Transportation assembly and machining equipment

By designing a transportation turntable to drive the circular motion of the pipe, the problems of large area, long transportation time and high labor costs in the prior art are solved, and more efficient pipe processing and lower labor costs are achieved.

CN222453446UActive Publication Date: 2025-02-11SHENZHEN TATFOOK FANGYUAN MOLDING TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420220553.7
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-01-29
Publication Date
2025-02-11
Estimated Expiration
2034-01-29

AI Technical Summary

Technical Problem

In the existing pipe processing process, multiple instruments need to be set up for cutting, processing grooves, punching and other operations, which covers a large area, has a long transportation time, and requires multiple personnel to operate, resulting in low processing efficiency and high labor costs.

Method used

A transport assembly is designed, including a transport turntable, a loading assembly, a loading assembly and at least one processing assembly. The transport turntable drives the pipe to be processed in a circular motion from the feeding assembly to at least one processing assembly for processing, and the pipe obtained after processing is rotated and transported to the feeding assembly for processing.

Benefits of technology

The transportation turntable drives the circular movement of the pipe, which reduces the floor area of ​​the processing components and the transportation time of the pipe, reduces labor costs, and improves the processing efficiency of the pipe.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222453446U_ABST
    Figure CN222453446U_ABST
Patent Text Reader

Abstract

The utility model discloses a transportation assembly and machining equipment, and the transportation assembly comprises a transportation rotating disc which is used for fixing a to-be-machined pipe and driving the to-be-machined pipe to rotate around a center shaft of the transportation rotating disc. Wherein the feeding assembly places a to-be-machined pipe on the conveying rotating disc, the conveying rotating disc drives the to-be-machined pipe to be rotationally conveyed to be machined through the at least one machining assembly, and the machined pipe is rotationally conveyed to the discharging assembly to be discharged. The to-be-machined pipe is driven to be conveyed in a circular motion mode through the conveying rotating disc, the defects that due to current linear conveying of the to-be-machined pipe, the occupied area of the machining assembly is large, and the conveying time of the to-be-machined pipe is long are overcome, the occupied area of the machining assembly is reduced, and the conveying time of the to-be-machined pipe is shortened. And due to the fact that the machining assemblies are arranged in a centralized mode, multiple workers do not need to be arranged to operate the machining assemblies, the labor cost is reduced, the pipe machining efficiency is improved, and the practicability of the conveying assembly is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of pipe processing, and in particular to a transport component and processing equipment. Background Art

[0002] In the current pipe processing process, multiple corresponding machines need to be set up for processing. For example, when the pipe needs to be cut, grooved, punched, etc., the corresponding machines need to be set up along the transportation path of the pipe, which occupies a large area and takes a long time to transport the pipe. In addition, each machine needs to be equipped with at least one person to operate it, which has high labor costs and leads to low processing efficiency of the pipe. Utility Model Content

[0003] The present application provides a transport component to solve the above technical problems. The transport component includes:

[0004] The transport turntable is used to fix the pipe to be processed and drive the pipe to be processed to rotate with the center of the transport turntable as the rotation axis;

[0005] Among them, the loading component places the pipe to be processed on the transport turntable, the transport turntable fixes the pipe to be processed, drives the pipe to be processed to rotate and transport it to be processed by at least one processing component, and rotates and transports the processed pipe to the unloading component for unloading.

[0006] Therein, the transport turntable comprises at least one fixing element, which is arranged around an edge region of the transport turntable.

[0007] Wherein, the transport turntable includes a plurality of the fixing members, and the plurality of the fixing members are arranged at intervals in the edge area of ​​the transport turntable, and the intervals between any two adjacent fixing members are equal.

[0008] The transport assembly further comprises a frame and a drive module.

[0009] The transport turntable is connected to the driving module, the driving module is located between the transport turntable and the frame, and the driving module is used to drive the transport turntable to rotate relative to the frame;

[0010] The loading assembly and the unloading assembly are both partially arranged on the frame.

[0011] Among them, the surface of the frame close to the transport turntable includes at least one processing area, the processing area is arranged around the transport turntable, and the at least one processing component is arranged on the processing area, so that the transport turntable drives the pipe to be processed to rotate to the processing component on the processing area for processing.

[0012] In order to solve the above technical problems, the present application also provides a processing equipment, including the transport component as described above and at least one processing component, wherein the at least one processing component is arranged around the transport turntable of the transport component, and the transport turntable rotates and transports the pipe to be processed to the at least one processing component for processing.

[0013] Wherein, the at least one processing assembly includes a first processing assembly and a second processing assembly, the transport turntable receives the pipe to be processed obtained by processing at the first processing assembly, and rotates and transports the pipe to be processed to the second processing assembly for processing.

[0014] Wherein, the processing equipment also includes:

[0015] A feeding assembly is spaced apart from the first processing assembly, and provides materials to the first processing assembly, and the first processing assembly processes the materials to obtain the pipe to be processed;

[0016] The unloading assembly is spaced apart from the second processing assembly, located on the side of the second processing assembly away from the first processing assembly, and spaced apart from the transport turntable. The transport turntable receives the pipe obtained after processing at the second processing assembly, and rotates and transports the pipe to the unloading assembly for unloading.

[0017] Among them, the processing equipment also includes a structure detection component, which is arranged between the second processing component and the unloading component, and is spaced apart from the transport turntable. The transport turntable transports the pipe obtained after processing at the second processing component to the structure detection component. The structure detection component performs structural detection on the pipe, and then the transport turntable transports the pipe after the structural detection to the unloading component.

[0018] Beneficial effects of the present application: Different from the prior art, the transport component of the present application includes a transport turntable, which is used to fix the pipe to be processed and drive the pipe to be processed to rotate about the central axis of the transport turntable. Among them, the loading component places the pipe to be processed on the transport turntable, the transport turntable fixes the pipe to be processed, drives the pipe to be processed to rotate and transport it through at least one processing component for processing, and rotates and transports the pipe obtained after processing to the unloading component for unloading. The transport turntable drives the pipe to be processed to be transported from the loading component to at least one processing component in a circular motion for processing, which improves the current drawbacks of linear transportation of the pipe to be processed, and the large area occupied by each processing component and the long transportation time of the pipe to be processed, reduces the area occupied by the processing component, and shortens the transportation time of the pipe to be processed. And because the processing components are arranged in a centralized manner, there is no need to set up multiple personnel to operate each processing component separately, which reduces labor costs, improves the processing efficiency of pipes, and improves the practicality of the transport components. BRIEF DESCRIPTION OF THE DRAWINGS

[0019] In order to more clearly illustrate the technical solutions in the embodiments of the present application, the drawings required for use in the description of the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present application. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work.

[0020] in:

[0021] Figure 1 It is a structural schematic diagram of the first embodiment of the transport component of the present application;

[0022] Figure 2 It is a structural schematic diagram of the first embodiment of the processing equipment of the present application.

[0023] Figure numbers: processing equipment A; transport component 1; transport turntable 11; fixing part 12; frame 13; drive module 14; processing area 15; loading component 2; processing component 3; first processing component 31; second processing component 32; unloading component 4; structure detection component 5. DETAILED DESCRIPTION

[0024] The scheme of the embodiment of the present application is described in detail below in conjunction with the drawings of the specification.

[0025] In the following description, for the purpose of explanation rather than limitation, specific details such as specific system structures, interfaces, and technologies are provided to facilitate a thorough understanding of the present application.

[0026] Reference to "embodiments" in this application means that a particular feature, structure, or characteristic described in conjunction with the embodiments may be included in at least one embodiment of the present application. The appearance of the phrase in various locations in the specification does not necessarily refer to the same embodiment, nor is it an independent or alternative embodiment that is mutually exclusive with other embodiments. It is explicitly and implicitly understood by those skilled in the art that the embodiments described herein may be combined with other embodiments.

[0027] The term "and / or" in this application is only a description of the association relationship of associated objects, indicating that there may be three relationships. For example, A and / or B can represent: A exists alone, A and B exist at the same time, and B exists alone. In addition, the character " / " in this article generally indicates that the objects associated before and after are in an "or" relationship. In addition, "many" in this article means two or more than two. In addition, the term "at least one" in this article means any combination of at least two of any one or more of a plurality of, for example, including at least one of A, B, and C, and can mean including any one or more elements selected from the set consisting of A, B, and C. In addition, the terms "first", "second", and "third" in this application are used for descriptive purposes only and cannot be understood as indicating or implying relative importance or implicitly indicating the number of indicated technical features.

[0028] See also Figure 1 , Figure 1 The transport assembly 1 provided in the embodiment of the present application includes a transport turntable 11 .

[0029] The transport turntable 11 is used to fix the pipe to be processed and drive the pipe to be processed to rotate with the center of the transport turntable 11 as the rotation axis, so as to transport the pipe to be processed in a rotating manner.

[0030] Specifically, the loading assembly places the pipe to be processed on the transport turntable 11, the transport turntable 11 fixes the pipe to be processed, drives the pipe to be processed to rotate and transport it to at least one processing assembly for processing, and rotates and transports the processed pipe to the unloading assembly for unloading.

[0031] In one embodiment, at least one processing component may include a cutting component, a milling component, a punching component, etc. The cutting component may cut the material into a fixed length of the pipe to be processed according to the user's needs; the milling component may process the end surface of the pipe to be processed to add an arc or a groove, etc.; and the punching component may punch holes at a specific position of the pipe body of the pipe to be processed. In other embodiments, the processing component may also include components with other functions of processing the pipe to be processed, and the present application does not limit the specific structure of the processing component.

[0032] In summary, the transport assembly 1 provided in the embodiment of the present application includes a transport turntable 11, which drives the pipe to be processed to be transported from the loading assembly to at least one processing assembly in a circular motion through the transport turntable 11, thereby improving the current disadvantages of the pipe to be processed being transported in a straight line, and the large floor space occupied by each processing assembly and the long transportation time of the pipe to be processed, reducing the floor space occupied by the processing assembly and shortening the transportation time of the pipe to be processed. In addition, since the processing assemblies are centrally arranged, there is no need to set up multiple personnel to operate each processing assembly separately, thereby reducing labor costs, improving the processing efficiency of the pipe, and improving the practicality of the transport assembly 1.

[0033] Optionally, the transport carousel 11 comprises at least one fixing element 12 .

[0034] At least one fixing member 12 is arranged around the edge area of ​​the transport turntable 11 to fix the pipe to be processed, so as to prevent the pipe to be processed from detaching from the transport turntable 11 due to centrifugal movement when the transport turntable 11 drives the pipe to be processed for rotation and transportation, thereby improving the safety of the pipe to be processed and improving the safety and practicality of the transport assembly 1.

[0035] Furthermore, the transport turntable 11 can transport multiple pipes to be processed at the same time, and multiple pipes to be processed are processed at the same time. Specifically, the transport turntable 11 fixes the first pipe to be processed through the fixing member 12, and rotates and transports the first pipe to be processed to the first processing assembly for processing. Another fixing member 12 adjacent to the fixing member 12 that fixes the first pipe to be processed can fix the second pipe to be processed, and after the first pipe to be processed is processed in the first processing assembly, the transport turntable 11 transports the first pipe to be processed to the second processing assembly for processing, and at the same time, the second pipe to be processed is transported to the first processing assembly for processing, and so on. At least one pipe to be processed can be fixed on the transport turntable 11 for processing at the same time, thereby improving the processing efficiency of the pipes to be processed.

[0036] Alternatively, if Figure 1 As shown, the transport turntable 11 includes a plurality of fixing members 12 , which are arranged at intervals at the edge region of the transport turntable 11 , and the intervals between any two adjacent fixing members 12 are equal.

[0037] Specifically, any two adjacent processing components in at least one processing component can also be arranged at an equal distance from the transport turntable 11, so that when the transport turntable 11 drives the pipe to be processed to rotate, the pipe to be processed can be better controlled to be transported to the processing component, so as to avoid that the two pipes to be processed separated by the transport turntable 11 cannot be transported to the processing component for processing at the same time, and the controller for controlling the rotation of the transport turntable 11 needs to control the rotation of the transport turntable 11 each time according to the distance between the two adjacent pipes to be processed, which increases the processing capacity of the controller and reduces the processing efficiency of the pipe to be processed. In this embodiment, the spacing between any two adjacent fixing members 12 is equal, ensuring that the transport turntable 11 can simultaneously transport multiple pipes to be processed on the turntable to the corresponding processing components for processing, thereby improving the processing efficiency of the pipe to be processed and improving the practicality of the transport component 1.

[0038] In one embodiment, the number of fixing members 12 can be set corresponding to the number of processing components, thereby ensuring that multiple pipes to be processed are simultaneously transported to multiple processing components for processing. This application does not limit the specific number of fixing members 12.

[0039] Optionally, see Figure 2 , Figure 2 The transport assembly 1 further comprises a frame 13 and a drive module 14 .

[0040] The transport turntable 11 is connected to the driving module 14, and the driving module 14 is located between the transport turntable 11 and the frame 13, and is used to drive the transport turntable 11 to rotate relative to the frame 13. The loading assembly and the unloading assembly are both partially arranged on the frame 13, and then the loading assembly moves the pipe to be processed to the transport turntable 11 on the frame 13, and after the pipe to be processed is processed, the unloading assembly receives the processed pipe on the transport turntable 11 and transports the pipe to the processing completion placement area.

[0041] Optionally, see Figure 1 The surface of the frame 13 close to the transport turntable 11 includes at least one processing area 15, which is arranged around the transport turntable 11. The processing components are arranged on the processing area 15, and then the transport turntable 11 drives the pipe to be processed to rotate to the processing components on the processing area 15 for processing.

[0042] Among them, the distance between the processing position in the processing component and the frame 13 is equal to the distance between the pipe to be processed on the transport turntable 11 and the frame 13, that is, the height of the processing position in the processing component on the frame 13 is equal to the height of the pipe to be processed on the frame 13, and then when the transport turntable 11 rotates and transports the pipe to be processed to the processing component, the pipe to be processed can correspond to the processing position of the processing component, and the processing component processes the pipe to be processed located at the processing position, thereby improving the processing efficiency of the pipe to be processed.

[0043] Specifically, the residence time of the transport turntable 11 when moving the pipe to be processed to the processing assembly is greater than or equal to the processing time of the processing assembly with the longest processing time for the pipe to be processed among at least one processing assembly. For example, at least one processing assembly includes a first processing assembly, a second processing assembly, and a third processing assembly, wherein the first processing assembly, the second processing assembly, and the third processing assembly sequentially process different items on the pipe to be processed, and the first processing assembly takes 2 seconds to process the pipe to be processed, the second processing assembly takes 1 second to process the pipe to be processed, and the third processing assembly takes 4 seconds to process the pipe to be processed. After the transport turntable 11 transports the three pipes to be processed to the first processing assembly, the second processing assembly, and the third processing assembly at the same time, it needs to stay for at least 4 seconds before making the next rotation to ensure that the third processing assembly completes the processing of the pipe to be processed located at the third processing assembly. If the transport turntable 11 stays for less than 4 seconds, the pipe to be processed at the third processing assembly will not be processed when the transport turntable 11 rotates again after staying. The pipe to be processed may even move while the third processing assembly is processing the pipe, thus damaging the third processing assembly.

[0044] This embodiment proposes that the residence time of the transport turntable 11 when moving the pipe to be processed to the processing assembly is greater than or equal to the processing time of at least one processing assembly with the longest processing time for the pipe to be processed, thereby ensuring that the pipe to be processed on the transport turntable 11 is processed completely, improving the processing safety of the pipe to be processed, and improving the safety of the transport assembly 1.

[0045] In summary, the transport assembly 1 provided in the embodiment of the present application includes a transport turntable 11, which drives the pipe to be processed to be transported from the loading assembly to at least one processing assembly in a circular motion for processing, thereby improving the current drawbacks of the pipe to be processed being transported in a straight line, and the large floor space occupied by each processing assembly and the long transportation time of the pipe to be processed, reducing the floor space occupied by the processing assembly and shortening the transportation time of the pipe to be processed. Furthermore, since the processing assembly is centrally arranged, it is not necessary to set up multiple personnel to operate each processing assembly separately, thereby reducing labor costs, improving the processing efficiency of the pipe, and improving the practicality of the transport assembly.

[0046] The present application also provides a processing device, such as Figure 2 As shown, the processing equipment A includes a transport component 1 and at least one processing component 3. The at least one processing component 3 is arranged around the transport turntable 11 of the transport component 1. Specifically, at least one processing component 3 is arranged on the processing area 15. The transport turntable 11 rotates and transports the pipe to be processed to at least one processing component 3 for processing.

[0047] Optionally, at least one processing assembly 3 includes a first processing assembly 31 and a second processing assembly 32, and the transport turntable 11 receives the pipe to be processed obtained by the first processing assembly 31, and rotates and transports the pipe to be processed to the second processing assembly 32 for processing.

[0048] Specifically, the transport turntable 11 can receive the pipe to be processed after being processed at the first processing component 31, and transport the pipe to be processed to the second processing component 32 for processing. At the same time, the transport turntable 11 can transport another pipe to be processed to the first processing component 31 for processing, thereby improving the processing efficiency of the processing equipment A on the pipe to be processed.

[0049] Optionally, the processing equipment A also includes a loading component 2 and a unloading component 4.

[0050] The feeding component 2 is spaced apart from the first processing component 31, and provides materials for the first processing component 31, and the first processing component 31 processes the materials to obtain the pipe to be processed. The first processing component 31 may be a cutting component, and then the feeding component 2 transports the materials to the first processing component 31, and the first processing component 31 cuts the materials according to user requirements to obtain the pipe to be processed of a fixed length, and then the transport turntable 11 fixes the pipe to be processed after the cutting by the first processing component 31, and transports it to the second processing component 32 for processing.

[0051] The unloading assembly 4 is spaced apart from the second processing assembly 32, located on the side of the second processing assembly 32 away from the first processing assembly 31, and spaced apart from the transport turntable 11, that is, the unloading assembly 4 can be set on the processing area 15 spaced apart from the processing area 15 where the second processing assembly 32 is set. After the transport turntable 11 transports the pipe to be processed to the second processing assembly 32 for processing, it receives the pipe obtained after processing at the second processing assembly 32, and rotates and transports the pipe to the unloading assembly 4 for unloading. Among them, since the unloading assembly 4 is spaced apart from the second processing assembly 32 and spaced apart from the transport turntable 11, the transport turntable 11 can directly transport the pipe to the unloading assembly 4 for unloading along the transport direction of the transport turntable 11, thereby improving the transport efficiency of the transport turntable 11 for pipes, and improving the processing efficiency of the processing equipment A for the pipe to be processed.

[0052] It can be understood that the second processing assembly 32 mentioned above is not just one processing assembly 3, but a general term for all processing assemblies 3 between the first processing assembly 31 and the blanking assembly 4. That is, when the pipe to be processed needs to undergo three different processes, this embodiment includes three second processing assemblies 32 to process the pipe to be processed, thereby increasing the diversity of the processing functions of the processing equipment A for the pipe to be processed and improving the practicality of the processing equipment A.

[0053] Optionally, the processing equipment A further includes a structure detection component 5, which is arranged between the second processing component 32 and the blanking component 4, and is arranged at intervals from the transport turntable 11, that is, the second processing component 32, the structure detection component 5 and the blanking component 4 can be arranged in sequence on the processing area 15 along the rotation direction of the transport turntable 11. The transport turntable 11 transports the pipe obtained after processing at the second processing component 32 to the structure detection component 5, and the structure detection component 5 performs a structural inspection on the pipe to detect whether the pipe is qualified for processing. After detecting that the pipe is qualified for processing, the structure detection component 5 places the pipe after the inspection on the transport turntable 11, and the transport turntable 11 transports the pipe after the structural inspection to the blanking component 4 for unloading. By setting the structure detection component 5, the processing efficiency of the pipe to be processed is further ensured, and the practicality of the processing equipment A is improved.

[0054] The above description is only an implementation method of the present application, and does not limit the patent scope of the present application. Any equivalent structure or equivalent process transformation made using the contents of the present application specification and drawings, or directly or indirectly used in other related technical fields, are also included in the patent protection scope of the present application.

Claims

1. A transport component, characterized in that: include: The transport turntable is used to fix the pipe to be processed and drive the pipe to be processed to rotate with the center of the transport turntable as the rotation axis; Among them, the loading component places the pipe to be processed on the transport turntable, the transport turntable fixes the pipe to be processed, drives the pipe to be processed to rotate and transport it to be processed by at least one processing component, and rotates and transports the processed pipe to the unloading component for unloading.

2. The transport assembly according to claim 1, characterized in that The transport carousel comprises at least one fixing element which is arranged around an edge region of the transport carousel.

3. The transport assembly according to claim 2, characterized in that The transport turntable includes a plurality of the fixing members, which are arranged at intervals at the edge area of ​​the transport turntable, and the intervals between any two adjacent fixing members are equal.

4. The transport assembly according to claim 1, characterized in that The transport assembly also includes a frame and a drive module. The transport turntable is connected to the driving module, the driving module is located between the transport turntable and the frame, and the driving module is used to drive the transport turntable to rotate relative to the frame; The loading assembly and the unloading assembly are both partially arranged on the frame.

5. The transport assembly according to claim 4, characterized in that The surface of the frame close to the transport turntable includes at least one processing area, which is arranged around the transport turntable. The at least one processing component is arranged on the processing area, and then the transport turntable drives the pipe to be processed to rotate to the processing component on the processing area for processing.

6. The transport assembly according to claim 5, characterized in that The distance between the processing position in the processing assembly and the frame is equal to the distance between the pipe to be processed on the transport turntable and the frame.

7. A processing equipment, characterized in that: It comprises the transport component as described in any one of claims 1 to 6 and at least one processing component, wherein the at least one processing component is arranged around a transport turntable of the transport component, and the transport turntable rotates and transports the pipe to be processed to the at least one processing component for processing.

8. The processing equipment according to claim 7, characterized in that: The at least one processing assembly includes a first processing assembly and a second processing assembly. The transport turntable receives the pipe to be processed obtained by the first processing assembly, and rotates and transports the pipe to be processed to the second processing assembly for processing.

9. The processing equipment according to claim 8, characterized in that The processing equipment also includes: A feeding assembly is spaced apart from the first processing assembly, and provides materials to the first processing assembly, and the first processing assembly processes the materials to obtain the pipe to be processed; The unloading assembly is spaced apart from the second processing assembly, located on the side of the second processing assembly away from the first processing assembly, and spaced apart from the transport turntable. The transport turntable receives the pipe obtained after processing at the second processing assembly, and rotates and transports the pipe to the unloading assembly for unloading.

10. The processing equipment according to claim 9, characterized in that The processing equipment also includes a structure detection component, which is arranged between the second processing component and the unloading component and is spaced apart from the transport turntable. The transport turntable transports the pipe obtained after processing at the second processing component to the structure detection component. The structure detection component performs structural detection on the pipe, and then the transport turntable transports the pipe after the structural detection to the unloading component.