Intelligent edge protection warning device for construction site
By designing an adjustable length front-facing warning device and a stable connection structure, the existing skirting boards have poor strength, complex installation and inability to reuse, and the goal of adapting to multiple spans and reducing construction costs is achieved.
Patent Information
- Application Number
- CN202421308038.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-11
- Publication Date
- 2025-03-11
- Estimated Expiration
- 2034-06-11
AI Technical Summary
The existing edge protection warning device has poor strength and cannot withstand the impact of concrete fragments. It is complex in installation and is inconvenient for reuse, resulting in waste of resources and increased construction costs.
A smart construction site front-facing protection warning device is designed, and a second skirting board and a first skirting board that can be slidably shaped so that the overall length of the device is adjustable, and a firm connection with the guardrail is achieved through the first fastener and the second fastener.
The device can be used for guardrails of multiple spans, solving the problem of the inability to reuse the skirting boards, simplifying the installation process, improving the reliability of the connection, and reducing construction costs.
Smart Images

Figure CN222595616U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of edge protection, and more specifically, to an edge protection warning device for a smart construction site. Background Art
[0002] During the construction of smart construction sites, it is necessary to build edge protection. Edge protection refers to the protection of the perimeter of balconies that have not yet been installed with railings, the perimeter of roofs without external frame protection, the perimeter of frame engineering floors, the sides of upper and lower runways and ramps, and the sides of unloading platforms, in order to comply with the construction project safety production management regulations and ensure the safety of construction workers;
[0003] The safety technical management regulations for construction companies require that areas with edge heights exceeding 2 meters must be equipped with guardrails as edge protection, and the height of the guardrails must not be less than 1.2 meters; in the actual construction process, a striking warning device is usually installed at the bottom of the guardrail, on the one hand to warn construction workers that this is a dangerous area, and on the other hand to remind construction workers not to pile construction waste here to avoid falls from heights; the warning devices in the prior art are mostly 150mm wide foam or wooden skirting boards, which are fixed to the guardrails with nylon ties, and the surface of the skirting boards is sprayed with red and white stripes to provide a warning effect.
[0004] However, the warning device in the prior art has the following technical problems:
[0005] 1. Skirting boards are usually cut from waste building wood formwork or extruded board waste, which have poor strength and cannot withstand the impact of concrete fragments and prevent concrete fragments from falling from the edge;
[0006] 2. When installing the skirting board on site, it is necessary to drill holes in multiple locations on the board surface, and then tie the nylon tie through the holes and tie it to the guardrail. Not only is the entire installation process time-consuming and laborious, but the nylon tie is easy to break;
[0007] 3. When erecting guardrails, the span between adjacent columns is determined according to the curvature of the edge. The smaller the curvature of the edge, the larger the span, and the maximum span does not exceed 2m. The length of existing skirting boards is usually customized according to the current span. After use, they cannot be reused for the next edge protection, resulting in a waste of resources and increased construction costs. Utility Model Content
[0008] The purpose of the utility model is to solve the technical problems in the prior art that skirting boards cannot be reused, are complicated to install and have poor reliability, and to propose an intelligent edge protection warning device for construction sites.
[0009] In order to achieve the above purpose, the utility model adopts the following technical solutions:
[0010] A smart construction site edge protection warning device, comprising:
[0011] a first skirting board, wherein the first skirting board is in a strip-shaped structure;
[0012] A second skirting board and a third skirting board, wherein the second skirting board is provided with a chamber having a shape and size matching that of the first skirting board, and the second skirting board and the third skirting board are respectively located at two ends of the first skirting board;
[0013] A connecting piece, which is arranged on the second skirting board and the third skirting board and is used to connect a guardrail;
[0014] Wherein, the first skirting board is located in the chamber and is slidably connected to the second skirting board, so that the distance between the second skirting board and the third skirting board is adjustable.
[0015] Furthermore, the second skirting board is provided with a pulley, and the pulley is located in the chamber; the first skirting board is provided with a slide groove matching the pulley along its length direction; the pulley is slidably connected in the slide groove, so that the second skirting board and the first skirting board can slide relative to each other.
[0016] Furthermore, the third skirting board is fixedly connected to an end of the first skirting board away from the second skirting board.
[0017] Furthermore, the connecting piece includes:
[0018] a first fastener, the first fastener being arranged on a surface of the second skirting board away from the third skirting board;
[0019] A second fastener is arranged on a surface of the third skirting board away from the second skirting board.
[0020] Furthermore, a height of a lower surface of the second fastener is higher than a height of an upper surface of the first fastener.
[0021] Furthermore, the second skirting board is provided with a first mounting groove; the third skirting board is provided with a second mounting groove, and LED light strips are provided in the first mounting groove and the second mounting groove.
[0022] Furthermore, the first skirting board, the second skirting board and the third skirting board are provided with warning stripes on their surfaces facing away from the adjacent edges.
[0023] Furthermore, a plurality of support frames are provided on the surfaces of the second skirting board and the third skirting board away from the warning stripes.
[0024] The beneficial effects of the utility model are:
[0025] A smart edge protection warning device for construction sites provided by the present application adopts a second skirting board and a first skirting board that can slide relatively to each other, so that the overall length of the device is adjustable, so that the smart edge protection warning device for construction sites provided by the present application is suitable for guardrails of various spans, solving the technical problem in the related art that the skirting board cannot be reused for the next edge protection erection; a smart edge protection warning device for construction sites provided by the present application achieves a stable connection with the guardrail through a first fastener and a second fastener, solving the technical problem in the related art that the skirting board installation process is complicated and the connection reliability is poor. BRIEF DESCRIPTION OF THE DRAWINGS
[0026] Figure 1 This is a schematic diagram of the overall structure of a smart construction site edge protection warning device provided in an embodiment of the utility model;
[0027] Figure 2 This is a schematic diagram of the second skirting board structure in an embodiment of the utility model;
[0028] Figure 3 This is a schematic diagram of the first skirting board structure in an embodiment of the utility model;
[0029] Figure 4 This is a schematic diagram of the overall structure of an intelligent edge protection warning device for construction sites provided in an embodiment of the utility model (from another perspective);
[0030] Figure 5 This is a schematic structural diagram of a smart construction site edge protection warning device provided in an embodiment of the utility model when the total length is the shortest;
[0031] Figure 6 A schematic diagram of the connection relationship between a smart construction site edge protection warning device and a guardrail provided in an embodiment of the utility model;
[0032] The markings in the figure are as follows:
[0033] 1. First skirting board;
[0034] 11. Chute; 12. Warning stripes;
[0035] 2. Second skirting board;
[0036] 21. pulley; 22. first mounting groove;
[0037] 3. The third skirting board;
[0038] 31. Second mounting slot; 32. Support frame;
[0039] 4. Connectors;
[0040] 41. first fastener; 42. second fastener;
[0041] 5. LED light strip. DETAILED DESCRIPTION
[0042] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments of the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0043] It should be noted that all directional indications in the embodiments of the present invention (such as up, down, left, right, front, back...) are only used to explain the relative position relationship, movement status, etc. between the components under a certain specific posture (as shown in the accompanying drawings). If the specific posture changes, the directional indication will also change accordingly.
[0044] In the present invention, unless otherwise clearly specified and limited, the terms "connection", "fixation", etc. should be understood in a broad sense. For example, "fixation" can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium, it can be the internal connection of two elements or the interaction relationship between two elements, unless otherwise clearly defined. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0045] In addition, if there are descriptions involving "first", "second", etc. in the embodiments of the utility model, the descriptions of "first", "second", etc. are only used for descriptive purposes and cannot be understood as indicating or implying their relative importance or implicitly indicating the number of technical features indicated. Therefore, the features defined as "first" and "second" may explicitly or implicitly include at least one of the features. In addition, the meaning of "and / or" appearing in the full text includes three parallel schemes. Taking "A and / or B" as an example, it includes scheme A, or scheme B, or a scheme that satisfies both A and B. In addition, the technical solutions between the various embodiments can be combined with each other, but it must be based on the ability of ordinary technicians in this field to implement. When the combination of technical solutions is contradictory or cannot be implemented, it should be deemed that such a combination of technical solutions does not exist and is not within the scope of protection required by the utility model.
[0046] Example
[0047] See also Figures 1 to 6The embodiment of the present application shown provides an edge protection warning device for a smart construction site. In actual application, the edge protection warning device is fixed to the bottom of the guardrail to warn construction workers that this is a dangerous area and remind construction workers not to pile construction waste here; please refer to Figure 1 The edge protection warning device for a smart construction site includes: a first skirting board 1, a second skirting board 2, a third skirting board 3 and a connecting piece 4; wherein the first skirting board 1 is a strip structure, the second skirting board 2 is located at one end of the first skirting board 1, the third skirting board 3 is located at the other end of the first skirting board 1, and the connecting piece 4 is arranged on the second skirting board 2 and the third skirting board 3 for connecting the guardrail.
[0048] In order to solve the technical problem that the skirting board cannot be reused after being customized and cut in the related art; please refer to Figure 2 and Figure 3 The length of the second skirting board 2 matches the first skirting board 1, and a cavity matching the shape and size of the first skirting board 1 is provided in the second skirting board 2, and a pulley 21 is provided on the inner surface of the second skirting board 2 in the cavity. In the present embodiment, the first skirting board 1 is located in the cavity of the second skirting board 2, and a slide groove 11 matching the pulley 21 is provided on the first skirting board 1 along its length direction, and is slidably connected to the slide groove 11 by the pulley 21, so that the second skirting board 2 can slide relative to the first skirting board 1 along the direction of the slide groove 11; adopting this technical scheme, the first skirting board 1 can be completely stored in the cavity of the second skirting board 2, and when the combined length of the second skirting board 2 and the third skirting board 3 is less than the span of the guardrail, the first skirting board 1 can be extended again, so as to achieve the technical effect of indirectly extending the length of the second skirting board 2, thereby meeting the installation requirements of the warning device length when the span of the guardrail is large.
[0049] It can be understood that the third skirting board 3 can adopt the same structure as the second skirting board 2, and be slidably connected to the end of the first skirting board 1 away from the second skirting board 2, so as to realize flexible adjustment of the total length of the edge protection warning device; as another preferred embodiment of the present application, the third skirting board 3 is fixedly connected to the end of the first skirting board 1 away from the second skirting board 2. The adoption of this technical solution can avoid the situation where the first skirting board 1 slips inside the second skirting board 2 and the third skirting board 3 after the edge protection warning device is installed on the guardrail due to the sliding connection at both ends, thereby reducing the wear of the device and extending the service life of the device.
[0050] In order to ensure that the edge protection warning device can be firmly connected to the guardrail and optimize the installation steps of the edge protection warning device; please refer to Figure 1 and Figure 5The connecting member 4 includes: a first fastener 41 and a second fastener 42, wherein the first fastener 41 is arranged on the surface of the second skirting board 2 away from the third skirting board 3, and the second fastener 42 is arranged on the surface of the third skirting board 3 away from the second skirting board 2; adopting this technical scheme, when installing the edge protection warning device, first adjust the total length of the device, and then install the first fastener 41 and the second fastener 42 on the two vertical poles in the same span of the guardrail respectively, and the fixation can be completed; in the related art, nylon cable ties are used to fix the skirting board to the guardrail, and at the same time, multiple nylon cable ties must be inserted along the length direction of the upper part of the skirting board to tie it to the crossbar of the guardrail, and use To prevent the skirting board from swinging back and forth; compared with the connection method of traditional nylon tie, the first fastener 41 and the second fastener 42 can provide strong fastening force without destroying the original structure of the device, which can effectively suppress the forward and backward swing of the device; the first fastener 41 and the second fastener 42 are both metal structures, which have greatly improved durability compared with nylon tie, and effectively avoid the risk of connection failure with the guardrail; and nylon tie needs to be drilled in advance, threaded on site, and can only be disassembled by destruction after use, while the first fastener 41 and the second fastener 42 can be disassembled and assembled only by loosening and tightening bolts, which makes the installation method more convenient, eliminates material waste, and further saves construction costs.
[0051] As a preferred embodiment of the present application, the height of the lower surface of the second fastener 42 is higher than the height of the upper surface of the first fastener 41; Figure 6 When the edge protection warning device is installed on the guardrail, the second fastener 42 and the first fastener 41 on the adjacent edge protection warning device can be connected to the same column and staggered in position; the first fastener 41 and the second fastener 42 on the adjacent edge protection warning device can be connected to the same column and staggered in position.
[0052] In this example, see Figure 2 A first mounting groove 22 is arranged above the second skirting board 2, and a second mounting groove 31 (not shown in the figure) is arranged above the third skirting board 3, and LED light strips 5 are arranged in both the first mounting groove 22 and the second mounting groove 31; dust often accumulates on the ground at the construction site; in the related art, the skirting boards are close to the ground, and the areas where the skirting boards are arranged are mostly indoors where natural light is difficult to cover, so the red and white warning stripes on the surface of the skirting boards are covered with dust, and the warning effect is weakened; the design of the LED light strip 5 can have a striking warning effect even in a dim environment.
[0053] It can be understood that, in actual use, the first skirting board 1, the second skirting board 2 and the third skirting board 3 are all sprayed with warning stripes 12 on the side facing away from the edge; as a preferred embodiment of the present application, please refer to Figure 4A plurality of support frames 32 are arranged on the surfaces of the second skirting board 2 and the third skirting board 3 away from the warning stripes 12; the support frames 32 can be detachably connected to the ground by bolt fixing; the support frames 32 are used to provide auxiliary support behind the edge protection warning device to prevent the edge protection warning device from moving in the horizontal direction, thereby reducing the possibility of the edge protection warning device being bent as a whole after large pieces of concrete fragments hit the front of the edge protection warning device.
[0054] A smart edge protection warning device for construction sites provided in the present application adopts a second skirting board 2 and a first skirting board 1 that can slide relative to each other, so that the overall length of the device is adjustable, so that the smart edge protection warning device for construction sites provided in the present application is suitable for guardrails of various spans, solving the technical problem in the related art that the skirting board cannot be reused for the next edge protection erection; a smart edge protection warning device for construction sites provided in the present application is firmly connected to the guardrail through the first fastener 41 and the second fastener 42, solving the technical problem in the related art that the skirting board installation process is complicated and the connection reliability is poor.
[0055] The above description is only a preferred specific implementation manner of the present invention, but the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can make equivalent replacements or changes within the technical scope disclosed by the present invention according to the technical scheme and the utility model concept of the present invention, which should be covered by the protection scope of the present invention.
Claims
1. A smart construction site edge protection warning device, characterized in that: include: a first skirting board, wherein the first skirting board is in a strip-shaped structure; A second skirting board and a third skirting board, wherein the second skirting board is provided with a chamber having a shape and size matching that of the first skirting board, and the second skirting board and the third skirting board are respectively located at two ends of the first skirting board; A connecting piece, which is arranged on the second skirting board and the third skirting board and is used to connect a guardrail; Wherein, the first skirting board is located in the chamber and is slidably connected to the second skirting board, so that the distance between the second skirting board and the third skirting board is adjustable.
2. The edge protection warning device for a smart construction site according to claim 1 is characterized in that: The second skirting board is provided with a pulley, and the pulley is located in the chamber; the first skirting board is provided with a sliding groove matching the pulley along its length direction; the pulley is slidably connected in the sliding groove, so that the second skirting board and the first skirting board can slide relative to each other.
3. The smart construction site edge protection warning device according to claim 1 is characterized in that: The third skirting board is fixedly connected to an end of the first skirting board away from the second skirting board.
4. The smart construction site edge protection warning device according to claim 1 is characterized in that: The connecting piece comprises: a first fastener, the first fastener being arranged on a surface of the second skirting board away from the third skirting board; A second fastener is arranged on a surface of the third skirting board away from the second skirting board.
5. The smart construction site edge protection warning device according to claim 4 is characterized in that: The height of the lower surface of the second fastener is higher than the height of the upper surface of the first fastener.
6. The edge protection warning device for a smart construction site according to claim 1 is characterized in that: The second skirting board is provided with a first mounting groove; the third skirting board is provided with a second mounting groove, and LED light strips are provided in the first mounting groove and the second mounting groove.
7. The smart construction site edge protection warning device according to claim 1 is characterized in that: The first skirting board, the second skirting board and the third skirting board are all provided with warning stripes on their surfaces facing away from the adjacent edges.
8. The smart construction site edge protection warning device according to claim 7 is characterized in that: A plurality of support frames are arranged on the surfaces of the second skirting board and the third skirting board away from the warning stripes.