Auxiliary operation platform for in-column concrete pouring construction of bracket-free steel pipe column

By designing an auxiliary operating platform including the outer frame and the inner frame, and using the first positioning component to abut the surface of the steel pipe column, the problem of inconvenience in the installation of the auxiliary operating platform for the concrete casting construction in the traditional bull-leg steel pipe column column is solved, and the problem of inconvenience in the installation of the auxiliary operating platform for the concrete casting construction in the traditional bull-leg steel pipe column column column is realized. Stable, safe and efficient construction results.

CN222456743UActive Publication Date: 2025-02-11CSCEC BRIDGES CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202421236343.3
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-05-31
Publication Date
2025-02-11
Estimated Expiration
2034-05-31

AI Technical Summary

Technical Problem

The auxiliary operating platform for concrete pouring construction in traditional bull-leg steel pipe columns is inconvenient to install, has a large workload, a long construction cycle, poor stability, and is cumbersome to remove and easily damage the steel pipe column.

Method used

An auxiliary operating platform including an outer frame and an inner frame is designed. The outer frame has a top and a bottom, with an open top and an operating platform at the bottom; the inner frame extends to the top of the outer frame, forming a mounting cavity for mounting on the steel pipe. The top of the column; the positioning plate abuts or separates the surface of the steel pipe column through the first positioning assembly to ensure the stability of the operating platform.

Benefits of technology

It realizes a stable auxiliary operating platform with bull legless steel pipe columns, reduces construction costs, shortens construction cycle, ensures the stability and safety of the operating platform, and is suitable for concrete pouring construction of various steel pipe columns.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222456743U_ABST
    Figure CN222456743U_ABST
Patent Text Reader

Abstract

The utility model provides an auxiliary operation platform for in-column concrete pouring construction of a corbel-free steel pipe column, which comprises an outer frame, an inner frame, an inner frame, an upper frame, a lower frame, a lower frame, a lower frame and an upper frame, and is characterized in that the outer frame is provided with a top and a bottom; the inner frame is arranged on the operation platform, the inner frame extends towards the top of the outer frame to form a mounting cavity protruding out of the operation platform, and the inner frame is used for being arranged on the top of a steel pipe column in a sleeving mode; each first positioning assembly comprises a positioning plate and a fixing bolt which are connected with each other, the positioning plates extend into the mounting cavities, and the fixing bolts penetrate through the inner frame and are locked through nuts, so that the positioning plates abut against or are separated from the surface of the steel pipe column. The auxiliary operation platform solves the technical problem that a traditional auxiliary operation platform for pouring construction is inconvenient to install.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of building construction, in particular to an auxiliary operation platform for concrete pouring construction in a steel pipe column without a corbel. Background Art

[0002] In the traditional process of pouring concrete in steel pipe columns, for steel pipe columns with corbels (such as beam-column joints, etc.), it is usually only necessary to insert the steel structure operation platform into the steel pipe column and place it on the corbels to form an auxiliary operation platform for subsequent concrete pouring construction in steel pipe columns; for steel pipe columns without corbels (such as beam-column joints, etc.), steel pipes or disc buckle frames are usually used to build from the bottom of the column to the construction surface, which is used as an auxiliary operation platform for subsequent concrete pouring construction in steel pipe columns. However, there are some problems with the above-mentioned traditional construction method for setting up auxiliary operation platforms for steel pipe columns without corbels. First, for steel pipe columns without corbels, starting from the bottom of the column to build from steel pipes or disc buckle frames to the construction surface, not only the workload is large, but also the construction period is long and the efficiency is low. Secondly, the auxiliary operation platform set up has poor stability and is prone to shaking during the pouring process, affecting the construction quality. In addition, the auxiliary operation platform of the steel pipe or disc buckle frame needs to be removed after the pouring is completed, and the removal work is cumbersome and easy to cause damage to the steel pipe column. Utility Model Content

[0003] In view of the deficiencies in the prior art, the utility model provides an auxiliary operation platform for concrete pouring construction in a corbel-free steel pipe column, so as to solve the technical problem of the inconvenience of installing the auxiliary operation platform for conventional pouring construction in the related technology.

[0004] The utility model provides an auxiliary operation platform for concrete pouring construction in a steel pipe column without a corbel, comprising:

[0005] An outer frame having a top and a bottom, wherein the top of the outer frame is an open structure and the bottom is provided with an operating platform;

[0006] An inner frame is arranged on the operating platform, and the inner frame extends toward the top of the outer frame to form an installation cavity protruding from the operating platform, and is used to be sleeved on the top of the steel pipe column;

[0007] A plurality of first positioning components include connected positioning plates and fixing bolts, wherein the positioning plates extend into the installation cavity, the fixing bolts penetrate the inner frame and are locked by nuts so that the positioning plates abut against or separate from the surface of the steel pipe column.

[0008] Furthermore, an arc-shaped opening is provided at one end of the positioning plate away from the fixing bolt, and the arc-shaped opening is bent toward the direction of the fixing bolt.

[0009] Furthermore, two fixing sections are spaced apart at one end of the positioning plate away from the fixing bolt, the two fixing sections are respectively located on two sides of the arc-shaped opening, and the fixing sections are planes.

[0010] Furthermore, the outer frame is provided with a plurality of second positioning components, the second positioning components include first positioning rods threadedly mounted on the outer frame, and the first positioning rods are arranged in a transverse direction.

[0011] Furthermore, the second positioning assembly also includes a second positioning rod threadedly mounted on the outer frame, and the second positioning rod is arranged vertically.

[0012] Furthermore, the first positioning rod and the second positioning rod are respectively located at the top and the bottom of the outer frame.

[0013] Furthermore, the operating platform is paved with a number of steel plates.

[0014] Furthermore, the operating platform is provided with a plurality of flanges for abutting against the steel plate.

[0015] Compared with the prior art, the utility model has the following beneficial effects: the auxiliary operation platform has a simple structure, is easy to install, can be reused, does not need to use corbels as a supporting structure, and compared with the traditional method of using steel pipes or buckle frames to set up from the bottom of the column, the auxiliary operation platform reduces the construction cost and shortens the construction period, and can achieve the clamping of steel pipe columns without corbels, ensuring the stability and safety of the operation platform when in use. And the utility model can be widely used in the concrete pouring construction of various steel pipe columns, not only for steel pipe columns without corbels, but also for steel pipe columns with corbels, and can be widely used in the concrete pouring construction of steel pipe columns. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] Figure 1 This is a schematic diagram of the structure of the auxiliary operation platform in one embodiment of the utility model;

[0017] Figure 2 is a structural diagram of the inner frame;

[0018] Figure 3 for Figure 2 A partial enlarged view of point A in the middle.

[0019] Description of Figure Numbers:

[0020] 1. Outer frame; 101. Operating platform; 2. Inner frame; 3. Installation cavity; 4. Fixing bolts; 5. Positioning plate; 501. Arc-shaped opening; 502. Fixing section; 6. First positioning rod; 7. Second positioning rod; 8. Flange.

[0021] The realization of the purpose, functional features and advantages of the utility model will be further explained in conjunction with embodiments and with reference to the accompanying drawings. DETAILED DESCRIPTION

[0022] In order to make the purpose, technical solution and beneficial effects of the utility model more clear, the technical solution of the utility model is further described below in conjunction with the drawings and embodiments. It should be understood that the specific embodiments described here are only used to explain the utility model and are not used to limit the utility model.

[0023] See also Figures 1 to 3 The utility model provides an auxiliary operation platform 101 for concrete pouring construction in a steel pipe column without a corbel, comprising:

[0024] The outer frame 1 has a top and a bottom, the top of the outer frame 1 is an open structure, and the bottom is provided with an operating platform 101;

[0025] An inner frame 2 is provided on the operating platform 101. The inner frame 2 extends toward the top of the outer frame 1 to form a mounting cavity 3 protruding from the operating platform 101, and is used to be sleeved on the top of the steel pipe column;

[0026] A plurality of first positioning components include a connected positioning plate 5 and a fixing bolt 4, wherein the positioning plate 5 extends into the installation cavity 3, and the fixing bolt 4 passes through the inner frame 2 and is locked by a nut so that the positioning plate 5 abuts against or separates from the surface of the steel pipe column.

[0027] In this embodiment, the outer frame 1 is formed by welding horizontal and vertical rectangular square steel pipes to form a frame structure with an open top and an operating platform 101 at the bottom. The top is used for outsiders to enter the operating platform 101. An inner frame 2 is provided on the operating platform 101. The semi-enclosed frame structure is used to prevent construction workers from falling and improve safety. The inner frame 2 is formed with an installation cavity 3 protruding from the operating platform 101. The installation cavity 3 is used to abut against the top of the steel pipe column to achieve a supporting effect on the outer frame 1; at the same time, a plurality of first positioning components are provided on the inner frame 2. The first positioning components include a connected positioning plate 5 and a fixing bolt 4. When in use, the inner rectangular steel frame is first installed through the installation The cavity 3 is sleeved on the top of the steel pipe column without corbels, and then the fixing screw is adjusted to make the positioning plate 5 hold the circumference of the steel pipe column without corbels in the installation cavity 3, ensuring the stability and safety of the workers when they are in the operating platform 101. The auxiliary operating platform 101 has a simple structure, is easy to install, and is reusable. There is no need to use corbels as a supporting structure during installation. Compared with the traditional method of erecting from the bottom of the column using steel pipes or disc-shaped frames, the auxiliary operating platform 101 reduces construction costs and shortens construction period. The auxiliary operating platform 101 can be widely used in concrete pouring construction in various steel pipe columns, and is not only suitable for steel pipe columns without corbels, but also for steel pipe columns with corbels, thereby improving versatility.

[0028] An arc-shaped opening 501 is formed at one end of the positioning plate 5 away from the fixing bolt 4 , and the arc-shaped opening 501 is bent toward the fixing bolt 4 .

[0029] In this embodiment, an arc-shaped opening 501 is provided on the positioning plate 5, and the open end of the arc-shaped opening 501 faces the installation cavity 3. When the four positioning plates 5 are all tightly held against the installation cavity 3, the enclosure of the four arc-shaped openings 501 can hold the circumference of the steel pipe column tightly, reduce the gap between the positioning plates 5, and prevent it from loosening. Furthermore, two fixing sections 502 are provided at intervals at one end of the positioning plate 5 away from the fixing bolt 4, and the two fixing sections 502 are respectively located on both sides of the arc-shaped opening 501, and the fixing sections 502 are planes; in order to improve the versatility of the positioning plate 5, flat fixing sections 502 are provided at the left and right ends of the arc-shaped opening 501, which are suitable for holding a rectangular pipe column tightly.

[0030] The outer frame 1 is provided with a plurality of second positioning components, and the second positioning components include first positioning rods 6 threadedly screwed on the outer frame 1 , and the first positioning rods 6 are arranged in a transverse direction.

[0031] In this embodiment, a first positioning rod 6 is threadedly penetrated on the outer frame 1, and the first positioning rod 6 is transversely arranged along the outer frame 1. After the outer frame 1 is installed on the top of the steel pipe column, according to the actual situation, the first positioning rod 6 is selected to be penetrated above the outer frame 1 (a positioning hole can be opened at any position of the outer frame 1, and the penetration position of the first positioning rod 6 is determined according to the surrounding layout, and it can be installed as long as there is a stress point), and the first positioning rod 6 is abutted against any stress point of the construction site, such as a wall, a steel pipe column, a scaffolding, etc., to facilitate improving the stability of the operating platform 101 during use.

[0032] The second positioning assembly further includes a second positioning rod 7 threadedly mounted on the outer frame 1 , and the second positioning rod 7 is vertically arranged.

[0033] In this embodiment, a second positioning rod 7 can be provided on the outer frame 1, and the second positioning rod 7 is provided vertically, and the second positioning rod 7 is used to abut against the ground or a steel pipe column, and the second positioning rod 7 should be provided at a distance from the inner frame 2 to expand the support range and prevent the operating platform 101 from tilting due to movement of personnel when in use. Further, the first positioning rod 6 and the second positioning rod 7 are respectively located at the top and bottom of the outer frame 1.

[0034] The operating platform 101 is paved with a number of steel plates.

[0035] In this embodiment, a fully corrugated steel plate is laid on the operating platform, which is used as a standing surface for workers during construction to prevent construction workers from stepping on empty space.

[0036] The operating platform 101 is provided with a plurality of flanges 8 for abutting against the steel plate.

[0037] In this embodiment, a plurality of flanges 8 are provided on the operating platform 101 to facilitate installation and removal of the steel plate and also to improve the flatness of the steel plate during installation.

[0038] Finally, it should be noted that the above embodiments are only used to illustrate the technical solution of the utility model rather than to limit it. Although the utility model has been described in detail with reference to the preferred embodiments, ordinary technicians in the field should understand that the technical solution of the utility model can be modified or replaced by equivalents without departing from the purpose and scope of the technical solution of the utility model, which should be included in the scope of the claims of the utility model.

Claims

1. Auxiliary operation platform for concrete pouring construction in steel pipe columns without brackets, characterized by: include: An outer frame having a top and a bottom, wherein the top of the outer frame is an open structure and the bottom is provided with an operating platform; An inner frame is arranged on the operating platform, and the inner frame extends toward the top of the outer frame to form an installation cavity protruding from the operating platform, and is used to be sleeved on the top of the steel pipe column; A plurality of first positioning components include connected positioning plates and fixing bolts, wherein the positioning plates extend into the installation cavity, the fixing bolts penetrate the inner frame and are locked by nuts so that the positioning plates abut against or separate from the surface of the steel pipe column.

2. The auxiliary operation platform for concrete pouring construction in a steel pipe column without a corbel as claimed in claim 1, characterized in that: An arc-shaped opening is provided at one end of the positioning plate away from the fixing bolt, and the arc-shaped opening is bent toward the direction of the fixing bolt.

3. The auxiliary operation platform for concrete pouring construction in a steel pipe column without a corbel as claimed in claim 2, characterized in that: One end of the positioning plate away from the fixing bolt is provided with two fixing sections at intervals, the two fixing sections are respectively located on two sides of the arc-shaped opening, and the fixing sections are planes.

4. The auxiliary operation platform for concrete pouring construction in a steel pipe column without a corbel as claimed in claim 1, characterized in that: The outer frame is provided with a plurality of second positioning components, and the second positioning components include first positioning rods threadedly screwed on the outer frame, and the first positioning rods are arranged in a transverse direction.

5. The auxiliary operation platform for concrete pouring construction in a steel pipe column without a corbel as claimed in claim 4, characterized in that: The second positioning assembly also includes a second positioning rod threadedly mounted on the outer frame, and the second positioning rod is vertically arranged.

6. The auxiliary operation platform for concrete pouring construction in a steel pipe column without a corbel as claimed in claim 5, characterized in that: The first positioning rod and the second positioning rod are respectively located at the top and the bottom of the outer frame.

7. The auxiliary operation platform for concrete pouring construction in a steel pipe column without a corbel as claimed in claim 1, characterized in that: The operating platform is paved with a number of steel plates.

8. The auxiliary operation platform for concrete pouring construction in a steel pipe column without a corbel as claimed in claim 7, characterized in that: The operating platform is provided with a plurality of flanges for abutting against the steel plate.