Fabricated building wall surface separation type pipeline mounting structure
By designing a separate pipeline installation structure including main mechanism, pipeline mechanism and sorting mechanism in a prefabricated building, the problem of difficulty in repairing the traditional wall panel system after the pipeline is separated and installed is solved, and the rapid installation and convenient maintenance of the pipeline is achieved , reduces construction noise and maintenance costs, and improves waterproof performance and structural safety.
Patent Information
- Application Number
- CN202420561185.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-22
- Publication Date
- 2025-02-14
- Estimated Expiration
- 2034-03-22
AI Technical Summary
In prefabricated buildings, after the pipeline is separated and installed, traditional wall panel systems are not easy to repair or replace damaged pipelines, and are likely to affect the waterproof function and lead to structural safety problems.
Design a prefabricated building wall separation pipeline installation structure, including main mechanism, pipeline mechanism and finishing mechanism. By reserving components such as casing and distributors, the pipeline can be easily installed and repaired, preventing direct contact with concrete and reducing Construction noise and maintenance costs.
It realizes rapid installation and convenient maintenance of pipelines, reduces construction noise and maintenance costs, avoids damage to the building structural layer, and improves waterproof performance, ensuring structural safety.
Smart Images

Figure CN222479642U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of assembled buildings, in particular to an assembled building wall separated pipeline installation structure. Background Art
[0002] With the increasing application rate of prefabricated buildings in the construction industry, prefabricated buildings have also been widely used in various public buildings. However, in prefabricated buildings, most of the internal and external walls are prefabricated walls. The finished prefabricated walls are evenly distributed with structural components such as steel bars. Once some corresponding equipment needs to be laid on the wall during the decoration process, it is necessary to open deep grooves in a large area in the wall, which is very likely to cause cracks that affect the waterproof function or even cause cracks that lead to structural safety. Prefabricated structures provide a new idea for building wall decoration, which can reduce material consumption and reduce later maintenance costs while improving the overall quality of the building.
[0003] After searching, the applicant found that a Chinese patent disclosed "a pipeline-separated assembled wall", and its publication (announcement) number is "CN 114351890 A". The patent mainly uses a plurality of wall assemblies to form a wall panel in an array-like manner, and two wall panels are opposed to form an integral wall panel. The two ends of a plurality of support block mechanisms are respectively clamped on the inner sides of the two wall panels, and any three rows of wall panels in a wall panel are respectively fixedly installed with a plurality of pipeline support mechanisms. The pipeline-separated assembled wall of the present invention makes the installation between walls simpler and more convenient by designing the shape of the wall, and solves the problems of high labor cost, difficult installation and low construction efficiency of the traditional wall panel system. The decorative wall panel with integrated pipelines of the present invention makes the pipeline installation simpler and does not occupy space by designing the pipeline support mechanism, and solves the problem that the traditional wall panel cannot solve the pipeline separation. However, after the pipeline separation and installation, it is not easy to repair or replace the damaged pipeline. For this reason, we propose a prefabricated building wall separated pipeline installation structure. Utility Model Content
[0004] The utility model aims to provide a prefabricated building wall separated pipeline installation structure.
[0005] In order to solve the problems raised in the above-mentioned background technology, the utility model provides the following technical solutions: an assembled building wall separated pipeline installation structure, comprising a main body mechanism, a pipeline mechanism and a sorting mechanism, the pipeline mechanism is installed at the front end of the main body mechanism, the sorting mechanism is installed at the front end of the pipeline mechanism, the main body mechanism comprises a waterproof back plate, a distributor, a connecting power line and a wire tube, the waterproof back plate is installed at the rear end of the main body mechanism, the distributor is installed at the front end of the main body mechanism, the connecting power line is installed on the left side of the distributor, and two groups of the wire tubes are installed on the upper and lower sides of the distributor.
[0006] As a further solution of the utility model: the main body mechanism includes reserved installation holes, and four groups of reserved installation holes are all opened outside the main body mechanism.
[0007] As a further solution of the utility model: the pipeline mechanism includes a reserved sleeve, a water pipe, a pipeline fixing ring and a distribution cross pipe, the reserved sleeve is installed inside the pipeline mechanism, the two groups of water pipes are installed inside the reserved sleeve, the pipeline fixing ring is installed outside the pipeline mechanism, and the distribution cross pipe is installed inside the pipeline mechanism.
[0008] As a further solution of the utility model: the arranging mechanism includes a front wire burying splint, a rear wire burying splint and a fixing buckle, the front wire burying splint is installed at the bottom end of the arranging mechanism, the rear wire burying splint is installed at the rear end of the front wire burying splint, and two groups of fixing buckles are installed on both sides of the front wire burying splint.
[0009] As a further solution of the utility model: the tidying mechanism comprises a vent, and the vent is opened at the front end of the tidying mechanism.
[0010] As a further solution of the utility model: the water delivery pipe is installed outside the distribution cross pipe.
[0011] As a further solution of the utility model: the distribution transverse pipe is fixedly connected to the front end of the distributor, and a control valve is arranged inside the distribution transverse pipe.
[0012] By adopting the above technical solution, compared with the prior art, the beneficial effects of the utility model are:
[0013] 1. The utility model installs a reserved casing inside the pipeline mechanism, making the device more convenient and quick to install. The water pipe and the wire pipe are installed inside the reserved casing, so that the water pipe and the wire pipe will not directly contact the concrete. The internal pipeline can be directly pulled out for maintenance or replacement, which is convenient to dismantle and modify, with low construction noise, low maintenance cost and no damage to the building structure layer;
[0014] 2. The utility model has a distributor installed at the front end of the main body mechanism, so that the device can control all connected pipes after the wiring is completed, reducing the possibility of pipeline failure. A waterproof back plate is installed at the rear end of the main body mechanism, so that the device is not easily affected by wall moisture during assembly and installation, causing damage or short circuit to the device, which is convenient for staff to install and maintain the device. BRIEF DESCRIPTION OF THE DRAWINGS
[0015] Figure 1 It is a three-dimensional schematic diagram of the overall mechanism in the embodiment of the utility model;
[0016] Figure 2It is a partial three-dimensional schematic diagram of the overall mechanism in the embodiment of the utility model;
[0017] Figure 3 It is a partial three-dimensional schematic diagram of the pipeline mechanism in the embodiment of the utility model;
[0018] Figure 4 This is a rear perspective schematic diagram of the overall mechanism in the embodiment of the utility model;
[0019] Figure 5 It is a bottom view schematic diagram of the pipeline mechanism in the embodiment of the utility model.
[0020] In the figure: 1. Main body; 101. Reserved hole for installation; 102. Waterproof back plate; 103. Distributor; 104. Connect power line; 105. Wire tube; 2. Pipeline mechanism; 201. Reserved sleeve; 202. Water pipe; 203. Pipe fixing ring; 204. Distribution cross pipe; 3. Arrangement mechanism; 301. Ventilation port; 302. Front clamp for buried wire; 303. Rear clamp for buried wire; 304. Fixing buckle. DETAILED DESCRIPTION
[0021] The specific implementation methods of the present invention are further described below in conjunction with the accompanying drawings. It should be noted that the description of these implementation methods is used to help understand the present invention, but does not constitute a limitation of the present invention. In addition, the technical features involved in each implementation method of the present invention described below can be combined with each other as long as they do not conflict with each other.
[0022] Example 1, please refer to the attached Figure 1 -Attached Figure 5 The utility model provides a technical solution: including a main body mechanism 1, a pipeline mechanism 2 and a sorting mechanism 3, the pipeline mechanism 2 is installed at the front end of the main body mechanism 1, the sorting mechanism 3 is installed at the front end of the pipeline mechanism 2, the main body mechanism 1 includes a waterproof back plate 102, a distributor 103, a connecting power line 104 and a wire tube 105, the waterproof back plate 102 is installed at the rear end of the main body mechanism 1, the distributor 103 is installed at the front end of the main body mechanism 1, the connecting power line 104 is installed on the left side of the distributor 103, and two sets of wire tubes 105 are installed on the upper and lower sides of the distributor 103.
[0023] In this embodiment, the main body mechanism 1 includes reserved installation holes 101 , and four groups of reserved installation holes 101 are all opened outside the main body mechanism 1 .
[0024] The construction line is connected to the distribution transverse pipe 204 through the reserved casing 201, and the water outlet opening state of each connecting pipe is controlled by the distributor 103, so as to facilitate the repair of the damaged pipe at a later time.
[0025] In this embodiment, the pipeline mechanism 2 includes a reserved sleeve 201, a water pipe 202, a pipeline fixing ring 203 and a distribution cross pipe 204. The reserved sleeve 201 is installed inside the pipeline mechanism 2, two groups of water pipes 202 are installed inside the reserved sleeve 201, the pipeline fixing ring 203 is installed on the outside of the pipeline mechanism 2, and the distribution cross pipe 204 is installed inside the pipeline mechanism 2.
[0026] Specifically, by installing a reserved sleeve 201 inside the pipeline mechanism 2, the device is more convenient and quick to install. The water pipe 202 and the wire pipe 105 are installed inside the reserved sleeve 201, so that the water pipe 202 and the wire pipe 105 will not come into direct contact with the concrete. The internal pipes can be directly pulled out for maintenance or replacement, which is convenient to dismantle and modify, with low construction noise, low maintenance cost and no damage to the building structure layer.
[0027] Example 2, please refer to the attached Figure 1 -Attached Figure 5 The utility model provides a technical solution: it includes a main body mechanism 1, a pipeline mechanism 2 and a sorting mechanism 3, the pipeline mechanism 2 is installed at the front end of the main body mechanism 1, the sorting mechanism 3 is installed at the front end of the pipeline mechanism 2, the main body mechanism 1 includes a waterproof back plate 102, a distributor 103, a connecting power line 104 and a wire tube 105, the waterproof back plate 102 is installed at the rear end of the main body mechanism 1, the distributor 103 is installed at the front end of the main body mechanism 1, the connecting power line 104 is installed on the left side of the distributor 103, two groups of wire tubes 105 are installed on the upper and lower sides of the distributor 103, the sorting mechanism 3 includes a front wire burying splint 302, a rear wire burying splint 303 and a fixing buckle 304, the front wire burying splint 302 is installed at the bottom of the sorting mechanism 3, the rear wire burying splint 303 is installed at the rear end of the front wire burying splint 302, and two groups of fixing buckles 304 are installed on both sides of the front wire burying splint 302.
[0028] In this embodiment, the arranging mechanism 3 includes a vent 301 , and the vent 301 is opened at the front end of the arranging mechanism 3 .
[0029] In this embodiment, the water delivery pipe 202 is installed outside the distribution cross pipe 204.
[0030] A control valve is installed inside the distribution cross pipe 204, and the control valve inside the distribution cross pipe 204 is connected through the distributor 103 to facilitate control of the pipeline. A wire embedding splint is installed at the bottom of the sorting mechanism 3 to facilitate sorting and arranging the reserved sleeve 201.
[0031] In this embodiment, the distribution transverse pipe 204 is fixedly connected to the front end of the distributor 103 , and a control valve is provided inside the distribution transverse pipe 204 .
[0032] Specifically, a distributor 103 is installed at the front end of the main body mechanism 1, so that the device can control all connected pipes after the wiring is completed, reducing the possibility of pipeline failure. A waterproof back plate 102 is installed at the rear end of the main body mechanism 1, so that the device is not easily affected by wall moisture during assembly and installation, causing damage to the device or short circuit, which makes it convenient for staff to install and maintain the device.
[0033] Working principle:
[0034] In the first step, the main body 1 is installed on the building wall through the installation reserved hole 101, and a waterproof back plate 102 is installed at the rear end to prevent the whole mechanism from being damaged by moisture. A distributor 103 is installed inside the main body 1, and a pipeline mechanism 2 is installed at the front end; the connecting power line 104 is installed at the left end of the distributor 103, and the wire tube 105 is installed at the front end of the distributor 103;
[0035] In the second step, the water pipe 202 and the wire pipe 105 are both installed in the reserved sleeve 201. The water pipe 202 is connected to the bottom of the distribution cross pipe 204. The reserved sleeve 201 sleeve pipe fixing ring 203 is installed inside the pipeline mechanism 2. The reserved sleeve 201 needs to be clamped by the front clamping plate 302 and the rear clamping plate 303 for pre-buried wiring. The two sets of clamping plates are fixedly connected to each other by fixing buckles 304. A vent 301 is opened at the front end of the sorting mechanism 3 to facilitate ventilation of the device. At this point, the entire work flow is completed.
[0036] The above-mentioned front, back, left, right, top and bottom are all based on the figures in the specification. Figure 1 As a benchmark, according to the person's observation perspective, the side of the device facing the observer is defined as the front, the left side of the observer is defined as the left, and so on.
[0037] In the description of the present invention, it should be understood that the terms "center", "longitudinal", "lateral", "front", "rear", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside", etc., indicating orientations or positional relationships, are based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as limiting the scope of protection of the present invention.
[0038] It should be noted that the equipment structure and drawings of the utility model mainly describe the principle of the utility model. In terms of the technology of the design principle, the settings of the power mechanism, power supply system and control system of the device are not fully described. On the premise that the technical personnel in this field understand the principle of the above utility model, the details of the power mechanism, power supply system and control system can be clearly known. The control method of the application document is automatic control through a controller, and the control circuit of the controller can be realized by simple programming by the technical personnel in this field;
[0039] The standard parts used therein can all be purchased from the market and can be customized according to the instructions and drawings. The specific connection methods of each part adopt conventional means such as mature bolts, rivets, welding, etc. in the prior art. The machinery, parts and equipment all adopt conventional models in the prior art, and the structures and principles of the components known to technical personnel in this field can be known by these technical personnel through technical manuals or through conventional experimental methods.
[0040] The embodiments of the present invention are described in detail above with reference to the accompanying drawings, but the present invention is not limited to the described embodiments. For those skilled in the art, various changes, modifications, substitutions and variations of these embodiments are made without departing from the principles and spirit of the present invention, and still fall within the scope of protection of the present invention.
Claims
1. A prefabricated building wall separated pipeline installation structure, comprising a main body mechanism (1), a pipeline mechanism (2) and a tidying mechanism (3), wherein the pipeline mechanism (2) is installed at the front end of the main body mechanism (1), and the tidying mechanism (3) is installed at the front end of the pipeline mechanism (2), characterized in that: The main body (1) comprises a waterproof back plate (102), a distributor (103), a connecting power line (104) and a wire tube (105); the waterproof back plate (102) is mounted at the rear end of the main body (1); the distributor (103) is mounted at the front end of the main body (1); the connecting power line (104) is mounted on the left side of the distributor (103); and two sets of the wire tubes (105) are mounted on the upper and lower sides of the distributor (103).
2. The prefabricated building wall separated pipeline installation structure according to claim 1, characterized in that: The main body mechanism (1) comprises reserved installation holes (101), and four groups of reserved installation holes (101) are all arranged outside the main body mechanism (1).
3. The prefabricated building wall separated pipeline installation structure according to claim 1, characterized in that: The pipeline mechanism (2) comprises a reserved sleeve (201), a water pipe (202), a pipe fixing ring (203) and a distribution cross pipe (204); the reserved sleeve (201) is installed inside the pipeline mechanism (2); two groups of water pipes (202) are installed inside the reserved sleeve (201); the pipe fixing ring (203) is installed outside the pipeline mechanism (2); and the distribution cross pipe (204) is installed inside the pipeline mechanism (2).
4. The prefabricated building wall separated pipeline installation structure according to claim 1, characterized in that: The arranging mechanism (3) comprises a front wire-burying splint (302), a rear wire-burying splint (303) and a fixing buckle (304); the front wire-burying splint (302) is mounted at the bottom end of the arranging mechanism (3); the rear wire-burying splint (303) is mounted at the rear end of the front wire-burying splint (302); and two sets of fixing buckles (304) are mounted on both sides of the front wire-burying splint (302).
5. The prefabricated building wall separated pipeline installation structure according to claim 1, characterized in that: The arranging mechanism (3) comprises a vent (301), and the vent (301) is opened at the front end of the arranging mechanism (3).
6. The prefabricated building wall separated pipeline installation structure according to claim 3 is characterized by: The water delivery pipe (202) is installed outside the distribution cross pipe (204).
7. The assembled building wall separated pipeline installation structure according to claim 3 is characterized by: The distribution transverse pipe (204) is fixedly connected to the front end of the distributor (103), and a control valve is provided inside the distribution transverse pipe (204).
Citation Information
Patent Citations
Pipeline separation type assembly wall
CN114351890A