Mountain low-type power cable pole tower
By designing a detachable low-level power cable tower, the inconvenience of traditional power cable towers during transportation and installation in mountainous areas is solved, and the effect of rapid installation and efficient transportation is achieved.
Patent Information
- Application Number
- CN202421243663.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-03
- Publication Date
- 2025-02-14
- Estimated Expiration
- 2034-06-03
AI Technical Summary
Traditional power cable towers are inconvenient during transportation and installation, especially in mountainous areas, which are difficult to use large-sized vehicles for transportation, and the assembly process is cumbersome.
A mountain low-sized power cable pole tower is designed, using a round table base, fixed steel pipe, strip reinforcement plate and a detachable connecting steel pipe structure, which can be split into multiple parts, which is convenient for small vehicles to transport. Quick installation and fixation are achieved through the cooperation of the fastening bolts and the positioning insertion rod.
This design makes the power cable tower small in size during transportation, suitable for mountain transportation, and is fast fixed during installation, improving work efficiency and stability.
Smart Images

Figure 00000000_0000_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of power pole towers, in particular to a low-profile power cable pole tower for mountainous areas. Background Art
[0002] As an important part of the power transmission system, the stability and service life of power cable towers directly affect the operation of the entire power system. Most traditional power cable towers are designed to be high, which is inconvenient to transport, especially in mountainous areas, where it is difficult to use large vehicles to transport power cable towers.
[0003] The patent with publication number CN215671429U discloses a power pole tower for power transmission engineering, including a base, a base rod threadedly mounted on the upper surface of the base, a support leg movably mounted on the outer surface of the base, a pull ring fixedly mounted on one end of the support leg, a fixed plate with holes fixedly mounted on the upper surface of the base, a steel wire rope is arranged between the fixed plate with holes and the pull ring, a connecting rod is arranged on the upper surface of the base rod, and a mounting rod is arranged on the upper surface of the connecting rod. The power pole tower for power transmission engineering described in the utility model can store the support legs during transportation, which is convenient for the transportation of equipment, reduces the volume of the transportation vehicle, and is convenient for the transportation vehicle to travel in mountainous areas. The support legs can also be unfolded during use to increase the contact area between the base and the ground and improve the stability of the base. The verticality calibration of the equipment is completed through the cooperation of the steel wire rope and the fixed plate with holes, so as to achieve the purpose of adjusting the verticality and increasing the stability of the base.
[0004] Although the above-mentioned prior art can store the supporting legs during transportation, which is convenient for the transportation of equipment, reduces the volume of the transport vehicle, and facilitates the transportation vehicle to travel in mountainous areas, the connection positions of the base pole and the connecting rod, and the connecting rod and the mounting rod all require the use of a large number of connecting studs and nuts for fixing, which is not convenient for workers to quickly assemble the power pole tower. In view of this, we propose a low-profile power cable pole tower for mountainous areas. Utility Model Content
[0005] The purpose of the utility model is to provide a low-profile power cable tower for mountainous areas to solve the problems raised in the above-mentioned background technology.
[0006] In order to achieve the above purpose, the utility model provides the following technical solutions:
[0007] A low-profile electric cable tower for mountainous areas comprises a truncated cone-shaped base, a fixed steel pipe is arranged in the middle of the top of the truncated cone-shaped base, and the outer wall of the fixed steel pipe is detachably connected with four strip reinforcement plates arranged in a circular array. When the truncated cone-shaped base is buried in the mountainous area, a part of the fixed steel pipe is also buried in the mountainous area, and the bottoms of the four strip reinforcement plates are against the ground, thereby improving the stability of the truncated cone-shaped base;
[0008] A first annular connecting seat is provided on the top of the outer wall of the fixed steel pipe, a plurality of positioning holes a arranged in an annular array are opened on the top of the first annular connecting seat, a first positioning vertical block is welded on the top of the inner wall of the fixed steel pipe, and the length of the fixed steel pipe is 0.5-1m;
[0009] A top steel sleeve is provided directly above the fixed steel pipe, the length of the top steel sleeve is 0.5-1m, a fourth annular connecting seat is provided at the bottom of the outer wall of the top steel sleeve, a plurality of second positioning plugs arranged in an annular array are provided at the bottom of the fourth annular connecting seat, a mounting rod is provided at the top of the top steel sleeve, the length of the mounting rod is 1-1.5m, a cable mounting bracket is provided on the mounting rod, and the cable mounting bracket is used to connect power cables;
[0010] A connecting steel pipe is provided between the fixed steel pipe and the top steel sleeve, and the connecting steel pipe is used to connect the fixed steel pipe and the top steel sleeve, that is, the low-profile power cable pole tower can be split into multiple parts, which is convenient for small vehicles to transport in mountainous areas. A second annular connecting seat is provided at the bottom of the outer wall of the connecting steel pipe, and a plurality of first positioning plugs arranged in a circular array are provided at the bottom of the second annular connecting seat. The plurality of first positioning plugs are respectively inserted into a plurality of positioning holes a, and the upper half of the first positioning vertical block is positioned in the connecting steel pipe by a first fastening bolt, which is convenient for the installation of the fixed steel pipe and the connecting steel pipe;
[0011] A third annular connecting seat is provided at the top of the outer wall of the connecting steel pipe, and a plurality of positioning holes b arranged in a circular array are opened on the top of the third annular connecting seat. A plurality of the second positioning plug rods are respectively inserted into the plurality of positioning holes b, and a second positioning vertical block is welded at the top of the inner wall of the connecting steel pipe. The upper half of the second positioning vertical block is positioned in the top steel sleeve by a second fastening bolt, which facilitates the installation of the top steel sleeve and the connecting steel pipe.
[0012] Preferably, the outer wall of the truncated cone base is provided with a plurality of annular grooves, which can improve the stability of the truncated cone base after being buried in the mountain. The bottom end of the fixed steel pipe is welded to the top of the truncated cone base to fix the position of the fixed steel pipe and the truncated cone base.
[0013] Preferably, the outer wall of the fixed steel pipe is provided with four connecting protrusions arranged in a circular array, and a first thread groove is opened on the side of the connecting protrusion away from the fixed steel pipe. The side of the strip reinforcement plate close to the fixed steel pipe is provided with a thread column, and the thread column is threadedly connected to the first thread groove, so as to facilitate the staff to disassemble and assemble the strip reinforcement plate.
[0014] Preferably, a mounting hole for a ground anchor to pass through is provided at the top of the strip reinforcement plate and near the outer end, so that the strip reinforcement plate can be fixed on the mountain, thereby stabilizing the truncated cone base.
[0015] Preferably, the number of the connecting steel pipes is at least one, and the length of the connecting steel pipe is 3-4m. The connecting steel pipe of this length can be easily transported by small vehicles. At the same time, after two or three connecting steel pipes are assembled, the power cable tower will not be too high. The specific number of connecting steel pipes used can be selected as needed to adapt to the use of power transmission in mountainous areas;
[0016] When it is necessary to connect two adjacent connecting steel pipes, the staff will insert the multiple first positioning rods of the upper connecting steel pipe into the multiple positioning holes b of the lower connecting steel pipe, so that the two adjacent connecting steel pipes are initially connected. At this time, the upper half of the second positioning vertical block of the lower connecting steel pipe is located in the upper connecting steel pipe. The staff will pass the second fastening bolt of the lower connecting steel pipe through the connecting hole a of the upper connecting steel pipe and thread it into the third thread groove of the lower connecting steel pipe, thereby fixing the position of the two adjacent connecting steel pipes.
[0017] Preferably, a second thread groove is provided on the front side of the first positioning vertical block and near the top, and a connecting hole a is provided on the outer wall of the connecting steel pipe and near the bottom. The threaded end of the first fastening bolt passes through the connecting hole a and is threadedly connected to the second thread groove. Under the cooperation of the first fastening bolt and the first positioning vertical block, the positions of the connecting steel pipe and the fixed steel pipe are fixed.
[0018] Preferably, a third thread groove is provided on the front side of the second positioning vertical block and near the top, and a connecting hole b is provided on the outer wall of the top steel sleeve and near the bottom. The threaded end of the second fastening bolt passes through the connecting hole b and is threadedly connected to the third thread groove. With the cooperation of the second fastening bolt and the second positioning vertical block, the position of the connecting steel pipe and the top steel sleeve is fixed.
[0019] Compared with the prior art, the beneficial effects of the utility model are:
[0020] 1. The low-profile power cable tower in the mountain area has a connecting steel pipe used to connect the fixed steel pipe and the top steel sleeve. That is, the low-profile power cable tower can be split into multiple parts. The length of the connecting steel pipe is 3-4m, which is convenient for small vehicles to transport. At the same time, two or three connecting steel pipes will not cause the power cable tower to be too high after assembly, so as to adapt to the use of power transmission in mountainous areas.
[0021] 2. The low-profile power cable tower in the mountain area, with the cooperation of the first fastening bolt and the first positioning vertical block, fixes the positions of the connecting steel pipe and the fixed steel pipe, and with the cooperation of the second fastening bolt and the second positioning vertical block, fixes the positions of the connecting steel pipe and the top steel sleeve, thereby facilitating the workers to quickly install the fixed steel pipe, the connecting steel pipe and the top steel sleeve.
[0022] 3. For the low-profile power cable tower in the mountain, when the truncated cone-shaped base is buried in the mountain, a part of the fixed steel pipe is also buried in the mountain, and the bottoms of the four strip reinforcement plates are against the ground. The strip reinforcement plates can be fixed on the mountain, thereby stabilizing the truncated cone-shaped base.
[0023] 4. The low-profile power cable tower in the mountain area has four connecting protrusions on the outer wall of the fixed steel pipe, a first thread groove is provided on the side of the connecting protrusion away from the fixed steel pipe, and a thread column is provided on the side of the strip reinforcement plate close to the fixed steel pipe, the thread column is threadedly connected to the first thread groove, so that the staff can disassemble and assemble the strip reinforcement plate easily. BRIEF DESCRIPTION OF THE DRAWINGS
[0024] Figure 1 It is a schematic diagram of the overall structure of the utility model;
[0025] Figure 2 It is a schematic diagram of the assembly structure of the truncated cone-shaped base, the fixed steel pipe and the strip-shaped reinforcement plate in the utility model;
[0026] Figure 3 This is a schematic diagram of the fixed steel pipe structure in the utility model;
[0027] Figure 4 This is a schematic diagram of the structure of the connecting steel pipe in the utility model from the first perspective;
[0028] Figure 5 This is a schematic diagram of the structure of the connecting steel pipe in the utility model from a second viewing angle;
[0029] Figure 6 It is a schematic diagram of the assembly structure of the top steel sleeve and the cable mounting bracket in the utility model.
[0030] In the figure: 1. truncated cone base; 10. annular groove; 2. fixed steel pipe; 20. connecting protrusion; 200. first threaded groove; 21. first annular connecting seat; 210. positioning hole a; 22. first positioning vertical block; 220. second threaded groove; 23. first fastening bolt; 3. strip reinforcement plate; 30. threaded column; 31. mounting hole; 4. connecting steel pipe; 40. second annular connecting seat; 400. first positioning plug rod; 41. third annular connecting seat; 410. positioning hole b; 42. second positioning vertical block; 420. third threaded groove; 43. second fastening bolt; 44. connecting hole a; 5. top steel sleeve; 50. fourth annular connecting seat; 500. second positioning plug rod; 51. connecting hole b; 52. mounting rod; 6. cable mounting bracket. DETAILED DESCRIPTION
[0031] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0032] In the description of the present invention, it should be understood that the terms "center", "longitudinal", "lateral", "length", "width", "thickness", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside", "clockwise", "counterclockwise" and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the referred device or element must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as a limitation on the present invention.
[0033] See also Figure 1-Figure 6 , the utility model provides a technical solution:
[0034] A low-profile electric power cable tower for mountainous areas comprises a truncated cone-shaped base 1, a fixed steel pipe 2 is arranged in the middle of the top of the truncated cone-shaped base 1, and four strip reinforcement plates 3 arranged in a circular array are detachably connected to the outer wall of the fixed steel pipe 2. When the truncated cone-shaped base 1 is buried in the mountainous area, a part of the fixed steel pipe 2 is also buried in the mountainous area, and the bottoms of the four strip reinforcement plates 3 are against the ground, thereby improving the stability of the truncated cone-shaped base 1;
[0035] A first annular connection seat 21 is provided at the top of the outer wall of the fixed steel pipe 2. A plurality of positioning holes a210 arranged in an annular array are opened at the top of the first annular connection seat 21. A first positioning vertical block 22 is welded at the top of the inner wall of the fixed steel pipe 2. The length of the fixed steel pipe 2 is 0.5-1m.
[0036] A top steel sleeve 5 is provided directly above the fixed steel pipe 2, the length of the top steel sleeve 5 is 0.5-1m, a fourth annular connecting seat 50 is provided at the bottom of the outer wall of the top steel sleeve 5, a plurality of second positioning plug rods 500 arranged in an annular array are provided at the bottom of the fourth annular connecting seat 50, a mounting rod 52 is provided at the top of the top steel sleeve 5, the length of the mounting rod 52 is 1-1.5m, a cable mounting bracket 6 is provided on the mounting rod 52, and the cable mounting bracket 6 is used to connect power cables;
[0037] A connecting steel pipe 4 is provided between the fixed steel pipe 2 and the top steel sleeve 5. The connecting steel pipe 4 is used to connect the fixed steel pipe 2 and the top steel sleeve 5. That is, the low-profile power cable tower can be split into multiple parts, which is convenient for small vehicles to transport in mountainous areas. A second annular connecting seat 40 is provided at the bottom of the outer wall of the connecting steel pipe 4. A plurality of first positioning rods 400 arranged in a circular array are provided at the bottom of the second annular connecting seat 40. The plurality of first positioning rods 400 are respectively inserted into a plurality of positioning holes a210. The upper half of the first positioning vertical block 22 is positioned in the connecting steel pipe 4 by the first fastening bolt 23, which is convenient for the installation of the fixed steel pipe 2 and the connecting steel pipe 4.
[0038] A third annular connecting seat 41 is provided at the top of the outer wall of the connecting steel pipe 4, and a plurality of positioning holes b410 arranged in a circular array are opened at the top of the third annular connecting seat 41. A plurality of second positioning rods 500 are respectively inserted into the plurality of positioning holes b410, and a second positioning vertical block 42 is welded to the top of the inner wall of the connecting steel pipe 4. The upper half of the second positioning vertical block 42 is positioned in the top steel sleeve 5 by a second fastening bolt 43, which facilitates the installation of the top steel sleeve 5 and the connecting steel pipe 4.
[0039] In this embodiment, the outer wall of the truncated cone base 1 is provided with a plurality of annular grooves 10, which can improve the stability of the truncated cone base 1 after being buried in the mountain. The bottom end of the fixed steel pipe 2 is welded to the top of the truncated cone base 1, so that the position of the fixed steel pipe 2 and the truncated cone base 1 is fixed.
[0040] Specifically, the outer wall of the fixed steel pipe 2 is provided with four connecting protrusions 20 arranged in a circular array, and a first thread groove 200 is opened on the side of the connecting protrusion 20 away from the fixed steel pipe 2. A thread column 30 is provided on the side of the strip reinforcement plate 3 close to the fixed steel pipe 2. The thread column 30 is threadedly connected in the first thread groove 200, which is convenient for the staff to disassemble and assemble the strip reinforcement plate 3.
[0041] Furthermore, a mounting hole 31 for a ground anchor to pass through is provided at the top of the strip reinforcement plate 3 and near the outer end, so that the strip reinforcement plate 3 can be fixed on the mountain, thereby stabilizing the truncated cone base 1.
[0042] Furthermore, the number of connecting steel pipes 4 is at least one, and the length of the connecting steel pipe 4 is 3-4m. The connecting steel pipe 4 of this length can be easily transported by a small vehicle. At the same time, after two or three connecting steel pipes 4 are assembled, the power cable tower will not be too high. The specific number of connecting steel pipes 4 can be selected as needed to adapt to the use of power transmission in mountainous areas.
[0043] When it is necessary to connect two adjacent connecting steel pipes 4, the staff will insert the multiple first positioning rods 400 of the upper connecting steel pipe 4 into the multiple positioning holes b410 of the lower connecting steel pipe 4, so that the two adjacent connecting steel pipes 4 are initially connected. At this time, the upper half of the second positioning vertical block 42 of the lower connecting steel pipe 4 is located in the upper connecting steel pipe 4, and the staff will pass the second fastening bolt 43 of the lower connecting steel pipe 4 through the connecting hole a44 of the upper connecting steel pipe 4 and thread it into the third thread groove 420 of the lower connecting steel pipe 4, thereby fixing the position of the two adjacent connecting steel pipes 4.
[0044] Furthermore, a second thread groove 220 is provided on the front side of the first positioning vertical block 22 and near the top, and a connecting hole a44 is provided on the outer wall of the connecting steel pipe 4 and near the bottom. The threaded end of the first fastening bolt 23 passes through the connecting hole a44 and is threadedly connected to the second thread groove 220. With the cooperation of the first fastening bolt 23 and the first positioning vertical block 22, the position of the connecting steel pipe 4 and the fixed steel pipe 2 is fixed.
[0045] Furthermore, a third thread groove 420 is provided on the front side of the second positioning vertical block 42 and near the top, and a connecting hole b51 is provided on the outer wall of the top steel sleeve 5 and near the bottom. The threaded end of the second fastening bolt 43 passes through the connecting hole b51 and is threadedly connected to the third thread groove 420. With the cooperation of the second fastening bolt 43 and the second positioning vertical block 42, the position of the connecting steel pipe 4 and the top steel sleeve 5 is fixed.
[0046] When the low-profile power cable pole tower in the mountains of this embodiment is in use, the staff uses a small transport vehicle to transport the truncated cone-shaped base 1 welded with a fixed steel pipe 2, four strip reinforcement plates 3, a top steel sleeve 5 equipped with a cable installation bracket 6, and at least one connecting steel pipe 4 to the required mountain area, and then the staff digs a foundation pit in the mountain for burying the truncated cone-shaped base 1. Later, when at least two connecting steel pipes 4 are needed, the staff first docks the two connecting steel pipes 4, and inserts the multiple first positioning rods 400 of the upper connecting steel pipe 4 into the multiple positioning holes b410 of the lower connecting steel pipe 4, so that the two upper and lower adjacent connecting steel pipes 4 are initially docked. At this time, the upper half of the second positioning vertical block 42 of the lower connecting steel pipe 4 is located in the upper connecting steel pipe 4. The staff passes the second fastening bolt 43 of the lower connecting steel pipe 4 through the connecting hole a44 of the upper connecting steel pipe 4 and threads it into the third thread groove 420 of the lower connecting steel pipe 4, thereby fixing the positions of the two upper and lower adjacent connecting steel pipes 4, and then the staff connects the connecting steel pipe 4 with the fixed steel pipe 2 docking, so that the plurality of first positioning rods 400 are respectively inserted into the plurality of positioning holes a210, and then the first fastening bolt 23 is passed through the connection hole a44 and threadedly connected in the second thread groove 220, so that the position of the connecting steel pipe 4 and the fixed steel pipe 2 is fixed, and then the staff docks the top steel sleeve 5 with the connecting steel pipe 4, so that the plurality of second positioning rods 500 are respectively inserted into the plurality of positioning holes b410, and then the second fastening bolt 43 is passed through the connection hole b51 and threadedly connected in the third thread groove 420, so that the top steel sleeve 5 and the connecting steel pipe 2 are fixed. The position of the connected steel pipe 4 is fixed. Finally, the staff threadedly connects the threaded columns 30 of the four strip reinforcement plates 3 into the first thread grooves 200 of the four connecting protrusions 20 respectively to fix the positions of the four strip reinforcement plates 3, and then places the truncated cone base 1 into the excavated foundation pit. The bottom of the four strip reinforcement plates 3 is against the ground, and then the ground anchor is used to pass through the mounting hole 31 so that the strip reinforcement plates 3 can be fixed on the mountain, so that the strip reinforcement plates 3 can stabilize the truncated cone base 1, thereby realizing the construction of the low-profile power cable pole tower in the mountain.
[0047] The above shows and describes the basic principle, main features and advantages of the utility model. Those skilled in the art should understand that the utility model is not limited by the above embodiments. The above embodiments and descriptions are only preferred examples of the utility model and are not used to limit the utility model. Without departing from the spirit and scope of the utility model, the utility model may have various changes and improvements, which fall within the scope of the utility model to be protected. The scope of protection of the utility model is defined by the attached claims and their equivalents.
Claims
1. A low-profile power cable tower for mountainous areas, comprising a truncated cone-shaped base (1), characterized in that: A fixed steel pipe (2) is provided in the middle of the top of the truncated cone-shaped base (1), and the outer wall of the fixed steel pipe (2) is detachably connected with four strip-shaped reinforcement plates (3) arranged in a circular array, and a first annular connecting seat (21) is provided at the top of the outer wall of the fixed steel pipe (2), and a plurality of positioning holes a (210) arranged in a circular array are opened on the top of the first annular connecting seat (21), and a first positioning vertical block (22) is welded to the top of the inner wall of the fixed steel pipe (2), and a top steel sleeve (5) is provided directly above the fixed steel pipe (2), and a fourth annular connecting seat (50) is provided at the bottom of the outer wall of the top steel sleeve (5), and a plurality of second positioning plug rods (500) arranged in a circular array are provided at the bottom of the fourth annular connecting seat (50), and a mounting rod (52) is provided at the top of the top steel sleeve (5), and a cable mounting bracket (6) is provided on the mounting rod (52), and a connecting steel sleeve (2) is provided between the fixed steel pipe (2) and the top steel sleeve (5). Tube (4), a second annular connecting seat (40) is provided at the bottom of the outer wall of the connecting steel pipe (4), a plurality of first positioning rods (400) arranged in a ring array are provided at the bottom of the second annular connecting seat (40), the plurality of first positioning rods (400) are respectively inserted into a plurality of positioning holes a (210), the upper half of the first positioning vertical block (22) is positioned in the connecting steel pipe (4) by a first fastening bolt (23), a third annular connecting seat (41) is provided at the top of the outer wall of the connecting steel pipe (4), a plurality of positioning holes b (410) arranged in a ring array are opened at the top of the third annular connecting seat (41), a plurality of second positioning rods (500) are respectively inserted into the plurality of positioning holes b (410), a second positioning vertical block (42) is welded at the top of the inner wall of the connecting steel pipe (4), the upper half of the second positioning vertical block (42) is positioned in the top steel sleeve (5) by a second fastening bolt (43).
2. The low-profile power cable tower for mountainous areas according to claim 1, characterized in that: The outer wall of the truncated cone-shaped base (1) is provided with a plurality of annular grooves (10), and the bottom end of the fixed steel pipe (2) is welded to the top of the truncated cone-shaped base (1).
3. The low-profile power cable tower for mountainous areas according to claim 1, characterized in that: The outer wall of the fixed steel pipe (2) is provided with four connecting protrusions (20) arranged in a ring array, and a first thread groove (200) is provided on a side of the connecting protrusion (20) away from the fixed steel pipe (2), and a thread column (30) is provided on a side of the strip reinforcement plate (3) close to the fixed steel pipe (2), and the thread column (30) is threadedly connected in the first thread groove (200).
4. The low-profile power cable tower for mountainous areas according to claim 1, characterized in that: A mounting hole (31) for a ground anchor to pass through is provided at the top of the strip-shaped reinforcement plate (3) and close to the outer end.
5. The low-profile power cable tower for mountainous areas according to claim 1, characterized in that: The number of the connecting steel pipe (4) is at least one, and the length of the connecting steel pipe (4) is 3-4 m.
6. The low-profile power cable tower for mountainous areas according to claim 1, characterized in that: A second thread groove (220) is provided on the front side of the first positioning vertical block (22) and near the top, and a connecting hole a (44) is provided on the outer wall of the connecting steel pipe (4) and near the bottom, and the threaded end of the first fastening bolt (23) passes through the connecting hole a (44) and is threadedly connected in the second thread groove (220).
7. The low-profile power cable tower for mountainous areas according to claim 1, characterized in that: A third thread groove (420) is provided on the front side of the second positioning vertical block (42) and near the top, and a connecting hole b (51) is provided on the outer wall of the top steel sleeve (5) and near the bottom, and the threaded end of the second fastening bolt (43) passes through the connecting hole b (51) and is threadedly connected in the third thread groove (420).