A grouting connection section for large-diameter jacket foundations in offshore wind power
By combining irregular shear keys on the sidewall of the steel pipe pile with high-performance grouting material, the problem of shear failure and fatigue damage of traditional grouting joints in complex marine environments has been solved, achieving higher structural stability and long-term service performance.
Patent Information
- Application Number
- CN202522770961.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2025-12-26
- Publication Date
- 2026-11-17
- Estimated Expiration
- 2035-12-26
AI Technical Summary
Traditional grouting joints are prone to shear failure and fatigue damage in complex marine environments, making it difficult to balance construction feasibility and long-term service performance, especially in large-diameter jacket foundations.
Multiple irregularly shaped shear keys, including arc-shaped and toothed shear keys, are set on the sidewall of the steel pipe pile. They are arranged in an alternating manner and combined with high-performance grouting materials to optimize the stress and material distribution at the shear interface.
It improves the shear bearing capacity of the grouting connection section, reduces the risk of stress concentration, enhances structural stability and fatigue resistance, and extends service life.
Smart Images

Figure CN224982231U_ABST
Abstract
Description
Technical Field
[0001] This application relates to the field of offshore wind power foundation engineering technology, specifically to a grouting connection section for a large-diameter jacket foundation of offshore wind power. Background Technology
[0002] The construction of offshore wind farms relies on reliable foundation structures, among which jacket foundations are widely used due to their adaptability to deeper waters and superior load-bearing performance. Jacket foundations typically consist of pile legs and nodes. To ensure the stability of the connection between the foundation and the pile legs, grouting connection technology is often employed. Grouting connection sections fill the space between the jacket pile legs and the steel pipe piles with high-strength grouting material and incorporate irregularly shaped shear keys to provide sufficient shear resistance, thereby ensuring the safety and durability of the overall foundation structure. Traditional grouting connection sections usually rely on circular or rectangular shear keys to enhance the shear resistance of the interface. However, these shear key shapes are relatively simple and prone to shear failure or pull-out failure under high dynamic loads such as waves, wind, and currents, affecting the long-term stability of the foundation. Furthermore, in complex marine environments (such as the combined effects of waves, currents, and wind loads), conventional shear keys are prone to localized stress concentration, leading to cracking or peeling of the grout layer, thus reducing the load-bearing capacity of the connection section. Furthermore, existing shear key structure designs fail to fully consider the mechanical properties of large-diameter jacket foundations, making it difficult to ensure both construction feasibility and long-term service performance. In particular, during long-term service, they are more susceptible to fatigue damage, affecting structural safety and durability. Summary of the Invention
[0003] The first aspect of this application provides a grouting connection section for a large-diameter jacket foundation of offshore wind power, which has better shear bearing capacity and long-term service performance.
[0004] The first aspect of this application provides a grouting connection section for a large-diameter offshore wind turbine jacket foundation, used to connect the jacket foundation and the grouting connection section. The jacket foundation includes jacket legs, and the grouting connection section includes steel pipe piles. The walls of the steel pipe piles are provided with irregularly shaped shear keys, which protrude outwards from the sidewall of the steel pipe pile towards the jacket legs. Multiple irregularly shaped shear keys are arranged at intervals along the sidewall of the steel pipe pile. Each irregularly shaped shear key includes an arc-shaped shear key and multiple toothed shear keys disposed on the arc-shaped shear key. The arc-shaped shear key has a circular arc-shaped outer wall, and the multiple toothed shear keys are arranged at intervals along the extension direction of the circular arc-shaped outer wall. Grouting material is filled between the jacket legs and the steel pipe piles, and the grouting material can seal the gap between the jacket legs and the steel pipe piles.
[0005] In one alternative scheme, the spacing of the plurality of irregular shear keys includes the axial and circumferential directions of the steel pipe pile. The plurality of irregular shear keys arranged along the axial direction of the steel pipe pile are defined as an irregular shear key group. Then, the adjacent groups of irregular shear keys along the circumferential direction of the steel pipe pile are staggered, and the arc-shaped outer walls of the plurality of arc-shaped shear keys in the same irregular shear key group form a wave-shaped structure extending along the axial direction of the steel pipe pile.
[0006] In one alternative embodiment, the grout is a high-performance grouting material, and the irregular shear key is also located on the outer wall of the guide frame leg facing the steel pipe pile, and the irregular shear key on the guide frame leg is staggered with the irregular shear key on the steel pipe pile.
[0007] The second aspect of this application provides an installation method for installing the grouting connection section of the large-diameter jacket foundation for offshore wind power provided in the first aspect. The installation method includes the following steps: S1: After completing the fabrication of the jacket foundation and grouting connection section, transport the jacket foundation, grouting connection section and related materials to the pre-designated construction sea area; S2: Measure and calibrate the pile foundation position, and debug the crane vessel, guide frame and grouting system; S3: Install pile foundations using methods such as vibratory pile driving, hammer pile driving, or bored pile driving to ensure positional accuracy and bearing capacity; S4: Hoist the guide frame and accurately fit it into the pre-embedded pile foundation, and temporarily fix it with the limiting device; S5: Lay out grouting pipes and ventilation pipes, check the grout-stopping device, and carry out grouting and filling in stages to ensure uniform material distribution; S6: Curing the grouting layer and checking its density and strength using non-destructive testing methods; S7: After confirming that the grouting quality is up to standard, remove the temporary fixing device, conduct a final inspection, and hand over the work to the subsequent construction.
[0008] In one alternative approach, a low-speed initial grouting method is used during the phased grouting process, followed by a gradual increase in pressure to ensure that the grouting material fully penetrates into all pores and forms a high-strength bond. The grouting material is selected as a high-fluidity, early-strength cement-based material to optimize construction feasibility and improve structural durability.
[0009] In one alternative, the jacket foundation and grouting connection section are combined with marine environmental load characteristics to improve the structure's adaptability and long-term service reliability; the non-destructive testing methods in step S6 include ultrasonic testing and core sampling to assess the grout density and perform compensatory grouting if the preset value is not reached.
[0010] The beneficial effects of this application are as follows: The grouting connection section of the large-diameter jacket foundation for offshore wind power in this application can improve the shear bearing capacity of the grouting connection section and enhance the structural stability of the jacket foundation by setting multiple irregular shear keys on the side wall of the steel pipe pile. The arrangement of the irregular shear keys can make the interface stress more uniform, reduce stress concentration, and reduce the risk of cracking or peeling of the grout layer. In addition, the combination of irregular shear keys and grout can further improve the fatigue resistance of the connection section and extend the service life of the jacket foundation.
[0011] It should be understood that the above general description and the following detailed description are merely exemplary and do not limit this application. Attached Figure Description
[0012] Figure 1 This is a schematic diagram of the overall structure of the large-diameter jacket foundation for this offshore wind power project. Figure 2 This is a partial sectional view of the grouting connection section; Figure 3 A schematic diagram of a steel pipe pile equipped with a composite irregular shear key; Figure 4 A front view of a steel pipe pile equipped with a composite irregular shear key; Figure 5 Side view of a steel pipe pile equipped with a composite irregular shear key.
[0013] Reference numerals: 1. Guide frame leg; 2. Grouting material; 3. Irregular shear key; 4. Steel pipe pile; 5. Toothed shear key; 6. Arc-shaped shear key.
[0014] The accompanying drawings, which are incorporated in and form part of this specification, illustrate embodiments consistent with this application and, together with the description, serve to explain the principles of this application. Detailed Implementation
[0015] To better understand the technical solution of this application, the embodiments of this application will be described in detail below with reference to the accompanying drawings.
[0016] It should be understood that the described embodiments are merely some embodiments of this application, and not all embodiments. All other technical solutions obtained by those skilled in the art based on the embodiments of this application without inventive effort are within the scope of protection of this application.
[0017] The terminology used in the embodiments of this application is for the purpose of describing particular embodiments only and is not intended to be limiting of this application. The singular forms “a,” “the,” and “the” used in the embodiments of this application and the appended claims are also intended to include the plural forms unless the context clearly indicates otherwise.
[0018] It should be understood that the term "and / or" used in this article is merely a description of the relationship between related objects, indicating that three relationships can exist. For example, A and / or B can represent: A existing alone, A and B existing simultaneously, and B existing alone. Additionally, the character " / " in this article generally indicates that the preceding and following related objects have an "or" relationship.
[0019] It should be noted that the directional terms such as "upper," "lower," "left," and "right" described in the embodiments of this application are used to describe the angles shown in the accompanying drawings and should not be construed as limiting the embodiments of this application. Furthermore, in the context, it should be understood that when it is mentioned that an element is connected "upper" or "lower" to another element, it can be directly connected to the other element "upper" or "lower," or indirectly connected to the other element "upper" or "lower" through an intermediate element.
[0020] like Figure 1-5 As shown, the first aspect of this application provides a grouting connection section for a large-diameter jacket foundation of offshore wind power. This grouting connection section is mainly applicable to wind power foundation structures in complex marine environments, that is, it is used to connect the jacket foundation and the grouting connection section. Specifically, the jacket foundation includes jacket legs 1, and the grouting connection section includes steel pipe piles 4. The walls of the steel pipe piles 4 are provided with irregularly shaped shear keys 3. The irregularly shaped shear keys 3 protrude outwards from the sidewall of the steel pipe pile 4 towards the jacket legs 1. There are multiple irregularly shaped shear keys 3, which are spaced apart along the sidewall of the steel pipe pile 4. The irregularly shaped shear keys 3 include arc-shaped shear keys 6 and multiple toothed shear keys 5 disposed on the arc-shaped shear keys 6. The arc-shaped shear keys 6 have a circular arc-shaped outer wall, and the multiple toothed shear keys 5 are spaced apart along the extension direction of the circular arc-shaped outer wall. Grouting material 2 is filled between the jacket legs 1 and the steel pipe piles 4, and the grouting material 2 can seal the gap between the jacket legs 1 and the steel pipe piles 4.
[0021] In this embodiment, the grouting connection section of the large-diameter jacket foundation for offshore wind power can improve the shear bearing capacity of the grouting connection section and enhance the structural stability of the jacket foundation by setting multiple irregular shear keys 3 on the side wall of the steel pipe pile 4. The arrangement of the irregular shear keys 3 can make the interface stress more uniform, reduce stress concentration, and reduce the risk of cracking or peeling of the grout layer. In addition, the combination of irregular shear keys 3 and grout 2 can further improve the fatigue resistance of the connection section and extend the service life of the jacket foundation.
[0022] like Figure 2-5As shown, in one specific embodiment, the spacing direction of the multiple irregular shear keys 3 includes the axial and circumferential directions of the steel pipe pile 4. The multiple irregular shear keys 3 arranged along the axial direction of the steel pipe pile 4 are defined as a group of irregular shear keys 3. Then, the adjacent groups of irregular shear keys 3 along the circumferential direction of the steel pipe pile 4 are staggered, and the arc-shaped outer walls of the multiple arc-shaped shear keys 6 in the same group of irregular shear keys 3 form a wave-shaped structure extending along the axial direction of the steel pipe pile 4.
[0023] like Figure 1-5 As shown, in one specific embodiment, the grouting material 2 is a high-performance grouting material, and the irregular shear key 3 is also located on the outer wall of the side of the guide frame leg 1 facing the steel pipe pile 4, and the irregular shear key 3 on the guide frame leg 1 is staggered with the irregular shear key 3 on the steel pipe pile 4.
[0024] The grouting connection section of the large-diameter jacket foundation for offshore wind power in this embodiment was designed according to the following steps and considerations: The shape design of the irregular shear key 3: In the grouting connection section of the jacket foundation, a combination of wavy (the shape formed by multiple irregular shear keys 3 along the axial direction) and toothed irregular shear key 3 is used. The shear strength of this irregular shear key 3 is extremely high compared with the traditional shape of shear key, and the applicable loads are also more extreme and complex. In addition, the shear key of this shape optimizes the stress distribution of the shear interface and improves the overall shear resistance of the structure.
[0025] Optimization of shear key arrangement: Irregularly shaped shear keys 3 are arranged in a staggered pattern to improve the interlocking force between the grouting layer and the steel structure interface, thereby enhancing shear bearing capacity. The arrangement of the shear keys is optimized based on the mechanical properties of the grouting material to adapt to dynamic loads in complex marine environments, improving structural stability and durability. Furthermore, the shear keys are placed on the outer surface of the steel pipe piles 4, maximizing shear resistance and avoiding difficulties in processing the inner walls of the jacket pile legs. The mechanical interlocking between the shear keys and the high-performance grouting material 2 enables efficient load transfer.
[0026] Matching design of irregular shear key 3 and grouting material: Select high-performance grouting material and optimize its fluidity and bonding properties so that it can fully fill the space around irregular shear key 3, improve the overall connection strength, and combine the shape of irregular shear key 3 to ensure that the grouting material can be evenly distributed, reduce local voids, reduce the risk of structural failure, and improve the fatigue resistance of the connection section.
[0027] The second aspect of this application provides an installation method for installing the grouting connection section of the large-diameter jacket foundation for offshore wind power provided in the first aspect embodiment. The installation method includes the following steps: S1: After completing the manufacturing of the jacket foundation and grouting connection section, including the installation of key structures such as columns, sleeves, and shear keys, ensure the accuracy of the dimensions and the reliability of the quality of each component. Use rock-socketed piles or inserted piles as foundation supports and complete the prefabrication of the pile foundation in advance. After prefabrication, load the jacket, pile foundation, grouting materials, hoisting equipment, and grouting system onto transport ships and transport them to the construction sea area.
[0028] S2: Use GPS or total station to measure and calibrate the pile foundation location, and debug equipment such as cranes, guide frames, and grouting systems to ensure normal operation; pay attention to weather conditions, select construction windows appropriately, and ensure stable sea conditions during construction.
[0029] S3: The pile foundation is installed to the design depth using methods such as vibratory pile driving, hammer pile driving, or bored pile driving. During the pile driving process, the verticality, positional accuracy, and penetration depth of the pile foundation are closely monitored to ensure that they meet the design requirements. After the pile driving is completed, further verification is carried out to confirm whether the pile foundation has sufficient bearing capacity.
[0030] S4: Use a crane vessel to lift the jacket, lower it slowly and precisely align it with the pre-embedded pile foundation; adjust the position to ensure accurate connection, and fix the jacket through limiting devices or temporary support structures.
[0031] S5: Lay grouting pipes and vent pipes between the casing and the pile foundation, check the grouting stop device, prepare high-strength grouting cement material, and strictly control its fluidity and setting time; during the grouting process, a staged filling method should be adopted, first perform low-speed initial grouting to ensure uniform filling, and then gradually increase the pressure to allow the grouting material to fully penetrate into each gap, ensuring that the connection section forms a high-strength bond.
[0032] S6: After grouting is completed, allow it to stand still and avoid external interference; after the material has initially solidified, use ultrasonic testing, core drilling or other non-destructive testing methods to check the density and conduct strength testing.
[0033] S7: After confirming that the grouting quality meets the expected standards, remove all temporary fixing devices, including limiting structures and guiding systems, and conduct a final comprehensive inspection to ensure that all connections are secure and free of defects. Clean up the construction site and hand it over to the subsequent wind turbine tower installation team.
[0034] The above are merely preferred embodiments of this application and are not intended to limit this application. Various modifications and variations can be made to this application by those skilled in the art. Any modifications, equivalent substitutions, improvements, etc., made within the spirit and principles of this application should be included within the protection scope of this application.
Claims
1. A grouting connection section for a large-diameter jacket foundation in offshore wind power, used to connect the jacket foundation and the grouting connection section, characterized in that, The jacket foundation includes jacket legs, and the grouting connection section includes steel pipe piles. The walls of the steel pipe piles are provided with irregularly shaped shear keys, which protrude outwards from the sidewall of the steel pipe pile towards the jacket legs. Multiple irregularly shaped shear keys are arranged at intervals along the sidewall of the steel pipe pile. Each irregularly shaped shear key includes an arc-shaped shear key and multiple toothed shear keys disposed on the arc-shaped shear key. The arc-shaped shear key has a circular arc-shaped outer wall, and the multiple toothed shear keys are arranged at intervals along the extension direction of the circular arc-shaped outer wall. Grouting material is filled between the jacket legs and the steel pipe piles, and the grouting material can seal the gap between the jacket legs and the steel pipe piles.
2. The grouting connection section for large-diameter jacket foundation of offshore wind power according to claim 1, characterized in that, The spacing of the multiple irregular shear keys includes the axial and circumferential directions of the steel pipe pile. The multiple irregular shear keys arranged along the axial direction of the steel pipe pile are defined as an irregular shear key group. Then, the adjacent groups of irregular shear keys along the circumferential direction of the steel pipe pile are staggered, and the arc-shaped outer walls of the multiple arc-shaped shear keys in the same irregular shear key group form a wave-shaped structure extending along the axial direction of the steel pipe pile.
3. The grouting connection section for large-diameter jacket foundation of offshore wind power according to claim 2, characterized in that, The grouting material is a high-performance grouting material, and the irregular shear key is also located on the outer wall of the side of the guide frame leg facing the steel pipe pile, and the irregular shear key on the guide frame leg is staggered with the irregular shear key on the steel pipe pile.