House building construction operation platform

By combining the design of the base, frame, protective netting, and lifting platform, the instability and limited construction area of ​​the spider-type aerial work platform are solved, achieving efficient and safe high-altitude construction results.

CN224134186UActive Publication Date: 2026-04-17TIANJIN NO 6 MUNICIPAL & HIGHWAY ENG CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
TIANJIN NO 6 MUNICIPAL & HIGHWAY ENG CO LTD
Filing Date
2025-04-28
Publication Date
2026-04-17

AI Technical Summary

Technical Problem

Existing spider-type aerial work platforms are prone to swaying when suspended at high heights and lack a connection structure with the building's exterior walls, resulting in instability. Furthermore, the construction area is restricted by ropes, affecting construction efficiency.

Method used

A building construction operation platform was designed, including a base, frame, protective net frame, enclosure, positioning seat and lifting platform. The frame and base can be stably raised and lowered by the combination of guide rod and positioning seat, expanding the working area, and the protective net frame and enclosure provide safety protection.

Benefits of technology

It improves the stability and efficiency of high-altitude operations, expands the working area, enhances worker safety, and reduces the risk of swaying.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN224134186U_ABST
    Figure CN224134186U_ABST
Patent Text Reader

Abstract

The utility model discloses a house building construction operation platform, which relates to the technical field of house building construction and comprises a base, a shallow groove is arranged at the top of the base, a lifting platform is arranged in the shallow groove, and frames are fixedly mounted on two sides of the top of the base; a protective net rack is arranged on one side of the top of the base, a fence is arranged on the other side of the top of the base, the protective net rack and the fence are oppositely distributed, meshes of the protective net rack are dense, hole sites of the fence are sparse, and the fence is close to one side of an outer wall of the house building; and the positioning seats are fixedly mounted on the outer wall of the house building. The adopted lifting rope can be horizontally suspended at the outer wall of a building, meanwhile, the guide rod and the positioning seat are used for guiding lifting of the frame and the base, the stability of the frame and the base is guaranteed, the lifting platform arranged in the frame and the base can be used for driving an operator to ascend and descend, and the lifting efficiency is improved. And the operation area of an operator is increased.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This utility model relates to the field of building construction technology, specifically a building construction operation platform. Background Technology

[0002] Building construction, generally referred to as building engineering, encompasses all technical work and completed engineering entities involved in the surveying, planning, design, construction, installation, and maintenance of newly built, renovated, or expanded buildings and ancillary structures. In particular, building construction involves a type of work platform. For example, when constructing the exterior walls of outdoor buildings, a spider-type aerial work platform is typically used, suspended on the outside of the wall to facilitate construction work.

[0003] However, current spider-type aerial work platforms are prone to significant swaying at high altitudes due to their large suspension height. They also lack a connection structure to the building's exterior walls, relying solely on ropes to secure the platform, which increases the risk of accidents.

[0004] Meanwhile, the working area of ​​this type of platform is limited by ropes, requiring workers to be raised or lowered to reach the designated construction area, which is detrimental to improving construction efficiency. Therefore, we propose a building construction work platform. Utility Model Content

[0005] To address the shortcomings of existing technologies, this utility model provides a building construction operation platform, which solves the problems mentioned in the background section.

[0006] To achieve the above objectives, this utility model is implemented through the following technical solution: a building construction operation platform, comprising: a base: a shallow groove is provided on the top of the base, and a lifting platform is provided inside the shallow groove; and a frame is fixedly installed on both sides of the top of the base.

[0007] A protective net frame is provided on one side of the top of the base, and a fence is provided on the other side of the top of the base. The protective net frame and the fence are distributed opposite each other. The mesh of the protective net frame is dense, while the mesh of the fence is sparse. The fence is close to the outer wall of the building.

[0008] Several positioning seats are fixedly installed on the exterior wall of the building. Guide rods are slidably inserted into the positioning seats. An adjustment module is provided on one side of the guide rod, and the adjustment module is located on one side of the outer wall of the frame.

[0009] Preferably, the base is provided with casters at the four corners of its bottom, and the casters are equipped with brakes.

[0010] Preferably, the frame includes a full cover plate connected to the top of the base, and load-bearing arms are fixedly installed on the outer walls on both sides of the top of the base. Several horizontal beams are arranged vertically between the two load-bearing arms, and steel wire rope guide wheels are installed on the top of the load-bearing arms.

[0011] Preferably, the protective net frame is arranged in a herringbone pattern, the enclosure has a rectangular hole structure, and the enclosure consists of several horizontal bars and a vertical beam.

[0012] Preferably, the positioning seat is an annular structure with an opening on one side, and the positioning seat partially surrounds the outside of the guide rod.

[0013] Preferably, the adjustment module includes a liner fixed to one outer wall of the frame. The liner has through holes at both the top and bottom, and a sliding plate is inserted into the through hole. An end plate is fixed to one outer wall of the sliding plate. Several binding rods are provided on one outer wall of the liner, and damping springs are sleeved on the outside of the binding rods. One end of the binding rod is slidably inserted into the inside of the end plate. A rotating seat is provided on one outer wall of the guide rod, and a lead screw is provided inside the rotating seat. A handwheel is fixed to one end of the lead screw.

[0014] Preferably, the lifting platform includes a pedal disposed above the base, and a plurality of rotating hinge seats are disposed between the pedal and the base. Rotating rods one and two are disposed on the rotating hinge seats in an alternating manner. A guide rail is disposed at the bottom of the rotating hinge seat located at one end of the pedal, and the rotating hinge seat is slidably disposed on the guide rail. A motor is disposed on one side of the top of the base, and a lead screw two is connected to the output shaft of the motor. The lead screw two drives the rotating hinge seat located on the guide rail to slide linearly through the lead screw nut. A bearing seat is disposed on the lead screw two.

[0015] Preferably, toolboxes are provided on both sides of the top of the base, located in the corners.

[0016] Preferably, the positioning seat includes several mounting plates fixed to the exterior wall of the building, and a retainer is fixedly provided on one side of the mounting plate.

[0017] This utility model provides a building construction operation platform, which has the following beneficial effects:

[0018] The suspension ropes used allow the frame and base to be suspended flush against the exterior wall of the building. Guide rods and positioning seats are used to guide the lifting and lowering of the frame and base, ensuring their stability. The lifting platform installed inside the frame and base allows the operator to be lifted and lowered, increasing the operator's working area. Attached Figure Description

[0019] Figure 1This is a schematic diagram of the structure of a building construction operation platform according to this utility model from one angle;

[0020] Figure 2 This is a schematic diagram of the structure of a building construction operation platform according to this utility model from another angle;

[0021] Figure 3 This is a schematic diagram of the base and frame structure of a building construction operation platform according to the present invention;

[0022] Figure 4 This is a schematic diagram of the adjustment module structure of a building construction operation platform according to the present invention;

[0023] Figure 5 This is a schematic diagram of the lifting platform structure of a building construction operation platform according to the present invention. Figure 1 ;

[0024] Figure 6 This is a schematic diagram of the lifting platform structure of a building construction operation platform according to the present invention. Figure 2 .

[0025] 1. Base; 11. Shallow groove; 12. Casters; 2. Frame; 21. Full cover plate; 22. Crossbeam; 23. Load-bearing arm; 24. Wire rope guide wheel; 3. Protective net frame; 4. Enclosure; 5. Positioning seat; 51. Mounting plate; 52. Sleeve; 6. Guide rod; 7. Adjustment module; 71. Sliding plate; 72. Liner plate; 73. End plate; 74. Restraint rod; 75. Damping spring; 76. Rotating seat; 77. Lead screw one; 78. Handwheel; 8. Lifting platform; 81. Pedal; 82. Rotating hinge seat; 83. Rotating rod one; 84. Rotating rod two; 85. Lead screw two; 86. Guide rail; 87. Motor; 88. Bearing seat; 9. Toolbox. Detailed Implementation

[0026] The embodiments of this utility model will be described in further detail below with reference to the accompanying drawings and examples. The following examples are for illustrative purposes only and should not be construed as limiting the scope of this utility model.

[0027] like Figures 1-6As shown, this utility model provides a technical solution: a building construction operation platform, comprising: a base 1; a shallow groove 11 is provided on the top of the base 1, and a lifting platform 8 is provided inside the shallow groove 11; a frame 2 is fixedly installed on both sides of the top of the base 1; a protective net frame 3 is provided on one side of the top of the base 1, and a fence 4 is provided on the other side of the top of the base 1; the protective net frame 3 and the fence 4 are distributed opposite each other; the mesh of the protective net frame 3 is dense, and the mesh of the fence 4 is sparse; and the fence 4 is close to the outer wall of the building; a plurality of positioning seats 5 are fixedly installed on the outer wall of the building; a guide rod 6 is slidably inserted into the positioning seat 5; an adjustment module 7 is provided on one side of the guide rod 6; and the adjustment module 7 is provided on one side of the outer wall of the frame 2.

[0028] This embodiment includes: a base 1; a shallow groove 11 is provided on the top of the base 1, which allows the pedal 81 to be hidden inside the shallow groove 11, ensuring the flatness of the upper surface of the base 1; four casters 12 are provided at the four corners of the bottom of the base 1, and the casters 12 are equipped with a braking structure. Tool boxes 9 are provided on both sides of the top of the base 1, located in the corners. The tool boxes 9 are designed in the corners to store the corresponding tools, avoiding cluttered placement of tools inside the frame 2.

[0029] In this embodiment, a lifting platform 8 is provided inside the shallow trough 11, and a frame 2 is fixedly installed on both sides of the top of the base 1. The frame 2 includes a full cover 21 connected to the top of the base 1, which plays a better protective role and prevents tools on the platform from falling. A load-bearing arm 23 is fixedly installed on the outer wall of both sides of the top of the base 1. Several vertically distributed crossbeams 22 are provided between the two load-bearing arms 23. A wire rope guide wheel 24 is provided on the top of the load-bearing arm 23. The wire rope is inserted in the wire rope guide wheel 24, thereby realizing the hoisting of the frame 2. The lifting platform 8 includes a footboard 81 positioned above the base 1. Several rotating hinge seats 82 are located between the footboard 81 and the base 1. Each rotating hinge seat 82 has staggered rotating rods 83 and 84. A guide rail 86 is located at the bottom of the rotating hinge seat 82 at one end of the footboard 81, and the rotating hinge seat 82 is slidably mounted on the guide rail 86. A motor 87 is located on one side of the top of the base 1, and a lead screw 85 is connected to the output shaft of the motor 87. The lead screw 85 drives the rotating hinge seats 82 on the guide rail 86 to slide linearly via a lead screw nut. A bearing seat 88 is provided on the lead screw 85. Normally, when using this frame, people can stand on the footboard 81 to perform construction. When construction on a high exterior wall is required, the operator can start the motor 87, causing the motor 87 to drive the lead screw... The rotation of the second rod 85 causes the first rotating rod 83 and the second rotating rod 84 to rotate, thus raising the pedal 81. At this time, the worker on the pedal 81 is also raised, allowing the worker to work on the outer wall. The reason why the entire frame 2 is not used for lifting is that the traditional suspended platform structure relies solely on ropes for lifting, resulting in no contact between the suspended platform and the outer wall. When working inside the suspended platform, it is prone to swaying, causing instability. In this invention, positioning seats 5 are pre-installed on the outer wall, allowing the frame 2 to connect with the positioning seats 5. Since the positioning seats 5 are spaced apart, the height of the frame 2 must stop according to the position of the positioning seats 5. Using the lifting platform 8 in conjunction with the lifting movement of the frame 2 can expand the working area and improve the stability of the frame 2 at high altitudes.

[0030] In this embodiment, a protective net frame 3 is provided on one side of the top of the base 1, and a barrier 4 is provided on the other side of the top of the base 1. The protective net frame 3 and the barrier 4 are distributed opposite each other. The protective net frame 3 has dense mesh and is located behind the worker, which plays a protective role for the worker. The barrier 4 has sparse holes and is close to the outer wall of the building. The protective net frame 3 is distributed in a herringbone shape, and the barrier 4 has a rectangular hole structure. The barrier 4 is composed of several horizontal bars and a vertical beam. The barrier 4 with sparse holes makes it easier for people to reach over the barrier 4 to carry out construction on the outer wall, such as spraying and scraping operations.

[0031] In this embodiment, several positioning seats 5 are fixedly installed on the exterior wall of the building, and guide rods 6 are slidably inserted into the positioning seats 5. The positioning seats 5 are annular structures with one side opening, and the positioning seats 5 partially surround the guide rods 6. The positioning seats 5 include several mounting plates 51 fixed to the exterior wall of the building, and a retaining sleeve 52 is fixedly provided on one side of the mounting plate 51. The mounting plate 51 is fixed to the exterior wall by expansion screws. The guide rods 6 are raised and lowered by the lifting of the frame 2. The guide rods 6 are inserted into the retaining sleeves 52 of the positioning seats 5 to restrain the suspended platform and improve the stability of the platform.

[0032] In this embodiment, an adjustment module 7 is provided on one side of the guide rod 6, and the adjustment module 7 is located on one side of the outer wall of the frame 2. The adjustment module 7 includes a liner 72 fixed to one side of the outer wall of the frame 2. The liner 72 has through holes at both the top and bottom, and a sliding plate 71 is inserted into the through holes. An end plate 73 is fixedly provided on one side of the outer wall of the sliding plate 71. Several binding rods 74 are provided on one side of the outer wall of the liner 72, and a damping spring 75 is sleeved on the outside of the binding rods 74. One end of the binding rod 74 is slidably inserted into the inside of the end plate 73. A rotating seat 76 is provided on one side of the outer wall of the guide rod 6, and a lead screw 77 is provided inside the rotating seat 76. A handwheel 78 is fixedly provided at one end of the lead screw 77, allowing the operator to operate the handwheel 78. 8. This causes the lead screw 77 to rotate, which in turn drives the guide rod 6 to move linearly, changing its position and thus altering the contact point between the guide rod 6 and the retaining sleeve 52. This changes the friction between the guide rod 6 and the retaining sleeve 52, adjusting the stability of the frame 2. When the frame 2 is stationary, the guide rod 6 and the retaining sleeve 52 are tightly pressed together. When the frame 2 needs to be raised or lowered, the lead screw 77 is operated to loosen the guide rod 6 and the retaining sleeve 52. Furthermore, since the frame 2 is difficult to move linearly up and down during raising and lowering, the design of the damping spring 75 and the restraint rod 74 makes the raising and lowering of the frame 2 more stable.

Claims

1. A house building construction work platform comprising: Base (1): characterized in that: a shallow groove (11) is provided on the top of the base (1), and a lifting platform (8) is provided inside the shallow groove (11), and a frame (2) is fixedly installed on both sides of the top of the base (1). A protective net frame (3) is provided on one side of the top of the base (1), and a fence (4) is provided on the other side of the top of the base (1). The protective net frame (3) and the fence (4) are distributed opposite to each other. The mesh of the protective net frame (3) is dense, and the mesh of the fence (4) is sparse. The fence (4) is close to the outer wall of the building. Several positioning seats (5) are fixedly installed on the exterior wall of the building. A guide rod (6) is slidably inserted into the positioning seat (5). An adjustment module (7) is provided on one side of the guide rod (6), and the adjustment module (7) is located on one side of the outer wall of the frame (2).

2. The house building construction operation platform according to claim 1, characterized in that: The base (1) is provided with four corners at the bottom of each of the four corners of the base (1), and the four corners of the base (1) are equipped with a brake structure.

3. The house building construction operation platform according to claim 1, characterized in that: The frame (2) includes a full cover plate (21) connected to the top of the base (1). Load-bearing arms (23) are fixedly installed on the outer walls on both sides of the top of the base (1). Several horizontal beams (22) are arranged between the two load-bearing arms (23). A wire rope guide wheel (24) is installed on the top of the load-bearing arm (23).

4. The house building construction operation platform according to claim 1, characterized in that: The protective net frame (3) is arranged in a herringbone pattern, and the enclosure (4) is a rectangular hole structure, consisting of several horizontal bars and a vertical beam.

5. The house building construction operation platform according to claim 1, characterized in that: The positioning seat (5) is an annular structure with an opening on one side, and the positioning seat (5) is partially surrounded by the guide rod (6).

6. The house building construction operation platform according to claim 1, characterized in that: The adjustment module (7) includes a liner (72) fixed on one side of the outer wall of the frame (2). The liner (72) has through holes on its upper and lower sides, and a sliding plate (71) is inserted into the through holes. An end plate (73) is fixed on one side of the outer wall of the sliding plate (71). Several binding rods (74) are provided on one side of the outer wall of the liner (72), and a damping spring (75) is sleeved on the outside of the binding rods (74). One end of the binding rod (74) is slidably inserted into the inside of the end plate (73). A rotating seat (76) is provided on one side of the outer wall of the guide rod (6), and a lead screw (77) is provided inside the rotating seat (76). A handwheel (78) is fixed on one end of the lead screw (77).

7. The house building construction operation platform according to claim 1, characterized in that: The lifting platform (8) includes a pedal (81) set above the base (1). A plurality of rotating hinge seats (82) are provided between the pedal (81) and the base (1). Rotating hinge seats (82) are provided with rotating rods 1 (83) and rotating rods 2 (84) arranged in an alternating manner. A guide rail (86) is provided at the bottom of the rotating hinge seat (82) located at one end of the pedal (81), and the rotating hinge seat (82) is slidably set on the guide rail (86). A motor (87) is provided on one side of the top of the base (1), and a lead screw 2 (85) is connected to the output shaft of the motor (87). The lead screw 2 (85) drives the rotating hinge seat (82) located on the guide rail (86) to slide linearly through the lead screw nut. A bearing seat (88) is provided on the lead screw 2 (85).

8. The house building construction work platform according to claim 1, characterized in that: Toolboxes (9) are provided on both sides of the top of the base (1) in the corners.

9. The house building construction work platform according to claim 1, characterized in that: The positioning seat (5) includes several mounting plates (51) fixed to the exterior wall of the building, and a sleeve (52) is fixedly provided on one side of the mounting plate (51).