Positioning structure and gas pipeline positioning device thereof

By designing a positioning structure including base, side rod, support rod and clamping structure, the problem of poor protection of the existing gas pipeline positioning device for pipelines is solved, and stronger pipeline protection and a wider scope of application are achieved.

CN222559396UActive Publication Date: 2025-03-04QIQIHAR PORT GAS PIPELINE INSTALLATION ENGINEERING CO LTD
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202421428233.7
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-06-21
Publication Date
2025-03-04
Estimated Expiration
2034-06-21

AI Technical Summary

Technical Problem

The existing gas pipeline positioning device has poor protection to the pipeline after fixing the pipeline, which can easily lead to pipeline rupture and gas leakage.

Method used

A positioning structure including a base, side rod, support rod and clamping structure is designed. The clamping structure is composed of a slide plate, a straight plate, a top plate, a clamping plate, a straight rod and a stressed plate to form a highly stressed rectangular frame to protect the pipe, and reduce the vibration of the pipe through the elastic block and a spring.

Benefits of technology

Improve the protection of the pipe, avoid pipe breakage and gas leakage caused by pressure, and adapt to pipes of different sizes through flexible ply spacing and spring shock absorption, improving the scope of application of the device.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222559396U_ABST
    Figure CN222559396U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of gas pipeline construction, and discloses a positioning structure and a gas pipeline positioning device thereof, the positioning structure comprises a base, the top of the base is symmetrically and fixedly connected with side rods; the supporting rod is fixedly connected to the top of the side rod; the clamping structure is arranged at the top of the base and used for protecting the gas pipeline, the clamping structure comprises a sliding plate, a straight plate, a top plate, a clamping plate, a straight rod and a stress plate, the sliding plate is slidably connected between the symmetrical side rods, the straight plate is fixedly connected to the top of the sliding plate, the top plate is fixedly connected to the top of the straight plate, and the clamping plate is slidably connected between the top plate and the locking screw hole; the straight rods are fixedly connected to the tops of the side rods, the straight rods and the supporting rods are mutually symmetrical at the tops of the side rods, the stress plates are slidably connected to the wall faces of the straight rods, the clamping plates are symmetrically arranged between the symmetrical side rods, and the size of the stress plates is larger than that of the base.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model belongs to the technical field of gas pipeline construction, and in particular relates to a positioning structure and a gas pipeline positioning device thereof. Background Art

[0002] Gas is a general term for gaseous fuels, which can burn and release heat for use by residents and industrial enterprises. There are many types of gas, mainly natural gas, artificial gas, liquefied petroleum gas, biogas, and coal-to-gas. People usually use gas by laying pipes indoors.

[0003] The prior art (publication number: CN220060819U) discloses a gas pipeline positioning assembly, which relates to the field of gas pipeline fixing technology. It solves the problem that the current gas pipeline fixing clamp needs to repeatedly measure the position during installation, needs to be cut when encountering uneven walls, and is laborious to install. It includes a wall fixing plate; a first support plate is fixedly arranged on the right side of the wall fixing plate.

[0004] The prior art clamps the pipeline between two symmetrical upper and lower arc-shaped clamps, and then fixes it with bolts. Although the prior art can fix the pipeline, the prior art has poor protection for the pipeline after fixing the pipeline, because if the symmetrical clamps are subjected to pressure, the clamped pipeline will also be subjected to pressure at the same time, resulting in pipeline rupture and gas leakage. Therefore, the prior art has poor protection for the gas pipeline.

[0005] In view of this, the present utility model is proposed. Utility Model Content

[0006] In order to solve the technical problem of poor protection of pipelines in the above-mentioned prior art, the basic concept of the technical solution adopted by the utility model is:

[0007] A positioning structure, comprising:

[0008] A base, the top of which is symmetrically fixedly connected with side rods;

[0009] A support rod, the support rod is fixedly connected to the top of the side rod;

[0010] A clamping structure is arranged on the top of the base to protect the gas pipeline. The clamping structure includes: a slide plate, a straight plate, a top plate, a clamping plate, a straight rod and a force plate. The slide plate is slidably connected between symmetrical side rods, the straight plate is fixedly connected to the top of the slide plate, the top plate is fixedly connected to the top of the straight plate, the clamping plate is slidably connected between the top plate and the locking screw hole, the straight rod is fixedly connected to the top of the side rod, the straight rod and the support rod are symmetrical to each other at the top of the side rod, the force plate is slidably connected to the wall of the straight rod, the clamping plate is symmetrically arranged between the symmetrical side rods, and the size of the force plate is larger than the base.

[0011] As a preferred embodiment of the present utility model, when the skateboard, the straight plate and the top plate are combined, the side wall surface is in a U shape. The lengths of both sides of the skateboard are greater than those of both sides of the straight plate. The clamping plate is in an arc shape. The straight plate, the top plate and the skateboard are also symmetrically arranged between the symmetric side rods. The symmetric clamping plates are respectively connected to the symmetric straight plate, top plate and skateboard. The top parts of the symmetric side rods are respectively fixedly connected with straight rods, and the force-bearing plate is slidably connected to the wall surfaces of the symmetric straight rods.

[0012] As a preferred embodiment of the present utility model, the clamping structure further includes a chute, a locking groove, a straight groove, side blocks and sliding columns. The chute is opened on one side wall surface of the side rod, the locking groove is opened at the top of the side rod, the straight groove is贯穿 opened on the side wall surface of the straight rod, the side blocks are symmetrically and fixedly connected to both sides of the bottom of the force-bearing plate, and the sliding columns are fixedly connected between the symmetric side blocks.

[0013] As a preferred embodiment of the present utility model, both side wall surfaces of the skateboard can respectively slide in the corresponding chute on one side. The sliding column is in a cylindrical shape, the straight groove can be adapted to the sliding column, and the sliding column can vertically slide simultaneously in the straight rod on the wall surface of the symmetric straight groove. The clamping structure further includes a locking plate, a locking screw hole and a locking bolt. The locking plates are respectively fixedly connected to the top of each support rod, the locking screw holes are opened at the top of each locking plate, the locking bolts are symmetrically threadedly connected to the top of the force-bearing plate, and the locking bolts can pass through the force-bearing plate and be threadedly connected into the corresponding locking screw holes.

[0014] As a preferred embodiment of the present utility model, the clamping structure further includes an adjustment groove, a spring groove, a spring block, a locking screw hole, a locking bolt, an adjustment block and an adjustment rod. The adjustment groove is opened on the side rod wall surface symmetric to the chute, the spring groove is opened at the top of the skateboard, the spring block is elastically connected in the spring groove through a spring, the top of the spring block is also fixedly connected to the bottom of the clamping plate, the locking screw hole is opened on the wall surface of the skateboard in the chute, the locking bolt is threadedly connected in the locking screw hole, the adjustment blocks are symmetrically fixedly connected to both side wall surfaces of the skateboard, and the adjustment rod is threadedly connected to the wall surface of the adjustment block.

[0015] As a preferred embodiment of the present utility model, the spring block is an inverted T-shaped block, the spring groove can be adapted to the sliding of the spring block, the spring blocks are arranged on both the upper and lower wall surfaces of the clamping plate, and the same spring grooves are also opened at the bottom of the top plate. The symmetric spring blocks on the upper and lower sides of the clamping plate are elastically connected in the spring grooves on the wall surfaces of the top plate and the skateboard. The locking bolt can pass through between the locking grooves and be threadedly connected in the locking screw hole. The adjustment groove, the locking groove and the chute are communicated with each other. The adjustment block can slide in the adjustment groove. One end of the adjustment rod is threadedly connected to the adjustment block on the wall surface of the skateboard, and the other end of the adjustment rod is rotatably connected to the adjustment block on the wall surface of another skateboard.

[0016] A gas pipeline positioning device includes a mounting base and also includes all the above-mentioned positioning structures. The base is fixedly connected to the top wall surface of the mounting base.

[0017] Compared with the prior art, the utility model has the following beneficial effects:

[0018] 1. The clamping structure provides better protection for the pipeline, because after the clamping structure clamps the pipeline between the symmetrical clamping plates and lays the force-bearing plate flat and fixes it on the top of the device, the clamping structure and the base will form a rectangular frame with strong force-bearing capacity to protect the pipeline. When the device is under pressure, the symmetrical clamping plates will not be under pressure. Therefore, compared with the prior art, this solution has better protection for the clamped pipeline.

[0019] 2. By setting the splint, not only can the pipes of different sizes be adapted through the flexibly adjustable spacing, but the vibration of the pipe can also be reduced through the spring on the wall of the spring block, thereby further improving the protection of the pipe.

[0020] 3. By setting the positioning structure, the protection of the gas pipeline positioning device to the pipeline can be improved, and its scope of application can also be improved.

[0021] The specific implementation modes of the present utility model are further described in detail below in conjunction with the accompanying drawings. BRIEF DESCRIPTION OF THE DRAWINGS

[0022] In the attached picture:

[0023] Figure 1 It is a three-dimensional diagram of the utility model;

[0024] Figure 2 This is a three-dimensional view of the top of the base after the load-bearing plate of the utility model is removed;

[0025] Figure 3 This is an exploded view of the top structure of the base of the utility model;

[0026] Figure 4 This is a schematic diagram of the disassembly of the splint and the straight rod of the utility model;

[0027] Figure 5 It is a schematic diagram of the decomposition of the load-bearing plate and the straight rod of the utility model.

[0028] In the figure: 20, base; 30, side rod; 31, slide groove; 32, locking groove; 33, adjustment groove; 34, slide plate; 35, straight plate; 36, top plate; 37, spring groove; 38, spring block; 39, clamping plate; 40, locking screw hole; 41, locking bolt; 42, adjustment block; 43, adjustment rod; 50, support rod; 51, locking plate; 52, locking screw hole; 53, straight rod; 54, straight groove; 55, force plate; 56, side block; 57, slide column; 58, locking bolt. DETAILED DESCRIPTION

[0029] In order to make the purpose, technical scheme and advantages of the embodiments of the utility model clearer, the technical scheme in the embodiments will be clearly and completely described below in conjunction with the drawings in the embodiments of the utility model. The following embodiments are used to illustrate the utility model.

[0030] like Figure 1 and Figure 2 As shown, a positioning structure includes:

[0031] A base 20, with side bars 30 symmetrically fixedly connected to the top of the base 20;

[0032] The support rod 50 is fixedly connected to the top of the side rod 30, and the wall surface of the base 20 is provided with a threaded hole for connection. This is an existing technology and will not be described in detail here.

[0033] like Figure 1 , Figure 2 , Figure 3 , Figure 4 and Figure 5 As shown, a clamping structure is arranged on the top of the base 20 to protect the gas pipeline. The clamping structure includes: a slide plate 34, a straight plate 35, a top plate 36, a clamping plate 39, a straight rod 53 and a force plate 55. The slide plate 34 is slidably connected between the symmetrical side rods 30, the straight plate 35 is fixedly connected to the top of the slide plate 34, the top plate 36 is fixedly connected to the top of the straight plate 35, the clamping plate 39 is slidably connected between the top plate 36 and the locking screw hole 40, the straight rod 53 is fixedly connected to the top of the side rod 30, the straight rod 53 and the support rod 50 are symmetrical to each other at the top of the side rod 30, the force plate 55 is slidably connected to the wall of the straight rod 53, the clamping plate 39 is symmetrically arranged between the symmetrical side rods 30, and the size of the force plate 55 is larger than the base 20.

[0034] like Figure 1 , Figure 2 , Figure 3 , Figure 4 and Figure 5As shown, when the skateboard 34, the straight plate 35 and the top plate 36 are combined, the side wall surface is in a U-shape. The lengths of both sides of the skateboard 34 are greater than those of both sides of the straight plate 35. The clamping plate 39 is an arc-shaped plate. The straight plate 35, the top plate 36 and the skateboard 34 are also symmetrically arranged between the symmetric side rods 30. The symmetric clamping plates 39 are respectively connected to the symmetric straight plate 35, top plate 36 and skateboard 34. Straight rods 53 are respectively fixedly connected to the tops of the symmetric side rods 30. The force-bearing plate 55 is slidably connected to the wall surfaces of the symmetric straight rods 53. The clamping structure further includes a chute 31, a locking groove 32, a straight groove 54, side blocks 56 and sliding columns 57. The chute 31 is opened on one side wall surface of the side rod 30. The locking groove 32 is opened at the top of the side rod 30. The straight groove 54 is penetrated and opened on the side wall surface of the straight rod 53. The side blocks 56 are symmetrically and fixedly connected to both sides of the bottom of the force-bearing plate 55. The sliding columns 57 are fixedly connected between the symmetric side blocks 56. The side wall surfaces of both sides of the skateboard 34 can respectively slide in the corresponding chute 31 on one side. The sliding columns 57 are cylindrical. The straight groove 54 can be adapted to the sliding columns 57. The sliding columns 57 can vertically slide simultaneously in the straight rods 53 on the wall surfaces of the symmetric straight grooves 54. The clamping structure further includes a locking plate 51, a locking screw hole 52 and a locking bolt 58. The locking plates 51 are respectively fixedly connected to the tops of each support rod 50. The locking screw holes 52 are opened at the tops of each locking plate 51. The locking bolts 58 are symmetrically threadedly connected to the top of the force-bearing plate 55. The locking bolts 58 can pass through the force-bearing plate 55 and enter the corresponding locking screw holes 52 for threaded connection. The clamping structure further includes an adjustment groove 33, an elastic groove 37, an elastic block 38, a locking screw hole 40, a locking bolt 41, an adjustment block 42 and an adjustment rod 43. The adjustment groove 33 is opened on the wall surface of the side rod 30 symmetric to the chute 31. The elastic groove 37 is opened at the top of the skateboard 34. The elastic block 38 is elastically connected in the elastic groove 37 through a spring. The top of the elastic block 38 is also fixedly connected to the bottom of the clamping plate 39. The locking screw hole 40 is opened on the wall surface of the skateboard 34 in the chute 31. The locking bolt 41 is threadedly connected in the locking screw hole 40. The adjustment blocks 42 are symmetrically and fixedly connected to the side wall surfaces of both sides of the skateboard 34. The adjustment rod 43 is threadedly connected to the wall surface of the adjustment block 42;

[0035] When in use, first drive the slide post 57 with the force plate 55 to slide to the bottom in the straight groove 54. At this time, the force plate 55 will be in an upright state and parallel to the straight rod 53. At this time, the pipe to be fixed can be placed in the clamping plate 39 between the symmetrical straight plates 35. After the pipe is placed, the adjusting rod 43 can be rotated. When the adjusting rod 43 is rotated, the adjusting block 42 connected to the threaded connection can be translated toward the other adjusting block 42. When the adjusting block 42 is translated, the corresponding slide plate 34 can be translated. The slide plate 34 can drive the straight plate 35 and the top plate 36 to move at the same time. The top plate 36 and the slide plate 34 can also drive the spring block 38 and the clamping plate 39 to slide at the same time. The slide plate 34 will slide in the slide groove 31 when it moves. After the symmetrical clamping plates 39 are moved to clamp the pipe, each locking bolt 41 can be rotated to make the bottom of the locking bolt 41 contact with the top of the side rod 30, so as to fix the position of each slide plate 34, thereby fixing the position of the pipe. After the pipe is fixed, the force-bearing plate 55 drives the sliding column 57 to slide to the highest point in the straight groove 54, and the force-bearing plate 55 is turned over to be flat on the top of the straight groove 54. After the force-bearing plate 55 is flat, the locking bolt 58 is rotated to pass through the force-bearing plate 55 and enter the corresponding locking screw hole 52. After the locking bolt 58 is rotated into the locking screw hole 52, the position of the force-bearing plate 55 will be fixed, and the force-bearing plate 55 will cover the top of the entire device.

[0036] In summary, by setting up a clamping structure, the pipeline can be better protected, because after the clamping structure clamps the pipeline between the symmetrical clamps 39 and lays the force-bearing plate 55 flat and fixes it on the top of the device, the clamping structure and the base 20 will form a rectangular frame with strong force-bearing capacity to protect the pipeline. When the device is under pressure, the symmetrical clamps 39 will not be under pressure. Therefore, compared with the prior art, this solution has stronger protection for the clamped pipeline.

[0037] like Figure 1 , Figure 2 , Figure 3 , Figure 4 and Figure 5 As shown, the spring block 38 is an inverted T-shaped block, and the spring groove 37 can adapt to the sliding of the spring block 38. The spring block 38 is provided on both the upper and lower walls of the clamping plate 39, and the same spring groove 37 is also provided at the bottom of the top plate 36. The spring blocks 38 symmetrically arranged on the upper and lower walls of the clamping plate 39 are elastically connected in the spring grooves 37 on the top plate 36 and the wall of the slide plate 34. The locking bolt 41 can pass through the locking groove 32 and be threadedly connected in the locking screw hole 40. The adjustment groove 33, the locking groove 32 and the slide groove 31 are interconnected. The adjustment block 42 can slide in the adjustment groove 33. One end of the adjustment rod 43 is threadedly connected to the adjustment block 42 on the wall of the slide plate 34, and the other end of the adjustment rod 43 is rotatably connected to the adjustment block 42 on the wall of another slide plate 34.

[0038] In actual use, when the symmetrical clamping plates 39 clamp the pipe, the clamping plates 39 will drive the elastic block 38 to slide in the corresponding elastic groove 37 according to the diameter of the pipe, and the spring on the wall of the elastic block 38 will be compressed when the elastic block 38 slides;

[0039] In summary, by providing the clamping plate 39, not only can the pipes of different sizes be adapted through the flexibly adjustable spacing, but the vibration of the pipe can also be reduced through the spring on the wall of the spring block 38, thereby further improving the protection of the pipe.

[0040] A gas pipeline positioning device, not shown in the figure, includes a mounting seat and all the positioning structures mentioned above, wherein the base 20 is fixedly connected to the top wall of the mounting seat;

[0041] In actual use, the base 20 is installed on the top of the mounting seat through the threaded holes provided on the wall surface thereof with bolts, and the mounting seat is then installed into the wall or on the ground through bolts;

[0042] In summary, by providing a positioning structure, the protectiveness of the gas pipeline positioning device on the pipeline can be improved, and its scope of application can also be improved.

[0043] Working principle: First, the force-bearing plate 55 drives the sliding column 57 to slide to the bottom in the straight groove 54. At this time, the force-bearing plate 55 will be in an upright state and parallel to the straight rod 53. At this time, the pipe to be fixed can be placed in the clamping plate 39 between the symmetrical straight plates 35. After the pipe is placed, the adjusting rod 43 can be rotated. When the adjusting rod 43 is rotated, the adjusting block 42 connected to it with a thread will be translated toward another adjusting block 42. When the adjusting block 42 is translated, it will drive the corresponding slide plate 34 to translate. The slide plate 34 will drive the straight plate 35 and the top plate 36 to move at the same time. The top plate 36 and the slide plate 34 will also drive the spring block 38 and the clamping plate 39 to slide at the same time. When the slide plate 34 moves, it will slide in the slide groove 31 After the symmetrical clamping plates 39 are moved to clamp the pipe, each locking bolt 41 can be rotated at this time to make the bottom of the locking bolt 41 contact with the top of the side rod 30 to fix the position of each slide plate 34, thereby fixing the position of the pipe. After the pipe is fixed, the force-bearing plate 55 drives the sliding column 57 to slide to the highest point in the straight groove 54, and the force-bearing plate 55 is turned over to lay flat on the top of the straight groove 54. After the force-bearing plate 55 is laid flat, the locking bolt 58 is rotated to pass through the force-bearing plate 55 and enter the corresponding locking screw hole 52. After the locking bolt 58 is rotated into the locking screw hole 52, the position of the force-bearing plate 55 will be fixed, and at this time the force-bearing plate 55 will cover the top of the entire device.

[0044] It is understood that the present invention is described by some embodiments, and those skilled in the art are aware that various changes or equivalent substitutions may be made to these features and embodiments without departing from the spirit and scope of the present invention. In addition, under the teachings of the present invention, these features and embodiments may be modified to adapt to specific circumstances and materials without departing from the spirit and scope of the present invention. Therefore, the present invention is not limited to the specific embodiments disclosed herein, and all embodiments falling within the scope of the claims of this application are within the scope of protection of the present invention.

Claims

1. A positioning structure, characterized in that: Including: A base (20), with side rods (30) symmetrically and fixedly connected to the top of the base (20); Support rods (50), which are fixedly connected to the tops of the side rods (30); A clamping structure, which is arranged on the top of the base (20) for protecting the gas pipeline. The clamping structure includes: a sliding plate (34), a straight plate (35), a top plate (36), a clamping plate (39), a straight rod (53) and a stress plate (55). The sliding plate (34) is slidably connected between the symmetric side rods (30). The straight plate (35) is fixedly connected to the top of the sliding plate (34). The top plate (36) is fixedly connected to the top of the straight plate (35). The clamping plate (39) is slidably connected between the top plate (36) and the locking screw hole (40). The straight rod (53) is fixedly connected to the top of the side rod (30). The straight rod (53) and the support rod (50) are symmetric with each other on the top of the side rod (30). The stress plate (55) is slidably connected to the wall surface of the straight rod (53). The clamping plates (39) are symmetrically arranged between the symmetric side rods (30). The size of the stress plate (55) is larger than that of the base (20).

2. The positioning structure according to claim 1, characterized in that: When the sliding plate (34), the straight plate (35) and the top plate (36) are combined, the side wall surface is in a U shape. The lengths of both sides of the sliding plate (34) are greater than those of both sides of the straight plate (35). The clamping plate (39) is in an arc-shaped plate. The straight plate (35), the top plate (36) and the sliding plate (34) are also symmetrically arranged between the symmetric side rods (30). The symmetric clamping plates (39) are respectively connected to the symmetric straight plate (35), top plate (36) and sliding plate (34). Straight rods (53) are respectively fixedly connected to the tops of the symmetric side rods (30). The stress plate (55) is slidably connected to the wall surfaces of the symmetric straight rods (53).

3. The positioning structure according to claim 1, characterized in that: The clamping structure further includes a sliding groove (31), a locking groove (32), a straight groove (54), side blocks (56) and sliding columns (57). The sliding groove (31) is opened on one side wall surface of the side rod (30). The locking groove (32) is opened on the top of the side rod (30). The straight groove (54) is贯穿 opened on the side wall surface of the straight rod (53). The side blocks (56) are symmetrically and fixedly connected to both sides of the bottom of the stress plate (55). The sliding columns (57) are fixedly connected between the symmetric side blocks (56).

4. The positioning structure according to claim 3, characterized in that: Both side wall surfaces of the sliding plate (34) can slide in the corresponding sliding groove (31) on one side. The sliding column (57) is in a cylindrical shape. The straight groove (54) can be adapted to the sliding column (57). The sliding column (57) can vertically slide simultaneously in the straight rod (53) on the wall surface of the symmetric straight groove (54). The clamping structure further includes a locking plate (51), a locking screw hole (52) and a locking bolt (58). The locking plates (51) are respectively fixedly connected to the tops of each support rod (50). The locking screw holes (52) are opened on the tops of each locking plate (51). The locking bolts (58) are symmetrically threadedly connected to the tops of the stress plate (55). The locking bolts (58) can pass through the stress plate (55) and threadedly connect into the corresponding locking screw holes (52).

5. The positioning structure according to claim 4, characterized in that: The clamping structure further comprises an adjusting groove (33), an elastic groove (37), an elastic block (38), a locking screw hole (40), a locking bolt (41), an adjusting block (42) and an adjusting rod (43); the adjusting groove (33) is arranged on a wall surface of the side rod (30) symmetrical to the sliding groove (31); the elastic groove (37) is arranged on the top of the sliding plate (34); the elastic block (38) is elastically connected to the elastic groove (37) by a spring; the top of the elastic block (38) is also fixedly connected to the bottom of the clamping plate (39); the locking screw hole (40) is arranged on a wall surface of the sliding plate (34) in the sliding groove (31); the locking bolt (41) is threadedly connected to the locking screw hole (40); the adjusting block (42) is symmetrically fixedly connected to the wall surfaces on both sides of the sliding plate (34); and the adjusting rod (43) is threadedly connected to the wall surface of the adjusting block (42).

6. The positioning structure according to claim 5, characterized in that: The spring block (38) is an inverted T-shaped block, and the spring groove (37) can adapt to the sliding of the spring block (38). The spring block (38) is provided on both the upper and lower walls of the clamping plate (39). The bottom of the top plate (36) is also provided with a similar spring groove (37). The spring blocks (38) symmetrically arranged on the upper and lower walls of the clamping plate (39) are elastically connected in the spring grooves (37) on the top plate (36) and the wall of the slide plate (34). The locking bolt (41) can pass through the locking groove (32) and be threadedly connected in the locking screw hole (40). The adjustment groove (33), the locking groove (32) and the slide groove (31) are connected to each other. The adjustment block (42) can slide in the adjustment groove (33). One end of the adjustment rod (43) is threadedly connected to the adjustment block (42) on the wall of the slide plate (34), and the other end of the adjustment rod (43) is rotatably connected to the adjustment block (42) on the wall of another slide plate (34).

7. A gas pipeline positioning device, comprising a mounting seat, characterized in that: It also comprises the positioning structure according to any one of claims 1 to 6, wherein the base (20) is fixedly connected to the top wall of the mounting seat.

Citation Information

Patent Citations

  • Gas pipeline positioning assembly

    CN220060819U