Mounting structure for multiple heat supply pipelines of gas-fired boiler
By designing the installation structure of multi-heating pipelines for gas boilers and optimizing gas delivery by using gas rectifiers and thermostats, the problem that heating pipelines can only provide one temperature and cannot be adjusted in the prior art is solved, and efficient and energy-saving supply is achieved Thermal effect.
Patent Information
- Application Number
- CN202421298603.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-07
- Publication Date
- 2025-02-11
- Estimated Expiration
- 2034-06-07
AI Technical Summary
The existing multi-heating pipeline installation structure of gas boiler has insufficient in the transmission and temperature regulation of heating pipelines, which leads to the heating pipelines that can only provide one temperature and cannot be effectively adjusted and controlled, resulting in disorderly transportation of heating pipelines. Phenomenon.
A multi-heating pipe installation structure of gas boiler is designed. By setting a first heating component, a second heating component and a third heating component, the irregular flow of gas flow is converted into regular flow by using a gas rectifier and a thermostat. , and local cooling or heating is performed through a thermostat to change the speed and collision frequency of gas molecules, thereby improving gas delivery efficiency and energy utilization.
It has achieved efficient transportation and temperature regulation of multiple heating pipelines, improved gas delivery efficiency and energy utilization, achieved "heat supply on demand and heat on demand", and achieved the goal of energy conservation and emission reduction.
Smart Images

Figure CN222459642U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of gas boilers, in particular to a multi-heating pipeline installation structure for a gas boiler. Background Art
[0002] Gas boilers are boilers that use gas as fuel, so most people choose gas boilers as boiler equipment for steam, heating, and bathing. Gas boilers do not require coal ash storage, saving land and reducing labor intensity. Coal-fired boilers require high-intensity physical labor in the process of coal transportation and slag removal, while gas boiler workers have less labor intensity. When using a gas boiler, the heating pipeline will be connected to the gas boiler. The heating pipeline starts from the gas boiler and runs from the heat source to the heating pipeline at the thermal entrance of the building.
[0003] Authorization announcement number CN219976574U discloses a gas boiler multi-heating pipe installation structure. This patented technology uses the inner cavity of the first circular groove block and the second circular groove block to be provided with circular grooves, which can fit with the top of the gas boiler body, and then hoist and move the heating pipe downward. Since the circular groove plate is arranged just above the connecting pipe, the heating pipe will slide on the inner ring wall of the circular groove plate when it moves downward, and then the heating pipe is fixed by flange connection, which is convenient for positioning during installation, so that the heating pipe can slide within a limited position, avoiding deviation during docking and preventing squeezing. The phenomenon of pressure is avoided to avoid damage to the pipe mouth affecting subsequent use; however, there are still many inappropriate places in the arrangement and installation of the heating pipes in this scheme. Although the heating pipes can prevent sliding and be used stably, the transmission of the heating pipes themselves is optimized, so that the heating pipes can only supply one temperature, and the device cannot adjust and control the temperature of the heating pipes. The division of labor of multiple heating pipes is not clear, resulting in the phenomenon of disorderly transportation of the heating pipes. Therefore, a gas boiler multi-heating pipe installation structure is needed to improve the above problems. Utility Model Content
[0004] In order to solve the many inappropriate aspects in the arrangement and installation of heating pipes in the existing solutions, although the heating pipes can prevent sliding and be used stably, the transmission of the heating pipes themselves has been optimized, so that the heating pipes can only supply one temperature, and the device cannot adjust and control the temperature of the heating pipes. The division of labor of multiple heating pipes is unclear, resulting in disorderly transportation of the heating pipes. The purpose of the utility model is to provide a gas boiler multi-heating pipe installation structure to solve the problems raised in the above-mentioned background technology.
[0005] In order to achieve the above purpose, the utility model provides the following technical solutions:
[0006] A gas boiler multi-heating pipeline installation structure, comprising a receiving assembly, wherein a first heating assembly, a second heating assembly and a third heating assembly are arranged inside the receiving assembly;
[0007] The first heating component includes a flow divider, a boiler hot gas pipe and a first valve are fixedly connected to the side of the flow divider, a pressure transmitter is fixedly connected to the side of the first valve, a first transport pipe, a pressure gauge and a first adapter are fixedly connected to the top of the pressure transmitter, a first gas rectifier is fixedly connected to the side of the first transport pipe, and a first temperature controller is fixedly connected to the top of the first gas rectifier;
[0008] The second heating assembly includes a second delivery pipe, a second adapter is fixedly connected to the side of the second delivery pipe, a second delivery pipe is fixedly connected to the side of the second adapter, a second gas rectifier is fixedly connected to the top of the second delivery pipe, and an energy-saving valve and a second thermostat are fixedly connected to the top of the second gas rectifier;
[0009] The third heating component includes a third delivery pipe, a side of the third delivery pipe is fixedly connected to an extraction pump, a top of the third delivery pipe is fixedly connected to a third temperature controller, and a top of the third delivery pipe is fixedly connected to a third gas rectifier.
[0010] As a preferred solution of the utility model, a first delivery pipe is fixedly connected to the side of the diverter, and a main pipe is arranged at the bottom of the first delivery pipe.
[0011] As a preferred solution of the utility model, a first output pipe is fixedly connected to the top of the first gas rectifier, and a control valve is fixedly connected to the top of the first output pipe.
[0012] As a preferred solution of the utility model, a second output pipe is fixedly connected to the side of the second gas rectifier, and a fixing frame is arranged on the top of the second output pipe.
[0013] As a preferred solution of the utility model, the bottom of the third gas rectifier is fixedly connected to a third output pipe, the top of the third output pipe is fixedly connected to a flow meter, and the side of the third output pipe is fixedly connected to an exhaust pump.
[0014] As a preferred solution of the utility model, the housing assembly includes a load-bearing frame, and a control box is fixedly connected to the side of the load-bearing frame.
[0015] As a preferred solution of the utility model, a door handle, a display and an indicator light are fixedly connected to the side of the control box.
[0016] As a preferred solution of the utility model, the bottom of the supporting frame is provided with adjusting feet, and four adjusting feet are provided.
[0017] Compared with the prior art, the beneficial effects of the utility model are:
[0018] 1. In the utility model, the irregular flow of gas is changed into a regular flow of gas by using the first gas rectifier, the second gas rectifier and the third gas rectifier. When the gas is transmitted in the pipeline, the speed and collision frequency of the gas molecules can be changed by locally cooling or heating the first temperature controller, the second temperature controller and the third temperature controller, which is of great significance for improving the gas transmission efficiency, purifying the gas and improving the energy utilization rate.
[0019] 2. In the utility model, by using a pressure gauge, a flow meter, a first thermostat, a second thermostat and a third thermostat to calculate and analyze the energy consumption of each link and the efficiency of each unit, the heat source operation and the heat outlet parameters are optimized, and the flow, heat, water supply pressure, return water pressure, water supply temperature, return water temperature and other information of each heating main pipeline are displayed respectively, and transmitted to the heating scheduling monitoring center, and the operating parameters of the heat source and the outlet are monitored in real time to achieve "heating on demand and heat use on demand" and realize the goal of energy conservation and emission reduction. BRIEF DESCRIPTION OF THE DRAWINGS
[0020] Figure 1 It is a schematic diagram of the overall structure of the utility model;
[0021] Figure 2 This is a schematic diagram of the structure of the first heating component of the utility model;
[0022] Figure 3 This is a schematic diagram of the structure of the second heating component of the utility model;
[0023] Figure 4 This is a schematic structural diagram of the third heating component of the present utility model.
[0024] In the figure: 1. receiving assembly; 101. bearing frame; 102. adjusting foot; 103. control box; 104. door handle; 105. display; 106. indicator light; 2. first heating assembly; 201. diverter; 202. boiler hot gas pipe; 203. first delivery pipe; 204. main pipe; 205. first valve; 206. pressure transmitter; 207. first delivery pipe; 208. pressure gauge; 209. first gas rectifier; 210. first temperature controller; 211. first output pipe; 212. Control valve; 213, first adapter; 3, second heating component; 301, second delivery pipe; 302, second adapter; 303, second delivery pipe; 304, second gas rectifier; 305, energy-saving valve; 306, second thermostat; 307, second output pipe; 308, fixing bracket; 4, third heating component; 401, third delivery pipe; 402, extraction pump; 403, third thermostat; 404, third gas rectifier; 405, third output pipe; 406, flow meter; 407, exhaust pump. DETAILED DESCRIPTION
[0025] The technical solutions in the embodiments of the utility model will be clearly and completely described below in conjunction with the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, rather than all of the embodiments. Based on the embodiments of the utility model, all other embodiments obtained by ordinary technicians in this field without making creative work are within the scope of protection of the utility model.
[0026] Example: See Figure 1-Figure 4 The illustrated gas boiler multi-heating pipe installation structure comprises a receiving assembly 1, wherein a first heating assembly 2, a second heating assembly 3 and a third heating assembly 4 are arranged inside the receiving assembly 1;
[0027] In this embodiment, refer to Figure 1 , Figure 2 , Figure 3 and Figure 4As shown, the first heating component 2 includes a diverter 201, a boiler hot gas pipe 202 and a first valve 205 are fixedly connected to the side of the diverter 201, a pressure transmitter 206 is fixedly connected to the side of the first valve 205, a first transport pipe 207, a pressure gauge 208 and a first adapter 213 are fixedly connected to the top of the pressure transmitter 206, a first gas rectifier 209 is fixedly connected to the side of the first transport pipe 207, and a first temperature controller 210 is fixedly connected to the top of the first gas rectifier 209, and the second heating component 3 includes a second transport pipe 301, a second adapter 302 is fixedly connected to the side of the second transport pipe 301, a second transport pipe 303 is fixedly connected to the side of the second adapter 302, a second transport pipe 303 is fixedly connected to the top of the second transport pipe 303, and a second gas rectifier 304 is fixedly connected to the second gas rectifier 210. The top of the device 304 is fixedly connected with an energy-saving valve 305 and a second thermostat 306, the third heating component 4 includes a third delivery pipe 401, the side of the third delivery pipe 401 is fixedly connected with an extraction pump 402, the top of the third delivery pipe 401 is fixedly connected with a third thermostat 403, and the top of the third delivery pipe 401 is fixedly connected with a third gas rectifier 404. The first gas rectifier 209, the second gas rectifier 304 and the third gas rectifier 404 are used to convert irregular flow of gas into regular flow of gas. When the gas is transmitted in the pipeline, the speed and collision frequency of the gas molecules can be changed by local cooling or heating through the first thermostat 210, the second thermostat 306 and the third thermostat 403, which is of great significance for improving gas delivery efficiency, purifying gas and improving energy utilization.
[0028] The side of the flow divider 201 is fixedly connected to a first delivery pipe 203, a main pipe 204 is provided at the bottom of the first delivery pipe 203, a first output pipe 211 is fixedly connected to the top of the first gas rectifier 209, a control valve 212 is fixedly connected to the top of the first output pipe 211, a second output pipe 307 is fixedly connected to the side of the second gas rectifier 304, a fixing frame 308 is provided at the top of the second output pipe 307, a third output pipe 405 is fixedly connected to the bottom of the third gas rectifier 404, a flow control valve 212 is fixedly connected to the top of the third output pipe 405, and a flow control valve 212 is fixedly connected to the top of the first output pipe 211. Table 406, the side of the third output pipe 405 is fixedly connected with an exhaust pump 407, and the pressure gauge 208, flow meter 406, the first thermostat 210, the second thermostat 306 and the third thermostat 403 are used to calculate and analyze the energy consumption of each link and the efficiency of each unit, optimize the heat source operation and the heat outlet parameters, and display the flow, heat, water supply pressure, return water pressure, water supply temperature, return water temperature and other information of each heating main pipeline respectively, and transmit it to the heating scheduling monitoring center to monitor the operating parameters of the heat source and the outlet in real time, so as to achieve "heating on demand and heat use on demand" and realize the goal of energy conservation and emission reduction.
[0029] In this embodiment, refer to Figure 1As shown, the housing component 1 includes a carrier frame 101, a control box 103 is fixedly connected to the side of the carrier frame 101, a door handle 104, a display 105 and an indicator light 106 are fixedly connected to the side of the control box 103, and an adjustment foot 102 is provided at the bottom of the carrier frame 101. The adjustment foot 102 is provided with four, and the display 105 and the indicator light 106 facilitate the control and display of various data such as energy consumption of each link, efficiency of each unit, and optimization of heat source operation.
[0030] In the present scheme, a multi-heating pipeline installation structure for a gas boiler will enter the diverter 201 from the boiler hot gas pipe 202 when in use, and will be diverted to three places in the diverter 201 for heating. The first place will enter the pressure transmitter 206, and after being pressurized, it will flow through the first transport pipe 207 and be transported to the first gas rectifier 209, and after being temperature-regulated by the first gas rectifier 209 and the first thermostat 210, it will be discharged from the first output pipe 211. The second heat source will enter the second transport pipe 301 from the main pipe 204. , and flows through the second transport pipe 303 into the second gas rectifier 304, and is discharged from the second output pipe 307 after being temperature-regulated by the second gas rectifier 304 and the second thermostat 306. The third heat source will enter the third transport pipe 401 from the main pipe 204, and enter the third gas rectifier 404 through the extraction pump 402 and the third thermostat 403. The heat source inside the third gas rectifier 404 can be discharged by turning on the exhaust pump 407. Multiple heating pipelines can provide heat energy needs for places that cannot be reached, greatly increasing the utilization rate of heat energy.
[0031] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. A gas boiler multi-heating pipeline installation structure, comprising a mounting assembly (1), characterized in that: The receiving component (1) is provided with a first heating component (2), a second heating component (3) and a third heating component (4) inside; The first heating component (2) comprises a flow divider (201), a boiler hot gas pipe (202) and a first valve (205) are fixedly connected to the side of the flow divider (201), a pressure transmitter (206) is fixedly connected to the side of the first valve (205), a first transport pipe (207), a pressure gauge (208) and a first adapter (213) are fixedly connected to the top of the pressure transmitter (206), a first gas rectifier (209) is fixedly connected to the side of the first transport pipe (207), and a first temperature controller (210) is fixedly connected to the top of the first gas rectifier (209); The second heat supply component (3) comprises a second delivery pipe (301), a second adapter (302) is fixedly connected to the side of the second delivery pipe (301), a second delivery pipe (303) is fixedly connected to the side of the second adapter (302), a second gas rectifier (304) is fixedly connected to the top of the second delivery pipe (303), and an energy-saving valve (305) and a second temperature controller (306) are fixedly connected to the top of the second gas rectifier (304); The third heating component (4) comprises a third delivery pipe (401), a side of the third delivery pipe (401) is fixedly connected to an extraction pump (402), a top of the third delivery pipe (401) is fixedly connected to a third temperature controller (403), and a top of the third delivery pipe (401) is fixedly connected to a third gas rectifier (404).
2. A gas boiler multi-heating pipeline installation structure according to claim 1, characterized in that: A first delivery pipe (203) is fixedly connected to the side of the flow divider (201), and a main pipe (204) is arranged at the bottom of the first delivery pipe (203).
3. The gas boiler multi-heating pipeline installation structure according to claim 1 is characterized by: A first output pipe (211) is fixedly connected to the top of the first gas rectifier (209), and a control valve (212) is fixedly connected to the top of the first output pipe (211).
4. The gas boiler multi-heating pipeline installation structure according to claim 1 is characterized by: A second output pipe (307) is fixedly connected to the side of the second gas rectifier (304), and a fixing frame (308) is arranged on the top of the second output pipe (307).
5. The gas boiler multi-heating pipeline installation structure according to claim 1 is characterized by: The bottom of the third gas rectifier (404) is fixedly connected to a third output pipe (405), the top of the third output pipe (405) is fixedly connected to a flow meter (406), and the side of the third output pipe (405) is fixedly connected to an exhaust pump (407).
6. The gas boiler multi-heating pipeline installation structure according to claim 1 is characterized by: The receiving assembly (1) comprises a supporting frame (101), and a control box (103) is fixedly connected to a side surface of the supporting frame (101).
7. A gas boiler multi-heating pipeline installation structure according to claim 6, characterized in that: A door handle (104), a display (105) and an indicator light (106) are fixedly connected to the side of the control box (103).
8. The gas boiler multi-heating pipeline installation structure according to claim 6, characterized in that: The bottom of the support frame (101) is provided with an adjustment foot (102), and four adjustment feet (102) are provided.