pipe are located in the same horizontal direction, and the inner wall of the ferrule joint is in contact with the outer wall of the first rod portion.

10. The blockage clearing device according to claim 1, characterized in that: The volume of the cavity in the second pipe is greater than or equal to the volume of the cavity in the first pipe.