Lime silo dust removal device

By designing a lime silo dust removal device including water sealing tank and spraying system, the problems of difficulty in maintenance and dust escape of lime silo dust removal device are solved, and convenient installation, reduced maintenance costs and improved dust recovery efficiency are achieved.

CN222605838UActive Publication Date: 2025-03-14WENGFU (GRP) CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420886810.0
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-04-26
Publication Date
2025-03-14
Estimated Expiration
2034-04-26

AI Technical Summary

Technical Problem

During use, the dust removal device of lime silo has problems such as maintenance and dust escape, resulting in environmental pollution and inconvenient dust recovery.

Method used

A lime silo dust removal device is designed, including the silo body, a water sealing tank and a lime preparation tank. Dust is introduced into the water sealing tank through the ash discharge pipe, and spray cooling and dust removal is carried out in combination with the water distribution pipe and the water injection pipe, and dust is collected and recovered through the overflow pipe.

Benefits of technology

It realizes convenient installation and maintenance of dust removal devices, reduces maintenance costs, and at the same time, through spraying and recycling technologies, reduces dust recovery efficiency, and reduces waste of raw materials.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222605838U_ABST
    Figure CN222605838U_ABST
Patent Text Reader

Abstract

The utility model belongs to the technical field of lime dust removal, and discloses a lime silo dust removal device which comprises a silo body, a water seal tank and a lime preparation tank. An ash discharge pipe is fixedly connected between the silo body and the water seal tank in a penetrating manner, and a lime truck ash discharge pipe is fixedly connected to the outer side of the silo body; a fixed pipe is inserted into the top end of the water seal tank, and a mounting pipe is mounted at the top end of the fixed pipe through a first flange; a dust removal assembly is arranged in the mounting pipe; an overflow pipe and a blow-off pipe are fixedly connected to one side of the water seal tank in a penetrating manner, the blow-off pipe is located below the overflow pipe, a valve is mounted on the blow-off pipe, and one end, far away from the water seal tank, of the overflow pipe and one end, far away from the water seal tank, of the blow-off pipe are movably connected into the lime preparation tank in a penetrating manner. The device is beneficial to dust removal and collection of lime dust during silo dust discharging, and is convenient to mount and dismount and low in maintenance cost.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model belongs to the technical field of lime dust removal, and in particular relates to a lime silo dust removal device. Background Art

[0002] Lime silo is a facility for storing lime, usually in cylindrical form, which is easy to load, unload and store. This structure helps to maintain the dryness and stability of the lime, ensuring its quality is not affected. Lime silo is widely used in industry and construction. During the use of lime silo, dust removal device is required to remove dust from the inside of the lime silo.

[0003] In phosphorus chemical wastewater treatment, lime is the main treatment agent with a large demand, and is usually stored in silos. Most of the original lime silos are equipped with bag dust collectors on the top and are equipped with fans. The dust collectors need to be cleaned regularly during the use of the device. However, due to the high height of the lime silo, the dust collector is difficult to repair. At the same time, dust will escape when the dust removal device is working, and the escape is not conducive to recovery, causing dust pollution to the environment. Utility Model Content

[0004] The utility model aims to provide a lime silo dust removal device to solve the problems raised in the above background technology.

[0005] In order to achieve the above purpose, the utility model provides the following technical solutions:

[0006] A lime silo dust removal device comprises a silo body, a water seal tank and a lime preparation tank; a ash discharge pipe is fixedly connected between the silo body and the water seal tank, and a lime truck ash discharge pipe is fixedly connected to the outside of the silo body;

[0007] A fixing pipe is inserted and connected to the top of the water seal groove, and a mounting pipe is installed on the top of the fixing pipe through a first flange; a dust removal component is arranged in the mounting pipe;

[0008] An overflow pipe and a sewage pipe are fixedly connected and inserted on one side of the water seal groove. The sewage pipe is located below the overflow pipe. A valve is installed on the sewage pipe. The ends of the overflow pipe and the sewage pipe away from the water seal groove are movably connected and inserted in the lime preparation groove.

[0009] Preferably, the dust removal assembly includes an inlet pipe, one end of which is connected to a water distribution pipe; the bottom end of the inlet pipe is fixedly connected to a standpipe, and four distribution pipes are fixedly interlaced and connected at equal distances on the upper outer surface and the lower outer surface of the standpipe, and the bottom ends of the distribution pipes are fixedly connected to two nozzles;

[0010] Limiting grooves are arranged on both sides of the top of the installation pipe, and the introduction pipe is inserted and fixed in the two limiting grooves.

[0011] Preferably, one end of the introduction tube is fixedly connected to a limiting block, and a side of the outer surface of the introduction tube away from the limiting block is threadedly connected to a fastening nut.

[0012] Preferably, the inlet pipe and the water distribution pipe are connected via a second flange.

[0013] Preferably, a water injection pipe is fixedly connected to the bottom end of the water distribution pipe, and the lower part of the water injection pipe passes through the top end of the water seal groove and extends into the water seal groove.

[0014] Preferably, a mounting block is provided at the connection between the water injection pipe and the water seal groove.

[0015] Preferably, the lower end of the water injection pipe is located below the overflow pipe.

[0016] During the ash unloading work of the silo body, the above-mentioned lime silo dust removal device introduces the escaped dust in the silo body into the water seal tank through the ash discharge pipe, and introduces water into the water injection pipe through the water distribution pipe, and then introduces it into the water seal tank through the water injection pipe. At the same time, the water distribution pipe will introduce water into the introduction pipe, and then spray it through the nozzle to further cool down and remove dust. By taking prepared water for spraying and injection, the use of production water is reduced. At the same time, the escaped dust enters the water through collection and finally enters the preparation system, which is conducive to timely recovery of dust and reduction of raw material waste.

[0017] The device is easy to install and also very convenient to repair. The installation pipe and the fixed pipe are connected by a flange, which makes it easy to disassemble the installation pipe and the fixed pipe, thereby reducing the maintenance cost of the device. BRIEF DESCRIPTION OF THE DRAWINGS

[0018] Figure 1 It is a three-dimensional structural diagram of a lime silo dust removal device in a specific embodiment of the utility model;

[0019] Figure 2 for Figure 1 A cross-sectional view of the middle installation pipe portion and a three-dimensional structural view of the dust removal assembly;

[0020] Figure 3 for Figure 1 The three-dimensional structure diagram of the central inlet pipe and the riser;

[0021] Figure 4 for Figure 1 Three-dimensional structural diagram of the water distribution pipe and water injection pipe.

[0022] In the figure: 1. Silo body; 2. Lime truck unloading pipe; 3. Ash discharge pipe; 4. Water seal groove; 5. Fixed pipe; 6. Mounting block; 7. First flange; 8. Water distribution pipe; 9. Overflow pipe; 10. Drain pipe; 11. Valve; 12. Lime preparation tank; 13. Second flange; 14. Mounting pipe; 15. Limiting groove; 16. Inlet pipe; 17. Distribution pipe; 18. Nozzle; 19. Vertical pipe; 20. Limiting block; 21. Fastening nut; 22. Water injection pipe. DETAILED DESCRIPTION

[0023] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0024] See also Figure 1 - Figure 4 , Figure 1 It is a three-dimensional structural diagram of a lime silo dust removal device in a specific embodiment of the utility model; Figure 2 for Figure 1 A cross-sectional view of the middle installation pipe portion and a three-dimensional structural view of the dust removal assembly; Figure 3 for Figure 1 The three-dimensional structure diagram of the central inlet pipe and the riser; Figure 4 for Figure 1 Three-dimensional structural diagram of the water distribution pipe and water injection pipe.

[0025] A lime silo dust removal device comprises a silo body 1, a water seal tank 4 and a lime preparation tank 12; an ash discharge pipe 3 is fixedly connected and interspersed between the silo body 1 and the water seal tank 4, and a lime truck ash unloading pipe 2 is fixedly connected to one side of the outer surface of the silo body 1, so that the lime dust generated by the silo body 1 when unloading ash will enter the water seal tank 4 through the ash discharge pipe 3.

[0026] A fixed pipe 5 is fixedly connected to the top of the water seal groove 4, and a first flange 7 is fixedly connected to the top of the fixed pipe 5. A mounting pipe 14 is installed on the fixed pipe 5 through the first flange 7. A dust removal component is arranged in the mounting pipe 14, which can change the state of the dusty lime and send it into the water seal groove 4.

[0027] An overflow pipe 9 and a drain pipe 10 are fixedly connected and inserted on one side of the water seal tank 4. The drain pipe 10 is located below the overflow pipe 9. A valve 11 is installed on the outer surface of one side of the drain pipe 10. The ends of the overflow pipe 9 and the drain pipe 10 away from the water seal tank 4 are movably connected and inserted in the lime preparation tank 12. The drain pipe 10 can timely guide the lime slag in the water seal tank 4 into the lime preparation tank 12 to prevent blockage caused by excessive slag accumulation, thereby ensuring the continuous operation of the water seal tank 4. The overflow pipe 9 can collect dust escaping from the water seal tank 4 into the water of the lime preparation tank 12.

[0028] The dust removal assembly may include an inlet pipe 16, the bottom end of the inlet pipe 16 is fixedly connected to a standpipe 19, four distribution pipes 17 are fixedly connected and interlaced at equal distances on the upper outer surface and the lower outer surface of the standpipe 19, and two nozzles 18 are fixedly connected to the outer surface of the bottom end of the distribution pipe 17. One end of the inlet pipe 16 is connected to a water distribution pipe 8. When in use, the water distribution pipe 8 will introduce water into the inlet pipe 16, and then introduce it into the distribution pipe 17 fixedly connected thereto through the inlet pipe 16, and then spray it through the nozzle 18 to cool and remove the lime dust.

[0029] Limiting grooves 15 can be provided on both sides of the top of the mounting tube 14, and the introduction tube 16 can be inserted and fixed in the two limiting grooves 15, so as to ensure that the position of the introduction tube 16 is fixed. Furthermore, one end of the introduction tube 16 can be fixedly connected to a limiting block 20, which is clamped with a limiting groove 15 through the limiting block 20; at the same time, a fastening nut 21 can be threadedly connected to the side of the outer surface of the introduction tube 16 away from the limiting block 20. When the two sides of the introduction tube 16 are respectively inserted in the two limiting grooves 15, the end of the limiting block 20 close to the introduction tube 16 is tightly attached to the outer wall of the mounting tube 14, and the fastening nut 21 is rotated at this time, and the fastening nut 21 moves on the outer surface of the introduction tube 16 and is tightly attached to the outer surface of the mounting tube 14, so that the introduction tube 16 is stably inserted in the two limiting grooves 15.

[0030] It should be noted that, when the inlet pipe 16 is installed, the riser 19 is inserted into the mounting pipe 14 and the fixed pipe 5, which facilitates the installation of the distribution pipe 17 and the nozzle 18, and is also very convenient and easy to dismantle during maintenance. At the same time, the mounting pipe 14 and the fixed pipe 5 are connected by the first flange 7, which makes it easy to disassemble the mounting pipe 14 and the fixed pipe 5, thereby reducing the maintenance cost of the device.

[0031] The end of the introduction pipe 16 away from the limit block 20 is installed with a second flange 13, and it can be connected to the water distribution pipe 8 through the second flange 13. The bottom end of the water distribution pipe 8 can also be fixedly connected with a water injection pipe 22, and the lower part of the water injection pipe 22 passes through the top of the water seal groove 4 and extends into the water seal groove 4. Water is introduced into the water injection pipe 22 fixedly connected to it through the water distribution pipe 8, and is introduced into the water seal groove 4 by the water injection pipe 22, so as to realize the water injection of the water seal groove 4. The water injection pipe 22 and the introduction pipe 16 cool down and remove the lime dust entering the water seal groove 4. The outer surface of the lower part of the water injection pipe 22 is fixedly inserted and connected with a mounting block 6, and the mounting block 6 is installed together with the top of the water seal groove 4.

[0032] As can be seen from the above, the water seal tank 4 is arranged on the ground, and a sewage pipe 10 and an overflow pipe 9 are arranged on its outer wall, the sewage pipe 10 and the overflow pipe 9 are introduced into the lime preparation tank 12, and an ash discharge pipe 3 is sealed and installed between the silo body 1 and the water seal tank 4; during the ash unloading work of the silo body 1, the escaped dust in the silo body 1 is introduced into the water seal tank 4 through the ash discharge pipe 3, and the water is introduced into the water injection pipe 22 fixedly connected thereto through the water distribution pipe 8, and then introduced into the water seal tank 4 through the water injection pipe 22, and at the same time, the water distribution pipe 8 will introduce the water into the introduction pipe 16, and then introduce it into the distribution pipe 17 fixedly connected thereto through the introduction pipe 16, and then spray it through the nozzle 18 to further cool down and remove dust; when the ash unloading is completed, the valve 11 is opened as soon as possible, so that the sewage pipe 10 timely introduces the accumulated slag in the water seal tank 4 into the lime preparation tank 12 to prevent blockage caused by excessive accumulation of slag and affect the continuous operation of the lime system.

[0033] When the above-mentioned lime silo dust removal device is in use, it can be sprayed and injected with prepared water, thereby reducing the use of production water. At the same time, the escaping dust can be collected through the overflow pipe 9 and enter the water in the lime preparation tank 12, and finally enter the preparation system, which is conducive to timely recovery of dust and reduces the waste of raw materials. Therefore, the overflow pipe 9 is located above the sewage pipe 10, and the lower end of the water injection pipe 22 can also be located below the overflow pipe 9, so as to form a water seal in the water seal tank 4.

[0034] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. A lime silo dust removal device, characterized in that: It comprises a silo body (1), a water seal groove (4) and a lime preparation groove (12); an ash discharge pipe (3) is fixedly connected between the silo body (1) and the water seal groove (4), and a lime truck ash discharge pipe (2) is fixedly connected to the outside of the silo body (1); A fixing pipe (5) is inserted and connected to the top of the water seal groove (4); a mounting pipe (14) is mounted on the top of the fixing pipe (5) via a first flange (7); a dust removal component is arranged inside the mounting pipe (14); An overflow pipe (9) and a sewage pipe (10) are fixedly connected and inserted on one side of the water seal groove (4); the sewage pipe (10) is located below the overflow pipe (9); a valve (11) is installed on the sewage pipe (10); and the ends of the overflow pipe (9) and the sewage pipe (10) away from the water seal groove (4) are movably connected and inserted in the lime preparation groove (12).

2. A lime silo dust removal device according to claim 1, characterized in that: The dust removal assembly comprises an inlet pipe (16), one end of which is connected to a water distribution pipe (8); the bottom end of the inlet pipe (16) is fixedly connected to a standpipe (19); four distribution pipes (17) are fixedly interlaced and connected at equal distances on the upper outer surface and the lower outer surface of the standpipe (19); the bottom ends of the distribution pipes (17) are fixedly connected to two nozzles (18); Limiting grooves (15) are provided on both sides of the top end of the installation tube (14), and the introduction tube (16) is inserted and fixed in the two limiting grooves (15).

3. A lime silo dust removal device according to claim 2, characterized in that: One end of the introduction tube (16) is fixedly connected to a limiting block (20), and a side of the outer surface of the introduction tube (16) away from the limiting block (20) is threadedly connected to a fastening nut (21).

4. A lime silo dust removal device according to claim 2, characterized in that: The inlet pipe (16) and the water distribution pipe (8) are connected via a second flange (13).

5. A lime silo dust removal device according to claim 2, characterized in that: The bottom end of the water distribution pipe (8) is also fixedly connected to a water injection pipe (22), and the lower part of the water injection pipe (22) passes through the top end of the water seal groove (4) and extends into the water seal groove (4).

6. A lime silo dust removal device according to claim 5, characterized in that: A mounting block (6) is provided at the connection between the water injection pipe (22) and the water seal groove (4).

7. A lime silo dust removal device according to claim 5, characterized in that: The lower end of the water injection pipe (22) is located below the overflow pipe (9).