Hydrogen production apparatus and hydrogen production method
The reactor system with carbon dioxide supply and measurement units addresses inconsistent hydrogen production by optimizing reaction conditions and controlling raw material addition, ensuring efficient and energy-saving hydrogen generation.
Patent Information
- Application Number
- JP2023047534
- Authority / Receiving Office
- JP · JP
- Patent Type
- Applications
- Current Assignee / Owner
- Filing Date
- 2023-03-24
- Publication Date
- 2024-10-04
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
Conventional hydrogen production methods using scrap metal as a raw material face challenges in predicting hydrogen generation due to varying metal quality, making it difficult to control reaction time and add additional raw materials, leading to inconsistent hydrogen production.
A reactor system that includes a carbon dioxide supply section, separation section, and measurement units to monitor and control hydrogen production by measuring the amount of hydrogen generated, allowing for high-speed or energy-saving control based on real-time feedback to optimize production.
The system enables consistent and efficient hydrogen production by maintaining high carbon dioxide concentration, improving reaction efficiency, and allowing for timely addition or cessation of raw materials, even with varying metal quality, thus enhancing production control and reducing energy consumption.
Smart Images

Figure 2024136421000001_ABST
Abstract
Description
[Technical field]
[0001] The present invention relates to a hydrogen production device and a hydrogen production method. [Background technology]
[0002] Conventionally, techniques for producing hydrogen by chemical reactions have been publicly known, as described in Patent Document 1, for example.
[0003] Patent Document 1 describes a method for producing hydrogen by reacting the metal, water, and carbon dioxide with each other by placing raw materials such as metal (steel metal, etc.), water, and carbon dioxide in an apparatus such as a ball mill and operating the apparatus to grind the metal and stir the raw materials. In the method described in Patent Document 1, scrap can be used as the raw metal.
[0004] However, when scrap metal is used as the metal as in the method described in Patent Document 1, it is expected that the quality of the raw metal will vary. In this case, even if the same amount of raw material is fed into the device, it is expected that the amount of hydrogen generated will vary. When the amount of hydrogen generated varies in this way, it is difficult to predict in advance what the reaction time should be set to. In that case, it is difficult to control the hydrogen production device and to determine whether to feed additional raw material, making it difficult to produce hydrogen in an optimal manner. [Prior art documents] [Patent documents]
[0005] [Patent Document 1] JP 2007-31169 A Summary of the Invention [Problem to be solved by the invention]
[0006] The present invention has been made in view of the above circumstances, and an object of the present invention is to provide a hydrogen production device and a hydrogen production method that can suitably produce hydrogen. [Means for solving the problem]
[0007] The problem to be solved by the present invention has been described above, and the means for solving this problem will now be described.
[0008] That is, in claim 1, the present invention comprises a reactor that produces hydrogen by reacting a metal with carbon dioxide in water, a carbon dioxide supply unit that supplies carbon dioxide to the reactor, a separation unit that separates the hydrogen and carbon dioxide produced in the reactor, and a hydrogen amount measurement unit that measures the amount of hydrogen separated by the separation unit.
[0009] In claim 2, the carbon dioxide supplying unit is capable of supplying pressurized carbon dioxide to the reactor, and the separation unit separates hydrogen and carbon dioxide by the pressure of the carbon dioxide supplied by the carbon dioxide supplying unit through the reactor.
[0010] In claim 3, the reactor further comprises a gas phase detection unit that detects the amount of gas in the reactor, and an estimation unit that estimates the amount of hydrogen generated in the reactor based on the detection result of the gas phase detection unit.
[0011] In claim 4, the gas phase detection unit includes a carbon dioxide detection unit that detects the amount of carbon dioxide in the reactor.
[0012] In claim 5, the reactor is provided with a mechanism for crushing metal, and at least one of a path connecting the reactor and the carbon dioxide supply unit and a path connecting the reactor and the separation unit is formed by a piping having vibration isolation properties.
[0013] In claim 6, the method includes a raw material supplying step of supplying water and metal into the reactor, a hydrogen generating step of supplying carbon dioxide into the reactor and starting the operation of the reactor to generate hydrogen in the reactor, a production amount determining step of determining whether or not the amount of hydrogen generated in the reactor within a predetermined period is a first amount or less using a measurement result of a measuring unit that measures the amount of hydrogen generated in the reactor, and a stopping step of stopping the operation of the reactor when it is determined in the production amount determining step that the amount of hydrogen generated in the reactor within the predetermined period is the first amount or less.
[0014] In claim 7, in the hydrogen production step, a first control can be executed to constantly supply pressurized carbon dioxide into the reactor.
[0015] In claim 8, the measurement unit includes a hydrogen amount measurement unit that measures the amount of hydrogen obtained by separating hydrogen and carbon dioxide in the reactor, and an estimation unit that estimates the amount of hydrogen generated in the reactor based on the amount of gas in the reactor, and is capable of executing second control in the hydrogen generation process to supply pressurized carbon dioxide when the estimated amount of hydrogen generated as a result of the estimation unit is equal to or less than a second amount that is greater than the first amount, and to stop the supply of pressurized carbon dioxide when the measurement result of the hydrogen amount measurement unit exceeds the total amount of the estimated amount of hydrogen generated in the reactor.
[0016] In claim 9, the first control is executed when the amount of hydrogen stored in the hydrogen storage section in which the hydrogen generated in the hydrogen generation process is stored is less than a standard storage amount, and the second control is executed when the amount of hydrogen stored in the hydrogen storage section is equal to or greater than the standard storage amount. Effect of the Invention
[0017] The present invention provides an effect of being able to suitably produce hydrogen. [Brief description of the drawings]
[0018] [Figure 1] 1 is a schematic diagram showing a hydrogen production method using a hydrogen production device according to an embodiment of the present invention; [Diagram 2] FIG. 2 is a block diagram showing the configuration of devices used to control the hydrogen production device. [Diagram 3] 4 is a flowchart showing a control determination process. [Figure 4] 5 is a flowchart showing a process executed in high-speed control. [Diagram 5] 4 is a flowchart showing a process executed in energy saving control. [Figure 6] 1 is a graph showing the relationship between the amounts of hydrogen and carbon dioxide in a reactor and time. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0019] The configuration of a hydrogen production device 1 according to one embodiment of the present invention will be described below with reference to FIGS.
[0020] The hydrogen production device 1 produces hydrogen by reacting a metal raw material with carbon dioxide in water. In this embodiment, iron is used as the raw material metal. The hydrogen production device 1 produces hydrogen to be used as a fuel, for example. The hydrogen production device 1 includes a water tank 10, an iron supply device 20, a reactor 30, a carbon dioxide cylinder 40, a pressurizing pump 50, a hydrogen separation membrane module 60, a hydrogen storage section 70, a flow meter 80, a solid-liquid separator 90, and a control device 100.
[0021] 1, the above-mentioned devices (water tank 10, iron supply device 20, reactor 30, etc.) constituting the hydrogen production device 1 are connected by a solid-liquid path 2, which is a flow path for solids and liquids (iron and water, etc.), and a gas-phase path 3, which is a flow path for gases (hydrogen and carbon dioxide). In the example shown in the figure, the solid-liquid path 2 is indicated by a dashed line, and the gas-phase path 3 is indicated by a dashed line.
[0022] The water tank 10 shown in Fig. 1 stores water used for hydrogen production. The water is supplied (replenished) from the outside as needed. The water stored in the water tank 10 is supplied to a reactor 30 (described later) using, for example, an appropriate pump.
[0023] The iron supply device 20 supplies raw iron to the reactor 30. As the raw iron, iron recovered as waste such as scrap iron can be used. The iron is supplied (replenished) appropriately from the outside.
[0024] The reactor 30 shown in FIG. 1 produces hydrogen by reacting iron and carbon dioxide in water. A space is provided inside the reactor 30 for reacting the above-mentioned raw materials. When iron, water, and carbon dioxide are supplied to the inside of the reactor 30, a chemical reaction occurs between the carbonated water in which carbon dioxide is dissolved in water and the iron inside the reactor 30, producing hydrogen. After the above reaction, the inside of the reactor 30 contains the produced hydrogen, unreacted carbon dioxide (gas), water (carbonated water), and iron carbonate as a by-product.
[0025] In this embodiment, a pulverizer (vibration mill) that pulverizes the iron supplied inside is used as the reactor 30. The reactor 30 contains pulverizing media (e.g., stainless steel balls, etc.) for pulverizing the iron. The reactor 30 is vibrated to move the pulverizing media, thereby pulverizing the iron in the reactor 30. The iron that has been pulverized to increase its surface area is used to improve the reaction efficiency with carbon dioxide. According to this embodiment, the reactor 30 is operated to promote the chemical reaction while pulverizing the iron, thereby efficiently generating hydrogen. The reactor 30 includes a solid-liquid supply unit 31, a solid-liquid discharge unit 32, a gas phase supply unit 33, a gas phase discharge unit 34, and a carbon dioxide sensor 35.
[0026] The solid-liquid supply unit 31 is a section to which water from the water tank 10 and iron from the iron supply device 20 are supplied. The solid-liquid supply unit 31 can be switched between an open state that allows the supply of iron and water and a closed state that restricts the supply of iron and water. The water tank 10 and the iron supply device 20 are connected to the solid-liquid supply unit 31 by a solid-liquid path 2.
[0027] The solid-liquid discharge section 32 is a section where the by-products, ferrous carbonate and water, are discharged. The solid-liquid discharge section 32 discharges ferrous carbonate and water to a solid-liquid separator 90, which will be described later. The solid-liquid discharge section 32 can be switched between an open state that allows the discharge of ferrous carbonate and water, and a closed state that restricts the discharge of ferrous carbonate and water.
[0028] The gas phase supply unit 33 is a portion to which carbon dioxide, which is a raw material, is supplied. Carbon dioxide is supplied to the gas phase supply unit 33 from a pressurizing pump 50, which will be described later.
[0029] The gas phase discharge unit 34 is a portion where the produced hydrogen and unreacted carbon dioxide are discharged. The gas phase discharge unit 34 discharges the hydrogen and carbon dioxide to the hydrogen separation membrane module 60 described below.
[0030] In this embodiment, the gas supply part 33 and the gas discharge part 34 are always open.
[0031] The carbon dioxide sensor 35 detects the concentration of carbon dioxide (gas) inside the reactor 30.
[0032] The carbon dioxide cylinder 40 stores the carbon dioxide as a raw material. The carbon dioxide is supplied (replenished) from the outside as appropriate. As a means for supplying carbon dioxide from the outside, for example, a carbon dioxide recovery device can be adopted. The carbon dioxide stored in the carbon dioxide cylinder 40 is supplied to the reactor 30 via the gas phase supply unit 33. The carbon dioxide cylinder 40 is provided with an opening / closing means (for example, a valve) for switching between supplying and stopping the supply of carbon dioxide.
[0033] The pressurizing pump 50 pressurizes the carbon dioxide in the carbon dioxide cylinder 40 and supplies it to the reactor 30. The pressurizing pump 50 is provided between the carbon dioxide cylinder 40 and the reactor 30. When the pressurizing pump 50 is operated, pressurized carbon dioxide (pressurized carbon dioxide) is supplied to the reactor 30.
[0034] The carbon dioxide cylinder 40, the pressurizing pump 50, and the gas phase supply unit 33 (reactor 30) are connected by a gas phase path 3. Here, in this embodiment, in the gas phase path 3, a first path 3a which is a portion connecting the pressurizing pump 50 and the gas phase supply unit 33 is formed of a flexible pipe having vibration-proofing properties and capable of absorbing vibrations of the reactor 30. This makes it possible to suppress the vibrations of the reactor 30 from affecting the supply of carbon dioxide by the pressurizing pump 50.
[0035] The hydrogen separation membrane module 60 separates the mixed gas of hydrogen and carbon dioxide discharged from the gas phase discharge section 34 of the reactor 30 into hydrogen and carbon dioxide. The hydrogen separation membrane module 60 has a hydrogen separation membrane that allows only hydrogen to pass (not carbon dioxide to pass). By applying pressure to the hydrogen separation membrane and introducing the mixed gas, it is possible to separate hydrogen that passes through the hydrogen separation membrane from carbon dioxide that does not pass through. In this embodiment, the mixed gas is introduced into the hydrogen separation membrane module 60 by the pressure of the pressurized carbon dioxide from the pressurizing pump 50, and hydrogen is passed through the hydrogen separation membrane, thereby separating hydrogen and carbon dioxide. The hydrogen separated by the hydrogen separation membrane module 60 is supplied to a hydrogen storage section 70 described later.
[0036] The gas phase discharge section 34 (reactor 30) and the hydrogen separation membrane module 60 are connected by a gas phase path 3. In this embodiment, the second path 3b, which is a portion of the gas phase path 3 that connects the gas phase discharge section 34 and the hydrogen separation membrane module 60, is formed of flexible piping generally similar to that of the first path 3a. This makes it possible to suppress the vibration of the reactor 30 from affecting the separation by the hydrogen separation membrane module 60.
[0037] In addition, in this embodiment, the carbon dioxide separated by the hydrogen separation membrane module 60 is returned to the carbon dioxide cylinder 40 via the gas phase path 3, so that the separated carbon dioxide can be supplied to the reactor 30. This allows the carbon dioxide separated by the hydrogen separation membrane module 60 to be reused for the reaction in the reactor 30.
[0038] The hydrogen storage unit 70 stores hydrogen. The hydrogen stored in the hydrogen storage unit 70 is supplied to hydrogen utilization equipment 4, which is equipment that utilizes hydrogen, as needed. The hydrogen storage unit 70 and the hydrogen utilization equipment 4 are connected by a gas phase path 3. In addition, a capacitance sensor 71 is provided inside the hydrogen storage unit 70 to detect the amount of hydrogen stored in the hydrogen storage unit 70.
[0039] The flow meter 80 measures the flow rate of hydrogen separated by the hydrogen separation membrane module 60. The flow meter 80 is provided in the gas phase path 3 that connects the hydrogen separation membrane module 60 and the hydrogen storage section 70. The flow meter 80 can measure the amount of hydrogen flowing through the gas phase path 3 per unit time (e.g., 1 second).
[0040] The solid-liquid separator 90 separates the solid and liquid (iron carbonate and water) discharged from the solid-liquid discharge section 32 of the reactor 30 into a solid (iron carbonate) and a liquid (water). As the solid-liquid separator 90, for example, a centrifuge, a screw conveyor, a settling tank, or the like can be used.
[0041] The ferrous carbonate separated by the solid-liquid separator 90 is supplied to by-product storage facility 5, which stores the ferrous carbonate by-product. The ferrous carbonate stored in the by-product storage facility 5 is sold or disposed of as appropriate. Meanwhile, the water separated by the solid-liquid separator 90 is returned to the water tank 10. This allows the water separated by the solid-liquid separator 90 to be reused for the reaction in the reactor 30.
[0042] The solid-liquid discharge section 32 (reactor 30), the solid-liquid separator 90, and the by-product storage facility 5 are connected by a solid-liquid path 2. In addition, the solid-liquid separator 90 and the water tank 10 are connected by the solid-liquid path 2.
[0043] The control device 100 is capable of processing various types of information. The control device 100 includes a CPU, a memory, and the like. As shown in Fig. 2, the control device 100 is electrically connected to the solid-liquid supply unit 31, the solid-liquid discharge unit 32, the carbon dioxide sensor 35, the capacity sensor 71, and the flow meter 80 of the hydrogen production device 1. The control device 100 is also electrically connected to each device (such as the reactor 30 and the pressurizing pump 50) of the hydrogen production device 1, and is capable of controlling the operation of each of the above devices, etc.
[0044] The control device 100 acquires the detection results of the carbon dioxide sensor 35, the capacitance sensor 71, and the flow meter 80, and is capable of executing control for producing hydrogen by operating each device of the hydrogen production device 1 based on the detection results.
[0045] Hereinafter, the process of producing hydrogen by the hydrogen production device 1 will be described with reference to FIGS.
[0046] The hydrogen production device 1 according to this embodiment is capable of executing "high-speed control" (see FIG. 4) in which hydrogen is produced while constantly supplying carbon dioxide pressurized by the pressurizing pump 50 (pressurized carbon dioxide) into the reactor 30, and "energy saving control" (see FIG. 5) in which pressurized carbon dioxide is supplied into the reactor 30 at a timing when the reaction efficiency of hydrogen decreases. In addition, the hydrogen production device 1 is capable of executing a "control decision process" (see FIG. 3) that can switch between "high-speed control" and "energy saving control."
[0047] First, a description will be given of the "control decision process" shown in Fig. 3. In the control decision process, the control device 100 determines whether to execute "high-speed control" or "energy saving control" based on the detection result of the capacity sensor 71 of the hydrogen storage section 70.
[0048] In step S101, the control device 100 determines whether the amount of hydrogen stored in the hydrogen storage section 70 is less than a preset reference storage amount, based on the detection value of the capacity sensor 71. In this embodiment, the reference storage amount is set to 50% of the capacity of the hydrogen storage section 70. Note that the reference storage amount is not limited to the above-mentioned value, and any value can be used.
[0049] If the amount of hydrogen stored in hydrogen storage section 70 is less than the reference amount (step S101: YES), control device 100 proceeds to step S102 and executes "high-speed control". On the other hand, if the amount of hydrogen stored in hydrogen storage section 70 is equal to or greater than the reference amount (step S101: NO), control device 100 proceeds to step S103 and executes "energy saving control". After executing "high-speed control" and "energy saving control", control device 100 proceeds to step S101.
[0050] Next, a description will be given of the "high-speed control" shown in Fig. 4. In the high-speed control, the control device 100 produces hydrogen in a state in which pressurized carbon dioxide is constantly supplied into the reactor 30.
[0051] At the time when the "high speed control" is started, the raw material inside the reactor 30 is assumed to be empty. Also, at this time, the solid-liquid supply section 31 of the reactor 30 is assumed to be in an open state, and the solid-liquid discharge section 32 is assumed to be in a closed state.
[0052] 4, the control device 100 supplies raw materials into the reactor 30 and operates the reactor 30 to generate hydrogen. Specifically, the control device 100 supplies water from the water tank 10 and iron from the iron supply device 20 to the reactor 30 (solid-liquid supplying section 31) (step S111), and closes the solid-liquid supplying section 31 (step S112).
[0053] Furthermore, the control device 100 opens the opening and closing means of the carbon dioxide cylinder 40 and operates the pressurizing pump 50 to supply pressurized carbon dioxide to the reactor 30 (gas phase supply unit 33) (step S113). In this embodiment, by supplying the pressurized carbon dioxide, the air pressure in the reactor 30 increases, and carbon dioxide can be made to dissolve easily in water. This increases the carbon dioxide concentration in the water (carbonated water) in the reactor 30, and improves the reaction efficiency between iron and carbon dioxide in the water.
[0054] Furthermore, the control device 100 operates (vibrates) the reactor 30 (step S114). This causes the iron to be crushed in the reactor 30 to increase the surface area of the iron, thereby improving the efficiency of the reaction with carbon dioxide to generate hydrogen.
[0055] The mixed gas of hydrogen and unreacted carbon dioxide produced in the reactor 30 is discharged via the gas phase discharge section 34 and supplied to the hydrogen separation membrane module 60, where it is separated into hydrogen and carbon dioxide. The hydrogen is stored in the hydrogen storage section 70, and the carbon dioxide is returned to the carbon dioxide cylinder 40. After executing the process of step S114, the control device 100 proceeds to the process of step S115.
[0056] In the process of step S115, the control device 100 judges whether or not the generation of hydrogen in the reactor 30 has stopped based on the detection result of the flow meter 80. In this embodiment, the control device 100 judges that the generation of hydrogen has stopped when the flow meter 80 no longer detects the flow rate of hydrogen (the detection value of the flow meter 80 becomes approximately 0). In this case, it is estimated that all the iron in the reactor 30 has been used in the reaction.
[0057] When the control device 100 determines that the generation of hydrogen in the reactor 30 has stopped (step S115: YES), the process proceeds to step S116. On the other hand, when the control device 100 determines that the generation of hydrogen in the reactor 30 has not stopped (step S115: NO), the process proceeds to step S114.
[0058] In the process from step S116 to step S119, the control device 100 stops the operation of the reactor 30, stops the supply of pressurized carbon dioxide, and discharges the reactants (iron carbonate and water) in the reactor 30. Specifically, the control device 100 stops the operation of the reactor 30, closes the opening and closing means of the carbon dioxide cylinder 40, and stops the pressurizing pump 50 to stop the supply of pressurized carbon dioxide to the reactor 30 (gas phase supply unit 33) (step S116). Next, the control device 100 opens the solid-liquid discharge unit 32 (step S117) and discharges the iron carbonate and water in the reactor 30 to the solid-liquid separator 90 (step S118). After the discharge of the iron carbonate and water, the control device 100 opens the solid-liquid supply unit 31 and closes the solid-liquid discharge unit 32 (step S119). This completes preparations for supplying new raw materials into the reactor 30. After executing each of the above processes, the control device 100 ends the high-speed control. After the high-speed control ends, the control device 100 proceeds to a control determination process (see FIG. 3).
[0059] According to the high-speed control as described above, by producing hydrogen while constantly supplying pressurized carbon dioxide into the reactor 30, the carbon dioxide concentration in the water (carbonated water) in the reactor 30 can be constantly maintained high, and the hydrogen reaction efficiency can be improved. Furthermore, according to the high-speed control, it is possible to determine in real time (with almost no dime lag) based on the detection value of the flow meter 80 that all the iron in the reactor 30 has been used in the reaction, and the raw material can be replaced at an appropriate timing.
[0060] Next, the "energy saving control" shown in Fig. 5 will be described. In the energy saving control, when the reaction efficiency in the reactor 30 decreases, the control device 100 supplies pressurized carbon dioxide into the reactor 30 to produce hydrogen. Note that, in the following, explanations of points that overlap with the high-speed control will be omitted.
[0061] 5, the control device 100 supplies raw materials into the reactor 30 and operates the reactor 30 to generate hydrogen. The processes from step S121 to step S124 are generally similar to the processes from step S111 to step S114 in the high-speed control, except for the process of step S123. In step S123, the control device 100 opens the opening and closing means of the carbon dioxide cylinder 40 and operates the pressurizing pump 50 to supply pressurized carbon dioxide to the reactor 30 (gas phase supply unit 33), which is similar to step S113. However, when a certain amount of pressurized carbon dioxide (an amount that fills the volume of the gas phase of the reactor 30) is supplied, the control device 100 closes the opening and closing means of the carbon dioxide cylinder 40 and stops the pressurizing pump 50 to stop the supply of pressurized carbon dioxide to the reactor 30 (gas phase supply unit 33), which is different from the process of step S113. The control device 100 can determine, based on the detection value of the carbon dioxide sensor 35, for example, that the above-mentioned certain amount of pressurized carbon dioxide has been supplied to the reactor 30.
[0062] The processes in steps S121, S122, and S124 are generally similar to the processes in steps S111, S112, and S114, and therefore will not be described. After executing the above processes, the control device 100 proceeds to the process in step S125.
[0063] After the operation of the reactor 30 is started in the process of step S124, the reaction proceeds in the reactor 30 and hydrogen is generated. The control device 100 measures the amount of hydrogen estimated to have been generated in the reactor 30 (estimated amount of hydrogen generated) every unit time. For example, 30 minutes can be used as the unit time.
[0064] Here, it may be difficult to directly measure the concentration of hydrogen using a sensor. Therefore, in this embodiment, the estimated amount of hydrogen generated in the reactor 30 is calculated based on the detection value (carbon dioxide concentration) of the carbon dioxide sensor 35. A method for calculating the estimated amount of hydrogen generated based on the detection value of the carbon dioxide sensor 35 will be described below.
[0065] The graph in FIG. 6 shows the results of a hydrogen generation test in which iron, water, and carbon dioxide were placed in a container and the progress was observed. The graph shows the relationship between the amount of hydrogen and carbon dioxide (amount of substance) and time. As shown in the graph, the amount of hydrogen increases in the container as carbon dioxide is consumed. More specifically, the amount of hydrogen generated in the container corresponds to approximately 90% (87% to 92%) of the amount of carbon dioxide consumed. For example, the amount of carbon dioxide consumed 300 minutes after the start of the reaction is 8.97 (mmol), and the amount of hydrogen produced is 7.84 (mmol).
[0066] In this embodiment, based on the relationship between the carbon dioxide consumption and the amount of hydrogen produced, 90% of the carbon dioxide consumption calculated from the detection value of the carbon dioxide sensor 35 is calculated as the amount of hydrogen estimated to have been generated in the reactor 30 (estimated amount of hydrogen produced).
[0067] In step S125, the control device 100 judges whether the estimated amount of hydrogen generated per unit time in the reactor 30 is equal to or less than the reference amount. In this embodiment, a value of 60% of the estimated amount of hydrogen generated in the previous unit time (the unit time immediately preceding the unit time of the estimated amount of hydrogen generated that is the subject of judgment in step S125) is used as the reference amount. When the estimated amount of hydrogen generated per unit time becomes equal to or less than 60% of the estimated amount of hydrogen generated per unit time of the previous unit time, the reaction efficiency thereafter tends to decrease (see FIG. 6). For this reason, when the estimated amount of hydrogen generated per unit time becomes equal to or less than the reference amount, it is estimated that the reaction efficiency in the reactor 30 has decreased.
[0068] When the control device 100 determines that the estimated amount of hydrogen generated per unit time in the reactor 30 is equal to or less than the reference amount (step S125: YES), the control device 100 proceeds to the process of step S126. On the other hand, when the control device 100 determines that the estimated amount of hydrogen generated per unit time in the reactor 30 exceeds the reference amount (step S125: NO), the control device 100 proceeds to the process of step S124.
[0069] In step S126, the control device 100 opens the opening and closing means of the carbon dioxide cylinder 40 and operates the pressurizing pump 50 to supply pressurized carbon dioxide to the reactor 30. By performing the pressurization, the mixed gas of hydrogen and unreacted carbon dioxide generated in the reactor 30 can be separated into hydrogen and carbon dioxide by the hydrogen separation membrane module 60. This also allows the flow rate of the separated hydrogen to be measured by the flow meter 80, and the amount of hydrogen generated (amount of hydrogen) to be calculated by the control device 100 based on the measurement result. After executing the process of step S126, the control device 100 proceeds to the process of step S127.
[0070] In step S127, the control device 100 judges whether the amount of hydrogen based on the measurement result of the flowmeter 80 exceeds the total amount of estimated hydrogen generation in the reactor 30 (estimated total generation amount). Here, the "total amount of estimated hydrogen generation" is the sum of the estimated amount of hydrogen generation relative to the hydrogen generated in the reactor 30 from the time when all materials are supplied into the reactor 30 (when the supply of carbon dioxide is started in step S123). Note that, when the process proceeds to the process of step S125 in the process of step S129 described later (step S129: NO), the estimated total generation amount is reset.
[0071] When the amount of hydrogen based on the measurement results of the flowmeter 80 exceeds the estimated total amount generated, it is estimated that an amount of hydrogen equivalent to the estimated total amount generated has been discharged from the reactor 30. When the control device 100 determines that the amount of hydrogen based on the measurement results of the flowmeter 80 exceeds the estimated total amount generated, it proceeds to processing of step S128. On the other hand, when the control device 100 determines that the amount of hydrogen based on the measurement results of the flowmeter 80 is equal to or less than the estimated total amount generated, it proceeds to processing of step S126 (continues the supply of pressurized carbon dioxide).
[0072] In step S128, the control device 100 closes the opening and closing means of the carbon dioxide cylinder 40 and stops the supply of pressurized carbon dioxide by the pressurizing pump 50 to the reactor 30. After executing the process of step S128, the control device 100 proceeds to the process of step S129.
[0073] In step S129, the control device 100 judges whether or not the generation of hydrogen in the reactor 30 has stopped based on the detection result of the carbon dioxide sensor 35. In this embodiment, the control device 100 judges that the generation of hydrogen has stopped when the estimated amount of hydrogen generated based on the detection result of the carbon dioxide sensor 35 becomes approximately 0. In this case, since the supply of carbon dioxide to the reactor 30 has been completed, it is estimated that the iron in the reactor 30 has reacted completely, resulting in the generation of hydrogen being stopped.
[0074] When the control device 100 determines that the generation of hydrogen in the reactor 30 has stopped (step S129: YES), the process proceeds to step S130. On the other hand, when the control device 100 determines that the generation of hydrogen in the reactor 30 has not stopped (S129: NO), the process proceeds to step S125.
[0075] The processing from step S130 to step S133 is generally similar to the processing from step S116 to step S119 in the high-speed control, and therefore a description thereof will be omitted. Note that in step S130, the opening and closing means of the carbon dioxide cylinder 40 has already been closed at the stage of step S128 to stop the supply of pressurized carbon dioxide, and therefore it is only necessary to perform processing to stop the operation of the reactor 30, which is different from step S116. After executing each of the above processes, the control device 100 ends the energy saving control. After the energy saving control ends, the control device 100 transitions to a control judgment process (see FIG. 3).
[0076] According to the energy saving control as described above, it is possible to reduce energy and costs by reducing the supply of pressurized carbon dioxide. In addition, it is possible to suppress the decrease in hydrogen reaction efficiency by supplying pressurized carbon dioxide at a timing when the hydrogen reaction efficiency decreases.
[0077] According to the hydrogen production device 1 as described above, high-speed control is executed to efficiently produce hydrogen until the amount of hydrogen in the hydrogen storage section 70 reaches the standard storage amount (step S101: YES), and when the amount of hydrogen in the hydrogen storage section 70 reaches the standard storage amount (step S101: NO), energy saving control is executed to achieve energy conservation.
[0078] According to this embodiment, the flow rate of hydrogen separated by the hydrogen separation membrane module 60 is measured by the flow meter 80, so that hydrogen can be suitably produced even when raw materials of unstable quality such as scrap iron are used. That is, when the quality of raw materials varies, the amount of hydrogen generated is likely to vary even when the same amount of raw materials is put into the water tank. For this reason, in the conventional hydrogen production device, it is difficult to predict in advance what the reaction time should be set for production, and it is difficult to control the hydrogen production device and to determine whether to add additional raw materials. On the other hand, according to the hydrogen production device 1 according to this embodiment, the flow rate of hydrogen separated by the hydrogen separation membrane module 60 is measured by the flow meter 80, so that the amount of hydrogen generated in the reactor 30 can be grasped, and the timing of adding and discharging raw materials can be controlled, so that hydrogen can be suitably produced.
[0079] Furthermore, according to this embodiment, when it is determined that the generation of hydrogen in the reactor 30 has stopped (step S115: YES, step S129: YES), the reactants in the reactor 30 are discharged, so that the iron can be reacted to the end. As a result, the purity of the iron carbonate, which is a by-product, increases, making it easier to utilize and sell the iron carbonate.
[0080] As described above, the hydrogen production device 1 according to this embodiment has the following features: A reactor 30 that reacts metal (iron) with carbon dioxide in water to produce hydrogen; A carbon dioxide supply unit (pressurizing pump 50) that supplies carbon dioxide to the reactor 30; A separation unit (hydrogen separation membrane module 60) that separates hydrogen and carbon dioxide generated in the reactor 30; a hydrogen amount measuring unit (flow meter 80) that measures the amount of hydrogen separated by the hydrogen separation membrane module 60; It is equipped with the following.
[0081] With this configuration, hydrogen can be produced suitably. That is, by measuring the amount (flow rate) of hydrogen separated by the hydrogen separation membrane module 60 with the flow meter 80, the amount of hydrogen generated in the reactor 30 can be grasped, and hydrogen can be produced suitably.
[0082] In addition, the pressurizing pump 50 is Pressurized carbon dioxide can be supplied to the reactor 30; The hydrogen separation membrane module 60 is Hydrogen and carbon dioxide are separated by the pressure of carbon dioxide supplied by the pressurizing pump 50 through the reactor 30.
[0083] With this configuration, the pressurized carbon dioxide used for separating hydrogen in the hydrogen separation membrane module 60 can be utilized to increase the carbon dioxide concentration in the reactor 30, thereby improving the hydrogen reaction efficiency.
[0084] Moreover, the hydrogen production device 1 according to this embodiment has the following features: A gas phase detector (carbon dioxide sensor 35) for detecting the amount of gas in the reactor 30; an estimation unit (control device 100) that estimates the amount of hydrogen generated in the reactor based on the detection result of the gas phase detection unit; It is equipped with the following.
[0085] With this configuration, it is possible to control hydrogen production, such as the supply of raw materials, based on the estimated amount of hydrogen generated in the reactor 30. Furthermore, in this embodiment, since hydrogen is separated in the hydrogen separation membrane module 60 using the pressure of carbon dioxide pressurized by the pressurizing pump 50, the amount of hydrogen cannot be measured by the flow meter 80 when pressurization by the pressurizing pump 50 is not performed, but by providing a gas phase detection unit, it is possible to estimate the amount of hydrogen generated in the reactor 30 even when pressurization by the pressurizing pump 50 is not performed.
[0086] The gas phase detection unit includes: The reactor 30 includes a carbon dioxide detection unit (carbon dioxide sensor 35) that detects the amount of carbon dioxide in the reactor 30.
[0087] With this configuration, it is possible to suitably estimate the amount of hydrogen generated in the reactor 30. That is, it is sometimes difficult to measure the concentration of hydrogen using a sensor, and it is difficult to directly measure the amount of hydrogen generated in the reactor 30. Therefore, by estimating the amount of hydrogen generated in the reactor 30 based on the detection result of the carbon dioxide sensor 35, it is possible to suitably estimate the amount of hydrogen generated in the reactor 30.
[0088] The reactor 30 further comprises: Equipped with a mechanism for crushing iron, At least one of the path (first path 3a) connecting the reactor 30 and the pressurizing pump 50 and the path (second path 3b) connecting the reactor 30 and the hydrogen separation membrane module 60 is formed from vibration-proof piping.
[0089] With this configuration, the influence of vibrations generated in the reactor 30 on the pressurizing pump 50 and the hydrogen separation membrane module 60 can be suppressed.
[0090] In addition, the hydrogen production method according to this embodiment includes the steps of: A raw material supply step (step S111, step S121) of supplying water and iron into the reactor 30; a hydrogen production process (steps S113, S114, S123, and S124) in which carbon dioxide is supplied into the reactor and the operation of the reactor is started to produce hydrogen in the reactor; a generation amount determination step (step S115, step S129) for determining whether the amount of hydrogen generated in the reactor 30 within a predetermined period (per unit time) is equal to or less than a first amount (whether generation of hydrogen has stopped) using a measurement result of a measurement unit (flow meter 80, carbon dioxide sensor 35) that measures the amount of hydrogen generated in the reactor 30; a stop step (step S116, step S130) of stopping the operation of the reactor 30 when it is determined in the production amount determination step that the amount of hydrogen produced in the reactor 30 within a predetermined period is equal to or less than the first amount (the generation of hydrogen has stopped); It is equipped with the following.
[0091] With this configuration, hydrogen can be suitably produced. That is, the amount of hydrogen generated in the reactor 30 can be grasped based on the measurement results of the measurement unit (flow meter 80, carbon dioxide sensor 35) and control for hydrogen production can be performed, so that hydrogen can be suitably produced.
[0092] In addition, the hydrogen production method according to this embodiment includes the steps of: In the hydrogen generation step (step S113, step S114), It is possible to carry out a first control (high-speed control) in which pressurized carbon dioxide is constantly supplied into the reactor 30.
[0093] With this configuration, pressurized carbon dioxide can be constantly supplied into the reactor 30, so that the carbon dioxide concentration in the water (carbonated water) in the reactor 30 can be maintained high at all times, thereby improving the hydrogen reaction efficiency.
[0094] In addition, the measurement unit A hydrogen amount measuring unit (flow meter 80, control device 100) that measures the amount of hydrogen obtained by separating hydrogen and carbon dioxide in the reactor 30; An estimation unit (carbon dioxide sensor 35, control device 100) that estimates the amount of hydrogen generated in the reactor 30 based on the amount of gas in the reactor 30, In the hydrogen generation step (step S123, step S124), supplying pressurized carbon dioxide when the estimated amount of hydrogen generated, which is the result of estimation by the estimation unit (carbon dioxide sensor 35, control device 100), is equal to or less than a second amount (a value that is 60% of the previous estimated amount of hydrogen generated per unit time) that is greater than the first amount; When the measurement result of the flow meter 80 exceeds the total amount of the estimated hydrogen generation in the reactor 30, a second control (energy saving control) can be executed to stop the supply of pressurized carbon dioxide.
[0095] With this configuration, the estimated amount of hydrogen generated becomes equal to or less than the second amount, and pressurized carbon dioxide is supplied at a timing when the hydrogen reaction efficiency has decreased, thereby suppressing the decrease in hydrogen reaction efficiency. Also, by supplying pressurized carbon dioxide not all the time but at a timing when the hydrogen reaction efficiency has decreased, energy savings can be achieved.
[0096] In addition, the hydrogen production method according to this embodiment includes the steps of: When the amount of hydrogen stored in the hydrogen storage unit 70 in which the hydrogen generated in the hydrogen generation process is stored is less than a reference amount, the high-speed control is executed. When the amount of hydrogen stored in the hydrogen storage section 70 is equal to or greater than the reference amount, the energy saving control is executed.
[0097] By configuring in this manner, high-speed control is executed to efficiently produce hydrogen until the amount of hydrogen stored in the hydrogen storage section 70 reaches the standard storage amount (step S101: YES), and when the amount of hydrogen in the hydrogen storage section 70 reaches the standard storage amount (step S101: NO), energy saving control is executed to achieve energy conservation.
[0098] The pressurizing pump 50 according to this embodiment is one embodiment of a carbon dioxide supply unit according to the present invention. Moreover, the hydrogen separation membrane module 60 according to this embodiment is one embodiment of a separation section according to the present invention. The carbon dioxide sensor 35 according to this embodiment is one embodiment of a carbon dioxide detection section according to the present invention. Moreover, the flow meter 80 and the carbon dioxide sensor 35 according to this embodiment are one embodiment of a measuring unit according to the present invention. Moreover, the control device 100 according to this embodiment is one embodiment of an estimation unit according to the present invention.
[0099] Although the embodiment of the present invention has been described above, the present invention is not limited to the above embodiment, and appropriate modifications are possible within the scope of the technical idea of the invention described in the claims. For example, the configuration of each part constituting the hydrogen production device 1 is not limited to the above-mentioned, and can be appropriately modified. In the hydrogen production device 1, various mechanisms such as pumps and conveyors not shown in FIG. 1 can be appropriately used for supplying and discharging liquids, gases, and solids. Furthermore, the specific numerical values exemplified in the above description are merely examples, and can be arbitrarily modified.
[0100] In addition, in this embodiment, the hydrogen production apparatus 1 includes a water tank 10, an iron supply device 20, a carbon dioxide cylinder 40, a hydrogen storage section 70, and a solid-liquid separator 90, but it is not necessary for some or all of the above-mentioned components to be included in the hydrogen production apparatus 1.
[0101] In the present embodiment, the control determination process switches between high-speed control and energy-saving control depending on the amount of hydrogen stored in the hydrogen storage section 70, but the present invention is not limited to this. For example, the control may be switched between high-speed control and energy-saving control at any time. In this case, the control may be switched by an operator's operation, etc.
[0102] In addition, in this embodiment, when it is determined that the generation of hydrogen in the reactor 30 has stopped (the amount of hydrogen generated has become approximately 0) (step S115: YES, step S125: YES), the reactor 30 is stopped and the materials are discharged, but the present invention is not limited to such an embodiment. For example, when the amount of hydrogen generated in the reactor 30 becomes equal to or less than a predetermined standard value greater than 0, the reactor 30 may be stopped and the materials may be discharged.
[0103] In addition, in the present embodiment, an example has been shown in which the estimated amount of hydrogen generated in the reactor 30 is calculated based on the detection value of the carbon dioxide sensor 35, but the present invention is not limited to such an embodiment. For example, the estimated amount of hydrogen generated in the reactor 30 may be calculated using a sensor capable of measuring the concentration of hydrogen.
[0104] In addition, in the present embodiment, an example is shown in which the gas phase supply unit 33 and the gas phase discharge unit 34 of the reactor 30 are always open, but the present invention is not limited to such an embodiment. For example, the gas phase supply unit 33 and the gas phase discharge unit 34 may be configured to be switchable between an open state and a closed state, generally similar to the solid-liquid supply unit 31 and the solid-liquid discharge unit 32. In this case, for example, in energy saving control, the gas phase supply unit 33 and the gas phase discharge unit 34 may be set to a closed state when carbon dioxide is not supplied or hydrogen is not discharged.
[0105] In addition, in this embodiment, an example has been shown in which the opening and closing of the solid-liquid supply unit 31 and the solid-liquid discharge unit 32 of the hydrogen production device 1, the supply of raw materials, etc. are performed automatically, but the above operations may also be performed manually.
[0106] In this embodiment, iron is used as the raw material, but metals other than iron may be used. Examples of metals other than iron that can be used include aluminum, magnesium, titanium, zinc, manganese, nickel, and chromium. A mixture of two or more of these metals may also be used.
[0107] In this embodiment, a vibrating mill is used as the reactor 30, but other devices may be used as long as they are capable of pulverizing metals. For example, devices such as an attritor, a bead mill, or a hammer mill can be used as the reactor 30. [Explanation of symbols]
[0108] 1 Hydrogen production equipment 30 Reactor 50 Pressure Pump 60 Hydrogen separation membrane module 80 flow meter 100 Control device
Claims
1. a reactor for reacting a metal with carbon dioxide in water to produce hydrogen; A carbon dioxide supply unit that supplies carbon dioxide to the reactor; A separation section that separates hydrogen and carbon dioxide produced in the reactor; a hydrogen amount measuring unit that measures the amount of hydrogen separated by the separation unit; Equipped with Hydrogen production equipment.
2. The carbon dioxide supply unit is Pressurized carbon dioxide can be supplied to the reactor; The separation unit is Hydrogen and carbon dioxide are separated by the pressure of carbon dioxide supplied through the reactor by the carbon dioxide supply unit. The hydrogen production device according to claim 1 .
3. a gas phase detector for detecting an amount of gas in the reactor; an estimation unit that estimates an amount of hydrogen generated in the reactor based on a detection result of the gas phase detection unit; The hydrogen production device according to claim 2 , comprising:
4. The gas phase detection unit is A carbon dioxide detection unit for detecting the amount of carbon dioxide in the reactor is included. The hydrogen production device according to claim 3 .
5. The reactor comprises: Equipped with a mechanism for crushing metal, At least one of the path connecting the reactor and the carbon dioxide supply unit and the path connecting the reactor and the separation unit is formed of a piping having vibration resistance. The hydrogen production device according to claim 1 .
6. A raw material supplying step of supplying water and metal into the reactor; a hydrogen generating step of supplying carbon dioxide into the reactor and starting the operation of the reactor to generate hydrogen in the reactor; a generation amount determination step of determining whether or not the amount of hydrogen generated in the reactor within a predetermined period of time is equal to or less than a first amount, using a measurement result of a measurement unit that measures the amount of hydrogen generated in the reactor; a stop step of stopping the operation of the reactor when it is determined in the production amount determination step that the amount of hydrogen produced in the reactor within a predetermined period is equal to or less than the first amount; A hydrogen production method comprising the steps of:
7. In the hydrogen generation step, A first control can be performed to constantly supply pressurized carbon dioxide into the reactor. The method for producing hydrogen according to claim 6.
8. The measurement unit is a hydrogen amount measuring unit that measures the amount of hydrogen obtained by separating hydrogen and carbon dioxide in the reactor; an estimation unit that estimates an amount of hydrogen generated in the reactor based on an amount of gas in the reactor, In the hydrogen generation step, supplying pressurized carbon dioxide when the estimated amount of hydrogen generated, which is the estimation result of the estimation unit, is equal to or less than a second amount that is greater than the first amount; When the measurement result of the hydrogen amount measuring unit exceeds the total amount of the estimated hydrogen generation amount in the reactor, a second control is executed to stop the supply of pressurized carbon dioxide. The method for producing hydrogen according to claim 7.
9. When the amount of hydrogen stored in the hydrogen storage section in which the hydrogen generated in the hydrogen generation step is stored is less than a reference storage amount, the first control is executed; When the amount of hydrogen stored in the hydrogen storage section is equal to or greater than the reference amount, the second control is executed. The method for producing hydrogen according to claim 8.