Heavy truck forward extending beam split charging tool

By designing the heavy truck front extension beam split assembly tooling, the positioning components and release components are used to achieve precise positioning and release of the front extension beam, the problems of large workload and low production rhythm caused by the assembly of the front extension beam directly on the production line in the prior art are solved, and production efficiency and quality are improved.

CN222627705UActive Publication Date: 2025-03-18BAOJI HUSN ENG VEHICLE
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202421295306.X
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-06-06
Publication Date
2025-03-18
Estimated Expiration
2034-06-06

AI Technical Summary

Technical Problem

In the prior art, the front extension beam is mostly directly carried out on the production line, resulting in a large amount of assembly workload in the production line and the inability to increase the production rhythm.

Method used

A heavy truck front extension beam split-assembly tooling is designed, and the front extension beam, one cross beam assembly, and two cross beam welding assembly is performed in advance, and the positioning components and release components are used to achieve precise positioning and release of the front extension beam.

Benefits of technology

Through early assembly, the assembly workload on the production line is reduced, production efficiency and quality are improved, and the production rhythm is improved.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222627705U_ABST
    Figure CN222627705U_ABST
Patent Text Reader

Abstract

The utility model belongs to the field of workpiece assembly, particularly relates to a heavy truck forward extending beam split charging tool, and aims to solve the problems that the assembly workload of a production line is large and the production takt cannot be improved due to the fact that most existing forward extending beams are directly assembled on the production line, the following scheme is provided: the heavy truck forward extending beam split charging tool comprises a platform, a vertical plate is fixedly arranged on one side of the top of the platform; the two extending beam mounting arms are used for placing a front extending beam, and the two extending beam mounting arms are fixedly arranged at the two ends of one side of the vertical plate respectively; the positioning assembly is used for positioning the front extending beams, and after the left front extending beam and the right front extending beam are placed on the two extending beam mounting arms respectively, the front extending beams can be positioned through the positioning assembly, so that the front extending beams are fixed, and the next step of assembling of other parts such as a cross beam is facilitated; and then the positioning state of the forward extending beam can be relieved and the forward extending beam can be pushed out through the relieving assembly, so that the ending work of the process is completed.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of workpiece assembly, in particular to a heavy truck front extension beam subassembly tool. Background Art

[0002] With the rapid development of the heavy-duty truck industry, the requirements for the manufacturing and assembly precision of heavy-duty truck parts are becoming higher and higher. As an important part of heavy-duty trucks, the assembly of the front extension beam is particularly critical.

[0003] At present, most of the front extension beams on the market are directly assembled on the production line, which makes the assembly workload of the production line large and cannot improve the production rhythm. Therefore, designing an assembly tool that can pre-assemble the front extension beam, the first crossbeam assembly, and the second crossbeam welding assembly by simulating the frame is of great significance to improving the manufacturing efficiency and quality of heavy trucks. Utility Model Content

[0004] The utility model aims to solve the problem that the front extension beams in the prior art are mostly assembled directly on the production line, which results in a large assembly workload on the production line and inability to improve the production rhythm, and proposes a heavy truck front extension beam subassembly tooling.

[0005] In order to achieve the above purpose, the utility model adopts the following technical solutions:

[0006] A heavy truck front extension beam subassembly tooling comprises a platform, and a vertical plate is fixedly arranged on one side of the top of the platform;

[0007] Two extension beam mounting arms are used to place the front extension beam, and the two extension beam mounting arms are respectively fixedly arranged at two ends of one side of the vertical plate;

[0008] A positioning assembly, used for positioning the front extension beam, the positioning assembly is respectively arranged inside the two extension beam mounting arms, and the positioning assembly includes an upper positioning member and a side positioning member;

[0009] The releasing assembly is used for releasing the positioning of the front extension beam, and the releasing assembly is arranged between the two extension beam mounting arms.

[0010] In a possible design, a support frame is provided inside the extension beam mounting arm, and the upper positioning member includes two groups of sleeves, and the two groups of sleeves are respectively located inside the two support frames, each group of the sleeves is provided with a plurality of sleeves, and the sleeves are fixedly provided on the bottom inner wall of the support frame, an upper positioning pin is slidably provided inside the sleeve, and the top end of the upper positioning pin slides through to the top of the extension beam mounting arm, and a No. 2 compression spring is provided between the sleeve and the upper positioning pin.

[0011] In a possible design, the same cylinder bracket is fixedly arranged between the two extension beam mounting arms, and the side positioning member includes two No. 2 cylinders, and the two No. 2 cylinders are respectively fixedly arranged on both sides of the top of the cylinder bracket, and the output end of the No. 2 cylinder is fixedly sleeved with a limiting sleeve, and the end of the limiting sleeve away from the No. 2 cylinder is fixedly arranged with a push plate, and a side of the push plate away from the No. 2 cylinder is fixedly arranged with a plurality of side positioning pins, and one end of the side positioning pin slides through to the outside of the extension beam mounting arm.

[0012] In a possible design, two sliding rods are fixedly installed on the top inner wall of the extension beam mounting arm, and the support frame is slidably mounted on the outer walls of the two sliding rods. A No. 1 compression spring is arranged between the sliding rod and the support frame, and the No. 1 compression spring is mounted on the outer wall of the sliding rod. The same cross frame is fixedly installed between the two extension beam mounting arms.

[0013] In a possible design, the release assembly includes a No. 1 cylinder fixedly arranged on the top of the cross frame, and the same I-shaped plate is slidably arranged between the two extension beam mounting arms, the output end of the No. 1 cylinder is fixedly arranged on one side of the I-shaped plate, and inclined panels are fixedly arranged on the bottom of both sides of the I-shaped plate, and the two inclined panels are respectively located inside the two extension beam mounting arms, and a cross plate is fixedly arranged on the side of the support frame close to the inclined panel, and the inclined surface of the inclined panel cooperates with the cross plate.

[0014] In a possible design, a standard parts placement box is provided on the top of the vertical board.

[0015] In a possible design, an air gun rack is provided on one side of the vertical plate.

[0016] In the present application, during specific use, the two front extension beams are first placed on the top of the two extension beam mounting arms respectively. At this time, the corresponding upper locating pins will be inserted into the corresponding locating holes of the front extension beams for positioning. The front, rear, left and right sides of the front extension beams are positioned, and the redundant upper locating pins will be squeezed into the inside of the locking sleeve, so that they can adapt to the locating holes of different front extension beams. Then, the No. 2 cylinder is started, and the No. 2 cylinder drives the limit sleeve to move, and the limit sleeve drives the push plate to move, and the push plate drives the side locating pins to move, so that multiple side locating pins are inserted into the corresponding locating holes on the sides of the front extension beams. The top and bottom of the front extension beams are positioned, and then the two cross beams, the first cross beam and the remaining components can be installed for reference. Figure 4When the assembly is completed, the No. 2 cylinder is driven in reverse to release the up and down positioning of the front extension beam, and then the No. 1 cylinder can be driven to move the I-shaped plate through the No. 1 cylinder, and the I-shaped plate drives the inclined plate to move. The inclined plate squeezes the cross plate through the inclined surface, thereby driving the cross plate to move downward, and the cross plate drives the support frame to move downward. The support frame drives the upper positioning pin to disengage from the positioning hole of the front extension beam through the sleeve, and releases the front, rear, left and right positioning of the front extension beam. Then the I-shaped plate continues to move to push out the assembled front extension beam to complete the assembly process.

[0017] In the utility model, the heavy truck front extension beam subassembly tooling can achieve the purpose of placing two front extension beams on two extension beam mounting arms respectively through the positioning assembly, and then cooperate with the upper positioning pins to achieve preliminary positioning, and then drive the No. 2 cylinder to cooperate with the side positioning pins to perform further positioning, so as to fix the front extension beam, and then the cross beam and other parts can be conveniently assembled;

[0018] In the utility model, the heavy truck front extension beam subassembly tooling can achieve the following: after the front extension beam is assembled and the side positioning pin is released by the No. 2 cylinder, the No. 1 cylinder can be driven to drive the I-shaped plate to move, so that the upper positioning pin can be released and the front extension beam can be pushed out, thereby completing the finishing work of the process;

[0019] In the utility model, when in use, after the left and right front extension beams are placed on the two extension beam mounting arms respectively, the front extension beams can be positioned by the positioning assembly, so as to fix them, so as to facilitate the assembly of the remaining components such as the cross beam in the next step;

[0020] The process is then completed by releasing the assembly to release the forward beam from its position and push it out. BRIEF DESCRIPTION OF THE DRAWINGS

[0021] Figure 1 This is a schematic diagram of the main structure of a heavy truck front extension beam subassembly tooling proposed by the utility model;

[0022] Figure 2 This is a three-dimensional structural schematic diagram of a heavy truck front extension beam subassembly tooling positioning assembly proposed by the utility model;

[0023] Figure 3 It is a three-dimensional structural schematic diagram of a heavy truck front extension beam subassembly tooling release assembly proposed by the utility model;

[0024] Figure 4 The utility model provides a simplified three-dimensional structural diagram of the assembly of a heavy truck front extension beam subassembly tooling.

[0025] In the figure: 1. Platform; 2. Extension beam mounting arm; 3. Air gun stand; 4. Vertical plate; 5. Standard parts placement box; 6. Release assembly; 7. Cylinder bracket; 8. No. 2 cylinder; 9. Limit sleeve; 10. Side locating pin; 11. Push plate; 12. Sleeve; 13. Support frame; 14. Upper locating pin; 15. No. 1 cylinder; 16. I-shaped plate; 17. Inclined plate; 18. Horizontal plate; 19. Sliding rod; 20. No. 1 compression spring; 21. Horizontal frame; 22. First beam; 23. Second beam; 24. Front extension beam. DETAILED DESCRIPTION

[0026] The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all of the embodiments.

[0027] Example 1

[0028] Reference Figure 1 A heavy truck front extension beam subassembly tooling is used in the field of workpiece assembly, comprising: a platform 1, an extension beam mounting arm 2, a positioning component and a release component 6. A vertical plate 4 is fixedly arranged on one side of the top of the platform 1, and the vertical plate 4 is used to support and fix the extension beam mounting arm 2. Two extension beam mounting arms 2 are respectively fixedly arranged at both ends of one side of the vertical plate 4 for placing the front extension beam 24.

[0029] Reference Figure 2 The positioning assembly is used to position the front extension beam 24, and includes an upper positioning member and a side positioning member. The upper positioning member includes two groups of sleeves 12, each group of sleeves 12 is provided with a plurality of sleeves, and the sleeves 12 are fixedly arranged on the bottom inner wall of the support frame 13 inside the extension beam mounting arm 2, and an upper positioning pin 14 is slidably arranged inside the sleeve 12, and the top end of the upper positioning pin 14 slides through the top of the extension beam mounting arm 2, and a No. 2 compression spring is arranged between the sleeve 12 and the upper positioning pin 14, so that the upper positioning pin 14 remains in an extended state when not subjected to external force, thereby being positioned with the upper part of the front extension beam 24.

[0030] Specifically, after placing the two front extension beams 24 on the two extension beam mounting arms 2, the corresponding upper positioning pins 14 will be inserted into the positioning holes of the front extension beams 24, and the front and rear, left and right sides of the front extension beams 24 will be positioned. The excess upper positioning pins 14 will be squeezed into the interior of the locking sleeve 12, so that they can adapt to the positioning holes of different front extension beams 24.

[0031] The side positioning parts include two No. 2 cylinders 8, which are respectively fixed on both sides of the top of the cylinder bracket 7. The output end of the No. 2 cylinder 8 is fixedly sleeved with a limit sleeve 9, and the end of the limit sleeve 9 away from the No. 2 cylinder 8 is fixedly provided with a push plate 11, and the side of the push plate 11 away from the No. 2 cylinder 8 is fixedly provided with a plurality of side positioning pins 10, and one end of the side positioning pin 10 slides through the outside of the extension beam mounting arm 2. Through the extension and retraction of the No. 2 cylinder 8, the push plate 11 and the side positioning pin 10 are pushed to move, thereby positioning with the side of the front extension beam 24.

[0032] Specifically, the second cylinder 8 drives the limit sleeve 9 to move, the limit sleeve 9 drives the push plate 11 to move, and the push plate 11 drives the side positioning pins 10 to move, so that multiple side positioning pins 10 are inserted into the corresponding positioning holes on the side of the front extension beam 24, and the upper and lower parts of the front extension beam 24 are positioned, and then the second cross beam 23 and the first cross beam 22 and the remaining parts can be installed for reference. Figure 4 .

[0033] Example 2

[0034] refer to Figure 3 , improved on the basis of Example 1: the release component 6 is used to release the positioning of the front extension beam 24, which includes a No. 1 cylinder 15 fixedly set on the top of the cross frame 21, and the same I-shaped plate 16 is slidably set between the two extension beam mounting arms 2, and the output end of the No. 1 cylinder 15 is fixedly set on one side of the I-shaped plate 16, and the bottom of both sides of the I-shaped plate 16 are fixedly provided with inclined panels 17, and the two inclined panels 17 are respectively located inside the two extension beam mounting arms 2, and a cross plate 18 is fixedly set on one side of the support frame 13 close to the inclined panel 17, and the inclined surface of the inclined panel 17 matches the cross plate 18.

[0035] Specifically, when the assembly is completed and the side positioning pin 10 is released by the No. 2 cylinder 8, the No. 1 cylinder 15 drives the I-shaped plate 16 to move, and the I-shaped plate 16 drives the inclined plate 17 to move. The inclined plate 17 squeezes the cross plate 18 through the inclined surface, thereby driving the cross plate 18 to move downward, and the cross plate 18 drives the support frame 13 to move downward. The support frame 13 drives the upper positioning pin 14 to disengage from the positioning hole of the front extension beam 24 through the sleeve 12, and then continues to move the I-shaped plate 16 to push out the assembled front extension beam 24 to complete the assembly process.

[0036] In addition, a standard parts placement box 5 is provided on the top of the vertical plate 4 for placing the standard parts required for installing the front extension beam 24, which is convenient for operators to use. An air gun rack 3 is provided on one side of the vertical plate 4 for fixing the air gun, which is convenient for cleaning or deburring during the packaging process. Through this equipment, the front extension beam can be assembled separately, thereby reducing the pressure on the production line and improving the production rhythm.

[0037] However, as is well known to those skilled in the art, the working principles and wiring methods of cylinder No. 2 8 and cylinder No. 1 15 are commonplace, and are conventional means or common knowledge, and will not be elaborated here. Those skilled in the art may make any optional selections according to their needs or convenience.

[0038] The above description is only a preferred specific implementation manner of the present invention, but the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can make equivalent replacements or changes within the technical scope disclosed by the present invention according to the technical scheme and the utility model concept of the present invention, which should be covered by the protection scope of the present invention.

Claims

1. A heavy truck front extension beam assembly tool, characterized in that: include: A platform (1), wherein a vertical plate (4) is fixedly arranged on one side of the top of the platform (1); Two extension beam mounting arms (2) are used to place the front extension beam (24), and the two extension beam mounting arms (2) are respectively fixedly arranged at two ends of one side of the vertical plate (4); A positioning assembly, used for positioning the front extension beam (24), the positioning assembly being respectively arranged inside the two extension beam mounting arms (2), the positioning assembly comprising an upper positioning member and a side positioning member; A release assembly (6) is used to release the positioning of the front extension beam (24), and the release assembly (6) is arranged between two extension beam mounting arms (2).

2. The heavy truck front extension beam assembly tool according to claim 1, characterized in that: A support frame (13) is arranged inside the extension beam mounting arm (2), and the upper positioning member includes two groups of sleeves (12), and the two groups of sleeves (12) are respectively located inside the two support frames (13), and each group of the sleeves (12) is provided with a plurality of sleeves, and the sleeves (12) are fixedly arranged on the bottom inner wall of the support frame (13), and an upper positioning pin (14) is slidably arranged inside the sleeve (12), and the top end of the upper positioning pin (14) slides through to the top of the extension beam mounting arm (2), and a No. 2 compression spring is arranged between the sleeve (12) and the upper positioning pin (14).

3. The heavy truck front extension beam assembly tool according to claim 2, characterized in that: A same cylinder bracket (7) is fixedly arranged between the two extension beam mounting arms (2), and the side positioning member comprises two No. 2 cylinders (8), and the two No. 2 cylinders (8) are respectively fixedly arranged on both sides of the top of the cylinder bracket (7), and a limiting sleeve (9) is fixedly arranged on the output end of the No. 2 cylinder (8), and a push plate (11) is fixedly arranged on the end of the limiting sleeve (9) away from the No. 2 cylinder (8), and a plurality of side positioning pins (10) are fixedly arranged on the side of the push plate (11) away from the No. 2 cylinder (8), and one end of the side positioning pin (10) slides through to the outside of the extension beam mounting arm (2).

4. The heavy truck front extension beam assembly tool according to claim 3, characterized in that: Two sliding bars (19) are fixedly arranged on the top inner wall of the extension beam mounting arm (2); the support frame (13) is slidably mounted on the outer walls of the two sliding bars (19); a No. 1 compression spring (20) is arranged between the sliding bar (19) and the support frame (13); and the No. 1 compression spring (20) is mounted on the outer wall of the sliding bar (19); and a same cross frame (21) is fixedly arranged between the two extension beam mounting arms (2).

5. The heavy truck front extension beam assembly tool according to claim 4, characterized in that: The release assembly (6) comprises a No. 1 cylinder (15) fixedly arranged on the top of the cross frame (21); a same I-shaped plate (16) is slidably arranged between the two extension beam mounting arms (2); an output end of the No. 1 cylinder (15) is fixedly arranged on one side of the I-shaped plate (16); inclined panels (17) are fixedly arranged on the bottom of both sides of the I-shaped plate (16); the two inclined panels (17) are respectively located inside the two extension beam mounting arms (2); a cross plate (18) is fixedly arranged on one side of the support frame (13) close to the inclined panels (17); and the inclined surface of the inclined panel (17) matches the cross plate (18).

6. The heavy truck front extension beam assembly tool according to claim 1, characterized in that: A standard component placement box (5) is provided on the top of the vertical plate (4).

7. The heavy truck front extension beam assembly tool according to claim 1, characterized in that: An air gun rack (3) is arranged on one side of the vertical plate (4).