Safety protection detachable climbing frame for surge shaft inner wall construction
By designing a detachable climbing frame structure, the problems of inconvenient disassembly and high cost caused by the installation and fixation of the climbing frame in the pressure regulating well were solved, realizing convenient assembly and mobile use of the climbing frame and reducing construction costs.
Patent Information
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- SINOHYDRO BEREAU 10 CO LTD
- Filing Date
- 2025-05-26
- Publication Date
- 2026-05-05
AI Technical Summary
The existing surge tank climbing frame is fixed in place, inconvenient to disassemble, and cannot be used in a mobile manner, resulting in high costs.
A climbing frame structure was designed, comprising climbing frame one, climbing frame two, and climbing frame three. It adopts detachable support rods and foot pedals, combined with a safety belt self-locking hook protective locking frame, and is connected by a combination of positioning guide posts and threaded rods to achieve the detachable and mobile use of the climbing frame.
It enables convenient assembly and mobile use of climbing frames, reducing the cost of fixing them in each surge tank.
Smart Images

Figure CN224200573U_ABST
Abstract
Description
Technical Field
[0001] This utility model relates to the technical field of climbing formwork for pressure regulating well construction, specifically a detachable climbing formwork for safety protection during construction of the inner wall of a pressure regulating well. Background Technology
[0002] A surge tank, also known as a pressure well, is a mechanical device used in hydropower stations and other locations to regulate water pressure.
[0003] If the total length of the water diversion channel of a run-of-river hydropower station is relatively long, a surge chamber is often required at the junction of the tunnel and the pressure pipeline. The surge chamber can be a well-like structure excavated from the mountain, called a surge well, or a tower that rises above the ground, called a surge tower, or some kind of hybrid structure.
[0004] Because the power plant's water intake pipes are long, when the unit suddenly sheds its load and closes the guide vanes during operation, there is a significant water hammer effect due to the inertia of the water flow, which can easily damage the power generation equipment. If there is no surge tank, the water hammer will destroy the guide vanes and other flow components.
[0005] The function of a surge tank is to provide a channel for water hammer to be released, thereby reducing the pressure on the flow components.
[0006] In related technologies, for construction and maintenance, surge tanks are usually equipped with U-shaped climbing frames or fixed integrated climbing frames on the inner wall of the surge tank. Although the climbing frames mentioned above can be used for construction and maintenance inside the surge tank, the climbing frames are relatively fixed and do not have a good disassembly structure, which makes it inconvenient to disassemble them later. In addition, the climbing frames must be installed inside each surge tank, making them unusable and costly.
[0007] In view of this, this technical solution proposes a detachable climbing frame for safety protection during construction of the inner wall of a pressure regulating well, which can better solve the problems mentioned above. Utility Model Content
[0008] The technical solution adopted by this utility model is as follows: a detachable climbing frame for safety protection during construction of the inner wall of a pressure regulating well, comprising a climbing frame structure composed of climbing frame one, climbing frame two, and climbing frame three. Support rods for the inner wall of the pressure regulating well are fixed on both rear sides of climbing frame one, climbing frame two, and climbing frame three, and are used to support the climbing frame one, climbing frame two, and climbing frame three in close contact with the inner wall of the pressure regulating well. Safety belt self-locking hook protective locking frames are fixed on the inner foot pedals of climbing frame one, climbing frame two, and climbing frame three, and are used in conjunction with the self-locking hooks of the safety belts worn by the construction worker.
[0009] The top of the left support rods of both climbing frame 2 and climbing frame 3 are fixed with positioning guide posts. The positioning guide post fixed at the top of the left support rod of climbing frame 3 is inserted into the lower inside of the left support rod of climbing frame 2. The positioning guide post fixed at the top of the left support rod of climbing frame 2 is inserted into the lower inside of the left support rod of climbing frame 1. A rotating post is rotatably installed above the right support rods of climbing frame 2 and climbing frame 3, and the top of the rotating post is fixed with a threaded rod that is threadedly connected to the lower inside of the right support rods of climbing frame 1 and climbing frame 2.
[0010] The climbing frame has fixed blocks at the top of the support rods on both sides, and the fixed blocks have adjustment slots inside. A pressure regulating well opening overlap plate is inserted into the adjustment slot for use above the pressure regulating well. A pressure regulating well opening limiting plate is fixed behind the pressure regulating well opening overlap plate for use against the outer side of the pressure regulating well. A fastening bolt is threaded to the upper part of the fixed block, and the fastening bolt abuts against the top of the pressure regulating well opening overlap plate to position the pressure regulating well opening overlap plate.
[0011] In a preferred embodiment, each of the climbing frame one, climbing frame two, and climbing frame three is composed of two support rods and a foot pedal, with the foot pedal fixed between the two support rods, and there are several climbing frames two.
[0012] In a preferred embodiment, the inner wall support rod of the surge tank is adapted to the inner wall support surface of the surge tank.
[0013] In a preferred embodiment, the safety belt self-locking hook protective locking frame has a U-shaped structure and is adapted to the safety belt self-locking hook on the worker's body.
[0014] In a preferred embodiment, both the first and second climbing frames have a positioning groove on the lower part of the left side support that is adapted to the positioning guide post, and the positioning guide post is inserted into the positioning groove. The positioning guide post can be a regular hexagonal structure.
[0015] In a preferred embodiment, both the first and second climbing frames have a positioning groove on the lower part of the left side support that is adapted to the positioning guide post, and the positioning guide post is inserted into the positioning groove. The positioning guide post can be a regular hexagonal structure.
[0016] In a preferred embodiment, the lower part of the right support rod of the climbing frame one and the climbing frame two is provided with a threaded hole for use with a threaded rod, and the threaded rod is threadedly connected in the threaded hole, and the length of the threaded rod is less than the length of the positioning guide post.
[0017] In a preferred embodiment, the pressure regulating wellhead limiting plate is adapted to the outer surface of the pressure regulating well, and both sides of the fastening bolt head are fixed with operating handles for rotating the fastening bolt.
[0018] In summary, due to the adoption of the above technical solution, the beneficial effects of this utility model are: it facilitates the assembly and installation of climbing frame one, climbing frame two, and climbing frame three into the inside of the surge tank for construction and use, and climbing frame one, climbing frame two, and climbing frame three can be used in a mobile manner, reducing the cost of fixing the climbing frame inside each surge tank for independent use in the prior art.
[0019] 1. In this utility model, when assembling and using climbing frame one, climbing frame two, and climbing frame three, first select the number of climbing frames two according to the depth of the pressure regulating well, and then assemble climbing frames two between climbing frames one and climbing frames three. When assembling climbing frames one, climbing frames two, and climbing frames three, first insert the positioning guide post fixed at the top of the left support rod of climbing frame two into the inside of the left support of climbing frame one. Since the positioning guide post is longer than the threaded rod, when the threaded rod contacts the bottom of the right support rod of climbing frame one, the rotating post can be rotated to thread the threaded rod into the lower inside of the right support rod of climbing frame one. At this time, the installation of climbing frames one and climbing frames two is completed. Then, install climbing frame three in the above installation method, and the climbing frame three can be installed below climbing frame two for use.
[0020] 2. In this utility model, climbing frames one, two, and three are placed inside the pressure regulating well. At this time, the pressure regulating well inner wall support rods fixedly installed behind climbing frames one, two, and three are in contact with the inner wall of the pressure regulating well. At the same time, the pressure regulating well opening overlap plate overlaps above the pressure regulating well. By moving the pressure regulating well opening overlap plate, the pressure regulating well opening overlap plate is made to fit with the outer side of the pressure regulating well. Then, by operating the handle, the fastening bolts are tightened and abutted against the pressure regulating well opening overlap plate, thus positioning the climbing frame in the pressure regulating well for use. Attached Figure Description
[0021] Figure 1 This is a schematic diagram of the first state structure of this utility model;
[0022] Figure 2 This is a schematic diagram of the second state structure of this utility model;
[0023] Figure 3 This utility model Figure 2 Enlarged schematic diagram of the structure of region A in the middle;
[0024] Figure 4 This utility model Figure 1 and Figure 2 Enlarged schematic diagram of the structure of region B in the middle.
[0025] Markings in the diagram: 1-Climbing Frame 1; 2-Climbing Frame 2; 3-Climbing Frame 3; 4-Suppressor Well Inner Wall Support Rod; 5-Safety Belt Self-Locking Hook Protective Locking Frame; 6-Positioning Guide Column; 7-Bearing; 8-Mounting Column; 9-Rotating Column; 10-Threaded Rod; 11-Fixing Block; 12-Adjusting Slot; 13-Suppressor Wellhead Overlap Plate; 14-Suppressor Wellhead Limiting Plate; 15-Fastening Bolt; 16-Operating Handle. Detailed Implementation
[0026] To make the objectives, technical solutions, and advantages of the embodiments of this utility model clearer, the technical solutions of the embodiments of this utility model will be clearly and completely described below in conjunction with the embodiments of this utility model. Obviously, the described embodiments are only some embodiments of this utility model, not all embodiments. Based on the embodiments of this utility model, all other embodiments obtained by those skilled in the art without creative effort are within the protection scope of this utility model.
[0027] The following will combine Figures 1-4 This invention provides a detailed description of a detachable climbing frame for safety protection during construction of a pressure regulating well inner wall, according to an embodiment of the present invention.
[0028] refer to Figure 1-2 As shown, a detachable climbing frame for safety protection during construction of a surge tank inner wall includes a climbing frame structure composed of climbing frame 1, climbing frame 2, and climbing frame 3. Each climbing frame 1, climbing frame 2, and climbing frame 3 consists of two support rods and foot pedals, with the foot pedals fixed between the two support rods. There are multiple climbing frames 2. The rear sides of each climbing frame 1, climbing frame 2, and climbing frame 3 are fixed with supports that conform to the inner wall of the surge tank. The inner wall support rod 4 of the pressure regulating well is used for support of the climbing frame 3. The inner wall support rod 4 of the pressure regulating well is adapted to the inner wall support surface of the pressure regulating well. The inner foot pedals of climbing frame 1, climbing frame 2 and climbing frame 3 are all fixed with safety belt self-locking hook protective locking frame 5, which is used in conjunction with the self-locking hook of the safety belt on the worker. The safety belt is a high-altitude safety belt. The safety belt self-locking hook protective locking frame 5 has a U-shaped structure and is adapted to the self-locking hook of the safety belt on the worker.
[0029] refer to Figure 1-3As shown, both climbing frame 2 and climbing frame 3 have a positioning guide post 6 fixed to the top of their left support rods. The positioning guide post 6 fixed to the top of the left support rod of climbing frame 3 is inserted into the lower interior of the left support rod of climbing frame 2. The positioning guide post 6 fixed to the top of the left support rod of climbing frame 2 is inserted into the lower interior of the left support rod of climbing frame 1. Both climbing frame 1 and climbing frame 2 have a positioning groove inside the lower interior of their left support rods that is compatible with the positioning guide post 6, and the positioning guide post 6 is inserted into the positioning groove. The positioning guide post 6 can be a regular hexagonal structure. A rotating column 9 is rotatably mounted above the right support rod of climbing frame 3. A mounting column 8 is fixed at the bottom of the rotating column 9, and the mounting column 8 is mounted inside the right support rod of climbing frame 2 and climbing frame 3 via a bearing 7. A threaded rod 10 is fixed at the top of the rotating column 9 and is threadedly connected to the lower inside of the right support rod of climbing frame 1 and climbing frame 2. A threaded hole is opened inside the lower inside of the right support rod of climbing frame 1 and climbing frame 2 to cooperate with the threaded rod 10, and the threaded rod 10 is threadedly connected in the threaded hole. The length of the threaded rod 10 is less than the length of the positioning guide column 6.
[0030] refer to Figure 1 , 2 As shown in Figure 4, the top of the support rods on both sides of the climbing frame 11 are fixed with fixing blocks 11, and the fixing blocks 11 have adjustment slots 12 inside. The adjustment slots 12 are inserted with pressure regulating well opening overlap plates 13 used to overlap the pressure regulating well. The pressure regulating well opening limit plates 14 are fixed behind the pressure regulating well opening overlap plates 13 and are used to fit against the outer side of the pressure regulating well. The pressure regulating well opening limit plates 14 are adapted to the outer side of the pressure regulating well. The bolt heads of the fastening bolts 15 are fixed with operating handles 16 on both sides for rotating the fastening bolts 15. The upper part of the fixing blocks 11 is threaded with fastening bolts 15, and the fastening bolts 15 abut against the top of the pressure regulating well opening overlap plates 13 to position the pressure regulating well opening overlap plates 13. The bolt heads of the fastening bolts 15 are fixed with operating handles 16 on both sides for rotating the fastening bolts 15.
[0031] Advantages of this application: It facilitates the assembly and installation of climbing frames 1, 2, and 3 into the inside of the surge tank for construction and use. Furthermore, climbing frames 1, 2, and 3 can be used in a mobile manner, reducing the cost of fixing the climbing frames inside each surge tank for independent use in the prior art.
[0032] Working principle: When assembling and using climbing frames 1, 2, and 3, first select the number of climbing frames 2 based on the depth of the pressure regulating well. Then, assemble climbing frames 2 between climbing frames 1 and 3. When assembling climbing frames 1, 2, and 3, first insert the positioning guide post 6 fixed at the top of the left support rod of climbing frame 2 into the inside of the left support of climbing frame 1. Since the positioning guide post 6 is longer than the threaded rod 10, when the threaded rod 10 contacts the bottom of the right support rod of climbing frame 1, the rotating post 9 can be rotated to thread the threaded rod 10 into the lower inside of the right support rod of climbing frame 1. This completes the installation of climbing frames 1 and 2. Install climbing frame 3 in the same way as described above, and then install climbing frame 3 below climbing frame 2 for use.
[0033] Place climbing frames 1, 2, and 3 inside the pressure regulating well. At this time, the pressure regulating well inner wall support rod 4, which is fixedly installed behind climbing frames 1, 2, and 3, is in contact with the inner wall of the pressure regulating well. At the same time, the pressure regulating well opening overlap plate 13 overlaps above the pressure regulating well. By moving the pressure regulating well opening overlap plate 13, the pressure regulating well opening overlap plate 13 is made to fit with the outer side of the pressure regulating well. Then, by operating the handle 16, the fastening bolt 15 is tightened and abutted against the pressure regulating well opening overlap plate 13, and the climbing frame can be positioned in the pressure regulating well for use.
[0034] The embodiments described above are merely illustrative of several implementations of this utility model, and while the descriptions are relatively specific and detailed, they should not be construed as limiting the scope of the utility model patent. It should be noted that those skilled in the art can make various modifications and improvements without departing from the concept of this utility model, and these all fall within the protection scope of this utility model. Therefore, the protection scope of this utility model patent should be determined by the appended claims.
Claims
1. A detachable climbing frame for safety protection during construction of a pressure regulating well inner wall, comprising a climbing frame structure composed of climbing frame one (1), climbing frame two (2), and climbing frame three (3), characterized in that: The climbing frame 1 (1), climbing frame 2 (2) and climbing frame 3 (3) are all fixed with pressure regulating well inner wall support rods (4) that fit against the inner wall of the pressure regulating well to support the climbing frame 1 (1), climbing frame 2 (2) and climbing frame 3 (3). The foot pedals on the inner side of the climbing frame 1 (1), climbing frame 2 (2) and climbing frame 3 (3) are all fixed with safety belt self-locking hook protective locking frames (5) that cooperate with the safety belt self-locking hooks on the construction worker's body. The top of the left support rod of the climbing frame 2 (2) and the climbing frame 3 (3) are fixed with positioning guide posts (6). The positioning guide posts (6) fixed at the top of the left support rod of the climbing frame 3 (3) are inserted into the lower part of the left support rod of the climbing frame 2 (2). The positioning guide posts (6) fixed at the top of the left support rod of the climbing frame 2 (2) are inserted into the lower part of the left support rod of the climbing frame 1 (1). A rotating post (9) is rotatably installed above the right support rod of the climbing frame 2 (2) and the climbing frame 3 (3). The top of the rotating post (9) is fixed with a threaded rod (10) that is threadedly connected to the lower part of the right support rod of the climbing frame 1 (1) and the climbing frame 2 (2). The top of the support rods on both sides of the climbing frame (1) is fixed with a fixing block (11), and the fixing block (11) has an adjustment slot (12) inside. The adjustment slot (12) is inserted with a pressure regulating wellhead overlapping plate (13) used to overlap the pressure regulating well. The pressure regulating wellhead overlapping plate (13) is fixed behind the pressure regulating wellhead limiting plate (14) used to fit the outer side of the pressure regulating well. The fixing block (11) is threaded with a fastening bolt (15) on the upper part of the inside. The fastening bolt (15) abuts against the top of the pressure regulating wellhead overlapping plate (13) to position the pressure regulating wellhead overlapping plate (13).
2. The detachable climbing frame for safety protection during construction of the inner wall of a surge tank as described in claim 1, characterized in that: The climbing frame one (1), climbing frame two (2) and climbing frame three (3) are all composed of two support rods and foot pedals. The foot pedals are fixed between the two support rods. There are several climbing frames two (2).
3. The detachable climbing frame for safety protection during construction of the inner wall of a surge tank as described in claim 1, characterized in that: The inner wall support rod (4) of the pressure regulating well is adapted to the inner wall support surface of the pressure regulating well.
4. The detachable climbing frame for safety protection during construction of the inner wall of a pressure regulating well as described in claim 1, characterized in that: The safety belt self-locking hook protective locking frame (5) has a U-shaped structure and is compatible with the safety belt self-locking hook on the worker's body.
5. The detachable climbing frame for safety protection during construction of the inner wall of a pressure regulating well as described in claim 2, characterized in that: The lower left side support of both climbing frame one (1) and climbing frame two (2) is provided with a positioning groove adapted to the positioning guide post (6), and the positioning guide post (6) is inserted into the positioning groove. The positioning guide post (6) can be a regular hexagonal structure.
6. The detachable climbing frame for safety protection during construction of the inner wall of a surge tank as described in claim 1, characterized in that: The bottom end of the rotating column (9) is fixed with a mounting column (8), and the mounting column (8) is installed above the inside of the right support rod of the climbing frame 2 (2) and the climbing frame 3 (3) through a bearing (7).
7. The detachable climbing frame for safety protection during construction of the inner wall of a surge tank as described in claim 2, characterized in that: The right support rod of the climbing frame one (1) and the climbing frame two (2) has a threaded hole for use with the threaded rod (10) and the threaded rod (10) is threaded in the threaded hole. The length of the threaded rod (10) is less than the length of the positioning guide post (6).
8. The detachable climbing frame for safety protection during construction of the inner wall of a pressure regulating well as described in claim 1, characterized in that: The pressure regulating wellhead limiting plate (14) is adapted to the outer surface of the pressure regulating well. The fastening bolt (15) has an operating handle (16) fixed on both sides of the bolt head for rotating the fastening bolt (15).