Furnace roller on-line replacing mechanism of quenching furnace
By designing an online replacement mechanism for the quenching furnace rollers and using equipment such as an overhead crane and an electric hoist, the rapid horizontal movement and removal of the furnace bottom rollers can be achieved, solving the problem of time-consuming furnace bottom roller replacement in the existing technology and improving the working efficiency and safety of the quenching furnace.
Patent Information
- Application Number
- CN202422718793.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-11-07
- Publication Date
- 2025-10-10
- Estimated Expiration
- 2034-11-07
AI Technical Summary
In the prior art, the replacement of the furnace bottom rollers of the quenching furnace requires the operator to enter the furnace after the furnace is cooled, which is time-consuming and affects the replacement efficiency.
An online replacement mechanism for the furnace rollers of a quenching furnace was designed. Utilizing equipment such as an overhead crane and an electric hoist, the horizontal movement and removal of the furnace bottom rollers can be achieved through a combination of pull ropes and extension rods. The limit device and pulley system are combined to ensure the stability and safety of the moving trajectory.
The rapid replacement of the furnace bottom rollers is achieved, which reduces the replacement time and improves the working efficiency and safety of the quenching furnace.
Smart Images

Figure CN223422727U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of workpiece processing, and more specifically, to an online replacement mechanism for a furnace roller of a quenching furnace. Background Art
[0002] A quenching furnace is used to heat workpieces before quenching. Its operating principles are primarily based on heat conduction and electromagnetic induction heating. Once a workpiece is placed in the furnace, heat generated by the heating elements is transferred through the furnace body to the workpiece, heating it to a predetermined temperature. After a period of uniform heating, the workpiece is quickly removed and placed in a quenching bath for quenching. During the quenching process, the workpiece surface cools rapidly, forming a high-hardness hardened layer, thereby improving the workpiece's wear resistance and fatigue resistance.
[0003] In the prior art, when the hearth rollers of a quenching furnace need to be replaced, the temperature in the quenching furnace needs to be lowered to a specified temperature, and then an operator needs to enter the quenching furnace to replace the hearth rollers. This process is too time-consuming and is not conducive to replacing the hearth rollers in the quenching furnace. Utility Model Content
[0004] In order to overcome the above-mentioned defects of the prior art, the utility model proposes an online replacement mechanism for a quenching furnace roller.
[0005] In order to achieve the above-mentioned purpose, the utility model provides the following technical solutions: an online replacement mechanism for furnace rollers of a quenching furnace, comprising a quenching furnace body, a connecting seat fixedly connected to one side of the quenching furnace body, a support platform fixedly connected to the center of the connecting seat, a normalizing furnace fixedly connected to the other end of the connecting seat, a furnace bottom roller arranged inside the quenching furnace body, extension rods fixedly connected to both ends of the furnace bottom roller, a group of the extension rods having one end fixedly connected to a processing flange, an arc buckle fixedly connected to the top end of the arc buckle, a first pull rope fixedly connected to the top end of the first pull rope, and a plurality of the plurality of the plurality of the plurality of the plurality of the plurality of the plurality of the plurality of the plurality of the plurality of the plurality of the plurality of the plurality of the plurality of the plurality of the plurality of The top end of the pull rope is fixedly connected to the first electric hoist, the top end of the first electric hoist is fixedly connected to the fixed frame, the top end of the fixed frame is rotatably connected to the pulley, a steel beam is provided on one side of the quenching furnace body, the pulley is slidably connected to both sides of the steel beam, a third pull rope is provided on the side of the quenching furnace body away from the steel beam, the bottom of the third pull rope is fixedly connected to a hook, the bottom of the hook is fixedly connected to the second electric hoist, the bottom of the second electric hoist is fixedly connected to the second pull rope, and the bottom of the second pull rope is fixed to the arc buckle of another set of extension rods.
[0006] Furthermore, a top plate is fixedly connected to the top of the quenching furnace body, a slide groove is provided on the inner wall of the top, a slider is fixedly connected to the top of the steel beam, and the slider is slidably connected to the inner wall of the slide groove.
[0007] Further, the top end of the steel beam is fixedly connected with a limiting rod, the limiting rod is L-shaped, a limiting groove is formed in one side of the limiting rod, and the third pull rope is arranged on the inner wall of the limiting groove.
[0008] Further, the top end of the supporting table is provided with a bottom block, the top end of the bottom block is fixedly connected with a placing table, and one side of the supporting table is fixedly connected with an inclined slope.
[0009] Further, the top end of the placing table is provided with a mounting groove, and a plurality of groups of rolling shafts are rotationally connected to the inner wall of the mounting groove.
[0010] Further, the bottom of the bottom block is rotationally connected with a roller, the top end of the supporting table and the inclined slope is provided with a guide groove, and the roller is arranged in the guide groove.
[0011] The technical effects and advantages of the on-line replacement mechanism of the quenching furnace roller are as follows:
[0012] The third pull rope, the second electric hoist, the second pull rope, the two groups of extension rods and the furnace bottom roller are moved by the movement of the crown block, the first pull rope, the first electric hoist, the fixing frame and the pulley on the other side are moved when the furnace bottom roller moves, the fixing frame and the pulley slide on the steel beam, the movement track of the bottom furnace bottom roller is limited, the extension rod on one side of the first pull rope is extended by the flange when the furnace bottom roller is pulled to a certain distance on one side, a new group of extension rods is installed through the flange, and the first pull rope is installed on the arc-shaped buckle of the new group of extension rods, a plurality of groups of extension rods are arranged, the furnace bottom roller can be kept horizontally moved through the plurality of groups of extension rods when the furnace bottom roller is moved out of the quenching furnace body, the furnace bottom roller is moved out of the quenching furnace body, and the problem that the furnace bottom roller is inconvenient to replace is solved. BRIEF DESCRIPTION OF DRAWINGS
[0013] Figure 1 It is a whole structure schematic view of the utility model.
[0014] Figure 2 It is a whole cross section structure schematic view of the utility model.
[0015] Figure 3 It is a limiting rod structure schematic view of the utility model.
[0016] Figure 4 It is a furnace bottom roller structure schematic view of the utility model.
[0017] Figure 5 It is a placing table structure schematic view of the utility model.
[0018] In the drawing:
[0019] 1. Quenching furnace body; 2. Connecting seat; 3. Support platform; 4. Normalizing furnace; 5. Furnace bottom roller; 6. Extension rod; 7. Processing flange; 8. Arc buckle; 9. First pull rope; 10. First electric hoist; 11. Fixed frame; 12. Pulley; 13. Steel beam; 14. Second pull rope; 15. Hook; 16. Second electric hoist; 17. Third pull rope; 18. Top plate; 19. Slider; 20. Limit rod; 21. Placement table; 22. Bottom block; 23. Ramp; 24. Roller; 25. Roller. DETAILED DESCRIPTION
[0020] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the embodiments described are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without making creative efforts are within the scope of protection of the present invention.
[0021] Example 1
[0022] Reference Figure 1-5 , a quenching furnace roller online replacement mechanism, including a quenching furnace body 1, one side of the quenching furnace body 1 is fixedly connected to a connecting seat 2, the center of the connecting seat 2 is fixedly connected to a support platform 3, the other end of the connecting seat 2 is fixedly connected to a normalizing furnace 4, the interior of the quenching furnace body 1 is provided with a furnace bottom roller 5, both ends of the furnace bottom roller 5 are fixedly connected to an extension rod 6, one end of a group of the extension rods 6 is fixedly connected to a processing flange 7, the top of the extension rod 6 is fixedly connected to an arc buckle 8, the top of the arc buckle 8 is fixedly connected to a first pull rope 9, the top of the first pull rope 9 is fixedly connected to a first electric hoist 10, the first The top of the electric hoist 10 is fixed with a fixed frame 11, and the top of the fixed frame 11 is rotatably connected to a pulley 12. A steel beam 13 is provided on one side of the quenching furnace body 1, and the pulley 12 is slidably connected to both sides of the steel beam 13. A third pull rope 17 is provided on the side of the quenching furnace body 1 away from the steel beam 13, and the bottom of the third pull rope 17 is fixed with a hook 15, and the bottom of the hook 15 is fixed with a second electric hoist 16, and the bottom of the second electric hoist 16 is fixed with a second pull rope 14, and the bottom of the second pull rope 14 is fixed to the arc buckle 8 of another set of extension rods 6.
[0023] In order to solve the problem of inconvenience in replacing the furnace bottom roller 5, when the furnace bottom roller 5 needs to be replaced, two sets of extension rods 6 can be installed on both sides of the furnace bottom roller 5, and then the first pull rope 9 and the second pull rope 14 can be hung on the arc buckle 8 of the two sets of extension rods 6, and the third pull rope 17 is lifted by the overhead crane. The third pull rope 17, the second electric hoist 16, the second pull rope 14, the two sets of extension rods 6 and the furnace bottom roller 5 can be pulled to one side by the movement of the overhead crane. When the furnace bottom roller 5 moves, the first pull rope 9, the first electric hoist 10, the fixed frame 11 and the pulley 12 on the other side can be moved together, and the fixed frame 11 and the pulley 12 are on the steel beam. When sliding on 13, the moving trajectory of the bottom furnace bottom roller 5 can be limited. When the furnace bottom roller 5 is pulled to one side for a certain distance, the extension rod 6 on one side of the first pull rope 9 can be extended by processing the flange 7, so that a new set of extension rods 6 can be installed through the processing flange 7, and the first pull rope 9 is installed on the arc buckle 8 of the new set of extension rods 6. By setting multiple sets of extension rods 6, when the furnace bottom roller 5 is moved out of the quenching furnace body 1, it is convenient to use multiple sets of extension rods 6 to keep the furnace bottom roller 5 moving horizontally until the furnace bottom roller 5 is moved out of the quenching furnace body 1. The multiple sets of extension rods 6 can be disassembled by disassembling the processing flange 7.
[0024] Reference Figure 2 The top of the quenching furnace body 1 is fixed with a top plate 18, the inner wall of the top is provided with a slide groove, the top of the steel beam 13 is fixed with a slider 19, and the slider 19 is slidably connected to the inner wall of the slide groove.
[0025] By setting a top plate 18 on the quenching furnace body 1, when other furnace bottom rollers 5 need to be disassembled, the position of the steel beam 13 can be adjusted to move the steel beam 13 to the furnace bottom roller 5 that needs to be replaced. When the steel beam 13 moves, the slider 19 at the top can be driven to slide in the slide groove, so that when the steel beam 13 moves, it is beneficial to limit the moving trajectory of the steel beam 13 through the slider 19 and the slide groove.
[0026] Reference Figure 3 The top end of the steel beam 13 is fixedly connected to a limiting rod 20, the limiting rod 20 is L-shaped, a limiting groove is provided on one side of the limiting rod 20, and the third pull rope 17 is arranged on the inner wall of the limiting groove.
[0027] By setting a limit rod 20 at the top of the steel beam 13, the limit rod 20 can be driven to one side when the steel beam 13 moves. Since the third pull rope 17 is set in the limit groove on the limit rod 20, it is convenient for the operator to adjust the position of the third pull rope 17 according to the position of the limit rod 20, so that the third pull rope 17 and the steel beam 13 remain in a straight line.
[0028] Reference Figure 5A bottom block 22 is provided at the top of the support platform 3 , a placement platform 21 is fixedly connected to the top of the bottom block 22 , and a slope 23 is fixedly connected to one side of the support platform 3 .
[0029] By setting a bottom block 22 and a placing platform 21 at the top of the support platform 3, when the hearth roller 5 is taken out to one side, the placed platform 21 can lift the taken out hearth roller 5, and then the slope 23 set on one side of the support platform 3 can be used to move the bottom block 22 and the placing platform 21 obliquely downward, which is conducive to taking out the hearth roller 5.
[0030] Reference Figure 5 A mounting groove is provided at the top of the placement platform 21, and a plurality of rollers 24 are rotatably connected to the inner wall of the mounting groove.
[0031] By arranging multiple groups of rollers 24 on the top of the placement table 21, the gaps between the multiple groups of rollers 24 can help fix the position of the circular hearth roller 5. When the hearth roller 5 is moved out of the placement table 21, the multiple groups of cylindrical rollers 24 can be used to slide the hearth roller 5 to one side.
[0032] Reference Figure 5 The bottom of the bottom block 22 is rotatably connected to a roller 25, and the top of the support platform 3 and the slope 23 are provided with a guide groove, and the roller 25 is set in the guide groove.
[0033] By arranging the roller 25 at the bottom of the bottom block 22, when the bottom block 22 and the placement table 21 need to be moved, the roller 25 can slide in the guide groove to improve the smoothness of the movement of the bottom block 22 and the placement table 21.
[0034] Working principle: In order to solve the problem of inconvenience in replacing the furnace bottom roller 5, when the furnace bottom roller 5 needs to be replaced, two sets of extension rods 6 can be installed on both sides of the furnace bottom roller 5, and then the first pull rope 9 and the second pull rope 14 can be hung on the arc buckle 8 of the two sets of extension rods 6, and the third pull rope 17 is lifted by the overhead crane. The third pull rope 17, the second electric hoist 16, the second pull rope 14, the two sets of extension rods 6 and the furnace bottom roller 5 can be pulled to one side by the movement of the overhead crane. When the furnace bottom roller 5 moves, the first pull rope 9, the first electric hoist 10, the fixed frame 11 and the pulley 12 on the other side can be moved together, and the fixed frame 11 and the pulley 12 are on the steel beam. When sliding on 13, the moving track of the bottom furnace bottom roller 5 can be limited. When the furnace bottom roller 5 is pulled to one side for a certain distance, the extension rod 6 on one side of the first pull rope 9 can be extended by processing the flange 7, so that a new set of extension rods 6 can be installed through the processing flange 7, and the first pull rope 9 can be installed on the arc buckle 8 of the new set of extension rods 6. By setting multiple sets of extension rods 6, when the furnace bottom roller 5 is moved out of the quenching furnace body 1, it is convenient to keep the furnace bottom roller 5 moving horizontally through the multiple sets of extension rods 6. When the furnace bottom roller 5 is taken out to one side, the taken out furnace bottom roller 5 can be lifted up by the placement table 21, and the furnace bottom roller 5 can be lifted up by the placement table 21. Multiple sets of rollers 24 are provided at the end, and the gaps between the multiple sets of rollers 24 can help fix the position of the circular hearth roller 5 until the hearth roller 5 is removed from the quenching furnace body 1. The multiple sets of extension rods 6 can be disassembled by disassembling the processing flange 7, and the bottom block 22 and the placement table 21 are moved obliquely downward by the slope 23 provided on one side of the support platform 3, which is conducive to taking out the hearth roller 5. When the hearth roller 5 is removed from the placement table 21, it is convenient to slide the hearth roller 5 to one side through the multiple sets of cylindrical rollers 24. By providing a top plate 18 on the quenching furnace body 1, it can be adjusted when other hearth rollers 5 need to be disassembled. The position of the steel beam 13 allows the steel beam 13 to move to the furnace bottom roller 5 that needs to be replaced. When the steel beam 13 moves, it can drive the slider 19 at the top to slide in the slide groove, so that when the steel beam 13 moves, it is beneficial to limit the moving trajectory of the steel beam 13 through the slider 19 and the slide groove. By setting a limit rod 20 at the top of the steel beam 13, the limit rod 20 can be driven to one side when the steel beam 13 moves. Since the third pull rope 17 is set in the limit groove on the limit rod 20, it is beneficial for the operator to adjust the position of the third pull rope 17 according to the position of the limit rod 20, so that the third pull rope 17 and the steel beam 13 remain in a straight line.
[0035] Finally: The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent replacements, improvements, etc. made within the spirit and principles of the present invention should be included in the scope of protection of the present invention.
Claims
1. An online replacement mechanism for quenching furnace rollers, characterized in that: The invention comprises a quenching furnace body (1), wherein one side of the quenching furnace body (1) is fixedly connected to a connecting seat (2), a support platform (3) is fixedly connected to the center of the connecting seat (2), a normalizing furnace (4) is fixedly connected to the other end of the connecting seat (2), a furnace bottom roller (5) is provided inside the quenching furnace body (1), both ends of the furnace bottom roller (5) are fixedly connected to an extension rod (6), one end of a group of the extension rods (6) is fixedly connected to a processing flange (7), the top end of the extension rod (6) is fixedly connected to an arc buckle (8), the top end of the arc buckle (8) is fixedly connected to a first pull rope (9), the top end of the first pull rope (9) is fixedly connected to a first electric hoist (10), and the first electric hoist (10) The top of the quenching furnace body (1) is fixedly connected to a fixed frame (11), the top of the fixed frame (11) is rotatably connected to a pulley (12), a steel beam (13) is provided on one side of the quenching furnace body (1), the pulley (12) is slidably connected to both sides of the steel beam (13), a third pull rope (17) is provided on the side of the quenching furnace body (1) away from the steel beam (13), the bottom of the third pull rope (17) is fixedly connected to a hook (15), the bottom of the hook (15) is fixedly connected to a second electric hoist (16), the bottom of the second electric hoist (16) is fixedly connected to a second pull rope (14), and the bottom of the second pull rope (14) is fixedly connected to the arc buckle (8) of another group of extension rods (6).
2. The online replacement mechanism for quenching furnace rollers according to claim 1, characterized in that: The top of the quenching furnace body (1) is fixedly connected to a top plate (18), the inner wall of the top is provided with a slide groove, the top of the steel beam (13) is fixedly connected to a slider (19), and the slider (19) is slidably connected to the inner wall of the slide groove.
3. The online replacement mechanism for quenching furnace rollers according to claim 2, characterized in that: The top end of the steel beam (13) is fixedly connected to a limiting rod (20), the limiting rod (20) is L-shaped, a limiting groove is provided on one side of the limiting rod (20), and the third pull rope (17) is arranged on the inner wall of the limiting groove.
4. The online replacement mechanism for quenching furnace rollers according to claim 3, characterized in that: The top of the support platform (3) is provided with a bottom block (22), the top of the bottom block (22) is fixedly connected to a placement platform (21), and one side of the support platform (3) is fixedly connected to a slope (23).
5. The online replacement mechanism for quenching furnace rollers according to claim 4, characterized in that: A mounting groove is provided at the top of the placement platform (21), and the inner wall of the mounting groove is rotatably connected to multiple groups of rollers (24).
6. The online replacement mechanism for quenching furnace rollers according to claim 5, characterized in that: The bottom of the bottom block (22) is rotatably connected to a roller (25), and the tops of the support platform (3) and the slope (23) are provided with guide grooves, and the roller (25) is arranged in the guide grooves.