Spraying method and backfill method
The method addresses nozzle interference and rebound issues in tunnel backfilling by employing a structured approach to form the backfill layer with perpendicular material injection, enhancing construction efficiency and layer integrity.
Patent Information
- Application Number
- JP2023056504
- Authority / Receiving Office
- JP · JP
- Patent Type
- Applications
- Current Assignee / Owner
- Filing Date
- 2023-03-30
- Publication Date
- 2024-10-11
AI Technical Summary
In tunnel backfilling, existing spraying methods face challenges with nozzle interference near the edge, leading to increased material rebound and complexity in controlling the arm movement, which complicates the construction process and affects the integrity of the backfill layer.
A method involving specific steps to form a backfilling layer by orienting the spray nozzle perpendicularly to the tunnel walls, including lower edge, peripheral edge, and central part forming steps, ensuring perpendicular material injection to reduce rebound and simplify arm control, using a robot to adjust the nozzle's position and direction.
The method effectively reduces material rebound, maintains the integrity of the backfill layer, and ensures efficient construction by minimizing interference and maintaining perpendicular material application, thereby reducing construction costs and ensuring the water-stopping performance of the backfill layer.
Smart Images

Figure 2024143707000001_ABST
Abstract
Description
[Technical field]
[0001] The present invention relates to a spraying method and a backfilling method. [Background technology]
[0002] Conventionally, the spraying method described in the following Patent Document 1 is known. This spraying method forms a sprayed layer on the end wall surface of a tunnel, and this spraying method is repeated to form a wall body made of stacked sprayed layers. In this spraying method, the spray nozzle is directed perpendicularly to the end wall surface and moved horizontally by a driving device to form a sprayed belt extending horizontally. A plurality of these sprayed belts are formed at approximately equal intervals in the vertical direction, and ridges and valleys of the sprayed material are formed alternately. After that, sprayed belts extending horizontally are formed in layers to fill the above-mentioned valleys, and a sprayed layer with a surface shape close to a plane is formed. In this way, by making the surface of the sprayed layer into a shape close to a plane, rebound of the sprayed material sprayed in layers on the surface is reduced. [Prior art documents] [Patent documents]
[0003] [Patent Document 1] Patent No. 6093578 Summary of the Invention [Problem to be solved by the invention]
[0004] Consider the case where this type of spraying method is applied to backfilling of a tunnel. In this case, in the vicinity of the edge of the end wall (the corner between the end wall and the tunnel wall), it is necessary to avoid interference between the arm of the drive device holding the spraying nozzle and the tunnel wall, so there are cases where the spraying direction of the spraying nozzle cannot be directed perpendicular to the end wall. In that case, near the edge of the end wall, the spraying material will be sprayed at an angle to the end wall, which may cause an increase in rebound. The present invention aims to provide a spraying method and a backfilling method that reduce the rebound of the spraying material when backfilling a tunnel. [Means for solving the problem]
[0005] The gist of the present invention lies in the following [1] to [4].
[0006] [1] A spraying method for forming a backfilling layer by a spraying method in a backfilling work for backfilling a tunnel by repeatedly performing a process of forming a backfilling layer on the end wall surface of the tunnel, the method comprising: a peripheral portion forming step for forming a peripheral portion of the backfilling layer that is a portion of the backfilling layer that runs along the tunnel wall surface; and a central portion forming step that is performed after the peripheral portion forming step and forms a central portion of the backfilling layer that is a portion of the backfilling layer that is inside the backfilling layer peripheral portion, wherein in the peripheral portion forming step, the spraying material is sprayed perpendicular to the tunnel wall surface from a spray nozzle.
[0007] [2] The spraying method described in [1], further comprising a lower edge forming process which is carried out prior to the central portion forming process and forms a lower edge portion of the backfilling layer, which is the portion of the backfilling layer that runs along the bottom surface of the tunnel, and the upper surface of the lower edge portion of the backfilling layer is formed in a shape that becomes lower from the back side of the tunnel to the front side.
[0008] [3] The spraying method described in [2], wherein the lower edge portion forming process is performed before the peripheral edge portion forming process.
[0009] [4] A backfilling method for backfilling the tunnel by repeatedly forming the backfilling layer by the spraying method according to any one of [1] to [3]. Effect of the Invention
[0010] According to the present invention, it is possible to provide a spraying method and a backfilling method that reduce rebound of sprayed material when backfilling a tunnel. [Brief description of the drawings]
[0011] [Figure 1] (a) is a cross-sectional view of the tunnel, and (b) is a front view of the tunnel's gable wall. [Diagram 2] FIG. 2 is an enlarged view showing a tip side portion of the robot arm. [Diagram 3] 1A is a flowchart of the spraying method of the present embodiment, and FIG. 1B and FIG. 1C are flowcharts of spraying methods according to each of the modified examples. [Figure 4] 1A is a front view of the end wall in the lower edge forming step, and FIG. 1B is a cross-sectional view including the end wall. [Diagram 5] 1A is a front view of the end wall in the peripheral portion forming step, and FIG. 1B is a cross-sectional view including the end wall. [Figure 6] FIG. 11 is a front view of the spray nozzle and the end wall surface in a modified example of the peripheral portion forming process. [Figure 7] 1A is a front view of the end wall in the central portion forming step, and FIG. 1B is a cross-sectional view including the end wall. [Figure 8] 10 is an enlarged schematic cross-sectional view showing a layer structure of a central portion of the backfilling layer formed in a central portion forming step. FIG. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0012] Hereinafter, an embodiment of the spraying method and backfilling method according to the present invention will be described in detail with reference to the drawings. Fig. 1(a) is a cross-sectional view of a tunnel 101, and Fig. 1(b) is a front view of the gable wall of the tunnel 101. In the following, as shown in the drawings, the width direction of the tunnel 101 is the X direction, the longitudinal direction of the tunnel 101 is the Y direction, and the vertical direction is the Z direction, and X, Y, and Z may be used to explain the positional relationship of each part.
[0013] The tunnel 101 is a tunnel in a geological disposal facility for high-level radioactive waste. After the operation of the geological disposal facility, the tunnel 101 is backfilled to prevent the outflow of radioactive materials. The tunnel 101 is configured as an internal space of a concrete arch culvert 102. The lower part of the tunnel 101 is filled with soil material 103 and compacted by rolling. The upper part of the tunnel 101, which has a semicircular cross section, excluding the part filled with soil material 103, constitutes a new tunnel that is the target of the spraying method and backfilling method of this embodiment. Such a new tunnel that is the target of the spraying method and backfilling method of this embodiment is referred to as "tunnel 1". The width of the tunnel 1 is, for example, about 5 m, and the height of the tunnel 1 is, for example, about 2.2 m.
[0014] The backfilling work using the backfilling method of this embodiment includes a process of forming a backfilling layer 5 with a predetermined thickness on the end wall surface 3 of the tunnel 1 over the entire surface of the end wall surface 3. The process of forming the backfilling layer 5 is then repeatedly performed, and the tunnel 1 is backfilled by stacking a large number of backfilling layers 5 in the Y direction. The end wall surface 3 is composed of the surface of the previously formed existing backfilling layer 5, and forms a plane that is generally perpendicular to the Y direction. The spraying method of this embodiment forms the backfilling layer 5 with a predetermined backfilling material using a spraying method. The cross section of the tunnel 1 has, for example, a substantially semicircular shape when viewed from the Y direction. The thickness of one layer of the backfilling layer 5 is, for example, about 150 mm. The backfilling material used here is bentonite mixed soil, which is produced by mixing bentonite and local excavated soil, for example.
[0015] A construction device 10 for carrying out the spraying method of this embodiment includes a spray nozzle 11 that sprays the backfill material as a spraying material, a self-propelled robot 13 that operates the spray nozzle 11, a spraying machine 15 that delivers the spraying material to the spray nozzle 11 through a conveying pipe, a material supplying machine 17 that supplies the spraying material to the spraying machine 15, and a compressor 19 that supplies compressed air to the spraying machine 15. The spraying material supplied from the material supplying machine 17 to the spraying machine 15 is sent to the spray nozzle 11 at high pressure by the compressed air from the compressor 19, and is sprayed from the spray nozzle 11 at high speed. The spray nozzle 11 may be a supersonic nozzle.
[0016] The robot 13 is equipped with an arm 14 having multiple joints, and is installed at a position where the arm 14 can fully reach the gable wall surface 3. The tip of the arm 14 holds the spray nozzle 11. The robot 13 adjusts the position and orientation (spray direction) of the spray nozzle 11 by driving the arm 14 under remote control by an operator. Note that such driving of the arm 14 may be performed by automatic control of the robot 13 following a program prepared in advance.
[0017] By driving the arm 14, the position of the spray nozzle 11 can be adjusted three-dimensionally in the XYZ directions, and the orientation (spray direction) of the spray nozzle 11 can be adjusted in two axes. In this embodiment, as shown in FIG. 2, the tip side portion of the arm 14 of the robot 13 is equipped with connected links 14a, 14b, and 14c. The link 14a extends linearly. The link 14b is connected to the tip of the link 14a and can rotate about the axis B relative to the link 14a. The link 14c holds the spray nozzle 11 and can rotate about the axis C relative to the link 14b. The axis B is parallel to the extension direction of the link 14a, and the axis C is perpendicular to the axis B.
[0018] By using such a robot 13, the spraying work can be performed without the worker having to enter the poor environment close to the gable wall surface 3. The sprayer 15, material feeder 17, and compressor 19 may be appropriately disposed at a position away from the gable wall surface 3. Note that instead of the robot 13, a concrete spraying heavy machine or a general-purpose construction heavy machine may be used.
[0019] The spraying method of this embodiment for forming one layer of the backfilling layer 5 will be described below. In the following, as shown in FIG. 1(b), the backfilling layer 5 to be formed will be considered divided into three parts, namely, the backfilling layer lower edge part 21, the backfilling layer peripheral part 22, and the backfilling layer central part 23. The backfilling layer lower edge part 21 is a part of the backfilling layer 5 that extends linearly along the horizontal bottom surface 31 of the tunnel 1. The vertical width of the backfilling layer lower edge part 21 is, for example, about 300 mm. The backfilling layer peripheral part 22 is a part of the backfilling layer 5 that extends in an arc shape along the tunnel wall surface 32 of the tunnel 1. The radial thickness of the backfilling layer peripheral part 22 is, for example, about 300 mm. The backfilling layer central part 23 is an inner semicircular part surrounded by the backfilling layer lower edge part 21 and the backfilling layer peripheral part 22.
[0020] As shown in Fig. 3(a), the spraying method of this embodiment includes a lower edge forming step S301 for forming the lower edge 21 of the backfilling layer, a peripheral edge forming step S302 for forming the peripheral edge 22 of the backfilling layer, and a central portion forming step S303 for forming the central portion 23 of the backfilling layer. In the spraying method of this embodiment, the lower edge forming step S301 is performed first, followed by the peripheral edge forming step S302, and then the central portion forming step S303. Each step is described below. In each of the following steps, the movement of the spray nozzle 11, the adjustment of the XYZ position of the spray nozzle 11, and the change or adjustment of the direction (spray direction) of the spray nozzle 11 are performed by the robot 13 operating the arm 14 based on remote control or automatic control by the operator, unless otherwise specified.
[0021] (Lower edge forming step S301) FIG. 4(a) is a front view of the gable wall surface 3 in the lower edge forming step S301, and FIG. 4(b) is a cross-sectional view including the gable wall surface 3. As shown in the figure, in the lower edge forming step S301, the spray nozzle 11 is directed perpendicularly to the gable wall surface 3 (directed in the Y direction). Then, while the spray material is sprayed from the spray nozzle 11, the spray nozzle 11 is repeatedly moved in the XZ direction within the area corresponding to the backfill layer lower edge 21 while the spray direction J is adjusted so that it is always perpendicular to the gable wall surface 3. In addition, the distance between the spray nozzle 11 and the target to be sprayed is adjusted to be, for example, about 1 m. By such a spraying process, the spray material is gradually layered on the gable wall surface 3 at the bottom of the tunnel 1. Finally, the corner where the gable wall surface 3 and the bottom surface 31 intersect is filled with sprayed material, and the sprayed material (backfilling material) is stacked to the thickness of the backfilling layer 5 to form the lower edge 21 of the backfilling layer, which extends linearly along the bottom surface 31.
[0022] As shown in FIG. 4(b), the completed backfilling layer lower edge 21 has a trapezoidal cross section, and the upper surface 21a of the backfilling layer lower edge 21 is formed in a shape that becomes lower from the back side of the tunnel 1 to the front side. The side surface 21b of the backfilling layer lower edge 21 forms a plane perpendicular to the Y direction, and ultimately forms a part of the front side surface of the backfilling layer 5. In the example shown in the figure, the upper surface 21a forms an inclined plane. In order to form the backfilling layer lower edge 21 having the above-mentioned cross-sectional shape, for example, the number of repetitions of spraying may be appropriately adjusted for each height position of the backfilling layer lower edge 21. Alternatively, the moving speed of the spray nozzle 11 may be appropriately adjusted for each height position of the backfilling layer lower edge 21. In other words, the amount of spraying material per unit time from the spray nozzle 11 is constant, and the amount of spraying material sprayed per unit area is adjusted by adjusting the moving speed of the spray nozzle 11. In this way, by appropriately adjusting the number of times spraying is repeated and the movement speed of the spray nozzle 11 for each location of the backfilling layer lower edge portion 21, the backfilling layer lower edge portion 21 can be formed into the desired cross-sectional shape.
[0023] (Periphery forming process S302) FIG. 5(a) is a front view of the gable wall surface 3 in the peripheral portion forming step S302, and FIG. 5(b) is a cross-sectional view including the gable wall surface 3. As shown in the figure, in the peripheral portion forming step S302, the spray nozzle 11 is placed at a position above the backfill layer lower edge 21 and is directed in a direction parallel to the gable wall surface 3 (direction perpendicular to the Y direction). Then, while the spray material is sprayed from the spray nozzle 11, the spray nozzle 11 is repeatedly moved along the hole wall surface 32 while the spray direction J is always adjusted to be perpendicular to the hole wall surface 32. In addition, the distance between the spray nozzle 11 and the target to be sprayed is adjusted to be, for example, about 1 m. By such a spraying process, the spray material is gradually layered on the hole wall surface 32. Finally, the corner where the gable wall surface 3 and the hole wall surface 32 intersect is filled with sprayed material, and the sprayed material (backfilling material) is layered radially to a predetermined thickness to form a backfilling layer peripheral portion 22 extending in an arc shape along the hole wall surface 32.
[0024] If the entire hole wall surface 32 viewed from the Y direction is a perfect arc, as shown in Fig. 6, the spray nozzle 11 may be placed at the center D of the arc, and the orientation of the spray nozzle 11 may be rotated around an axis parallel to the Y direction while keeping the XZ position of the spray nozzle 11 fixed. Even in this case, the spray direction J of the spray material is always perpendicular to the hole wall surface 32. This is preferable in that it simplifies the control of the operation of the arm 14 in the peripheral edge forming step S302.
[0025] (Central part forming step S303) FIG. 7(a) is a front view of the gable wall surface 3 in the central portion forming step S303, and FIG. 7(b) is a cross-sectional view including the gable wall surface 3. As shown in the figure, in the central portion forming step S303, the spray nozzle 11 is directed perpendicularly to the gable wall surface 3 (directed in the Y direction). Then, while the spray material is sprayed from the spray nozzle 11, the spray nozzle 11 is repeatedly moved in the XZ direction within the area corresponding to the backfilling layer central portion 23, including on the inclined upper surface 21a of the backfilling layer lower edge portion 21, while the spray direction J is adjusted so as to always be perpendicular to the gable wall surface 3. In addition, the distance between the spray nozzle 11 and the target to be sprayed is adjusted to be, for example, about 1 m. By such a spraying process, the spray material is gradually layered on the gable wall surface 3 in the area surrounded by the backfilling layer lower edge portion 21 and the backfilling layer peripheral portion 22. Finally, the sprayed material (backfilling material) is layered to the thickness of the backfilling layer 5, so that a semicircular central portion 23 of the backfilling layer is formed.
[0026] The details of the spraying process in the central portion forming step S303 will be further described. FIG. 8 is a cross-sectional view showing an enlarged schematic layer structure of the backfilling layer central portion 23 formed in the central portion forming step S303. In this spraying process, as shown in FIG. 8, a plurality of sprayed layers 40 are stacked in the Y direction on the gable wall surface 3 to form the backfilling layer central portion 23. It is not necessary that the layer thicknesses of the respective sprayed layers 40 are all the same. One sprayed layer 40 is composed of a first sprayed portion 41 formed in the first spraying step and a second sprayed portion 42 formed in the second spraying step. In the first spraying step, the spray nozzle 11 moves in the X direction to form a first sprayed belt portion 41a extending in the X direction. Such first sprayed belt portions 41a are formed so that they overlap each other in part from the bottom and are arranged at approximately equal intervals in the vertical direction. The first spraying section 41, which is made up of the plurality of first spraying belts 41a, has a plurality of ridges and a plurality of valleys that appear alternately in the vertical direction. In the second spraying step, a plurality of second spraying belts 42a extending in the X direction are formed at approximately equal intervals so as to fill each valley of the first spraying section 41. A second spraying section 42, which is made up of the plurality of second spraying belts 42a, is formed on the first spraying section 41. One spraying layer 40 is formed by the first spraying step and the second spraying step, and the surface of the spraying layer 40 has a shape close to a plane perpendicular to the Y direction. Then, the formation of the spraying layer 40 as described above is repeated, and the spraying layers 40 are stacked until the layer thickness of the backfilling layer 5 is reached, thereby completing the backfilling layer central section 23.
[0027] The effects of the above-described spraying method and backfilling method of this embodiment will be described below.
[0028] Here, let us consider a case where spraying is performed with the injection direction J in the Y direction at all points throughout the backfill layer 5. In this case, when spraying the corner between the end wall surface 3 and the pit wall surface 32, the spray nozzle 11 needs to be positioned near the pit wall surface 32, so the arm 14 of the robot 13 may interfere with the pit wall surface 32. If the corner is to be worked on while avoiding the interference between the arm 14 and the pit wall surface 32, the injection direction J must be slightly inclined with respect to the end wall surface 3, which may result in an increase in rebound. In order to avoid the interference between the arm 14 and the pit wall surface 32, it is also possible to operate the arm 14 so that the spray nozzle 11 is always located between the pit wall surface 32 and the arm 14 when viewed from the Y direction when working on the corner. However, to realize such an operation, there is a problem that the control of the arm 14 becomes complicated, and it cannot be easily adopted.
[0029] In contrast, in the spraying method of this embodiment, the corner portion is constructed by the peripheral portion forming step S302. In the peripheral portion forming step S302, the spray nozzle 11 is directed in a direction parallel to the end wall surface 3, not perpendicular to the end wall surface 3, and the spray material is sprayed toward the hole wall surface 32. Therefore, the spray nozzle 11 only needs to be positioned radially inward from the hole wall surface 32, and interference between the arm 14 and the hole wall surface 32 or the end wall surface 3 is unlikely to occur. In addition, the spraying direction J of the spray material from the spray nozzle 11 is always perpendicular to the hole wall surface 32. In this way, according to the spraying method of this embodiment, the spray material is always sprayed perpendicularly to the hole wall surface 32 while avoiding interference between the arm 14 and the hole wall surface 32. Therefore, the spray material in the spraying method is always sprayed perpendicularly to the target surface, thereby reducing rebound of the spray material. Furthermore, the reduction in rebound reduces the amount of sprayed material (backfill material), resulting in reduced construction costs.
[0030] In addition, in the central portion forming step S303, the backfilling layer central portion 23 is sprayed with the injection direction J as the Y direction. Since the area where the backfilling layer central portion 23 is to be formed is away from the pit wall surface 32 by the radial thickness (e.g., 300 mm) of the backfilling layer peripheral portion 22, it is not necessary to bring the spray nozzle 11 extremely close to the pit wall surface 32 in the central portion forming step S303. That is, even when the spray nozzle 11 is closest to the pit wall surface 32, the spray nozzle 11 is away from the pit wall surface 32 by the radial thickness (e.g., 300 mm) of the backfilling layer peripheral portion 22. Therefore, it is possible to maintain a state in which the injection direction J of the spraying material is perpendicular to the end wall surface 3 while avoiding interference between the tip of the arm 14 and the pit wall surface 32. Therefore, even in the central portion forming step S303, the spraying material can always be sprayed perpendicularly to the end wall surface 3, and as a result, rebound of the spraying material is reduced.
[0031] In the central portion forming step S303, the first and second spraying steps are repeated in this order to form a plurality of sprayed layers 40. In the first spraying step, the first sprayed belt portions 41a extending in the X direction on the gable wall surface 3 are formed so as to be arranged in a vertical direction at substantially equal intervals by overlapping each other in part from the bottom, thereby forming the first sprayed portion 41 having a plurality of ridge portions and a plurality of valley portions that appear alternately in the vertical direction on the gable wall surface 3. After the first spraying step, in the second spraying step, the second sprayed portion 42 is formed on the first sprayed portion 41 by forming a plurality of second sprayed belt portions 42a extending horizontally arranged in the vertical direction so as to fill each valley portion of the first sprayed portion 41. As a result, the surface of the second sprayed portion 42 becomes substantially planar, substantially perpendicular to the Y direction. Therefore, when the first spraying step is carried out again after the second spraying step, rebound of the spray material is reduced because the spraying surface (the surface of the second spraying section 42) has a shape close to a flat surface.
[0032] Furthermore, in the spraying method of this embodiment, the backfilled layer lower edge portion 21 is formed in the lower edge portion forming step S301 prior to the peripheral portion forming step S302 and the central portion forming step S303, and the upper surface 21a of the backfilled layer lower edge portion 21 is inclined so as to become lower from the back side of the tunnel 1 toward the front side.
[0033] If the upper surface 21a were a horizontal surface, some of the rebound material generated in the peripheral portion forming step S302 and the central portion forming step S303 would drop onto and remain on the upper surface 21a. Since the area above the upper surface 21a of the backfilling layer lower edge portion 21 is within the area where the backfilling layer central portion 23 is to be constructed, the rebound material would remain within the area where the backfilling layer central portion 23 is to be constructed. If the central portion forming step S303 is performed in this state, the rebound material on the upper surface 21a would be rolled up in the newly sprayed material, and the backfilling layer central portion 23 would be formed.
[0034] In the spraying of bentonite-mixed soil, the gravel contained in the excavated soil on site is particularly likely to bounce back from the sprayed surface, so the rebound material has a higher gravel content than new sprayed materials. Therefore, when the rebound material is rolled in to form the backfill layer central portion 23 as described above, the rolled in portion contains a lot of gravel, and this portion may become a weak portion with deteriorated water-stopping performance. It is possible to remove the rebound material accumulated on the upper surface 21a before performing the central portion forming step S303, but this is not preferable because it will damage the continuity between the peripheral portion forming step S302 and the central portion forming step S303. Even if the rebound material is removed before performing the central portion forming step S303, the rebound material is generated during the central portion forming step S303 and remains on the upper surface 21a, so there will be a certain amount of rebound material rolled in the backfill layer central portion 23.
[0035] In contrast, in the spraying method of this embodiment, the upper surface 21a of the backfilling layer lower edge portion 21 is an inclined surface as described above. Therefore, even if the rebound material generated in the peripheral portion forming step S302 and the central portion forming step S303 falls onto the upper surface 21a, the rebound material is likely to slide down to the front side of the backfilling layer lower edge portion 21, and the rebound material remaining on the upper surface 21a is reduced. Therefore, the rebound material caught in the backfilling layer central portion 23 in the central portion forming step S303 is reduced, and deterioration of the water-stopping performance of the backfilling layer central portion 23 is suppressed. The rebound material that slides down from the upper surface 21a accumulates on the front side of the side surface 21b of the backfilling layer lower edge portion 21, but this accumulated rebound material may be removed before forming the next backfilling layer 5.
[0036] Here, construction test 1 and construction test 2 conducted by the present inventors will be described. In each construction test, a backfilling layer 5 was formed on the gable wall surface 3 inside a concrete arch culvert (width 5.0 m, height 2.2 m). In construction test 1, after the lower edge forming step S301 was performed to form the lower edge 21 of the backfilling layer, the peripheral portion forming step S302 was not performed, and the remaining gable wall surface 3 was entirely constructed by the method of the central portion forming step S303 to form the backfilling layer 5. In contrast, in construction test 2, the backfilling layer 5 was formed by the spraying method of this embodiment. For the backfilling layer 5 completed in each of construction tests 1 and 2, block sampling was performed at nine points including the vicinity of the corner with the pit wall surface 32 (the portion corresponding to the peripheral portion 22 of the backfilling layer in construction test 2), and the dry density of the samples was measured.
[0037] In the above construction tests, if the rebound rate is defined as the ratio of the weight of the rebound material to the weight of the sprayed material sprayed from the spray nozzle 11, the rebound rate in Construction Test 1 was 43%. In contrast, in Construction Test 2, the rebound rate in the peripheral portion forming step S302 was 32%, and the rebound rate in the central portion forming step S303 was 35%. Therefore, it was confirmed that the spraying method of this embodiment reduces rebound. Furthermore, the average dry density of the above samples in Construction Test 1 was 1.970 Mg / m 3 In construction test 2, it was 1.974 Mg / m 3Therefore, it was confirmed that the spraying method of this embodiment does not adversely affect the physical properties of the backfill layer 5 that is formed. When this dry density is applied to previous research (JAEA: Current status survey and test study of test methods toward the establishment of standard laboratory test methods for bentonite-based materials, 2010.), the permeability coefficient of the sample is 1.0×10 -12 It is estimated that the permeability is on the order of m / sec, which fully satisfies the permeability required for this type of backfill layer. As described above, it has been confirmed that the spraying method of this embodiment and the backfilling method using this method can reduce rebound while ensuring the watertight performance of the backfilling layer.
[0038] The present invention can be implemented in various forms including the above-described embodiment and various modifications and improvements based on the knowledge of those skilled in the art. In addition, it is possible to configure modified examples by utilizing the technical matters described in the above-described embodiment. The configurations of each embodiment may be used in appropriate combination.
[0039] For example, in the spraying method of the above embodiment, the steps are performed in the order of the lower edge forming step S301, the peripheral edge forming step S302, and the central portion forming step S303, but as shown in Fig. 3(b), the steps may be performed in the order of the peripheral edge forming step S302, the lower edge forming step S301, and the central portion forming step S303. In this case, the rebound material generated in the peripheral edge forming step S302 is also accumulated in the area where the backfill layer lower edge portion 21 is to be constructed on the bottom surface 31 of the tunnel 1, but this accumulated rebound material may be removed before the lower edge forming step S301. Then, in the central portion forming step S303 after the lower edge forming step S301, the rebound material generated slides down the upper surface 21a of the backfill layer lower edge portion 21, so that the rebound material remaining on the upper surface 21a is reduced, and as a result, the rebound material caught in the backfill layer central portion 23 is reduced, and the deterioration of the water-stopping performance of the backfill layer central portion 23 is suppressed.
[0040] 3(c), the lower edge forming step S301 may be omitted, and the peripheral portion forming step S302 and the central portion forming step S303 may be performed in this order. In this case, the backfilling layer central portion 23 formed in the central portion forming step S303 is the portion of the backfilling layer 5 surrounded by the bottom surface 31 of the tunnel 1 and the backfilling layer peripheral portion 22. Even in this case, the peripheral portion forming step S302 always sprays the sprayed material perpendicular to the tunnel wall surface 32, and the central portion forming step S303 always sprays the sprayed material perpendicular to the gable wall surface 3, thereby reducing rebound of the sprayed material.
[0041] Also, the peripheral portion forming step S302 may be omitted, and the lower edge portion forming step S301 and the central portion forming step S303 may be performed in this order. In this case, the backfilling layer central portion 23 formed in the central portion forming step S303 is a portion above the backfilling layer lower edge portion 21, and is a portion of the backfilling layer 5 surrounded by the tunnel wall surface 32 of the tunnel 1 and the backfilling layer lower edge portion 21. That is, a spraying method may be adopted that includes a lower edge portion forming step S301 for forming the backfilling layer lower edge portion 21, which is a portion of the backfilling layer 5 along the bottom surface 31 of the tunnel 1, and an upper portion forming step performed after the lower edge portion forming step S301 for forming the backfilling layer upper portion, which is a portion of the backfilling layer 5 above the backfilling layer lower edge portion 21. In this case, the upper surface 21a of the backfilling layer lower edge portion 21 is formed in a shape that becomes lower from the back side of the tunnel 1 to the front side. In this case, even if the rebound material generated in the above-mentioned upper portion forming step falls onto the upper surface 21a of the backfilling layer lower edge portion 21, the rebound material is likely to slide down to the front side of the backfilling layer lower edge portion 21, and the rebound material remaining on the upper surface 21a is reduced. Therefore, the rebound material caught in the upper part of the backfilling layer in the upper portion forming step is reduced, and deterioration of the water-stopping performance of the backfilling layer 5 is suppressed.
[0042] In the above embodiment, as shown in FIG. 4(b), the upper surface 21a of the backfill layer lower edge 21 is an inclined plane, but the shape of the upper surface 21a is not limited to this, and any shape that allows the rebound material to slide down easily may be appropriately selected. The upper surface 21a may be, for example, a convex surface that bulges outward, as long as the shape is lower from the back side of the tunnel 1 toward the front side. In the lower edge forming step S301 of the embodiment, the spray nozzle 11 is always directed perpendicularly to the gable wall surface 3, but the direction of the spray nozzle 11 may be controlled so as to easily form the upper surface 21a into a desired shape. In the lower edge forming step S301, the backfill layer lower edge 21 may be formed with the spray nozzle 11 directed perpendicularly (downward) to the bottom surface 31. [Explanation of symbols]
[0043] 1...tunnel, 3...gable wall surface, 5...backfilling layer, 11...spray nozzle, 21...lower edge of backfilling layer, 22...periphery of backfilling layer, 23...central part of backfilling layer, 31...bottom surface, 32...tunnel wall surface, 21a...upper surface, S302...peripheral part forming process, S302...peripheral part forming process, S303...central part forming process.
Claims
1. A backfilling method for forming a backfilling layer by a spraying method in a backfilling work for backfilling a tunnel by repeatedly performing a process for forming a backfilling layer on a gable wall surface of the tunnel, comprising: a peripheral portion forming step of forming a peripheral portion of the backfilling layer, which is a portion of the backfilling layer along the tunnel wall surface; a central portion forming step, which is performed after the peripheral portion forming step, and forms a central portion of the backfilling layer, which is a portion of the backfilling layer inside the backfilling layer peripheral portion, In the peripheral portion forming step, a spraying material is sprayed perpendicularly to the well wall surface from a spray nozzle.
2. The method further includes a lower edge forming step, which is performed before the central portion forming step and forms a lower edge portion of the backfill layer, which is a portion of the backfill layer along the bottom surface of the tunnel, The spraying method according to claim 1 , wherein an upper surface of the lower edge of the backfill layer is formed in a shape that becomes lower from the back side of the tunnel to the front side.
3. The spraying method according to claim 2 , wherein the lower edge forming step is performed before the peripheral edge forming step.
4. A backfilling method for backfilling the tunnel by repeatedly forming the backfilling layer by the spraying method according to any one of claims 1 to 3.