Inland river retaining wall
By setting concrete drilled piles on both sides of the river and setting water stop curtains therebetween, the problem of insufficient waterproofness of the existing upright retaining wall is solved, the waterproof performance of the retaining wall and the stability of the pile foundation are improved, and the river is reduced Collapse on both sides.
Patent Information
- Application Number
- CN202420535228.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-19
- Publication Date
- 2025-02-11
- Estimated Expiration
- 2034-03-19
AI Technical Summary
After a long time of use, the existing upright retaining wall is susceptible to erosion of river water flow, causing mud and sand to wash into the river. How to improve the waterproofness of the retaining wall is a technical problem that needs to be solved.
By setting concrete bored piles on both sides of the river and setting water stop curtains between the concrete bored piles, the river water on both sides of the river flushes the reinforced concrete retaining walls and setting water stop curtains to avoid the surrounding areas of concrete bored piles The soil is lost from the pores of the reinforced concrete retaining wall into the river channel.
It improves the waterproof performance of the retaining wall, and at the same time improves the stability of concrete drilled piles, which can effectively support both sides of the river and reduce the occurrence of collapse.
Smart Images

Figure CN222456172U_ABST
Abstract
Description
Technical Field
[0001] The utility model belongs to the technical field of retaining walls, and in particular relates to an inland river retaining wall. Background Art
[0002] Generally speaking, in order to reduce the collapse of soil on both sides of the river channel, retaining walls are built in the river channel during the excavation and construction of the river channel to effectively support both sides of the river channel and reduce the occurrence of collapse.
[0003] At present, vertical retaining walls are a common river retaining wall in life. Vertical retaining walls are vertical walls composed of stacked bricks. This type of retaining wall can reduce soil erosion on both sides of the river, thereby playing a protective role on both sides of the river.
[0004] During long-term use, the existing vertical retaining walls are eroded by the water flow of the river on both sides, and the silt on both sides of the river is easily washed into the river. How to improve the waterproofness of the retaining wall is a technical problem that technical personnel in this field need to solve. Utility Model Content
[0005] The utility model aims to solve the above-mentioned technical problems existing in the prior art and provides an inland river retaining wall. By arranging bored concrete piles on both sides of the river channel and arranging water-stop curtains between the bored concrete piles, the river water on both sides of the river channel scours the reinforced concrete retaining wall. The setting of the water-stop curtains prevents the soil around the bored concrete piles from flowing into the river channel through the pores of the reinforced concrete retaining wall, thereby improving the waterproof performance of the retaining wall and the stability of the bored concrete piles. It can effectively support both sides of the river channel and reduce the occurrence of collapse.
[0006] In order to solve the above technical problems, the utility model adopts the following technical solutions:
[0007] An inland river retaining wall comprises a retaining wall body, which is arranged on both sides of a river channel, the retaining wall body is provided with bored concrete piles, a water-stop curtain is arranged between the bored concrete piles, a plain concrete cushion layer 1 is arranged on the top of the bored concrete piles, a reinforced concrete retaining wall is arranged on the top of the plain concrete cushion layer 1, a viscous soil layer is backfilled on the reinforced concrete retaining wall, and a railing is arranged on the top of the reinforced concrete retaining wall near the river channel. The utility model arranges bored concrete piles on both sides of the river channel, and arranges water-stop curtains between the bored concrete piles, so that the river water on both sides of the river channel scours the reinforced concrete retaining wall, and the arrangement of the water-stop curtains prevents the soil around the bored concrete piles from flowing into the river channel through the pores of the reinforced concrete retaining wall, thereby improving the waterproof performance of the retaining wall, and at the same time improving the stability of the bored concrete piles, and can effectively support both sides of the river channel and reduce the occurrence of collapse.
[0008] Furthermore, the bottom of the river channel is paved with geotextiles, the top of the geotextiles is paved with a crushed stone cushion layer, the top of the crushed stone cushion layer is paved with a second plain concrete cushion layer, and the top of the second plain concrete cushion layer is paved with a concrete bottom protection layer. The bottom of the river channel is poured to maintain the flatness and stability of the bottom of the river channel, and the hardness of the foundation is also improved to withstand the impact and erosion of the water flow on the bottom, thereby maintaining the stability of the river channel.
[0009] Furthermore, reinforced concrete facings are installed on both sides of the river. The installation of reinforced concrete facings increases the anti-scouring ability of the retaining wall, which can reduce soil erosion on both sides of the river, thus playing a protective role on both sides of the river.
[0010] Furthermore, a coarse stone paving is laid on the top of the reinforced concrete paving near the river channel. The coarse stone paving has a long service life, prevents soil erosion, and also has a landscape function.
[0011] Furthermore, double-layer bidirectional mesh reinforcement is laid in the reinforced concrete face, which increases the structural strength of the reinforced concrete face and improves the anti-scouring capability of the retaining wall.
[0012] Furthermore, pine piles are provided at the bottom of the plain concrete cushion layer 1. Pine piles are a type of wood with excellent physical properties. They not only have excellent anti-corrosion properties, but also have strong shape and low water absorption, especially earthquake resistance, easy nailing, and easy sawing. Pine piles have high compressive and bending bearing capacity when subjected to water and soil pressure, and can effectively support the weight of the retaining wall and ensure the stability of the retaining wall.
[0013] Furthermore, the pinewood piles are arranged in a rectangular shape, so that the retaining wall is evenly stressed and the stability of the retaining wall is improved.
[0014] Furthermore, drainage pipes are evenly distributed in the reinforced concrete retaining wall, so that water accumulated on the back of the wall and water seepage from the soil can be discharged in time, thus ensuring the stability of the retaining wall.
[0015] Furthermore, one end of the drainage pipe is connected to a sand filter, and one end of the drainage pipe is wrapped with a geotextile. The drainage pipe and the outer side of the sand filter are tied and fixed by the geotextile. The setting of the sand filter prevents soil particles from leaking outward. It can effectively prevent the loss and excretion of soil particles, maintain the stability of the retaining wall, and protect the surrounding environment.
[0016] Furthermore, the diameter of the sand filter is greater than or equal to 40 cm, and the sand particle size in the sand filter is between 0.5 mm and 2 mm, which can effectively prevent the loss and discharge of soil particles, maintain the stability of the retaining wall, and protect the surrounding environment.
[0017] The utility model has the following beneficial effects due to the adoption of the above technical solution:
[0018] The utility model arranges bored concrete piles on both sides of the river channel and arranges water-stopping curtains between the bored concrete piles. The river water on both sides of the river channel scours the reinforced concrete retaining walls. The arrangement of the water-stopping curtains prevents the soil around the bored concrete piles from flowing into the river channel through the pores of the reinforced concrete retaining walls, thereby improving the waterproof performance of the retaining walls and at the same time improving the stability of the bored concrete piles, which can effectively support both sides of the river channel and reduce the occurrence of collapse.
[0019] In the utility model, the bottom surface of the river channel is paved with geotextile, the top of the geotextile is paved with a crushed stone cushion layer, the top of the crushed stone cushion layer is paved with a second plain concrete cushion layer, and the top of the second plain concrete cushion layer is paved with a concrete bottom protection layer. The bottom surface of the river channel is poured to maintain the flatness and stability of the bottom of the river channel, and the hardness of the foundation is improved to withstand the impact and erosion of the water flow on the bottom, thereby maintaining the stability of the river channel.
[0020] In the utility model, pine piles are arranged at the bottom of the plain concrete cushion layer 1. Pine piles are a kind of wood with excellent physical properties, not only with excellent anti-corrosion performance, but also with strong shape and low water absorption, especially with earthquake resistance, easy nailing and easy sawing, etc. Pine piles have high compressive and bending bearing capacity when bearing water and soil pressure, and can effectively support the weight of the retaining wall and ensure the stability of the retaining wall. BRIEF DESCRIPTION OF THE DRAWINGS
[0021] The utility model is further described below in conjunction with the accompanying drawings:
[0022] Figure 1 This is a structural schematic diagram of an inland river retaining wall of the utility model;
[0023] Figure 2 This is a cross-sectional view of the bank wall on the inner river in the utility model;
[0024] Figure 3 This is a schematic diagram of the arrangement of pine wood piles in the utility model;
[0025] Figure 4 It is a structural schematic diagram of the drainage pipe in the utility model.
[0026] In the figure, 1-retaining wall body; 2-concrete bored piles; 3-water-stop curtain; 4-plain concrete cushion layer 1; 5-reinforced concrete retaining wall; 6-cohesive soil layer; 7-railing; 8-geotextile; 9-crushed stone cushion layer; 10-plain concrete cushion layer 2; 11-concrete bottom protection; 12-reinforced concrete surface protection; 13-coarse stone surface protection; 14-pine wood piles; 15-drainage pipe; 16-anti-sand filter body; 17-anti-sand filter body. DETAILED DESCRIPTION
[0027] like Figures 1 to 4As shown, an inland river retaining wall of the utility model comprises a retaining wall body 1, the retaining wall body 1 is arranged on both sides of the river channel, the retaining wall body 1 is provided with concrete bored cast-in-place piles 2, a water-stop curtain 3 is arranged between the concrete bored cast-in-place piles 2, a plain concrete cushion layer 4 is arranged on the top of the concrete bored cast-in-place piles 2, a reinforced concrete retaining wall 5 is arranged on the top of the plain concrete cushion layer 4, a clay layer 6 is backfilled on the reinforced concrete retaining wall 5, and a railing 7 is arranged on the top of the reinforced concrete retaining wall 5 close to the river channel.
[0028] The bottom of the river channel is paved with a geotextile 8, a crushed stone cushion layer 9 is paved on the top of the geotextile 8, a plain concrete cushion layer 10 is paved on the top of the crushed stone cushion layer 9, and a concrete bottom protection layer 11 is paved on the top of the plain concrete cushion layer 10. The bottom of the river channel is poured to maintain the flatness and stability of the bottom of the river channel, and the hardness of the foundation can be improved to withstand the impact and erosion of the water flow on the bottom, thereby maintaining the stability of the river channel.
[0029] Reinforced concrete face 12 is provided on both sides of the river channel. The provision of reinforced concrete face 12 increases the anti-scouring ability of the retaining wall, can reduce water and soil loss on both sides of the river channel, and thus plays a protective role on both sides of the river channel. A coarse stone face 13 is laid on the top of the reinforced concrete face 12 near the river channel. The coarse stone face 13 has a long service life, prevents water and soil loss, and has a landscape function. Double-layer bidirectional mesh reinforcement is laid inside the reinforced concrete face 12. The provision of double-layer bidirectional mesh reinforcement increases the structural strength of the reinforced concrete face 12 and improves the anti-scouring ability of the retaining wall.
[0030] Pine piles 14 are arranged at the bottom of the plain concrete cushion layer 4. Pine piles 14 are a kind of wood with excellent physical properties. They not only have excellent anti-corrosion properties, but also have strong shape and low water absorption, especially earthquake resistance, easy nailing, and easy sawing. Pine piles 14 have high compressive and bending bearing capacity when subjected to water and soil pressure, and can effectively support the weight of the retaining wall and ensure the stability of the retaining wall. The pine piles 14 are arranged in a rectangular shape. The rectangular arrangement of pine piles 14 makes the retaining wall evenly stressed and improves the stability of the retaining wall.
[0031] Drain pipes 15 are evenly distributed in the reinforced concrete retaining wall 5. The setting of the drain pipe 15 facilitates the timely discharge of water accumulated on the back of the wall and water seepage in the soil, thereby ensuring the stability of the retaining wall. One end of the drain pipe 15 is connected to an anti-filter sand body 16, and one end of the drain pipe 15 is wrapped with a geotextile 8. The drain pipe 15 and the outer side of the anti-filter sand body 16 are tied and fixed by the geotextile 8. The setting of the anti-filter sand body 16 prevents soil particles from leaking outward. It can effectively prevent the loss and excretion of soil particles, maintain the stability of the retaining wall, and protect the surrounding environment. The diameter of the anti-filter sand body 16 is greater than or equal to 40 cm, and the particle size of the sand in the anti-filter sand body 16 is between 0.5 mm and 2 mm. It can effectively prevent the loss and excretion of soil particles, maintain the stability of the retaining wall, and protect the surrounding environment.
[0032] The utility model arranges bored concrete piles 2 on both sides of the river channel, and arranges water-stopping curtains 3 between the bored concrete piles 2. The river water on both sides of the river channel scours the reinforced concrete retaining walls 5. The arrangement of the water-stopping curtains 3 prevents the soil around the bored concrete piles 2 from flowing into the river channel through the pores of the reinforced concrete retaining walls 5, thereby improving the waterproof performance of the retaining wall and improving the stability of the bored concrete piles 2. It can effectively support both sides of the river channel and reduce the occurrence of collapse.
[0033] The above are only specific embodiments of the utility model, but the technical features of the utility model are not limited thereto. Any simple changes, equivalent replacements or modifications made based on the utility model to solve basically the same technical problems and achieve basically the same technical effects are all included in the protection scope of the utility model.
Claims
1. An inland river retaining wall, comprising a retaining wall body, wherein the retaining wall body is arranged on both sides of the river channel, and is characterized in that: The retaining wall body is provided with bored concrete piles, water-stop curtains are provided between the bored concrete piles, a plain concrete cushion layer 1 is provided on the top of the bored concrete piles, a reinforced concrete retaining wall is provided on the top of the plain concrete cushion layer 1, a clay layer is backfilled on the reinforced concrete retaining wall, and a railing is provided on the top of the reinforced concrete retaining wall close to the river channel.
2. An inland river retaining wall according to claim 1, characterized in that: The bottom surface of the river channel is paved with a geotextile, the top of the geotextile is paved with a crushed stone cushion layer, the top of the crushed stone cushion layer is paved with a second plain concrete cushion layer, and the top of the second plain concrete cushion layer is paved with a concrete bottom protection layer.
3. The inland river retaining wall according to claim 1, characterized in that: Both sides of the river channel are provided with reinforced concrete facings.
4. The inland river retaining wall according to claim 3, characterized in that: A coarse stone facing is laid on the top of the reinforced concrete facing close to the river channel.
5. The inland river retaining wall according to claim 3, characterized in that: Double-layer bidirectional mesh reinforcement is laid in the reinforced concrete protective surface.
6. The inland river retaining wall according to claim 1, characterized in that: Pine wood piles are arranged at the bottom of the first plain concrete cushion layer.
7. The inland river retaining wall according to claim 6, characterized in that: The pine wood piles are arranged in a rectangular shape.
8. The inland river retaining wall according to claim 1, characterized in that: Evenly distributed drainage pipes are arranged in the reinforced concrete retaining wall.
9. The inland river retaining wall according to claim 8, characterized in that: One end of the drainage pipe is connected to an inverted sand filter body, one end of the drainage pipe is wrapped with a geotextile, and the drainage pipe is tied and fixed to the outer side of the inverted sand filter body by the geotextile.
10. An inland river retaining wall according to claim 9, characterized in that: The diameter of the reverse sand filter body is greater than or equal to 40 cm, and the particle size of the sand particles in the reverse sand filter body is between 0.5 mm and 2 mm.