By designing a green building construction protective fence with threaded adjustment rods and guardrails, the problem of the fixed height of the existing protective fence cannot be adjusted is solved, and flexible adjustment of the protective height and the satisfaction of multiple protection needs are achieved, while improving the stability of the connection and providing warning functions.
Patent Information
- Application Number
- CN202420827669.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-22
- Publication Date
- 2025-03-18
- Estimated Expiration
- 2034-04-22
AI Technical Summary
The protective fence used for existing green building construction is fixed in height, which cannot be adjusted quickly, and cannot meet various protection needs.
A protective fence including an adjustment frame, a threaded adjustment rod, a guardrail and a support frame is designed. The threaded adjustment rod is driven to rotate through the rotating handle, and the connecting bar is threaded to connect the threaded adjustment rod to realize the height adjustment of the guardrail.
The protective height extension of the protective fence is achieved to meet a variety of protection needs, while improving the connection stability and assembly convenience between the protective fences, and providing safety warnings in night or in dim light environments.
Smart Images

Figure CN222632980U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of building construction, in particular to a green building construction protective fence. Background Art
[0002] During the construction of green buildings, in order to ensure the safety of on-site workers and to serve as an isolation and warning, it is usually necessary to use protective fences to separate areas.
[0003] The existing protective fences used in green building construction have a fixed height and cannot be quickly adjusted, which is not conducive to meeting various protection needs.
[0004] Therefore, it is particularly important to design a green building construction protection fence to solve the above-mentioned defects. Utility Model Content
[0005] 1) Technical problems to be solved by the utility model
[0006] In view of the deficiencies in the prior art, the utility model designs a green building construction protective fence, which aims to solve the technical problem that the height of the protective fence under the prior art is limited and the height cannot be adjusted, which is not conducive to meeting various protection needs.
[0007] 2) Technical solution
[0008] In order to achieve the above purpose, the utility model provides the following technical solutions:
[0009] A green building construction protective fence comprises an adjusting frame, wherein a threaded adjusting rod is rotatably connected inside the adjusting frame, a group of outer baffles are fixedly connected on both sides of the adjusting frame, a storage groove is provided inside the outer baffle, and a guardrail is slidably connected inside the storage groove, and a support frame is fixedly connected to the side of the two groups of outer baffles away from the adjusting frame, a movable groove is provided on the side of the support frame corresponding to the outer baffle, a limited position sliding groove is provided on the inner side of the movable groove, a sliding rod is fixedly connected inside the movable groove, and a mounting seat is fixedly connected to the bottom of the support frame, a pair of plug-in rods are fixedly connected to the side of the left support frame away from the outer baffle, and a pair of plug-in seats are fixedly connected to the side of the right support frame away from the outer baffle and at the position corresponding to the plug-in rod.
[0010] As a preferred solution of the utility model, one end of the threaded adjustment rod is fixedly connected to a rotating handle located at the bottom of the adjustment frame, and the outer side of the rotating handle is provided with anti-slip grooves.
[0011] As a preferred solution of the utility model, a pair of warning reflective strips are provided on the outer side of the outer baffle, and a protective net is provided inside the outer baffle.
[0012] As a preferred solution of the utility model, the guardrails are provided with two groups, and the bottoms of the two groups of guardrails are fixedly connected with connecting strips.
[0013] As a preferred solution of the utility model, a threaded adjustment hole is opened at a position of the connecting strip corresponding to the threaded adjustment rod, and the connecting strip is threadedly connected to the threaded adjustment rod through the threaded adjustment hole.
[0014] As a preferred solution of the utility model, directional pulleys are rotatably connected on both sides of the connecting strip and at positions corresponding to the limiting slide grooves, the connecting strip is slidably connected to the limiting slide grooves through the directional pulleys, a through hole is opened at the position of the connecting strip corresponding to the slide rod, and the connecting strip is slidably connected to the slide rod through the through hole.
[0015] As a preferred solution of the utility model, a reinforcing rib is fixedly connected at the connection between the support frame and the mounting seat.
[0016] As a preferred solution of the utility model, a plug-in slot is provided on the top of the plug-in socket, and the support frames are plug-connected to the plug-in slot via a plug-in rod.
[0017] 3) Beneficial effects
[0018] Compared with the prior art, the beneficial effects of the utility model are:
[0019] (1) The utility model drives the threaded adjustment rod to rotate by rotating the handle, so that the connecting strip is threadedly connected to the threaded adjustment rod through the threaded adjustment hole, driving the two sets of guardrails to adjust their heights, thereby extending the protective height of the protective fence to meet various protection requirements;
[0020] (2) The support frames of the utility model are connected by plugging rods and plugging slots, which improves the connection stability and assembly convenience between the protective fences;
[0021] (3) The utility model provides a safety warning to pedestrians and vehicles at night or in dimly lit environments by means of the warning reflective strips. BRIEF DESCRIPTION OF THE DRAWINGS
[0022] Figure 1 Schematic diagram of the overall structure of the protective fence for green building construction Figure 1 ;
[0023] Figure 2 Schematic diagram of the overall structure of the protective fence for green building construction Figure 2 ;
[0024] Figure 3 This is a schematic diagram of the internal structure of the protective fence for green building construction;
[0025] Figure 4 Schematic diagram of the guardrail and connecting strip structure.
[0026] In the figure: 1. adjustment frame; 101. threaded adjustment rod; 1011. rotating handle; 2. outer baffle; 201. storage slot; 202. warning reflective strip; 203. protection net; 3. guardrail; 301. connecting strip; 3011. threaded adjustment hole; 3012. directional pulley; 3013. through hole; 4. support frame; 401. movable slot; 402. limit slide slot; 403. slide rod; 404. mounting seat; 4041. reinforcing rib; 405. plug-in rod; 406. plug-in seat; 4061. plug-in slot. DETAILED DESCRIPTION
[0027] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of them. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0028] Example:
[0029] The utility model provides a green building construction protection fence, which aims to solve the technical problem that the height of the protection fence in the prior art is limited and cannot be adjusted, which is not conducive to meeting various protection requirements;
[0030] See also Figure 1-Figure 4 , the utility model provides a technical solution:
[0031] A green building construction protective fence includes an adjustment frame 1, wherein a threaded adjustment rod 101 is rotatably connected inside the adjustment frame 1, and a rotating handle 1011 is fixedly connected to one end of the threaded adjustment rod 101 and located at the bottom of the adjustment frame 1. The rotating handle 1011 drives the threaded adjustment rod 101 to rotate, so that a connecting strip 301 is threadedly connected to the connecting strip through a threaded adjustment hole 3011 to drive a guardrail 3 to adjust its height. Anti-skid patterns are provided on the outer side of the rotating handle 1011, and the anti-skid patterns enhance the anti-skid property of the rotating handle 1011.
[0032] Among them, see Figure 1 , Figure 2 and Figure 3 A group of outer baffles 2 are fixedly connected to both sides of the adjustment frame 1. A storage groove 201 is opened inside the outer baffle 2. A pair of warning reflective strips 202 are arranged on the outside of the outer baffle 2. The warning reflective strips 202 provide safety warnings to pedestrians and vehicles at night or in dim light. A protective net 203 is arranged inside the outer baffle 2 to enhance the protectiveness of the outer baffle 2.
[0033] For further information, see Figure 2 , Figure 3 and Figure 4 The storage slot 201 is internally slidably connected with a guardrail 3. When the guardrail 3 is stored in the storage slot 201, the structural strength of the outer baffle 2 is enhanced. When the guardrail 3 is pulled out of the storage slot 201, the protective height of the protective fence can be extended. The guardrail 3 is provided with two groups. The bottom of the two groups of guardrails 3 is fixedly connected with a connecting strip 301. The connecting strip 301 is provided with a threaded adjustment hole 3011 at a position corresponding to the threaded adjustment rod 101. The connecting strip 301 is threadedly connected to the threaded adjustment rod 101 through the threaded adjustment hole 3011, driving the two groups The guardrail 3 can be adjusted in height to extend the protective height of the guardrail. The two sides of the connecting bar 301 and the positions corresponding to the limiting slide grooves 402 are rotatably connected with directional pulleys 3012. The connecting bar 301 is slidably connected to the limiting slide grooves 402 through the directional pulleys 3012, thereby improving the smoothness of the height adjustment of the guardrail 3. A through hole 3013 is provided at the position corresponding to the sliding rod 403. The connecting bar 301 is slidably connected to the sliding rod 403 through the through hole 3013, thereby improving the stability of the height adjustment of the guardrail 3.
[0034] For further information, see Figure 1 , Figure 2 and Figure 3 The two sets of outer baffles 2 are fixedly connected to the support frame 4 on one side away from the adjustment frame 1. The support frame 4 is provided with a movable groove 401 on the side corresponding to the outer baffle 2. The connecting strip 301 is moved and adjusted inside the movable groove 401. A limited sliding groove 402 is provided on the inner side of the movable groove 401. A sliding rod 403 is fixedly connected to the inside of the movable groove 401.
[0035] For further information, see Figure 1 , Figure 2 and Figure 3 The bottom of the support frame 4 is fixedly connected with a mounting seat 404, and a reinforcing rib 4041 is fixedly connected at the connection between the support frame 4 and the mounting seat 404. The reinforcing rib 4041 enhances the connection strength between the support frame 4 and the mounting seat 404. A pair of plug-in rods 405 are fixedly connected to the side of the left support frame 4 away from the outer baffle 2, and a pair of plug-in seats 406 are fixedly connected to the side of the right support frame 4 away from the outer baffle 2 and at positions corresponding to the plug-in rods 405. A plug-in groove 4061 is provided on the top of the plug-in groove 406. The support frames 4 are plug-connected by the plug-in rod 405 and the plug-in groove 4061, which improves the connection stability and assembly convenience between the protective fences.
[0036] In addition, it should be added based on the above embodiments that the warning reflective strip 202 is a prior art, and its internal working principle and operation process will not be described in detail here.
[0037] The working process of the utility model is as follows: first, the support frames 4 are connected by plugging the plug rods 405 and the plug slots 4061, so that the protective fences are assembled and spliced. The support frames 4 are fixed to the ground through the mounting seat 404. When the protective fence 3 is stored in the storage slot 201, the structural strength of the outer baffle 2 is enhanced, and the protective net 203 enhances the protectiveness of the outer baffle 2. When the protective height of the protective fence needs to be adjusted, the rotating handle 1011 drives the threaded adjustment rod 101 to rotate, so that the connecting strip 301 passes through The threaded adjustment hole 3011 is threadedly connected with the threaded adjustment rod 101, driving the two groups of guardrails 3 to adjust their heights, extending the protective height of the guardrails, the connecting strip 301 is slidably connected with the slide bar 403 through the through hole 3013, improving the stability of the height adjustment of the guardrail 3, the connecting strip 301 is slidably connected with the limit slide groove 402 through the directional pulley 3012, improving the smoothness of the height adjustment of the guardrail 3, and the warning reflective strip 202 provides a safety warning to pedestrians and vehicles at night or in dim light. The entire operation process is simple and convenient. Compared with the existing guardrails, the utility model can freely adjust the protective height of the guardrails through design, and improve the connection stability and assembly convenience between the guardrails, while providing a warning function.
[0038] Although embodiments of the present invention have been shown and described, it will be understood by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. A green building construction protection fence, comprising an adjustment frame (1), characterized in that: The adjusting frame (1) is rotatably connected to a threaded adjusting rod (101) inside, and a group of outer baffles (2) are fixedly connected to both sides of the adjusting frame (1), and a storage groove (201) is provided inside the outer baffles (2), and a guardrail (3) is slidably connected inside the storage groove (201), and the two groups of outer baffles (2) are fixedly connected to a support frame (4) on the side away from the adjusting frame (1), and a movable groove (401) is provided on the side of the support frame (4) corresponding to the outer baffle (2). A limited sliding groove (402) is provided on the inner side of the movable groove (401), a sliding rod (403) is fixedly connected to the inside of the movable groove (401), a mounting seat (404) is fixedly connected to the bottom of the support frame (4), a pair of plug-in rods (405) are fixedly connected to the side of the left support frame (4) away from the outer baffle (2), and a pair of plug-in seats (406) are fixedly connected to the side of the right support frame (4) away from the outer baffle (2) and at positions corresponding to the plug-in rods (405).
2. A green building construction protection fence according to claim 1, characterized in that: One end of the threaded adjustment rod (101) is fixedly connected to a rotating handle (1011) located at the bottom of the adjustment frame (1), and an anti-slip pattern is provided on the outer side of the rotating handle (1011).
3. A green building construction protection fence according to claim 1, characterized in that: A pair of warning reflective strips (202) are provided on the outside of the outer baffle plate (2), and a protective net (203) is provided inside the outer baffle plate (2).
4. A green building construction protection fence according to claim 1, characterized in that: The guardrails (3) are provided in two groups, and the bottoms of the two groups of guardrails (3) are fixedly connected with connecting strips (301).
5. A green building construction protection fence according to claim 4, characterized in that: A threaded adjustment hole (3011) is provided at a position of the connection strip (301) corresponding to the threaded adjustment rod (101), and the connection strip (301) is threadedly connected to the threaded adjustment rod (101) via the threaded adjustment hole (3011).
6. A green building construction protection fence according to claim 4, characterized in that: Directional pulleys (3012) are rotatably connected to the two sides of the connecting strip (301) and at positions corresponding to the limiting sliding grooves (402); the connecting strip (301) is slidably connected to the limiting sliding grooves (402) via the directed pulleys (3012); a through hole (3013) is provided at a position of the connecting strip (301) corresponding to the sliding rod (403); the connecting strip (301) is slidably connected to the sliding rod (403) via the through hole (3013).
7. The green building construction protection fence according to claim 1, characterized in that: A reinforcing rib (4041) is fixedly connected at the connection between the support frame (4) and the mounting seat (404).
8. The green building construction protection fence according to claim 1, characterized in that: The top of the plug socket (406) is provided with a plug slot (4061), and the support frame (4) is plugged and connected to the plug slot (4061) via a plug rod (405).