AI Technical Summary

Technical Problem

Existing tunnel renovation methods fail to account for asymmetrical tunnel cross-sections, leading to uneven cutting and reduced stability due to partial thinning of the lining, which can compromise the structural integrity and construction efficiency.

Method used

A method for optimizing the tunnel center by using three-dimensional measurement data to determine a reference point for cutting, ensuring equal cutting volumes on both sides and adhering to construction limits, thereby stabilizing the tunnel and enhancing construction efficiency.

Benefits of technology

Ensures uniform cutting volumes, preventing partial thinning and maintaining structural stability while optimizing construction speed and reducing material costs.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 2024143766000001_ABST
    Figure 2024143766000001_ABST
Patent Text Reader

Abstract

To provide an optimization method for a tunnel center that determines the tunnel center so that the cutting volume obtained from the difference between three-dimensional measurement data of an existing lining surface and tunnel cutting surface data satisfies a prescribed condition when repairing the tunnel.SOLUTION: An optimization method for a tunnel center according to the present invention includes a step of conducting distance measuring of a lining concrete surface of a repaired tunnel by a three-dimensional measuring instrument and saving it as existing lining surface measurement data, a step of receiving cutting plan surface data as a target completed shape after cutting, created based on a tunnel cross-sectional view and saving it as cutting surface data, a step of superposing the cutting surface data on the existing lining surface measurement data while changing superposed conditions every prescribed intervals and repeating it until the cutting volume based on the difference between the existing lining surface measurement data and the cutting surface data satisfies a prescribed condition, and a step of determining starting points and end points of the tunnel center every prescribed intervals from positions of the cutting surface data in which the cutting volume satisfies the prescribed condition.SELECTED DRAWING: Figure 2
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to a method for optimizing a tunnel center, and in particular to a method for optimizing a tunnel center that determines a tunnel center serving as a standard for repair by making a cutting volume determined from the difference between three-dimensional measurement data of the surface of an existing lining and cutting surface data based on a cross-sectional view of the tunnel satisfy a predetermined condition when repairing a tunnel. [Background technology]

[0002] In Japan, where there is little flat land, many tunnels are used for roads, railways, etc., but many of them have deteriorated after many years of use and are in need of repair and renovation. In particular, tunnels constructed using the sheet pile method, which was the standard method used before NATM became widespread, are prone to problems such as water leakage and cracks due to gaps between the ground and the sheet piles.

[0003] There are various methods for repairing and renovating tunnels, including "inner surface reinforcement work," in which fiber sheets or the like are attached to the surface of the inner walls to prevent them from falling due to cracks, and "inner lining reinforcement work," which involves spraying concrete or installing reinforcing plates to stop the deterioration of strength or to restore or improve strength. However, when considering the long-term use of existing tunnels, it is preferable to adopt "inner reinforcement work" that can restore and improve strength rather than "internal reinforcement work" which is a temporary measure. At this time, due to the constraints of the construction gauge, a renovation method using a recycled lining is being considered, in which the tunnel lining concrete (hereinafter simply referred to as the lining) is cut to a specified thickness and then "inner reinforcement work" is applied.

[0004] Patent Document 1 describes a method for cutting and renewing the lining of an existing tunnel, in which linear reinforcement is installed on the natural ground side of the part where the lining concrete is to be cut to reinforce the tunnel, then a specified thickness of the lining concrete is cut, and then concrete is poured and sprayed so as not to exceed the thickness of the original lining concrete that was cut.

[0005] However, the cross-sectional shape of the existing tunnel lining to be cut may not be symmetrical due to construction errors, and may not be uniform along the longitudinal direction of the tunnel. Normally, the tunnel center is determined as the midpoint of the SL (Spring Line, the maximum point of the tunnel width) of the existing lining, but if cutting is performed based on the tunnel center set in this way, there will be a difference in the amount of cutting on the left and right sides if the cross-sectional shape of the tunnel is not symmetrical. This causes the existing lining to become partially thin after cutting, or the thickness of the new lining concrete to be uneven, compromising the stability of the tunnel. In addition, if cutting equipment is installed on both sides, there will be a difference in the amount of cutting on the left and right sides, which will slow down the construction speed.

[0006] Therefore, by accurately grasping the surface shape of the existing lining before cutting it and evaluating the cutting amount in advance, it is possible to set the tunnel center appropriately. Technology that uses a 3D laser scanner to grasp the inner shape of a tunnel is also described in, for example, Patent Document 2. The invention described in Patent Document 2 relates to a support system for excavating and constructing a tunnel, and Patent Document 2 describes that it shows how the strike and overexcavation are distributed by comparing the measured cross section with the reference cross section.

[0007] However, when renovating tunnel linings, it is being considered to install a center and renovate a specified section all at once. In this case, setting the tunnel center for renovation is important, but Patent Document 2 does not consider such issues. In order to make tunnel lining renovation practical in the future, it is desirable to provide a method for optimizing the setting of the tunnel center so that tunnel renovation can be carried out in a manner that is safe by cutting and lining in appropriate locations and that achieves specified objectives such as ease of construction, efficiency, and reduced material costs. [Prior art documents] [Patent documents]

[0008] [Patent Document 1] JP 2019-100031 A [Patent Document 2] JP 2010-217018 A Summary of the Invention [Problem to be solved by the invention]

[0009] The present invention has been made in consideration of the problems associated with the above-mentioned conventional tunnel renovation methods, and an object of the present invention is to provide a method for optimizing a tunnel center, which determines the tunnel center that serves as the basis for renovation by making the cutting volume calculated from the difference between 3D measurement data of the existing lining surface and cutting surface data based on a cross-sectional view of the tunnel satisfy specified conditions when renovating a tunnel. [Means for solving the problem]

[0010] The tunnel center optimization method according to the present invention, which has been devised to achieve the above-mentioned object, is a tunnel center optimization method for determining a reference tunnel center when renovating a tunnel lining, and is characterized by having an existing lining surface measurement data generation step of measuring the distance of the lining concrete surface of the tunnel to be renovated using a 3D measuring device to obtain 3D measurement data and saving it as existing lining surface measurement data; a cutting surface data storage step of receiving cutting plan surface data, which is the target completed shape after cutting for renovation, created based on a cross-sectional view of the tunnel, and saving it as cutting surface data in a data processing device; a data processing step of overlaying the cutting surface data on the existing lining surface measurement data for each specified section while changing the overlay conditions, and repeating this until the cutting volume based on the difference between the existing lining surface measurement data and the cutting surface data satisfies a specified condition; and a tunnel center setting step of determining the start point and end point of the tunnel center for each specified section from the position of the cutting surface data where the cutting volume satisfies the specified condition.

[0011] It is preferable that the method further includes a step of checking whether the construction gauge will be violated when cutting and renovating the tunnel lining based on the determined start point and end point, and if it is determined as a result of the check that the construction gauge will be violated, a step of correcting the position of the start point or end point of the tunnel center so as not to violate the construction gauge.

[0012] It is preferable that the specified condition includes either that the cutting volume is a minimum, or that when the cutting volume is divided in a left-right direction perpendicular to a straight line extending from the starting point to the end point, the left and right cutting volumes are the same. It is preferable to further include a step of determining a reference point for installing protective work when renovating the tunnel lining based on the obtained start point and end point. Effect of the Invention

[0013] According to the tunnel center optimization method of the present invention, the surface of the existing lining within a specified section is measured in advance by a 3D measuring device to generate existing lining surface measurement data, and the existing lining surface measurement data is superimposed on the cut surface data, which is the target completed shape after cutting, to determine the difference, thereby making it possible to grasp the amount of cutting of the existing lining in advance. By superimposing the existing lining surface measurement data and the cut surface data, it is possible to check in advance whether or not there is partial thinning of the lining within a specified section, which is also effective in preventing thinning of the existing lining and ensuring the stability and safety of the tunnel during and after renewal.

[0014] Furthermore, according to the tunnel center optimization method of the present invention, the tunnel center is set so that the cutting volume satisfies specified conditions. If the specified condition is that the cutting volumes on the left and right are the same when divided in the left and right direction perpendicular to the straight line from the start point to the end point of the tunnel center, then it is unlikely that there will be a bias in the cutting volume between the tool cutting the left side and the tool cutting the right side, and it is therefore possible to prevent a decrease in construction speed. [Brief description of the drawings]

[0015] [Figure 1]1 is a block diagram illustrating an example of a system configuration for implementing a tunnel center optimization method according to an embodiment of the present invention. [Diagram 2] FIG. 2 is a schematic diagram illustrating data overlay according to an embodiment of the present invention; [Diagram 3] FIG. 1 is a diagram for illustratively explaining the deviation of a tunnel center caused by a conventional method. [Figure 4] FIG. 2 is a schematic diagram illustrating data overlay according to an embodiment of the present invention; [Diagram 5] 1 is a diagram illustrating an exemplary method for setting a tunnel center according to an embodiment of the present invention. FIG. [Figure 6] 1 is a flowchart illustrating a tunnel center optimization method according to an embodiment of the present invention. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0016] Next, a specific example of an embodiment for carrying out the tunnel center optimization method according to the present invention will be described in detail with reference to the drawings. FIG. 1 is a block diagram illustrating an example of a system configuration for implementing a tunnel center optimization method according to an embodiment of the present invention. Referring to FIG. 1, a tunnel center setting system 1 according to an embodiment of the present invention includes a three-dimensional measuring device 20 and a data processing device 10.

[0017] The tunnel center optimization method according to the embodiment of the present invention is a method for appropriately determining the tunnel center, which serves as a reference point when cutting the lining concrete, in carrying out a lining restoration work in which the existing lining concrete is cut to a predetermined thickness and then new lining concrete is poured, as a method for renovating an existing tunnel. The lining concrete of an existing tunnel may not be symmetrical due to various construction errors, including errors in the installation of the formwork during construction, and the longitudinal direction of the tunnel may not have a uniform shape. Therefore, if the midpoint of the SL of the existing lining of the tunnel is set as the tunnel center as in the conventional method and cutting is performed based on this, partial thinning may occur, which may lead to a situation in which the quality of the tunnel is insufficient.

[0018] For this reason, the tunnel center optimization method according to the embodiment of the present invention includes an existing lining surface measurement data generation step of acquiring 3D measurement data by performing distance measurement with a 3D measuring device 20 on the lining concrete surface of the tunnel to be renovated and storing it as existing lining surface measurement data in the data processing device 10, a cutting surface data storage step of receiving cutting plan surface data, which is a target completed shape after cutting for renovation created based on the cross-sectional view of the tunnel, and storing it as cutting surface data in the data processing device 10, a data processing step of superimposing the cutting surface data on the existing lining surface measurement data for each predetermined section by the data processing device 10 while changing the superimposition conditions, and repeating until the cutting volume based on the difference between the existing lining surface measurement data and the cutting surface data satisfies the predetermined condition, and a tunnel center setting step of determining the start point and end point of each predetermined section of the tunnel center from the position of the cutting surface data where the cutting volume satisfies the predetermined condition. The predetermined section is a section corresponding to the unit of starting work for performing lining restoration work at one time, and is, for example, about 10 m, but may be set longer in a section with a series of straight lines.

[0019] The three-dimensional measuring device 20 and the data processing device 10 will now be described in detail. Three-dimensional measuring device 20 is a device that measures the distance to a measurement object three-dimensionally, and in this embodiment includes a control unit 21, an input / output unit 22, a storage unit 23, a laser light irradiation unit 24, and a laser light detection unit 25.

[0020] The laser light irradiation unit 24 includes a laser light generating unit and a laser light scanning unit that scans the optical axis of the generated laser light. The measurement target in the tunnel center setting system 1 is the surface of the lining of an existing tunnel. Therefore, it is preferable that the scanning range of the optical axis of the laser light is wide so that the three-dimensional measuring device 20 is installed inside the tunnel and the shape of the inner surface of the tunnel can be widely measured.

[0021] However, even if the scanning range is wide, the tunnel to be measured is a long structure along the longitudinal direction, so it is not possible to measure the entire tunnel at once. Therefore, the measurement is carried out while changing the installation location of the 3D measuring device 20 along the longitudinal direction of the tunnel. At this time, a common reference point is set between adjacent installation locations, and the laser light is irradiated so that both installation locations include distance data to the reference point, making it possible to later combine the measurement data from different installation locations.

[0022] The laser light detection unit 25 detects the reflected light of the laser light irradiated by the laser light irradiation unit 24, which is reflected by the measurement object, and obtains the distance to the measurement object based on the elapsed time from the irradiation of the laser light to the detection of the reflected light. The three-dimensional position of the measurement point is specified from the irradiation angle indicating the spatial direction of the irradiation of the laser light at this time and the distance relative to this direction. The optical axis of the laser light irradiated to the measurement object is scanned by the laser light irradiation unit 24, and the irradiation position changes one after another, so the laser light detection unit 25 obtains distance data of new measurement points accordingly and accumulates the measurement points of the measurement object. The accumulated distance data of the measurement points constitutes a point cloud of the measurement of the measurement object.

[0023] The input / output unit 22 includes a communication means for receiving control commands from an external device that executes an application program that controls the three-dimensional measuring device 20, and for outputting a point cloud of measurements of a measurement target to the external device. The external device may be the data processing device 10, or a control personal computer that controls the three-dimensional measuring device 20 separately from the data processing device 10 and communicates with the data processing device 10. In an embodiment in which the three-dimensional measuring device 20 is configured integrally with the data processing device 10, the input / output unit 22 may include an input / output means for inputting and outputting data to and from the data processing device 10 via an internal bus.

[0024] The storage unit 23 sequentially stores distance data of the measurement points, and stores setting conditions of the three-dimensional measuring device 20, etc. The control unit 21 controls each component to perform the above-mentioned functions based on a control command received from an external device. Various devices for performing three-dimensional measurements are commercially available under names such as 3D laser scanners and LiDAR (Light Detection and Ranging), and the three-dimensional measuring device 20 can use such commercially available measuring devices.

[0025] The data processing device 10 comprises a control unit 11, an input / output unit 12, a memory unit 13, a display unit 14, an existing lining surface measurement data management unit 15, a cutting volume calculation unit 16, a construction limit determination unit 17, a tunnel center alignment unit 18, and a protective work reference point setting unit 19.

[0026] The existing lining surface measurement data management unit 15 acquires point cloud data, which is the result of distance measurement of the existing lining acquired by the three-dimensional measuring device 20, and stores and manages it as existing lining surface measurement data in the memory unit 13. When the tunnel to be renovated is short or the renovated section is limited, and all necessary point cloud data for the renovated section can be acquired by measuring at one location with the three-dimensional measuring device 20, the existing lining surface measurement data management unit 15 stores the acquired point cloud data almost as is as the existing lining surface measurement data.

[0027] However, as mentioned above, if the repair section is long and distance measurement of the repair section cannot be completed by measuring at one location, the measurement data acquired by the 3D measuring device 20 will be a collection of measurement data acquired for each installation location of the 3D measuring device 20. Therefore, the existing lining surface measurement data management unit 15 determines the positional relationship between the installation locations by using measurement data up to a reference point common to adjacent installation locations, and combines the measurement data of both installation locations based on this.

[0028] The existing lining surface measurement data management unit 15 acquires measurement data acquired for each installation location of the 3D measuring device 20 for the entire section of the tunnel renovation in advance, synthesizes it, and generates existing lining surface measurement data for the entire renovation section. This allows those involved in the tunnel renovation to grasp the current overall lining surface in advance. The existing lining surface measurement data is stored in the memory unit 13, but since the tunnel center obtains it for each specified section, it is preferable that the existing lining surface measurement data management unit 15 stores the generated existing lining surface measurement data in the memory unit 13 so that it can be retrieved for each specified section.

[0029] The cutting volume calculation unit 16 receives cutting plan surface data, which is created in advance based on a cross-sectional drawing of the tunnel and is the target completed cross-sectional shape after cutting for repair, and stores it as cutting surface data in the memory unit 13. Furthermore, the cutting surface data stored in the memory unit 13 is superimposed on the existing lining surface measurement data for each specified section to determine the cutting volume based on the difference between the existing lining surface measurement data and the cutting surface data.

[0030] In lining restoration work, the cutting plan surface data for each tunnel is set constant regardless of the longitudinal position within the tunnel. Furthermore, the cutting plan surface data is data only about the shape, and the position is not fixed. The cutting surface data, which is data for performing cutting, is essentially the same as the cutting plan surface data. Therefore, the shape of the tunnel after restoration of the lining changes depending on how the existing lining surface measurement data and the cutting surface data are superimposed. Since the cutting surface data is cross-sectional shape data, data in the length direction is required to calculate the volume, but since restoration of the lining is performed using a formwork called a center in a specified section, the cutting surface data is assumed to be in a kamaboko shape extended linearly in the length direction to match the construction form that results from this, and the overlapping part of this shape and the existing lining surface measurement data is calculated as the volume to be cut.

[0031] The cutting volume calculation unit 16 obtains the cutting volume while changing the overlapping conditions of the existing lining surface measurement data and the cutting surface data, and repeats this until the obtained cutting volume satisfies a predetermined condition. The overlapping conditions can be set in various ways according to the situation, such as a condition in which the cutting surface data is overlapped while shifting it left and right in the longitudinal direction of the tunnel, a condition in which the extension direction of the kamaboko shape is rotated horizontally, and a condition in which the data is overlapped by combining left and right shifting and horizontal rotation. In addition, the condition that the cutting volume satisfies is, for example, that when the cutting volume is divided into left and right by a vertical plane passing through the vertical center line of the cutting surface data, the left and right cutting volumes are the same. In another embodiment, the condition is that the cutting volume is minimized.

[0032] When the overlay condition is found under which the cutting volume based on the difference between the existing lining surface measurement data and the cutting surface data satisfies a predetermined condition, the cutting volume calculation unit 16 determines the tentative position of the tunnel center from the position of the cutting surface data at that time. That is, the intersection point between the vertical center line and the road surface in the cutting surface data at the end on the starting point side of the tunnel renovation of the specified section is set as the tentative start point, and the intersection point between the vertical center line and the road surface in the cutting surface data at the end opposite to the tentative start point of the specified section is set as the tentative end point.

[0033] The construction limit determination unit 17 judges whether the expected completed shape will violate the construction limit when the lining is cut according to the cutting surface data superimposed on the temporary position of the tunnel center set by the cutting volume calculation unit 16 and then a regenerative lining of a specified thickness is applied. If it is judged that the construction limit will not be violated, it sends a notification of conformity with the construction limit to the cutting volume calculation unit 16, and if it is judged that the expected completed shape will violate the construction limit, it sends a notification of correction instruction for the temporary position of the tunnel center to the cutting volume calculation unit 16 together with data indicating which location violates the construction limit and to what extent.

[0034] When the cutting volume calculation unit 16 receives a notification instructing the correction of the tentative position of the tunnel center, it refers to the data indicating which locations and to what extent the construction limit is violated, corrects the tentative position of the tunnel center to the extent that the cutting volume does not significantly deviate from the specified conditions, and continues to make corrections in the cutting volume calculation unit 16 and judgments in the construction limit judgment unit 17 until the construction limit judgment unit 17 determines that the construction limit is not violated.

[0035] The tunnel center grinding section 18 plays a role in adjusting the positions of the start and end points of the tunnel center determined for a certain specified section, so that no steps are created on the cutting surface when the position of the end point of the first specified section and the position of the start point of the subsequent specified section are significantly different.

[0036] Specifically, when the position of the first end point for the first predetermined section does not match the position of the second start point for the second predetermined section adjacent to the first end point, the tunnel center alignment unit 18 aligns the position of the second start point with the first end point and determines the position after alignment as a new second start point. As the alignment process, the position of the new second start point may be set to the midpoint between the positions of the first end point and the second start point, or weighting may be performed to determine the position of the new second start point as a point that divides the first end point and the second start point internally according to the cutting volume on the left and right, for example.

[0037] When the tunnel center is adjusted, the starting point of the tunnel center changes, and it becomes necessary to determine again in the construction limit judgment unit 17 whether the construction limit will be violated. Therefore, in an embodiment, adjustment may be performed by the tunnel center adjustment unit 18 when the position of the first end point and the position of the second start point are separated by a predetermined distance or more. If tunnel center alignment is not required, the cutting volume calculation unit 16 determines the positions of the tentative start point and the tentative end point as the final start point and end point, and if it is determined that the construction limit will not be violated after tunnel center alignment, it determines the new start point and tentative end point as the final start point and end point.

[0038] The protection work reference point setting unit 19 determines the installation reference point of the protection work when renovating the tunnel lining based on the determined start point and end point. The protection work has a space inside for people and vehicles to pass through, and is equipment that protects people and vehicles passing through this space, but the protection work used here also serves as a platform for installing the cutting equipment for the existing lining and the formwork when regenerating the lining. Therefore, even if the tunnel center is determined correctly, if the installation position of the protection work is shifted, the cutting shape of the existing lining and the completed shape of the regenerated lining will deviate from the target shape. By determining the installation reference point using the protection work reference point setting unit 19, unexpected construction errors can be prevented.

[0039] The input / output unit 12 includes a communication means for receiving point cloud measurement data for the existing lining from the three-dimensional measuring device 20 and, in some cases, outputting setting values ​​for the three-dimensional measuring device 20, etc. The memory unit 13 stores data such as existing lining surface measurement data and cutting surface data, and a control program for controlling the operation of the data processing device 10 itself. The memory unit 13 is realized by a semiconductor memory, a memory module in which a semiconductor memory is modularized, or the like.

[0040] The display unit 14 displays point cloud data for the existing lining obtained from the three-dimensional measuring device 20, existing lining surface measurement data created based on the point cloud data, etc. The display unit 14 is realized by a liquid crystal display panel or the like. The control unit 11 controls each component of the data processing device 10 to perform the above-mentioned functions in accordance with a control program stored in the storage unit 13. The control unit 11 is realized by a control board including a microprocessor.

[0041] The block diagram shown in Fig. 1 is one embodiment, and the tunnel center setting system 1 is not limited to this embodiment. For example, a personal computer having an application program for setting and controlling the three-dimensional measuring device 20 may be connected to the three-dimensional measuring device 20, and the personal computer and the data processing device 10 may be connected via a communication line, or the three-dimensional measuring device 20 and the data processing device 10 may be formed integrally. The data processing device 10 may be installed at a location separate from the three-dimensional measuring device 20, and the processing results of the data processing device 10 may be transmitted to a mobile terminal of a person involved in the field via wireless communication or the like. The measurement data may also be transferred from the three-dimensional measuring device 20 to the data processing device 10 indirectly via a storage medium.

[0042] FIG. 2 is a schematic diagram illustrating data overlay according to an embodiment of the present invention. Referring to Fig. 2, the upper left corner shows 3D measurement data of the existing lining obtained by the 3D measuring device 20. The figure shows point cloud data of the tunnel surface, but because the point cloud has a large number of points, it is possible to imagine the three-dimensional shape from the point cloud data alone. The data processing device 10 synthesizes this point cloud data in the tunnel longitudinal direction as necessary to generate measurement data of the existing lining surface.

[0043] The lower figure shows the overlapping of the existing lining surface measurement data at the position corresponding to the end of the specified section with the cutting surface data shown by the dashed line. In this figure, the part between the inside existing lining surface measurement data and the outside cutting surface data indicates the part to be cut. The figure in the upper right shows cutting surface data for a specified section overlaid on the current surface of the existing lining so that it can be viewed in three dimensions.

[0044] Figure 3 is a diagram for explaining an example of the deviation of the tunnel center caused by the conventional method. Figure 3(a) shows the positional relationship of the tunnel center when the existing tunnel is formed symmetrically, and Figure 3(b) shows the positional relationship of the tunnel center when the existing tunnel is formed partially asymmetrically. 3(a), the measurement data 30 of the existing tunnel lining surface is symmetrical, and the tunnel center 32 of the existing lining, which is found as the midpoint of SL, is in the same position as the original tunnel center 33. Therefore, if cutting is performed based on the cutting surface data 31 aligned with this tunnel center, cutting will be performed evenly on both the left and right.

[0045] On the other hand, as shown in the plan view at the top of Figure 3(b), in places where the existing lining surface measurement data 30 has been deformed towards the tunnel inner surface due to the influence of construction error 34, the tunnel center 32 of the existing lining obtained as the midpoint of SL does not coincide with the tunnel center 33 in its original position, but is shifted by the amount shown by the left-facing arrow A. For this reason, when cutting is performed according to the cutting surface data 31 based on the tunnel center 32 of the existing lining, it will be shifted by the amount shown by arrow B from the cutting surface data 31' of the original position where the existing lining should be without the construction error 34, resulting in a thinning of the lining.

[0046] FIG. 4 is a schematic diagram illustrating data overlay according to an embodiment of the present invention. Figure 4(a) shows the case where cutting surface data 31 is overlaid on the left side of the existing lining surface measurement data 30, Figure 4(b) shows the case where the existing lining surface measurement data 30 and cutting surface data 31 are overlaid so that they are at the same center, and Figure 4(c) shows the case where cutting surface data 31 is overlaid on the right side of the existing lining surface data 30.

[0047] 4(a), when the cutting surface data 31 is superimposed to the left on the existing lining surface measurement data 30, the cutting portion, i.e. the portion between the existing lining surface measurement data 30 and the cutting surface data 31 in the cross section of the tunnel shown at the top, has different sizes in the left and right halves from the center line of the cutting surface data 31, with the left half being wider. If the difference between the existing lining surface measurement data 30 and the cutting surface data 31 for a specified section L is calculated as shown in the tunnel plan view at the bottom, it is found to be the cutting volume of the specified section L, and as a result, it is found that the cutting volume of the left half from the center line of the cutting surface data 31 is larger than the cutting volume of the right half. Conversely, if the cutting surface data 31 is superimposed to the right on the existing lining surface measurement data 30 as shown in Figure 4 (c), it is found that the cutting volume of the left half is smaller than the cutting volume of the right half.

[0048] When the existing lining surface measurement data 30 and the cutting surface data 31 are superimposed so that they are at the same center as in Figure 4(b), the cutting volume of the left half and the cutting volume of the right half are the same. When the existing lining surface measurement data 30 is symmetrical, the existing lining surface measurement data 30 and the cutting surface data 31 have the same center, but in a part with partial deformation as in Figure 3(b), the superimposition condition where the cutting volume of the left half and the cutting volume of the right half are the same does not necessarily mean that the existing lining surface measurement data 30 and the cutting surface data 31 have the same center. In any case, by determining the cutting volume while changing the overlapping condition, such as by shifting the cutting surface data 31 slightly to the left or right, it is possible to find an overlapping condition that satisfies a predetermined condition, such as making the cutting volumes on the left and right the same.

[0049] FIG. 5 is a diagram for exemplarily explaining a method for setting a tunnel center according to an embodiment of the present invention. Referring to Figure 5, the calculation results of the cutting volume of the left half and right half from the center line of the cutting surface data 31 are shown when the cutting surface data 31 is overlaid on the existing lining surface measurement data 30 while shifting it left and right as shown in Figure 4. The solid line shows the right side cutting volume, and the dashed line shows the left side cutting volume. The horizontal axis is negative when the cutting surface data 31 is overlaid on the existing lining surface measurement data 30 by shifting it to the right, and positive when it is overlaid by shifting it to the left. The provisional center is a provisionally determined center point, for example, a point obtained as the midpoint of SL of the existing lining surface measurement data 30.

[0050] When the cutting surface data 31 is shifted from 10 cm on the right side to 10 cm on the left side and overlaid on the existing lining surface measurement data 30, the cutting volume on the left side decreases and the cutting volume on the right side increases, until the left and right cutting volumes are equal at the point 1.4 cm on the left side. In this way, under the condition that the cutting volumes on the left and right are the same, the position shifted 1.4 cm to the left from the provisional center is the center of the cutting surface data 31. The center of the cutting surface data 31 at one end of the specified section L is the start point, and the center of the cutting surface data 31 at the other end is the end point. When the cutting surface data 31 is overlaid on the existing lining surface measurement data 30, including horizontal rotation, even if the start point is 1.4 cm to the left as described above, the end point is not necessarily 1.4 cm to the left.

[0051] FIG. 6 is a flowchart illustrating a tunnel center optimization method according to an embodiment of the present invention. Referring to FIG. 6, in step S600, a three-dimensional measuring device 20 measures distance to the surface of the concrete lining of the tunnel to be renovated. In this embodiment, a three-dimensional measuring device 20 is used that irradiates a laser on a measurement target and measures distance based on the time from the irradiation to the detection of reflection from the measurement target. In order to obtain three-dimensional measurement data, the laser is irradiated while scanning the optical axis of the laser light. Even if a three-dimensional measuring device 20 with a wide scanning range, for example, capable of irradiating over 360°, is used, there is a limit to the area in which distance data can be obtained with high accuracy. Therefore, distance measurements are performed on the lining of the entire section of the tunnel to be renovated while changing the installation location of the three-dimensional measuring device 20. The results of the distance measurement are obtained as point cloud data, which is a collection of points with directions and distances.

[0052] In step S605, it is determined whether distance measurement for all sections has been completed, and if not, the process returns to S600, changes the installation location, and performs distance measurement again. If distance measurement for all sections has been completed in step S605, the three-dimensional measuring device 20 outputs the three-dimensional measurement data to the data processing device 10 in step S610. Although the three-dimensional measurement data is output in a consolidated manner after measurement for all sections has been completed, if the three-dimensional measuring device 20 is equipped with a control personal computer or the like, the measurement data for each installation location may be output to the control personal computer, and the measurement data for all sections may be consolidated in the control personal computer before being output to the data processing device 10.

[0053] The data processing device 10 acquires three-dimensional measurement data for the lining of the entire section of the tunnel to be renovated in step S615. Next, the data processing device 10 combines the measurement data for each installation location included in the three-dimensional measurement data with data for the entire section of the tunnel, and stores the combined data as existing lining surface measurement data (step S620).

[0054] The data processing device 10 also receives cutting plan surface data, which is a target completed shape after cutting for repair, created based on the cross-sectional view of the tunnel (step S625), and stores it as cutting surface data 31 (step S630). At this time, the coordinate system may be converted to facilitate subsequent processing. Since steps S615, S620 and steps S625, S630 are both for inputting data for data processing, it does not matter which one is performed first.

[0055] Next, in step S635, the data processing device 10 superimposes the existing lining surface measurement data 30 and the cut surface data 31 of the predetermined section, and calculates the difference between them. The difference is calculated as the cut volume including the length of the predetermined section. In step S640, the data processing device 10 judges whether the calculated cutting volume satisfies a predetermined condition. The predetermined condition is set in advance and stored in the data processing device 10. For example, the predetermined condition is a condition that when the existing lining surface measurement data 30 and the cutting surface data 31 are superimposed and divided into left and right along a center line that is symmetrical to the left and right of the cutting surface data 31, the cutting volume included in the left half and the cutting volume included in the right half are the same. In addition, the predetermined condition may be a condition that the cutting volume obtained when the existing lining surface measurement data 30 and the cutting surface data 31 are superimposed is the smallest. In this way, when there are a plurality of predetermined conditions, the data processing device 10 may display a screen so that the operator can select a predetermined condition, and make a judgment based on the condition selected in response to an instruction from the operator.

[0056] If it is determined that the cutting volume calculated in step S640 does not satisfy the predetermined condition, the data processing device 10 changes the overlapping condition (step S645) and returns to step S635 to calculate the cutting volume. On the other hand, if it is determined that the cutting volume calculated in step S640 satisfies the predetermined condition, a tentative start point and a tentative end point of the tunnel for a predetermined section are set from the position of the cutting surface data 31 relative to the existing lining surface measurement data 30 at that time (step S650). The tentative start point and the tentative end point are set as the intersection point between the vertical center line and the road surface in the cutting surface data 31 at the end on the starting point side of the tunnel renovation as the tentative start point, and as the tentative end point, the intersection point between the vertical center line and the road surface in the cutting surface data 31 at the end on the opposite side to the tentative start point.

[0057] The data processing device 10 generates recycled lining surface data assuming a case where a recycled lining is applied after cutting, based on the tentative start point and tentative end point that are the set tunnel center (step S655). The recycled lining surface data may be generated in advance in the cutting surface data 31 assuming a case where a recycled lining of a predetermined thickness is applied, and this recycled lining surface data may be set at the tentative tunnel center.

[0058] Next, in step S660, the data processing device 10 judges whether the recycled lining surface data formed or installed at the temporary tunnel center violates the construction gauge set based on the position of the road inside the tunnel. If it is judged that the recycled lining data violates the construction gauge, in step S665, the position of the tunnel center of the specified section is corrected, and the process returns to step S660 to judge whether the corrected position violates the construction gauge.

[0059] If it is determined in step S660 that the recycled lining data does not violate the construction gauge, the tentative start point and tentative end point of the tunnel center of the specified section are determined as the final start point and end point in step S670. Finally, in step S675, it is determined whether or not all sections have been completed, and if not, the process returns to step S635 to proceed with the task of finding the tunnel center of the next predetermined section. If all sections have been completed, the process ends.

[0060] Although not shown in Figure 6, after determining the tunnel center that satisfies the construction gauge, the data processing device 10 determines and outputs the installation reference point for installing protective work, which will also serve as a base for actual cutting work, based on the determined tunnel center. Also, although not shown in Figure 6, the data processing device 10 determines the tunnel center for each specified section sequentially from the starting point of the tunnel renovation, but if the end point of the previously determined specified section and the start point of the next adjacent specified section are separated by more than a specified distance, the data processing device 10 performs a process of adjusting the position of the start point of the next adjacent specified section to the position of the end point of the previously determined specified section.

[0061] The above steps performed by the data processing device 10 are realized by storing and executing in the data processing device 10 an application program in which each component described with reference to FIG. 1 is configured to execute under its respective role.

[0062] Thus, according to the tunnel center optimization method of the embodiment of the present invention, the tunnel center is determined according to the cutting volume of the lining for each specified section in accordance with the actual construction form, so that it is possible to eliminate factors that reduce quality, such as thinning of the tunnel lining, compared to the conventional method of determining the tunnel center.

[0063] Although the embodiments of the present invention have been described in detail above with reference to the drawings, the present invention is not limited to the above-described embodiments and can be modified in various ways without departing from the technical scope of the present invention. [Explanation of symbols]

[0064] 1 Tunnel center setting system 10 Data Processing Device 11, 21 Control section 12, 22 Input / output section 13, 23 Storage section 14 Display section 15 Existing lining surface measurement data management department 16 Cutting volume calculation unit 17. Construction Limit Judgment Department 18 Tunnel center fitting section 19 Protection work reference point setting section 20 3D Measuring Equipment 24 Laser light irradiation unit 25 Laser light detector 30 Measurement data of existing lining surface 31, 31' Cutting surface data 32 Tunnel center of existing lining 33 Tunnel center in original position 34 Construction error SL Tunnel Widest Point

Claims

1. A method for optimizing a tunnel center for determining a reference tunnel center when renovating a tunnel lining, comprising the steps of: an existing lining surface measurement data generation stage in which distance measurement is performed on the lining concrete surface of the tunnel to be renovated using a three-dimensional measuring device to obtain three-dimensional measurement data, and the three-dimensional measurement data is stored as existing lining surface measurement data; a cutting surface data storage step of receiving cutting plan surface data, which is a target completed shape after cutting for repair, created based on the cross-sectional view of the tunnel, and storing the data as cutting surface data in a data processing device; a data processing step in which cutting surface data is superimposed on existing lining surface measurement data for each predetermined section while changing the superimposition conditions, and the data is repeated until a cutting volume based on a difference between the existing lining surface measurement data and the cutting surface data satisfies a predetermined condition; A tunnel center setting step of determining a start point and an end point for each predetermined section of the tunnel center from the position of cutting surface data where the cutting volume satisfies a predetermined condition.

2. A step of checking whether or not the construction gauge will be violated when cutting and repairing the tunnel lining based on the obtained start point and end point; The tunnel center optimization method according to claim 1, further comprising a step of correcting the position of the start point or the end point of the tunnel center so as not to violate the construction limit if the check determines that the construction limit will be violated.

3. 2. The tunnel center optimization method according to claim 1, wherein the predetermined conditions include either that the cutting volume is a minimum or that the left and right cutting volumes are identical when the cutting volume is divided in a left and right direction perpendicular to a straight line from the start point to the end point.

4. 2. The method for optimizing a tunnel center according to claim 1, further comprising a step of determining a reference point for installing protective work when renovating a tunnel lining based on the obtained starting point and end point.

Citation Information

Patent Citations

  • Method for enlarging a tunnel and device for executing the method

    EP1972753A1

  • Execution control method in method of shielding construction

    JP1987225697A

  • Repair method of tunnel

    JP1995042496A

  • Protective structure of existing tunnel lining

    JP2003082991A

  • Centre surveying method

    JP2009186184A