Blast furnace blast data transmission system

By designing a blast furnace blower data transmission system, the existing vibration monitoring methods are solved, and the process data between the blast furnace blower and related systems is automatically interacted and adjusted, improving the equipment operation efficiency and management level.

CN222509446UActive Publication Date: 2025-02-18SHOUGANG JINGTANG IRON & STEEL CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202421075829.3
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-05-16
Publication Date
2025-02-18
Estimated Expiration
2034-05-16

AI Technical Summary

Technical Problem

The existing vibration monitoring methods are relatively single and not continuous, resulting in the blast furnace blower vibration equipment running independently and unable to meet the production needs of steel plants, especially in the complex situations of multiple equipment and different users monitoring needs.

Method used

A blast furnace blower data transmission system is designed, and the process data collection, processing and automatic adjustment of process data is achieved through the coordinated work of the blower control device, the energy operation center data acquisition and monitoring device, the blast furnace distribution control device and the centralized monitoring industrial control machine. The system includes a switch, a data forwarding device and an energy timing system to ensure reliable data transmission and clock synchronization.

Benefits of technology

The automatic interaction between the blast furnace blower and the energy operation center and the blast furnace system is achieved, which reduces the equipment failure rate, ensures the safe and stable operation of the blast furnace blower, improves the operating efficiency and management level, and increases economic benefits.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222509446U_ABST
    Figure CN222509446U_ABST
Patent Text Reader

Abstract

The utility model provides a blast furnace blast data transmission system, and relates to the technical field of steel plant energy systems, and the blast furnace blast data transmission system comprises an air blower control device used for collecting process data of an air blower area; the energy operation center data collecting and monitoring device is used for receiving the process data of the air blower area and outputting first processed process data; the blast furnace distributed control device is used for collecting process data of a blast furnace area and outputting second processed process data; and the centralized monitoring industrial personal computer is used for adjusting the operation condition of the air blower area and / or the blast furnace area according to the received first processed process data and the second processed process data. Therefore, automatic process data interaction between the blast furnace blower and the energy operation center and between the blast furnace blower and the blast furnace system is realized, the failure rate of blast furnace blower equipment is reduced, and the safety and stability of the blast furnace blower of the iron and steel plant are guaranteed. Meanwhile, the operation efficiency of the blast furnace blower of the steel plant is improved, the management level of the steel plant is improved, and the economic benefits of companies are increased.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of energy systems in steel plants, and more specifically, to a blast furnace air blast data transmission system. Background Art

[0002] Blast furnace blowers in steel plants are supporting facilities for blast furnaces and are relatively key equipment. Blast furnace blowers are connected through a comprehensive pipe network to provide compressed air for the blast furnaces throughout the plant. For blast furnace blowers, vibration data is one of the important tripping conditions and is particularly important. The blast furnace blower station in the steel plant is an unmanned station, and the operators are concentrated in a unified blast furnace blower main control room. In order to ensure the safe and stable operation of the blast furnace blower, real-time monitoring of vibration equipment is particularly urgent.

[0003] The existing vibration monitoring methods are relatively simple and not continuous. In addition, due to different manufacturers, the vibration equipment is extremely non-uniform, there are many hardware models, and the data interface and transmission protocol are incompatible. Therefore, the vibration equipment of multiple blast furnace blowers are operated independently, and the monitoring requirements of vibration data at all levels are different. The multiple blast furnace blower vibration equipment with high independence can no longer meet the production needs of steel plants.

[0004] In order to meet the monitoring needs of all users and to more efficiently monitor the operating conditions of blast furnace blower vibration equipment, it is particularly important to adopt a more effective distributed vibration monitoring system.

[0005] Therefore, a new technical solution is urgently needed to solve the above technical problems. Utility Model Content

[0006] A series of simplified concepts are introduced in the utility model content section, which will be further described in detail in the detailed implementation section. The utility model content section of the utility model does not mean to attempt to define the key features and essential technical features of the technical solution claimed for protection, nor does it mean to attempt to determine the scope of protection of the technical solution claimed for protection.

[0007] In a first aspect, the utility model provides a blast furnace blast data transmission system, comprising:

[0008] A blower control device is used to collect process data of the blower area, wherein the blower control device includes: a water pump room programmable logic control device, a first-phase dehumidification programmable logic control device, a second-phase dehumidification programmable logic control device, a first-phase blower programmable logic control device, and a second-phase blower programmable logic control device;

[0009] The data acquisition and monitoring device of the energy operation center is communicatively connected with the blower control device, and is used to receive the process data of the blower area and output the first processed process data;

[0010] A blast furnace distributed control device, used for collecting process data of the blast furnace area and outputting second processed process data;

[0011] The centralized monitoring industrial computer is respectively connected to the data acquisition monitoring device of the energy operation center and the blast furnace distributed control device for adjusting the operating conditions of the blower area and / or the blast furnace area according to the received first processed process data and the second processed process data.

[0012] Optionally, the system further comprises:

[0013] The switch is respectively connected to the blower control device, the energy operation center data acquisition and monitoring device and the centralized monitoring industrial computer for communication, and is used for collecting the process data of the blast furnace area, the process data of the blower area and the process data after the first processing, and then sending the collected data to the centralized monitoring industrial computer.

[0014] Optionally, the system further comprises:

[0015] A first data forwarding device, used for receiving process data of the blower area from the switch, so as to forward the process data of the blower area to the data acquisition and monitoring device of the energy operation center, and also used for receiving first processed process data from the data acquisition and monitoring device of the energy operation center, so as to forward the first processed process data to the centralized monitoring industrial computer;

[0016] The second data forwarding device is used to receive the process data of the blower area from the switch to forward the process data of the blower area to the blast furnace distributed control device, and is also used to receive the process data of the blast furnace area from the blast furnace distributed control device to forward the second processed process data to the centralized monitoring industrial computer.

[0017] Optionally, the centralized monitoring industrial computer exchanges data with the switch, the first data forwarding device and the second data forwarding device through a network time protocol;

[0018] The data acquisition and monitoring device of the energy operation center exchanges data with the first data forwarding device through the network time protocol;

[0019] The blast furnace distributed control device exchanges data with the second data forwarding device via the network time protocol.

[0020] Optionally, the system further comprises:

[0021] The energy timing system is respectively connected to the blower control device, the energy operation center data acquisition monitoring device, the blast furnace distributed control device, the switch, the centralized monitoring industrial computer, the first data forwarding device and the second data forwarding device;

[0022] Among them, the energy timing system is used to provide a unified reference clock signal for the blower control device, the energy operation center data acquisition and monitoring device, the blast furnace distributed control device, the switch, the centralized monitoring industrial computer, the first data forwarding device and the second data forwarding device.

[0023] Optionally, the reference clock signal is a network timing signal.

[0024] Optionally, the switch, the programmable logic control device, the first-phase dehumidification programmable logic control device, the second-phase dehumidification programmable logic control device, the first-phase blower programmable logic control device, the second-phase blower programmable logic control device, the first data forwarding device, the second data forwarding device, the centralized monitoring industrial computer, the energy operation center data acquisition and monitoring device and the blast furnace distributed control device are all connected to the network time output end of the energy timing system through the network time input end.

[0025] Optionally, the switch exchanges data with the programmable logic control device, the first-phase dehumidification programmable logic control device, the second-phase dehumidification programmable logic control device, the first-phase blower programmable logic control device, and the second-phase blower programmable logic control device through a network time protocol.

[0026] Optionally, the data acquisition and monitoring device of the energy operation center exchanges data with the first data forwarding device via a serial communication protocol;

[0027] The blast furnace distributed control device exchanges data with the second data forwarding device through a serial communication protocol;

[0028] The centralized monitoring industrial computer exchanges data with the switch, the first data forwarding device and the second data forwarding device through a serial communication protocol.

[0029] Optionally, a centralized industrial control monitoring machine is installed in the main control room of the first phase blast furnace blower.

[0030] According to the above technical scheme, the blower control device is used to collect the process data of the blower area, and then forward it to the data collection and monitoring device of the energy operation center. The data collection and monitoring device of the energy operation center processes the process data and outputs the first processed process data to the centralized monitoring industrial computer. At the same time, the blast furnace distributed control device collects the process data of the blast furnace area and outputs the second processed process data to the centralized monitoring industrial computer. After receiving the first processed process data and the second processed process data, the centralized monitoring industrial computer can automatically adjust the real-time working condition of the blast furnace blower through the integrated algorithm. In this way, the automatic interaction of the process data between the blast furnace blower and the energy operation center and the blast furnace system is realized, the failure rate of the blast furnace blower equipment is reduced, and the safety and stability of the blast furnace blower in the steel plant is guaranteed. At the same time, the operating efficiency of the blast furnace blower in the steel plant is improved, which helps to improve the management level of the steel plant and increase the economic benefits of the company.

[0031] The blast furnace blast data transmission system of the utility model, other advantages, objectives and features of the utility model will be partially reflected through the following description, and will also be partially understood by technicians in this field through research and practice of the utility model. BRIEF DESCRIPTION OF THE DRAWINGS

[0032] Various other advantages and benefits will become apparent to those of ordinary skill in the art by reading the detailed description of the preferred embodiments below. The accompanying drawings are only for the purpose of illustrating the preferred embodiments and are not to be considered as limiting the present specification. Also, the same reference symbols are used throughout the accompanying drawings to represent the same components. In the accompanying drawings:

[0033] Figure 1 A schematic block diagram of a blast furnace blast data transmission system according to an embodiment of the present application is shown;

[0034] Figure 2 A schematic block diagram of a blast furnace blast data transmission system according to another embodiment of the present application is shown. DETAILED DESCRIPTION

[0035] The terms "first", "second", "third", "fourth", etc. (if any) in the specification and claims of the present application and the above-mentioned drawings are used to distinguish similar objects, and are not necessarily used to describe a specific order or sequence. It should be understood that the data used in this way can be interchangeable where appropriate, so that the embodiments described herein can be implemented in an order other than that illustrated or described herein. In addition, the terms "including" and "having" and any of their variations are intended to cover non-exclusive inclusions, for example, a process, method, system, product or device that includes a series of steps or units is not necessarily limited to those steps or units that are clearly listed, but may include other steps or units that are not clearly listed or inherent to these processes, methods, products or devices. The technical solutions in the embodiments of the present application will be clearly and completely described below in conjunction with the drawings in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, rather than all of the embodiments.

[0036] According to a first aspect of the present application, a blast furnace blast data transmission system is provided. Figure 1 FIG. 1 shows a schematic block diagram of a blast furnace blast data transmission system 100 according to an embodiment of the present application. Figure 1 As shown, the system 100 may include: a blower control device 110 , an energy operation center data acquisition and monitoring device 120 , a blast furnace distributed control device 130 , and a centralized monitoring industrial computer 140 .

[0037] Exemplarily, the blower control device 110 can be used to collect process data of the blower area, wherein the blower control device 110 can include: a pump room programmable logic control (PLC) device, a first-phase dehumidification programmable logic control device, a second-phase dehumidification programmable logic control device, a first-phase blower programmable logic control device, and a second-phase blower programmable logic control device. Specifically, the first-phase dehumidification PLC device is installed in the first-phase dehumidification process room as a supporting facility of the first-phase blast furnace blower station, and is mainly used to collect process data of equipment such as refrigerators, filters, water pumps, valves and instruments in the dehumidification station supporting the first-phase blast furnace blower station. The second-phase dehumidification PLC device is installed in the second-phase dehumidification process room as a supporting facility of the second-phase blast furnace blower station, and is mainly used to collect process data of equipment such as refrigerators, filters, water pumps, valves and instruments in the dehumidification station supporting the second-phase blast furnace blower station. The first-phase blower PLC device is installed in the first-phase blower process room. As the main facility of the first-phase blast furnace blower station, it is mainly used to collect process data of the blowers, oil stations, water pumps, valves and instruments of the first-phase blast furnace blower station. The second-phase blower PLC device is installed in the second-phase blower process room. As the main facility of the second-phase blast furnace blower station, it is mainly used to collect process data of the blowers, oil stations, water pumps, valves and instruments of the second-phase blast furnace blower station. The pump room PLC device is installed in the pump room process room. As a supporting facility of the blast furnace blower station, it is mainly used to collect process data of the pumps, valves and instruments of the supporting pump rooms of the first and second phase blast furnace blower stations.

[0038] The energy operation center supervisory control and data acquisition (SCADA) device 120 may be communicatively connected to the blower control device 110 to receive process data of the blower area and output first processed process data.

[0039] Exemplarily, the energy operation center data acquisition monitoring (SCADA) device 120 can be installed in the process room of the energy operation center to collect process data of the energy area, that is, the first processed process data. The energy operation center data acquisition monitoring (SCADA) device 120 can also receive process data of the blower area, and then output the process data of the blower area and the process data of the energy area to the centralized monitoring industrial computer 140 as the first processed process data.

[0040] The blast furnace distributed control (DCS) device 130 can be used to collect process data of the blast furnace area and output second processed process data.

[0041] Exemplarily, the blast furnace distributed control (DCS) device 130 can be installed in the local blast furnace blower process room, collect vibration data sent by the 3500 vibration device through the 485 interface, and after processing, send the data to the local industrial computer through the RJ45 interface.

[0042] The centralized monitoring industrial computer 140 can be respectively communicated with the energy operation center data acquisition monitoring device 120 and the blast furnace distributed control device 130, and is used to adjust the operating conditions of the blower area and / or blast furnace area according to the received first processed process data and second processed process data.

[0043] For example, the centralized monitoring industrial computer 140 has functions such as data receiving, storage, and command issuing, and can receive process data from the energy operation center data acquisition monitoring device 120 and the blast furnace distributed control device 130 through the RJ45 interface. Through the integrated algorithm, the real-time working conditions of the blast furnace blower can be automatically adjusted, and vibration data alarms, tripping and other rules can be set for operation. Finally, after data processing, it is presented to the blast furnace blower operator for browsing.

[0044] According to the above technical scheme, the blower control device is used to collect the process data of the blower area, and then forward it to the data collection and monitoring device of the energy operation center. The data collection and monitoring device of the energy operation center processes the process data and outputs the first processed process data to the centralized monitoring industrial computer. At the same time, the blast furnace distributed control device collects the process data of the blast furnace area and outputs the second processed process data to the centralized monitoring industrial computer. After receiving the first processed process data and the second processed process data, the centralized monitoring industrial computer can automatically adjust the real-time working condition of the blast furnace blower through the integrated algorithm. In this way, the automatic interaction of the process data between the blast furnace blower and the energy operation center and the blast furnace system is realized, the failure rate of the blast furnace blower equipment is reduced, and the safety and stability of the blast furnace blower in the steel plant is guaranteed. At the same time, the operating efficiency of the blast furnace blower in the steel plant is improved, which helps to improve the management level of the steel plant and increase the economic benefits of the company.

[0045] Figure 2 FIG. 2 shows a schematic block diagram of a blast furnace blast data transmission system according to another embodiment of the present application. Figure 2 As shown, the system may also include: a switch, which is respectively connected to the blower control device, the energy operation center SCADA device and the centralized monitoring industrial computer for communication, and is used for collecting the process data of the blast furnace area, the process data of the blower area and the first processed process data, and then sending the collected data to the centralized monitoring industrial computer.

[0046] In this embodiment, the centralized monitoring industrial computer can also be connected to the blower control device and the energy operation center SCADA device through the switch. Specifically, the switch can be connected to the blower control device and the energy operation center SCADA device through the RJ45 interface. The switch can receive process data from the blower control device and the energy operation center SCADA device, respectively, and process these data, and then send the processed process data to the centralized monitoring industrial computer through the network.

[0047] The switch can provide a large number of ports for cable connection, which increases the types and quantity of data transmission equipment that can be connected to the blast furnace blast data transmission system, and improves the applicability of the blast furnace blast data transmission system.

[0048] See again Figure 2 The system may further include: a first data forwarding device, used to receive process data of the blower area from the switch, so as to forward the process data of the blower area to the data acquisition and monitoring device of the energy operation center, and also used to receive the first processed process data from the data acquisition and monitoring device of the energy operation center, so as to forward the first processed process data to the centralized monitoring industrial computer; and a second data forwarding device, used to receive process data of the blower area from the switch, so as to forward the process data of the blower area to the blast furnace distributed control device, and also used to receive process data of the blast furnace area from the blast furnace distributed control device, so as to forward the second processed process data to the centralized monitoring industrial computer.

[0049] Specifically, the first-phase dehumidification PLC device, as a supporting facility of the first-phase blast furnace blower station, is mainly used to collect process data of equipment such as refrigerators, filters, water pumps, valves and instruments in the dehumidification station supporting the first-phase blast furnace blower station, and transmit the data to the switch after processing. The second-phase dehumidification PLC device, as a supporting facility of the second-phase blast furnace blower station, is mainly used to collect process data of equipment such as refrigerators, filters, water pumps, valves and instruments in the dehumidification station supporting the second-phase blast furnace blower station, and transmit the data to the switch after processing. The first-phase blast furnace blower PLC device, as the main facility of the first-phase blast furnace blower station, is mainly used to collect process data of equipment such as blowers, oil stations, water pumps, valves and instruments in the first-phase blast furnace blower station, and transmit the data to the switch after processing. As the main facility of the second-phase blast furnace blower station, the PLC device of the second-phase blast furnace blower is mainly used to collect the process data of the blowers, oil stations, water pumps, valves, instruments and other equipment of the second-phase blast furnace blower station, and transmit the data to the switch after processing. As the supporting facility of the blast furnace blower station, the PLC device of the pump room is mainly used to collect the process data of the pumps, valves, instruments and other equipment of the supporting pump rooms of the first and second-phase blast furnace blower stations, and transmit the data to the switch after processing. As the main device for data interaction of blast furnace blowers, the switch is connected to other devices through the network time (NTP) protocol, and collects process data of the pump room PLC device, the first-phase dehumidification PLC device, the first-phase blower PLC device, the second-phase blower PLC device, and the second-phase dehumidification PLC device through a serial communication protocol, such as the MODBUS protocol, and forwards the collected process data to the first data forwarding device, the centralized monitoring industrial computer, and the second data forwarding device through the MODBUS protocol; the first data forwarding device is connected to the switch and the energy operation center data acquisition and monitoring (SCADA) device 120 through the NTP protocol. The process data sent by the switch is collected through the MODBUS protocol, and the data is forwarded to the energy operation center data acquisition and monitoring (SCADA) device 120, and data interaction is performed with the energy operation center data acquisition and monitoring (SCADA) device 120 through the MODBUS protocol, and the data is forwarded to the centralized monitoring industrial computer. Further, the second data forwarding device is connected to the switch and the blast furnace DCS device through the NTP protocol. The process data sent by the switch is collected through the MODBUS protocol, and the data is forwarded to the blast furnace DCS device. The blast furnace DCS device also interacts with the blast furnace DCS device through the MODBUS protocol and forwards the data to the centralized monitoring industrial computer. The blast furnace DCS device is connected to the second data forwarding device through the NTP protocol and interacts with the second data forwarding device through the MODBUS protocol. The energy operation center SCADA device is used to collect process data in the energy area, and is connected to the first data forwarding device through the NTP protocol, and interacts with the first data forwarding device through the MODBUS protocol.The centralized monitoring industrial computer collects process data of the pump room PLC device, the first-phase dehumidification PLC device, the first-phase blower PLC device, the second-phase blower PLC device, the second-phase dehumidification PLC device, the blast furnace DCS device and the energy operation center SCADA device transmitted by the switch, the first data forwarding device and the second data forwarding device through the MODBUS protocol, and automatically optimizes and adjusts the operating conditions of the blast furnace blower.

[0050] Therefore, the data transmission system can obtain the process data transmission status of the blast furnace blower, blast furnace system, and energy operation center in real time, realize the integration of the process data of the three parties, and provide a more effective means of adjusting the blast furnace blower. At the same time, it also has powerful data storage and processing capabilities, centralizing the online and offline data of interactive process data on a unified platform to meet the needs of users at all levels. In addition, the above data transmission system provides multiple data interfaces including RS-485, TCP / IP, OPC, MODBUS, etc., with good expansion performance.

[0051] Optionally, the system may also include: an energy timing system, which is respectively communicated with the blower control device, the energy operation center data acquisition and monitoring device, the blast furnace distributed control device, the switch, the centralized monitoring industrial computer, the first data forwarding device and the second data forwarding device; wherein the energy timing system is used to provide a unified reference clock signal for the blower control device, the energy operation center data acquisition and monitoring device, the blast furnace distributed control device, the switch, the centralized monitoring industrial computer, the first data forwarding device and the second data forwarding device.

[0052] It can be understood that if the clock of the data in the steel plant is not unified during the transmission process, the various systems in the whole plant cannot be analyzed and compared on the basis of a unified time reference, which brings great hidden dangers to effective energy operation management, correct analysis and statistics of energy costs and energy forecasting. Therefore, an energy timing system is introduced here to send a unified reference clock signal to the blower control device, the energy operation center data acquisition and monitoring device, the blast furnace distributed control device, the switch, the centralized monitoring industrial computer, the first data forwarding device and the second data forwarding device. Exemplarily, when the blast furnace blower is operating normally, the energy timing system can receive the time reference signal sent by the global satellite positioning system or the Beidou satellite, and then send a unified reference clock signal to the blower control device, the energy operation center data acquisition and monitoring device, the blast furnace distributed control device, the switch, the centralized monitoring industrial computer, the first data forwarding device and the second data forwarding device through the network, thereby completing the time unification of the control system and effectively improving the efficiency of energy operation management. In one embodiment, the reference clock signal can be a pulse-per-second timing signal (IRIG-B code). IRIG-B code, referred to as B code, is a precise time standard based on satellite signal transmission. It can synchronize the time of the device by receiving the B code signal and converting it into a time signal. The clock accuracy is extremely high.

[0053] Alternatively, the reference clock signal can also be a network time synchronization (NTP) signal. Network time synchronization is to synchronize the time between devices through the time synchronization protocol in the Internet protocol stack. It is necessary to run synchronization software in the device connected to the Internet and communicate with the NTP server on the network to obtain accurate time, and the clock accuracy is high. Specifically, it can be a simple network time synchronization (SNTP) signal.

[0054] Optionally, a centralized industrial control monitoring machine is installed in the main control room of the first phase blast furnace blower, which can optimize and adjust the operating conditions of the blast furnace blower station.

[0055] In a specific embodiment, under normal system operation, the PLC system of this station in the blast furnace blower area collects the process data of the equipment in this station, and after processing, the switch sends the process data to the first data forwarding device, the second data forwarding device and the centralized monitoring industrial computer; the first data forwarding device sends the process data in the energy area to the centralized monitoring industrial computer through data interaction with the SCADA device of the energy operation center, and sends the process data in the blower area to the SCADA device of the energy operation center; the second data forwarding device sends the process data in the blast furnace area to the centralized monitoring industrial computer through data interaction with the blast furnace DCS device, and sends the process data in the blower area to the blast furnace DCS device. Finally, the process data after interaction is processed and stored by the centralized monitoring industrial computer, and then presented to the blast furnace blower operator for browsing. The energy timing system provides accurate clock signals for each part. The data transmission, forwarding and interaction between the above-mentioned devices are all automatically completed by the system, without involving manual operation. In addition, the data transmission system also has a self-diagnosis function, which can report the equipment failure information of the blast furnace blower, the energy operation center, and the blast furnace system to the main control room at all levels in real time.

[0056] For ease of description, the term "connection" may be used here to describe the relationship between one or more elements or features shown in the figures and other elements or features. It should be understood that "connection" may include direct connection or indirect connection via other elements or features, and this article is intended to include all of these situations.

[0057] It should be noted that the terms used herein are only for describing specific embodiments and are not intended to limit the exemplary embodiments according to the present application. As used herein, unless the context clearly indicates otherwise, the singular form is also intended to include the plural form. In addition, it should be understood that when the terms "comprise" and / or "include" are used in this specification, it indicates the presence of features, steps, operations, parts, components and / or combinations thereof.

[0058] It should be noted that the terms "first", "second", etc. in the specification and claims of the present application and the above-mentioned drawings are used to distinguish similar objects, and are not necessarily used to describe a specific order or sequence. It should be understood that the numbers used in this way can be interchanged where appropriate, so that the embodiments of the present application described herein can be implemented in an order other than those illustrated or described herein.

[0059] The utility model has been described through the above embodiments, but it should be understood that the above embodiments are only for the purpose of example and description, and are not intended to limit the utility model to the scope of the described embodiments. In addition, it can be understood by those skilled in the art that the utility model is not limited to the above embodiments, and more variations and modifications can be made according to the teachings of the utility model, and these variations and modifications all fall within the scope of protection claimed by the utility model. The protection scope of the utility model is defined by the attached claims and their equivalents.

Claims

1. A blast furnace blast data transmission system, characterized in that: include: A blower control device, used for collecting process data of the blower area, wherein the blower control device comprises: a water pump room programmable logic control device, a first-phase dehumidification programmable logic control device, a second-phase dehumidification programmable logic control device, a first-phase blower programmable logic control device, and a second-phase blower programmable logic control device; A data acquisition and monitoring device of an energy operation center, which is in communication connection with the blower control device, is used to receive process data of the blower area and output first processed process data; A blast furnace distributed control device, used for collecting process data of the blast furnace area and outputting second processed process data; A centralized monitoring industrial computer is respectively communicated with the energy operation center data acquisition monitoring device and the blast furnace distributed control device, and is used to adjust the operating conditions of the blower area and / or the blast furnace area according to the received first processed process data and the second processed process data.

2. The blast furnace blast data transmission system according to claim 1, characterized in that: The system further comprises: The switch is respectively connected to the blower control device, the energy operation center data acquisition and monitoring device and the centralized monitoring industrial computer for communication, and is used for collecting the process data of the blast furnace area, the process data of the blower area and the first processed process data, and then sending the collected data to the centralized monitoring industrial computer.

3. The blast furnace blast data transmission system according to claim 2, characterized in that: The system further comprises: A first data forwarding device, used for receiving the process data of the blower area from the switch, so as to forward the process data of the blower area to the data acquisition and monitoring device of the energy operation center, and also used for receiving the first processed process data from the data acquisition and monitoring device of the energy operation center, so as to forward the first processed process data to the centralized monitoring industrial computer; The second data forwarding device is used to receive the process data of the blower area from the switch to forward the process data of the blower area to the blast furnace distributed control device, and is also used to receive the process data of the blast furnace area from the blast furnace distributed control device to forward the second processed process data to the centralized monitoring industrial computer.

4. The blast furnace blast data transmission system according to claim 3, characterized in that: The centralized monitoring industrial computer exchanges data with the switch, the first data forwarding device and the second data forwarding device through the network time protocol; The data acquisition and monitoring device of the energy operation center exchanges data with the first data forwarding device through the network time protocol; The blast furnace distributed control device exchanges data with the second data forwarding device via a network time protocol.

5. The blast furnace blast data transmission system according to claim 3, characterized in that: The system further comprises: The energy timing system is respectively connected to the blower control device, the energy operation center data acquisition and monitoring device, the blast furnace distributed control device, the switch, the centralized monitoring industrial computer, the first data forwarding device and the second data forwarding device; Among them, the energy timing system is used to provide a unified reference clock signal for the blower control device, the energy operation center data acquisition and monitoring device, the blast furnace distributed control device, the switch, the centralized monitoring industrial computer, the first data forwarding device and the second data forwarding device.

6. The blast furnace blast data transmission system according to claim 5, characterized in that: The reference clock signal is a network timing signal.

7. The blast furnace blast data transmission system according to claim 5, characterized in that: The switch, the programmable logic control device, the first-phase dehumidification programmable logic control device, the second-phase dehumidification programmable logic control device, the first-phase blower programmable logic control device, the second-phase blower programmable logic control device, the first data forwarding device, the second data forwarding device, the centralized monitoring industrial computer, the energy operation center data acquisition and monitoring device and the blast furnace distributed control device are all connected to the network time output end of the energy timing system through the network time input end.

8. The blast furnace blast data transmission system according to claim 2, characterized in that: The switch exchanges data with the programmable logic control device, the first-phase dehumidification programmable logic control device, the second-phase dehumidification programmable logic control device, the first-phase blower programmable logic control device, and the second-phase blower programmable logic control device through a network time protocol.

9. The blast furnace blast data transmission system according to claim 3, characterized in that: The data acquisition and monitoring device of the energy operation center exchanges data with the first data forwarding device through a serial communication protocol; The blast furnace distributed control device exchanges data with the second data forwarding device through a serial communication protocol; The centralized monitoring industrial computer exchanges data with the switch, the first data forwarding device and the second data forwarding device through a serial communication protocol.

10. The blast furnace blast data transmission system according to claim 1, characterized in that: The centralized monitoring industrial computer is installed in the main control room of the first phase blast furnace blower.