Practical training platform for meter installation and power connection
By designing an adjustable structure of the meter-mounted and powered training table, the problem that the existing training table cannot simulate installation and training in different environments is solved, and a more flexible and personalized training environment is achieved, while improving the maintenance of the training table. Convenience and student operational skills.
Patent Information
- Application Number
- CN202420755804.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-12
- Publication Date
- 2025-02-11
- Estimated Expiration
- 2034-04-12
AI Technical Summary
The existing training bench is fixed in the power installation structure, which cannot simulate the installation work of the electrical structure under different environments, resulting in the inability to simulate the installation and training under different environments. At the same time, the training bench parts are easily worn and inconvenient to maintain.
A table-mounted and powered training platform including hole plates, lift plates, connecting plates and support bases was designed. The slider, threaded rod and electrical mechanism were used to form a rotating and sliding structure to achieve adjustable table height and angle, which was convenient. Simulate disassembly and replacement of different environments and components.
It realizes simulated meter installation and power connection training without real power risks, enhances students' actual operation ability and skill level, and facilitates the maintenance and function adjustment of the practical training platform to adapt to different training needs.
Smart Images

Figure CN222462213U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of meter installation and power connection training, in particular to a meter installation and power connection training platform. Background Art
[0002] The meter installation and power connection training platform is a device used by power industry personnel to install and connect meters. It is usually used in educational institutions, vocational training centers or engineering laboratories for students or engineers to perform practical operations such as installation, wiring and debugging of electrical devices. It simulates the real power wiring environment and provides students with a safe and controllable practice platform.
[0003] In the process of realizing the present utility model, the inventors found that the prior art has the following problems: 1. In the actual process of installing and connecting the meter to the power supply, various unavoidable external factors will be encountered, which will lead to difficulties in installing and connecting the meter to the power supply. The corresponding pre-job training process also needs to simulate the actual operating environment as much as possible. The current training platform is mainly fixed in structure, which cannot simulate the installation of electrical structures in different environments, and thus cannot achieve installation training in different environments; 2. The purpose of training is to learn enough professional skills through multiple simulation trainings. Multiple repeated trainings will cause different degrees of wear on various training components. In order to ensure the quality of training, the various components of the training platform need to be easy to disassemble and replace. Utility Model Content
[0004] The utility model aims to provide a meter installation and power connection training platform to solve the problem in the above background technology that the meter installation and power connection training platform is fixed and cannot simulate electrical installation work in different environments, thereby failing to simulate installation in different environments.
[0005] To achieve the above purpose, the utility model provides the following technical solutions: a meter installation and power connection training platform, comprising a perforated board, a lifting plate is provided below the perforated board, a connecting plate is provided below the lifting plate, and a supporting seat is welded below the connecting plate;
[0006] A baffle and a connecting block are welded on the top of the support seat, and a connecting block is horizontally provided on one side of the baffle, a first threaded rod is inserted into the inside of the baffle, a slider is inserted into one side of the first threaded rod, and a first motor is inserted into the other side of the first threaded rod, a fixed plate is inserted above the slider, a movable plate is inserted into one side of the fixed plate, a fixed shaft is inserted into the inside of the movable plate, and a movable rod is inserted into one side of the connecting block.
[0007] Further preferably, the inside of the perforated board is fitted with an insertion rod, the top of the insertion rod is fitted with a movable plate, the inside of the movable plate is mounted with a moving block by screws, the inside of the moving block is connected with a rotating rod by threads, one side of the perforated board is fitted with a limiting plate, the top of the limiting plate is connected with a fixing rod by threads, and the perforated board is provided with a plurality of limiting holes, and the outer arc diameter of the insertion rod is consistent with the opening diameter of the perforated board, and the external structural dimensions of the perforated board are consistent with the internal structural dimensions between the limiting plate and the fixing rod through movement.
[0008] Further preferably, a movable plate A and a movable plate B are horizontally arranged inside the hole groove opened by the movable plate, and the internal structure size of the moving block is consistent with the external structure size of the rotating rod.
[0009] Further preferably, the first threaded rod forms a rotating structure through a first motor, and the fixed plate forms a sliding structure through a slider and a movable plate.
[0010] Further preferably, a sleeve is sleeved at the bottom of the lifting plate, the interior of the sleeve is threadedly connected to a second threaded rod, the outer wall of the sleeve is fitted with a support frame, a sliding rod is welded at the bottom of the lifting plate, a sliding cylinder is inserted at the bottom of the sliding rod, and the lifting plate forms a sliding structure through the sliding rod and the sliding cylinder, and the sleeve forms a sliding structure through the second threaded rod.
[0011] Further preferably, a base is welded above the connecting plate, a rotating handle is inserted on one side of the base, a rotating shaft is inserted on one side of the rotating handle, a first trapezoidal gear is inserted on the other side of the rotating shaft, a second trapezoidal gear is meshed above the first trapezoidal gear, a fixed disk is inserted above the second trapezoidal gear, a second pulley is attached to the outer wall of the fixed disk, the second pulley and the first pulley are connected to each other through a conveyor belt, a second motor is inserted below the first pulley, the first trapezoidal gear forms a rotating structure with the rotating handle through the rotating shaft, and the first pulley forms a rotating structure through the second motor.
[0012] Compared with the prior art, the utility model has the following beneficial effects:
[0013] In the present invention, a safe learning environment is provided by simulating a training platform, and trainees can practice and train without real power risks, thereby reducing the risk of accidents. At the same time, trainees can perform actual operation exercises on the training platform, simulating real meter installation and power connection scenarios, thereby enhancing their practical operation capabilities and skill levels. The current and voltage parameters of the training platform can be adjusted and controlled, and teachers can make adjustments based on the trainees' learning progress and ability levels to provide a more suitable training environment and challenges.
[0014] In the present invention, the easy disassembly and replacement of parts means that maintenance and repair can be easily performed. If a part fails or is damaged, it can be directly disassembled and replaced without repairing the entire training platform, thereby saving time and cost, and the configuration and function of the training platform can be adjusted at any time according to different training needs and goals. For example, different types or specifications of parts can be replaced according to the level and needs of the trainees, making the training more flexible and personalized. BRIEF DESCRIPTION OF THE DRAWINGS
[0015] Figure 1 This is a schematic diagram of the front view structure of the utility model;
[0016] Figure 2 This is a side view of the structure of the utility model;
[0017] Figure 3 This is a schematic diagram of the structure of one side of the pegboard of the utility model;
[0018] Figure 4 This is a schematic diagram of the structure above the support seat of the utility model;
[0019] Figure 5 This is a schematic diagram of the structure below the lifting plate of the utility model;
[0020] Figure 6 It is a schematic diagram of the upper structure of the connecting plate of the utility model.
[0021] In the figure: 1. perforated plate; 101. movable plate; 102. fixed rod; 103. limit plate; 104. plug rod; 105. rotating rod; 106. moving block; 2. support seat; 201. fixed shaft; 202. moving plate; 203. connecting block; 204. moving rod; 205. fixed plate; 206. baffle; 207. first threaded rod; 208. first motor; 209. slider; 3. lifting plate; 301. sleeve; 302. sliding rod; 303. sliding cylinder; 304. second threaded rod; 305. support frame; 4. connecting plate; 401. second pulley; 402. conveyor belt; 403. first pulley; 404. second motor; 405. fixed disk; 406. rotating shaft; 407. base; 408. rotating handle; 409. first trapezoidal gear; 410. second trapezoidal gear. DETAILED DESCRIPTION
[0022] The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the accompanying drawings in the embodiments of the present invention.
[0023] See also Figures 1 to 6 A meter installation and power connection training platform comprises a perforated board 1, a lifting board 3 is arranged below the perforated board 1, a connecting board 4 is arranged below the lifting board 3, and a supporting seat 2 is welded below the connecting board 4;
[0024] A baffle 206 and a connecting block 203 are welded on the top of the support seat 2, and a connecting block 203 is horizontally provided on one side of the baffle 206, a first threaded rod 207 is inserted into the inside of the baffle 206, a slider 209 is inserted into one side of the first threaded rod 207, a first motor 208 is inserted into the other side of the first threaded rod 207, a fixed plate 205 is inserted above the slider 209, a movable plate 202 is inserted into one side of the fixed plate 205, a fixed shaft 201 is inserted into the inside of the movable plate 202, and a movable rod 204 is inserted into one side of the connecting block 203.
[0025] In this embodiment, Figure 1 , Figure 2 and Figure 3 As shown, the inside of the perforated board 1 is fitted with an insertion rod 104, and the upper part of the insertion rod 104 is fitted with a movable board 101, and a moving block 106 is installed inside the movable board 101 by screws, and the inner part of the moving block 106 is connected with a rotating rod 105 by threads, and one side of the perforated board 1 is fitted with a limit plate 103, and the upper part of the limit plate 103 is connected with a fixing rod 102 by threads, and the perforated board 1 is provided with a plurality of limit holes, and the outer arc diameter of the insertion rod 104 is consistent with the opening diameter of the perforated board 1, and the outer structural dimensions of the perforated board 1 are consistent with the internal structural dimensions between the fixing rod 102 and the limit plate 103; because the meter installation training platform is mainly used for electrical engineering training and training equipment, It is necessary to repeatedly disassemble and install each component to achieve the training purpose. In order to ensure the quality of training and the accuracy of installation, a plug-in structure between the plug rod 104 and the perforated board 1 is now adopted to facilitate the replacement of each component. The improved plug rod 104 can be inserted into the perforated board 1 and can be fixed in the plug rod 104 by the movable plate 101. The limit plate 103 fits the perforated board 1 and the fixed plate 205. The fixed rod 102 is manually rotated to facilitate the fit of the perforated board 1 and the limit plate 103, which is convenient for disassembly and fixation of the socket and the circuit debugging device. The socket and the circuit debugging device can be quickly fixed and disassembled, thereby achieving the effect of fixing the plug rod 104 and the fixing rod 102.
[0026] In this embodiment, Figure 1 , Figure 2 and Figure 3As shown, movable plates A101 and movable plates B101 are horizontally arranged inside the hole grooves opened in the movable plate 101, and the internal structural dimensions of the movable block 106 are consistent with the external structural dimensions of the rotating rod 105; a meter installation and power connection training platform without a perforated plate 1 may make the learning process more abstract and complicated, and trainees may need to spend more time and energy to understand and master relevant knowledge and operating skills, which increases the steepness of the learning curve. Now the rotating rod 105 is rotated and fixed into the movable block 106 to prevent the meter installation device from falling due to tilting adjustment. An anti-slip device is provided on one side of the plug-in rod 104 to prevent the movable plate 101 from falling, so as to facilitate the stable display of the meter installation panel.
[0027] In this embodiment, Figure 4 As shown, the first threaded rod 207 forms a rotating structure through the first motor 208, and the fixed plate 205 forms a sliding structure with the movable plate 202 through the slider 209; the training process also needs to simulate the actual operating environment as much as possible. The current training platform is mainly fixed in structure, which may make it difficult for trainees to observe the details of the circuit connection and the position of small components, affecting their accurate understanding and analysis of the circuit connection situation, which may lead to operational errors or misunderstandings. Now the first motor 208 is improved to rotate the first threaded rod 207, and the first threaded rod 207 moves the slider 209, thereby achieving the effect of moving the slider 209, which is convenient for the slider 209 to drive the fixed plate 205 to adjust the angle, and realize the adjustable angle so that trainees can observe the circuit connection situation from different angles and fully understand the layout and connection of the entire circuit, which helps them to more accurately understand the circuit connection principle and analyze the circuit connection situation.
[0028] In this embodiment, Figure 1 , Figure 2 , Figure 5 and Figure 6As shown, a sleeve 301 is sleeved at the bottom of the lifting plate 3, and a second threaded rod 304 is threadedly connected to the inside of the sleeve 301, and a support frame 305 is attached to the outer wall of the sleeve 301. A sliding rod 302 is welded at the bottom of the lifting plate 3, and a sliding cylinder 303 is inserted at the bottom of the sliding rod 302. The lifting plate 3 forms a sliding structure with the sliding cylinder 303 through the sliding rod 302, and the sleeve 301 forms a sliding structure through the second threaded rod 304. The lack of a lifting device means that the height of the table top cannot be adjusted, which may make it difficult for users to find a suitable working height, especially for people of different heights or physical conditions, who may feel uncomfortable or inconvenient. The handle 408 is turned to drive the rotating shaft 406 to rotate, and the rotating shaft 406 causes the first trapezoidal gear 409 to rotate. The first trapezoidal gear 409 is meshed and connected with the second trapezoidal gear 410, and the second trapezoidal gear 410 causes the second threaded rod 304 to rotate. The second threaded rod 304 is consistent with the thread of the sleeve 301, and the sleeve 301 drives the lifting plate 3 and the sliding rod 302 to move vertically upward in turn, so that the lifting plate 3 can be adjusted in height. People have different heights. By adjusting the height of the training platform, it can adapt to users of different heights, provide a more comfortable and ergonomic working environment, and reduce users' discomfort and fatigue.
[0029] In this embodiment, Figure 1 , Figure 2 , Figure 5 and Figure 6 As shown, a base 407 is welded on the top of the connecting plate 4, a rotating handle 408 is plugged on one side of the base 407, a rotating shaft 406 is plugged on one side of the rotating handle 408, a first trapezoidal gear 409 is plugged on the other side of the rotating shaft 406, a second trapezoidal gear 410 is meshed on the top of the first trapezoidal gear 409, a fixed disk 405 is plugged on the top of the second trapezoidal gear 410, a second pulley 401 is attached to the outer wall of the fixed disk 405, the second pulley 401 and the first pulley 403 are connected to each other through a conveyor belt 402, a second motor 404 is plugged on the bottom of the first pulley 403, and the first trapezoidal gear 409 forms a rotating shaft with the rotating handle 408 through the rotating shaft 406. structure, and the first pulley 403 forms a rotating structure through the second motor 404; if the training platform cannot rotate, team members may encounter difficulties in communication and cooperation because they cannot easily adjust their positions to align and share work content. The first pulley 403 is rotated by the second motor 404, and the first pulley 403 and the second pulley 401 are connected by a conveyor belt 402, so that the second pulley 401 drives the slide 303 to rotate, and the slide 303 rotates the lifting plate 3. The lifting plate 3 can adjust the rotation angle, so that the training platform can be adjusted according to different work needs and scenarios, providing more diverse work experiences and working methods, and increasing work flexibility and versatility.
[0030] The use method and advantages of the utility model: When the meter connection training platform is used, the working process is as follows:
[0031] like Figure 1 , Figure 2 , Figure 3 , Figure 4 , Figure 5 and Figure 6 As shown, first, the rotating rod 105 rotates clockwise inside the moving block 106, so that the rotating rod 105 horizontally fixes the meter instrument to one side, and one side of the plug rod 104 is horizontally inserted into the perforated board 1, so that the plug rod 104 can stably fix the movable board 101, and the fixed rod 102 rotates clockwise and inserts into one side of the limiting plate 103, so that the perforated board 1 and the fixed plate 205 are respectively fixed in the arc groove of the limiting plate 103, which is convenient for quickly fixing the perforated board 1, and the first motor 208 above the support seat 2 drives the first threaded rod 207 to rotate clockwise, so that the slider 209 drives the fixed plate 205 and the moving plate 202 to move in turn, and the moving plate 202 drives the fixed shaft 201 to rotate to one side, so that the fixed plate 205 cooperates with the moving plate 202 to adjust the angle through the slider 209, and the second motor 4 04 drives the first pulley 403 to rotate clockwise, the first pulley 403 and the second pulley 401 rotate through the conveyor belt 402, the second pulley 401 drives the slide 303, the slide rod 302 and the lifting plate 3 to rotate in turn, so that the lifting plate 3 can adjust the rotation angle, which is convenient for communication and cooperation between team members, and the handle 408 is turned to drive the rotating shaft 406 and the first trapezoidal gear 409 to rotate in turn, the first trapezoidal gear 409 is meshed and connected with the second trapezoidal gear 410, so that the second trapezoidal gear 410 makes the second threaded rod 304 rotate, and the second threaded rod 304 is threadedly connected with the sleeve 301, which is convenient for adjusting the lifting plate 3 above the sleeve 301, and can adapt to users of different heights, providing a more comfortable and ergonomic working environment.
Claims
1. A training platform for installing and connecting electricity to a meter, comprising a perforated board (1), characterized in that: A lifting plate (3) is provided below the perforated plate (1), a connecting plate (4) is provided below the lifting plate (3), and a supporting seat (2) is welded below the connecting plate (4); A baffle (206) and a connecting block (203) are welded on the top of the support seat (2), and a connecting block (203) is horizontally arranged on one side of the baffle (206); a first threaded rod (207) is inserted inside the baffle (206); a slider (209) is inserted on one side of the first threaded rod (207); a first motor (208) is inserted on the other side of the first threaded rod (207); a fixed plate (205) is inserted above the slider (209); a movable plate (202) is inserted on one side of the fixed plate (205); a fixed shaft (201) is inserted inside the movable plate (202); and a movable rod (204) is inserted on one side of the connecting block (203).
2. A meter installation and power connection training platform according to claim 1, characterized in that: The perforated board (1) is fitted with an insertion rod (104) inside, a movable board (101) is fitted above the insertion rod (104), a moving block (106) is installed inside the movable board (101) by means of screws, a rotating rod (105) is connected inside the moving block (106) by means of threads, a limiting plate (103) is fitted on one side of the perforated board (1), a fixing rod (102) is connected above the limiting plate (103) by means of threads, the perforated board (1) is provided with a plurality of limiting holes, the outer arc diameter of the insertion rod (104) is consistent with the opening diameter of the perforated board (1), and the outer structural dimensions of the perforated board (1) are consistent with the inner structural dimensions between the fixing rod (102) and the limiting plate (103) through movement.
3. A meter installation and power connection training platform according to claim 2, characterized in that: The movable plate A (101) and the movable plate B (101) are horizontally arranged inside the hole groove opened in the movable plate (101), and the internal structure size of the moving block (106) is consistent with the external structure size of the rotating rod (105).
4. A meter installation and power connection training platform according to claim 1, characterized in that: The first threaded rod (207) forms a rotating structure through a first motor (208), and the fixed plate (205) forms a sliding structure with the movable plate (202) through a slider (209).
5. The meter installation and power connection training platform according to claim 1, characterized in that: A sleeve (301) is sleeved below the lifting plate (3), a second threaded rod (304) is threadedly connected inside the sleeve (301), a support frame (305) is attached to the outer wall of the sleeve (301), a sliding rod (302) is welded below the lifting plate (3), a sliding cylinder (303) is inserted below the sliding rod (302), and the lifting plate (3) forms a sliding structure with the sliding rod (302) and the sliding cylinder (303), and the sleeve (301) forms a sliding structure with the second threaded rod (304).
6. The meter installation and power connection training platform according to claim 1, characterized in that: A base (407) is welded above the connecting plate (4), a rotating handle (408) is plugged into one side of the base (407), a rotating shaft (406) is plugged into one side of the rotating handle (408), a first trapezoidal gear (409) is plugged into the other side of the rotating shaft (406), a second trapezoidal gear (410) is meshed above the first trapezoidal gear (409), a fixing plate (405) is plugged into the second trapezoidal gear (410), and a fixing plate (405) is fixed above the second trapezoidal gear (410). A second pulley (401) is attached to the outer wall of the disk (405), and the second pulley (401) and the first pulley (403) are connected to each other through a conveyor belt (402). A second motor (404) is inserted below the first pulley (403), and a first trapezoidal gear (409) forms a rotating structure with a rotating handle (408) through a rotating shaft (406), and the first pulley (403) forms a rotating structure through the second motor (404).