Water absorption tester

By designing a water absorption tester including drying bins and soaking bins, the problems of low equipment integration and low density of materials floating in the prior art are solved, and accurate water absorption tests for various building materials are achieved.

CN222599438UActive Publication Date: 2025-03-11王宣
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420913114.4
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-04-29
Publication Date
2025-03-11
Estimated Expiration
2034-04-29

AI Technical Summary

Technical Problem

When testing building materials, the existing water absorption tester has low degree of equipment integration, which is troublesome when transferring the materials to be tested, and some materials with low density will float when soaking, affecting the accuracy of the test.

Method used

A water absorption tester is designed, including a drying chamber and a soaking chamber. The drying chamber is equipped with a drying assembly and a placement grid. The soaking chamber is equipped with a soaking box, a fixing rod and a stop rod, which can limit and completely immerse building materials of various densities.

Benefits of technology

It improves the accuracy and scope of application of water absorption test for building materials, simplifies equipment operation, reduces the contact area on the material, and avoids the impact on water absorption.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222599438U_ABST
    Figure CN222599438U_ABST
Patent Text Reader

Abstract

The utility model belongs to the technical field of building material detection, and particularly relates to a water absorption tester which comprises a test box, a drying bin and a soaking bin are arranged in the test box, and the drying bin and the soaking bin are arranged on the upper portion and the lower portion of the test box respectively. The interior of the drying bin is slidably connected with a placing net rack for placing a building material to be tested, the interior of the soaking bin is slidably connected with a soaking box, a supporting net plate is arranged in the soaking box, and fixing rods are arranged on the two sides of the soaking box and located above the supporting net plate; two stop rods used for limiting the building materials are slidably connected between the two fixing rods. According to the tester, the drying bin and the soaking bin are arranged, the tester has drying and soaking functions at the same time, the integration degree is high, building materials with various densities can be tested by arranging the fixing rod and the stop lever in the soaking box, the application range is wide, and the accuracy of testing the water absorption rate of the building materials is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model belongs to the technical field of building material detection, and in particular relates to a water absorption tester. Background Art

[0002] The property of a material to absorb water in water is called water absorption. The water absorption of a material is expressed by water absorption rate, and currently it is often expressed by mass water absorption rate, which refers to the percentage of the mass of water absorbed by the material to the mass of the dry material when the material is saturated with water. Before testing the water absorption rate of building materials, it is usually necessary to dry the building materials to remove the moisture in the materials, and then soak the building materials. Therefore, it is necessary to use drying equipment and soaking equipment at the same time. The degree of integration is low, and it is troublesome to transfer the materials to be tested. In addition, since the density of some building materials is relatively small, such as filling cotton, foam bricks and other materials, they will float on the water surface during the soaking test and cannot be soaked. It is necessary to press a counterweight on the building material. However, the contact area between the counterweight and the building material is large, which may affect the water absorption rate of the building material, thereby affecting the accuracy of the water absorption test. Utility Model Content

[0003] In view of the above problems, the purpose of the present invention is to provide a water absorption tester to solve the problems raised in the above background technology.

[0004] To achieve the above objectives, the utility model adopts the following technical solution: a water absorption tester, comprising a test box, wherein a drying chamber and a soaking chamber are provided inside the test box, wherein the drying chamber and the soaking chamber are respectively arranged at the upper and lower parts of the test box, wherein a placing grid frame for placing building materials to be tested is slidably connected inside the drying chamber, wherein the outer end of the placing grid frame is connected to a sealing baffle whose size is larger than that of the drying chamber, wherein a drying assembly is arranged inside the drying chamber, wherein a soaking box is slidably connected inside the soaking chamber, wherein a supporting mesh plate is arranged inside the soaking box, wherein fixing rods are provided on both sides of the soaking box and above the supporting mesh plate, wherein two baffle rods for limiting the position of building materials are slidably connected between the two fixing rods.

[0005] The beneficial effects of the utility model are as follows: the tester has the functions of drying and soaking at the same time by arranging a drying chamber and a soaking chamber, and has a high degree of integration; and by arranging a fixing rod and a blocking rod in the soaking box, it can test building materials of various densities, has a wide range of applications, and improves the accuracy of building material water absorption test.

[0006] In order to be able to dry both the upper and lower sides of the building material at the same time:

[0007] As a further improvement of the above technical solution: the drying component includes a heating tube symmetrically arranged on the inner top wall and the inner bottom wall of the drying bin and having an air outlet provided on the side close to the grid, an air supply tube arranged on the rear side wall of the drying bin and used to connect the two heating tubes, a fan arranged at the rear end of the air supply tube, and a heating box arranged on the side of the air supply tube close to the heating tube and having a heating wire arranged inside.

[0008] The beneficial effect of this improvement is: when the fan is turned on, the gas is blown along the air supply pipe to the side close to the heating box, and is heated by the heating wire, and hot air is supplied to the drying chamber along the air outlet of the heating pipe box, and the upper and lower surfaces of the building materials placed on the grid are dried at the same time, which can improve the efficiency of drying the building materials.

[0009] In order to reduce the contact area between the bottom of the barrier and the building materials, so as not to affect the water absorption rate of the building materials:

[0010] As a further improvement of the above technical solution: the cross section of the bottom of the baffle rod is in a pointed cone shape.

[0011] The beneficial effect of this improvement is that after the building materials are placed, the two baffles are slid along the fixed rods to the side close to the building materials, so that the baffles are symmetrically located above the building materials, which can limit the building materials with lower density. At the same time, the bottom of the baffle is set to be in a pointed cone shape, which can reduce the contact area between the bottom of the baffle and the building materials, so as not to affect the water absorption rate of the building materials.

[0012] In order to make the barrier rod better limit the construction materials:

[0013] As a further improvement of the above technical solution: an installation cavity is provided inside the barrier rod, and a counterweight rod is provided inside the installation cavity.

[0014] The beneficial effect of this improvement is that by arranging a counterweight rod inside the barrier rod, the weight of the barrier rod can be increased to prevent the barrier rod from moving as water flows in, thereby better limiting the position of the building materials so that they are completely immersed in water.

[0015] In order to facilitate the introduction of water into the soaking box through the water filling pipe:

[0016] As a further improvement of the above technical solution: a water supply pipe is installed on the inner top wall of the soaking bin, and the tail end of the water supply pipe passes through the test box and extends to the outside of the test box.

[0017] The beneficial effect of this improvement is that after the soaking box is inserted into the soaking bin, the water supply pipe is connected to an external water source, and water is introduced into the soaking box through the water supply pipe.

[0018] In order to drain the water from the immersion box after the building materials have been immersed:

[0019] As a further improvement of the above technical solution: the soaking box is made of transparent material, and a drain pipe with a valve is arranged on the front side of the soaking box.

[0020] The beneficial effect of this improvement is that the water level in the immersion box can be easily observed through the transparent immersion box. When the water level exceeds the barrier rod, the building materials can be completely immersed in the water. After the building materials have been immersed for a period of time, the valve is opened to allow the water in the immersion box to be discharged along the drain pipe.

[0021] To facilitate the installation of the grid rack in the drying chamber:

[0022] As a further improvement of the above technical solution: slide rails are symmetrically arranged inside the drying bin, and slide rods slidably connected to the slide rails are symmetrically arranged on both sides of the grid placement.

[0023] The beneficial effect of this improvement is that when installing a placement grid containing building materials, the slide bars on both sides of the placement grid are aligned with the slide rails and inserted into the drying chamber, so that the placement grid is located between the upper and lower heating tubes, thereby being able to dry both sides of the building materials at the same time.

[0024] In order to facilitate the exhaust of excess heat in the drying chamber:

[0025] As a further improvement of the above technical solution: exhaust holes are symmetrically provided on the top wall of the drying chamber and on both sides of the heating tube.

[0026] The beneficial effect of this improvement is that during the process of drying the building materials, the excess hot air is discharged along the exhaust holes so as to discharge the moisture in the drying chamber. BRIEF DESCRIPTION OF THE DRAWINGS

[0027] Figure 1 It is a side view stereoscopic structural schematic diagram of the utility model;

[0028] Figure 2 It is a front view cross-sectional structural schematic diagram of the utility model;

[0029] Figure 3 It is a right side cross-sectional structural schematic diagram of the utility model;

[0030] Figure 4 It is a rear view structural schematic diagram of the utility model;

[0031] Figure 5 It is a schematic diagram of the top cross-sectional structure of the utility model.

[0032] In the figure: 1. test box; 2. drying chamber; 3. soaking chamber; 4. placement grid; 5. sealing baffle; 6. fixing rod; 7. baffle rod; 8. air outlet; 9. heating pipe; 10. air supply pipe; 11. fan; 12. heating wire; 13. heating box; 14. counterweight rod; 15. water supply pipe; 16. valve; 17. drain pipe; 18. slide rail; 19. slide rod; 20. exhaust hole; 21. soaking box; 22. support grid plate. DETAILED DESCRIPTION

[0033] In order to enable those skilled in the art to better understand the technical solution of the utility model, the utility model is described in detail below in conjunction with the accompanying drawings. The description in this part is only exemplary and explanatory and should not have any limiting effect on the protection scope of the utility model.

[0034] like Figure 1-5As shown, a water absorption tester is provided, wherein a drying chamber 2 and a soaking chamber 3 are provided inside the test box 1, wherein the drying chamber 2 and the soaking chamber 3 are respectively arranged at the upper part and the lower part of the test box 1, wherein a placing grid frame 4 for placing building materials to be tested is slidably connected inside the drying chamber 2, wherein the outer end of the placing grid frame 4 is connected to a sealing baffle 5 having a size larger than the drying chamber 2, wherein a drying component is provided inside the drying chamber 2, wherein a soaking box 21 is slidably connected inside the soaking chamber 3, wherein a supporting mesh plate 22 is provided inside the soaking box 21, wherein fixing rods 6 are provided on both sides of the soaking box 21 and above the supporting mesh plate 22, wherein two blocking rods 7 for limiting the position of building materials are slidably connected between the two fixing rods 6, and wherein the tester is provided with a The drying chamber 2 and the soaking chamber 3 are provided, and the drying and soaking functions are provided at the same time, and the degree of integration is high. By arranging the fixing rod 6 and the blocking rod 7 in the soaking box 21, the building materials of various densities can be tested, and the application range is wide, and the accuracy of the water absorption rate test of the building materials is improved. The drying component includes a heating pipe 9 symmetrically arranged on the inner top wall and the inner bottom wall of the drying chamber 2 and having an air outlet 8 on the side close to the grid 4, an air supply pipe 10 arranged on the rear side wall of the drying chamber 2 and used to connect the two heating pipes 9, a fan 11 arranged at the tail end of the air supply pipe 10, and a heating box 13 arranged on the side of the air supply pipe 10 close to the heating pipe 9 and having a heating wire 12 arranged therein. When the fan 11 is turned on, the gas flows along the air supply pipe 10 to the side close to the heating box 13. The drying chamber 2 is blown sideways and heated by the heating wire 12. Hot air is supplied to the drying chamber 2 along the heating tube 9 and the air outlet 8. The upper and lower surfaces of the building materials placed on the grid 4 are dried at the same time, which can improve the drying efficiency of the building materials. The cross-section of the bottom of the baffle rod 7 is in a pointed cone shape. After the building materials are placed, the two baffle rods 7 are slid along the fixing rod 6 to the side close to the building materials, so that the baffle rods 7 are symmetrically located above the building materials, which can limit the building materials with lower density. At the same time, the bottom of the baffle rod 7 is set in a pointed cone shape, which can reduce the contact area between the bottom of the baffle rod 7 and the building materials, so as not to affect the water absorption rate of the building materials. An installation cavity is opened inside the baffle rod 7, and a counterweight rod 14 is arranged inside the installation cavity. A counterweight rod 14 is arranged inside to increase the weight of the barrier rod 7 to prevent the barrier rod 7 from moving with the introduction of water, so as to better limit the position of the building materials and make them completely immersed in water. A water adding pipe 15 is arranged on the inner top wall of the immersion bin 3. The tail end of the water adding pipe 15 passes through the test box 1 and extends to the outside of the test box 1. When the immersion box 21 is inserted into the immersion bin 3, the water adding pipe 15 is connected to the external water source, and water is introduced into the immersion box 21 through the water adding pipe 15. The immersion box 21 is made of transparent material, and a drain pipe 17 with a valve 16 is arranged on the front side of the immersion box 21. The water level in the immersion box 21 can be easily observed through the transparent immersion box 21. When the water level exceeds the barrier rod 7, the building materials can be completely immersed in water.After the building materials have been soaked for a period of time, the valve 16 is opened to allow the water in the soaking box 21 to be drained along the drain pipe 17. The interior of the drying bin 2 is symmetrically provided with slide rails 18, and the two sides of the placement grid 4 are symmetrically provided with slide rods 19 that are slidably connected to the slide rails 18. When installing the placement grid 4 containing the building materials, the slide rods 19 on both sides of the placement grid 4 are aligned with the slide rails 18 and inserted into the drying bin 2, so that the placement grid 4 is located between the upper and lower heating tubes 9, so that both sides of the building materials can be dried at the same time. The top wall of the drying bin 2 and the two sides of the heating tube 9 are symmetrically provided with exhaust holes 20. In the process of drying the building materials, the excess hot air is discharged along the exhaust holes 20, so as to discharge the moisture in the drying bin 2.

[0035] The working principle and use process of the utility model are as follows: when using the device, the building materials to be tested are placed on the placing grid frame 4, the slide bars 19 on both sides of the placing grid frame 4 are aligned with the slide rails 18, and inserted into the drying chamber 2, so that the placing grid frame 4 is located between the upper and lower heating tubes 9, and the fan 11 is turned on. The gas is blown along the air supply pipe 10 to the side close to the heating box 13, and is heated by the heating wire 12. The hot air is supplied to the drying chamber 2 along the heating tube 9 and the air outlet 8, and the upper and lower sides of the building materials placed on the grid frame 4 are dried at the same time. After the building materials are dried for a period of time, the building materials are taken out for weighing, and then the building materials are put back into the drying chamber 2. Place it on the supporting mesh plate 22, slide the two blocking rods 7 along the fixing rods 6 to the side close to the building materials, so that the blocking rods 7 are symmetrically located above the building materials. As the water supply pipe 15 introduces water into the immersion box 21, if the building materials have a small density and float up, the blocking rods 7 can limit the building materials with a small density, so that the building materials are completely immersed in water to avoid affecting the detection of water absorption rate. After the building materials are soaked for a period of time, open the valve 16 to drain the water in the immersion box 21 along the drain pipe 17. After the surface water of the building materials is drained on the supporting mesh plate 22, take them out and weigh them again, so as to calculate the water absorption rate of the building materials.

[0036] It should be noted that, in this article, the terms "comprises", "includes" or any other variations thereof are intended to cover non-exclusive inclusion, so that a process, method, article or apparatus that includes a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or apparatus.

[0037] This article uses specific examples to illustrate the principles and implementation methods of the utility model. The above examples are only used to help understand the method and core ideas of the utility model. The above is only the preferred implementation method of the utility model. It should be pointed out that due to the limitations of textual expression, there are objectively infinite specific structures. For ordinary technicians in this technical field, without departing from the principle of the utility model, they can make several improvements, modifications or changes, and can also combine the above technical features in an appropriate manner; these improvements, modifications, changes or combinations, or the direct application of the inventive concept and technical solution to other occasions without improvement, should be regarded as the protection scope of the utility model.

Claims

1. A water absorption tester, comprising a test box (1), wherein a drying chamber (2) and a soaking chamber (3) are provided inside the test box (1), characterized in that: The drying bin (2) and the soaking bin (3) are respectively arranged at the upper and lower parts of the test box (1); a placement grid frame (4) for placing the building materials to be tested is slidably connected inside the drying bin (2); a sealing baffle (5) having a size larger than that of the drying bin (2) is connected to the outer end of the placement grid frame (4); a drying assembly is arranged inside the drying bin (2); a soaking box (21) is slidably connected inside the soaking bin (3); a supporting mesh plate (22) is arranged inside the soaking box (21); fixing rods (6) are arranged on both sides of the soaking box (21) and above the supporting mesh plate (22); two blocking rods (7) for limiting the position of the building materials are slidably connected between the two fixing rods (6).

2. A water absorption tester according to claim 1, characterized in that: The drying assembly comprises a heating tube (9) symmetrically arranged on the inner top wall and the inner bottom wall of the drying chamber (2) and having an air outlet (8) opened on the side close to the grid frame (4), an air supply tube (10) arranged on the rear side wall of the drying chamber (2) and used to connect the two heating tubes (9), a fan (11) arranged at the rear end of the air supply tube (10), and a heating box (13) arranged on the side of the air supply tube (10) close to the heating tube (9) and having a heating wire (12) arranged therein.

3. A water absorption tester according to claim 1, characterized in that: The cross section of the bottom of the blocking rod (7) is in the shape of a pointed cone.

4. A water absorption tester according to claim 1, characterized in that: An installation cavity is provided inside the barrier rod (7), and a counterweight rod (14) is provided inside the installation cavity.

5. A water absorption tester according to claim 1, characterized in that: A water supply pipe (15) is installed on the inner top wall of the soaking bin (3), and the tail end of the water supply pipe (15) passes through the test box (1) and extends to the outside of the test box (1).

6. A water absorption tester according to claim 1, characterized in that: The soaking box (21) is made of a transparent material, and a drainage pipe (17) with a valve (16) is arranged on the front side of the soaking box (21).

7. A water absorption tester according to claim 1, characterized in that: Slide rails (18) are symmetrically arranged inside the drying bin (2), and slide rods (19) slidably connected to the slide rails (18) are symmetrically arranged on both sides of the placement grid frame (4).

8. A water absorption tester according to claim 1, characterized in that: The top wall of the drying chamber (2) is symmetrically provided with exhaust holes (20) located on both sides of the heating tube (9).