Opposite-penetrating embedded part mounting structure, opposite-penetrating embedded part and auxiliary device for building
By introducing removable installation components into the installation structure of the embedded parts, the installation process of the anchor plate is simplified, and the problems of slow construction speed and difficult operation in the prior art are solved, construction efficiency is improved and later recycling is facilitated.
Patent Information
- Application Number
- CN202421263722.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-04
- Publication Date
- 2025-03-07
- Estimated Expiration
- 2034-06-04
AI Technical Summary
In the prior art, the installation process of embedded parts is cumbersome, resulting in slow construction speed, difficult operation and low efficiency.
A counter-embedded mounting structure is proposed, including a first anchor plate, a second anchor plate and an installation assembly. Through the removability of the installation assembly, the installation and connection process of the anchor plate is simplified.
Through the simplified installation process, the labor intensity and time of operators are reduced, construction efficiency is improved, and the detachability of the installation components is convenient for later recycling and cost savings.
Smart Images

Figure CN222575935U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of embedded parts, in particular to an embedded part installation structure, embedded parts and an auxiliary device for construction. Background Art
[0002] The current common practice in the industry for embedded parts is: after the civil engineering steel bar binding is completed, the anchor plate is first welded to the anchor bar, and the anchor plate is opened and welded to the anchor bar after aligning the anchor bar. The construction speed is slow; in the civil engineering steel bar binding stage, the embedded bar and the anchor plate are welded as a whole and then inserted into the steel mesh. The embedded parts embedding work is carried out simultaneously with the steel bar binding, which requires a lot of coordination, is difficult to operate, and is not efficient. Utility Model Content
[0003] The main purpose of the utility model is to provide a through-embedded component installation structure, through-embedded components and auxiliary devices for construction, aiming to provide a through-embedded component installation structure, through-embedded components and auxiliary devices for construction that are easy to assemble.
[0004] In order to achieve the above-mentioned purpose, the installation structure of the embedded parts proposed in the utility model includes:
[0005] first anchor plate;
[0006] A second anchor plate is arranged opposite to the first anchor plate, and a steel bar is sandwiched between the first anchor plate and the second anchor plate; and
[0007] The mounting assembly is disposed between the first anchor plate and the second anchor plate, and is used for mounting and fixing the first anchor plate and the second anchor plate.
[0008] In one embodiment, the mounting assembly includes a connecting rib disposed between the first anchor plate and the second anchor plate.
[0009] In one embodiment, the mounting assembly further comprises a sleeve threadedly connected to the connecting rib;
[0010] Wherein, one of the connecting rib and the sleeve is arranged on the first anchor plate, and the other is arranged on the second anchor plate.
[0011] In one embodiment, one of the first anchor plate and the second anchor plate is provided with a countersunk hole for accommodating the sleeve; and the other is welded to the connecting rib.
[0012] In one embodiment, the first anchor plate and / or the second anchor plate is provided with a through hole, and an end of the connecting rib away from the sleeve is passed through the through hole;
[0013] The mounting assembly further comprises a welding foot, wherein an end of the welding foot, which is opposite to the connecting rib and away from the sleeve, is welded to the outer side of the first anchor plate and / or the second anchor plate.
[0014] In one embodiment, the sleeve and the connecting rib are configured as an installation group, and a plurality of the installation groups are provided and are evenly spaced between the first anchor plate and the second anchor plate.
[0015] The utility model also provides a pair of embedded parts, and the pair of embedded parts includes the above-mentioned pair of embedded parts installation structure.
[0016] The utility model also provides an auxiliary device for construction, which comprises the above-mentioned through-embedded component.
[0017] The technical solution of the utility model adopts an installation component to install and connect the first anchor plate and the second anchor plate. Since the installation component can be loaded and unloaded, it avoids the labor intensity, time and effort of operators during welding and overall assembly, thereby making the first anchor plate and the second anchor plate relatively easier to assemble. BRIEF DESCRIPTION OF THE DRAWINGS
[0018] In order to more clearly illustrate the embodiments of the utility model or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the utility model. For ordinary technicians in this field, other drawings can be obtained based on the structures shown in these drawings without paying creative work.
[0019] Figure 1 An exploded schematic diagram of an embodiment of the through-embedded component installation structure provided by the utility model;
[0020] Figure 2 for Figure 1 Assembly diagram of .
[0021] Description of Figure Numbers:
[0022]
[0023]
[0024] The realization of the purpose, functional features and advantages of the utility model will be further explained in conjunction with embodiments and with reference to the accompanying drawings. DETAILED DESCRIPTION
[0025] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments of the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0026] It should be noted that if the embodiments of the present invention involve directional indications (such as up, down, left, right, front, back...), the directional indications are only used to explain the relative position relationship, movement status, etc. between the components in a certain specific posture. If the specific posture changes, the directional indications will also change accordingly.
[0027] In addition, if there are descriptions involving "first", "second", etc. in the embodiments of the utility model, the descriptions of "first", "second", etc. are only used for descriptive purposes and cannot be understood as indicating or implying their relative importance or implicitly indicating the number of technical features indicated. Therefore, the features limited to "first" and "second" may explicitly or implicitly include at least one of the features. In addition, if "and / or" or "and / or" appears in the full text, its meaning includes three parallel solutions. Taking "A and / or B" as an example, it includes solution A, solution B, or solutions that satisfy both A and B. In addition, the technical solutions between the various embodiments can be combined with each other, but it must be based on the ability of ordinary technicians in this field to implement. When the combination of technical solutions is contradictory or cannot be implemented, it should be deemed that such combination of technical solutions does not exist and is not within the scope of protection required by the utility model.
[0028] At present, the conventional practice of the industry for embedded parts is: after the civil engineering reinforcement is tied, the anchor plate 1 is welded to the anchor bar first, and the anchor plate 2 is opened and welded to the anchor bar after aligning the anchor bar. The construction speed is slow. During the civil engineering reinforcement tying stage, the embedded bar and the anchor plate are welded as a whole and then inserted into the steel mesh. The embedded parts are buried and the reinforcement is tied at the same time. The coordination workload is large, difficult to operate, and inefficient.
[0029] In order to solve the above problems, the utility model proposes a through-embedded component installation structure, through-embedded component and auxiliary device for construction, aiming to provide a through-embedded component installation structure, through-embedded component and auxiliary device for construction that are easy to assemble. Figure 1 to Figure 2 The present invention is a structural schematic diagram of an embodiment of the embedded component installation structure provided by the present invention.
[0030] Please refer to Figure 1 to Figure 2In one embodiment of the utility model, the embedded component installation structure 100 includes a first anchor plate 1, a second anchor plate 2 and an installation assembly 3; the second anchor plate 2 is arranged relative to the first anchor plate 1, and the steel bar clamp is arranged between the first anchor plate 1 and the second anchor plate 2; the installation assembly 3 is arranged between the first anchor plate 1 and the second anchor plate 2, and is used for installation and fixation between the first anchor plate 1 and the second anchor plate 2.
[0031] The technical solution of the present invention adopts an installation component 3 to install and connect the first anchor plate 1 and the second anchor plate 2. Since the installation component 3 is loadable and detachable, the labor intensity, time-consuming and labor-intensive situation of the operators during welding and overall assembly is avoided, thereby making the first anchor plate 1 and the second anchor plate 2 relatively easy to assemble.
[0032] For further information, please refer to Figure 1 , the installation assembly 3 includes a connecting rib 31, and the connecting rib 31 is arranged between the first anchor plate 1 and the second anchor plate 2. It can be understood that in order to save costs and speed up the installation efficiency of the first anchor plate 1 and the second anchor plate 2, the installation assembly 3 includes the connecting rib 31, and the first anchor plate 1 and the second anchor plate 2 are installed by the way that the connecting rib 31 is arranged between the first anchor plate 1 and the second anchor plate 2, and the way that the connecting rib 31 is installed between the first anchor plate 1 and the second anchor plate 2 can be that the two ends of the connecting rib 31 are respectively welded to the first anchor plate 1 and the second anchor plate 2, or directly cast from one of the first anchor plate 1 and the second anchor plate 2, protruding on its end surface, and then the free end of the connecting rib 31 is welded to the other.
[0033] For further information, please refer to Figure 1, the installation assembly 3 also includes a sleeve 32, which is threadedly connected to the connecting rib 31; wherein, one of the connecting rib 31 and the sleeve 32 is arranged on the first anchor plate 1, and the other is arranged on the second anchor plate 2. It can be understood that the method of welding the connecting rib 31 is still relatively time-consuming and labor-intensive. Therefore, the installation assembly 3 also includes the sleeve 32, which is threadedly connected to the connecting rib 31. One of the connecting rib 31 and the sleeve 32 is arranged on the first anchor plate 1, and the other is arranged on the second anchor plate 2. Therefore, the sleeve 32 and the connecting rib 31 are respectively arranged on the first anchor plate 1 and the second anchor plate 2, and then the sleeve 32 is threadedly connected to the connecting rib 31, so that the first anchor plate 1 and the second anchor plate 2 are installed and fixed, which further speeds up the assembly speed. At the same time, this installation method can be disassembled and recycled when it is not needed in the future, saving economic costs and reducing waste. At the same time, the threaded connection method of the sleeve 32 greatly saves the intensity of manpower operation.
[0034] For further information, please refer to Figure 1 , one of the first anchor plate 1 and the second anchor plate 2 is provided with a countersunk hole 11 to accommodate the sleeve 32; the other is welded to the connecting rib 31. It can be understood that, for the sake of installation strength on the one hand, and aesthetics after installation on the other hand, one of the first anchor plate 1 and the second anchor plate 2 is provided with a countersunk hole 11 to accommodate the sleeve 32, that is, by providing the countersunk hole 11 on the first anchor plate 1 or the second anchor plate 2, the sleeve 32 that would otherwise protrude from the outer end side is accommodated inside the first anchor plate 1 or the second anchor plate 2, which on the one hand ensures aesthetics, and on the other hand can also strengthen the tensile strength of the sleeve 32, making it less likely to be damaged by external forces, thereby ensuring the stability of the embedded part 200; in addition, the connecting rib 31 is welded to one of the first anchor plate 1 and the second anchor plate 2 that does not have the countersunk hole 11, that is, the connecting rib 31 can be directly welded on the first anchor plate 1 or the second anchor plate 2 before completing the final assembly.
[0035] It can be understood that, in the present embodiment, the first anchor plate 1 is provided with the countersunk hole 11 for accommodating the sleeve 32 , and the second anchor plate 2 is connected to the connecting rib 31 by welding.
[0036] For further information, please refer to Figure 1, the first anchor plate 1 and / or the second anchor plate 2 are provided with a through hole 21, and the end of the connecting rib 31 away from the sleeve 32 is inserted into the through hole 21; the installation assembly 3 also includes a welding foot 33, and the welding foot 33 is welded to the outside of the first anchor plate 1 and / or the second anchor plate 2 relative to the end of the connecting rib 31 away from the sleeve 32. It can be understood that since the second anchor plate 2 is too heavy, it is very difficult to directly connect it to the connecting rib 31 as a whole by welding, and the labor intensity is high. Therefore, the first anchor plate 1 and / or the second anchor plate 2 are provided with a through hole 21, and the end of the connecting rib 31 away from the sleeve 32 is inserted into the through hole 21; the installation assembly 3 also includes a welding foot 33, and the welding foot 33 is welded to the outside of the first anchor plate 1 and / or the second anchor plate 2 relative to the end of the connecting rib 31 away from the sleeve 32.
[0037] According to another embodiment, please refer to Figure 1 The first anchor plate 1 is provided with the countersunk hole 11 for installing the sleeve 32; after the connecting rib 31 is connected to the sleeve 32 by threading, the free end of the connecting end is penetrated by the through hole 21, and the welding foot 33 is connected to the free end of the connecting rib 31. The welding foot 33 is arranged corresponding to the through hole 21 on the second anchor plate 2. The welding foot 33 can be welded near the second through hole 21, or the welding foot 33 can be directly matched with the through hole 21, for example, the welding foot 33 is embedded in the through hole 21, thereby completing the assembly between the first anchor plate 1 and the second anchor plate 2, and the installation efficiency is high and the assembly difficulty is small.
[0038] In addition, please refer to Figure 1 , the sleeve 32 and the connecting rib 31 are set as an installation group, and a plurality of the installation groups are provided, which are evenly spaced between the first anchor plate 1 and the second anchor plate 2. It can be understood that the relative area of the first anchor plate 1 and the second anchor plate 2 is relatively large, and it is far from enough to set the sleeve 32 and the connecting rib 31 as an installation group, and only set one installation group between the first anchor plate 1 and the second anchor plate 2. Therefore, a plurality of the installation groups are provided, which are evenly spaced between the first anchor plate 1 and the second anchor plate 2, thereby meeting the mechanical requirements for installation and assembly between the first anchor plate 1 and the second anchor plate 2.
[0039] The utility model also proposes a through-embedded member 200, please refer to Figure 2The embedded member 200 includes the embedded member installation structure 100. The specific structure of the embedded member installation structure 100 refers to the above embodiment. Since the embedded member 200 adopts all the technical solutions of all the above embodiments, it at least has all the beneficial effects brought by the technical solutions of the above embodiments, which will not be repeated here one by one.
[0040] The utility model also proposes an auxiliary device for construction, which includes the embedded member 200, and the embedded member 200 includes the embedded member installation structure 100. The specific structure of the embedded member installation structure 100 refers to the above-mentioned embodiment. Since the auxiliary device for construction adopts all the technical solutions of all the above-mentioned embodiments, it at least has all the beneficial effects brought by the technical solutions of the above-mentioned embodiments, which will not be described one by one here.
[0041] The above description is only an exemplary embodiment of the present invention, and does not limit the patent scope of the present invention. All equivalent structural changes made by using the contents of the present invention specification and drawings under the technical concept of the present invention, or directly / indirectly applied in other related technical fields are included in the patent protection scope of the present invention.
Claims
1. A through-embedded component installation structure, characterized in that: include: first anchor plate; a second anchor plate, arranged opposite to the first anchor plate, with a steel bar sandwiched between the first anchor plate and the second anchor plate; as well as, The mounting assembly is disposed between the first anchor plate and the second anchor plate, and is used for mounting and fixing the first anchor plate and the second anchor plate.
2. The embedded component installation structure according to claim 1, characterized in that: The mounting assembly includes a connecting rib disposed between the first anchor plate and the second anchor plate.
3. The embedded component installation structure according to claim 2, characterized in that: The mounting assembly further comprises a sleeve, which is threadedly connected to the connecting rib; Wherein, one of the connecting rib and the sleeve is arranged on the first anchor plate, and the other is arranged on the second anchor plate.
4. The embedded component installation structure according to claim 3, characterized in that: One of the first anchor plate and the second anchor plate is provided with a countersunk hole for accommodating the sleeve; the other is welded to the connecting rib.
5. The embedded component installation structure according to claim 4, characterized in that: The first anchor plate and / or the second anchor plate is provided with a through hole, and one end of the connecting rib away from the sleeve is passed through the through hole; The mounting assembly further comprises a welding foot, wherein an end of the welding foot, which is opposite to the connecting rib and away from the sleeve, is welded to the outer side of the first anchor plate and / or the second anchor plate.
6. The embedded component installation structure according to claim 3, characterized in that: The sleeve and the connecting rib are configured as an installation group, and a plurality of the installation groups are provided and are evenly spaced between the first anchor plate and the second anchor plate.
7. A through-embedded part, characterized in that: The embedded parts include the embedded parts installation structure according to any one of claims 1 to 6.
8. A construction auxiliary device, characterized in that: The auxiliary construction device includes the through-and-through embedded part as described in claim 7.