Monitoring system and monitoring method
The monitoring system differentiates between operational activities and anomalies by setting baselines and analyzing operation work, reducing unnecessary alerts and improving notification accuracy.
Patent Information
- Application Number
- JP2023060306
- Authority / Receiving Office
- JP · JP
- Patent Type
- Applications
- Current Assignee / Owner
- Filing Date
- 2023-04-03
- Publication Date
- 2024-10-16
AI Technical Summary
Conventional system anomaly detection using machine learning mistakenly identifies normal operational activities like software updates as anomalies, leading to unnecessary notifications for system administrators.
A monitoring system that calculates a baseline for normal operating conditions, acquires operation work information, and determines if deviations are due to scheduled maintenance or actual anomalies by analyzing the relationship between outlier periods and operation work.
This approach reduces unnecessary notifications by distinguishing between expected operational activities and true anomalies, allowing for appropriate notification of system administrators.
Smart Images

Figure 2024147352000001_ABST
Abstract
Description
[Technical field]
[0001] The present invention relates to a monitoring system and a monitoring method. [Background technology]
[0002] Conventionally, methods for monitoring a system in which a virtual machine is formed and detecting an abnormality have been known.
[0003] For example, Patent Document 1 discloses a technology for a computer system S having at least one HCI node 103-105 and an upper management platform 100 configured to be able to communicate with this HCI node 103-105 and acquiring operation information of the HCI nodes 103-105 to detect abnormalities, the HCI nodes 103-105 creating an event notification table 113 including the resources of the HCI nodes 103-105 related to an event executed on the HCI nodes 103-105 and the type of effect of the event on the HCI nodes 103-105 and sending it to the upper management platform 100, the operation information including the load on the resources of the HCI nodes 103-105, and the upper management platform 100 detecting abnormalities using the operation information and the event notification table 113. As a result, in Patent Document 1, when the anomaly detection function based on the learning model is used, the confirmation work that occurs due to unnecessary notifications is reduced. [Prior art documents] [Patent documents]
[0004] [Patent Document 1] Patent Publication No. 2022-28208 Summary of the Invention [Problem to be solved by the invention]
[0005] However, in conventional system anomaly detection using machine learning, irregular and expected behaviors caused by operational tasks such as software updates may be mistakenly regarded as anomalies. In other words, unnecessary notifications are sent to the system administrator, causing inconvenience to the system administrator. Patent Document 1 does not anticipate the occurrence of such unnecessary notifications. Therefore, an object of the present invention is to provide a technique for providing an appropriate notification to a system administrator. [Means for solving the problem]
[0006] In order to solve the above problems, one representative monitoring system of the present invention is a monitoring system that monitors a business system and notifies of abnormalities, and includes a monitoring index analysis unit that acquires monitoring indexes that indicate the operating status of the business system and calculates a baseline that indicates the range within which the monitoring indexes are considered to be normal, an operation work information acquisition unit that acquires operation work information that indicates operation work for the business system and the period during which the operation work is performed, and a notification determination unit that issues a notification regarding the business system based on the baseline and the operation work information, wherein the notification determination unit detects an outlier occurrence period, which is a period during which the monitoring index deviates from the baseline, and if there is a correlation between the outlier occurrence period and the operation work information, does not issue an abnormality notification, which is a notification indicating an abnormality, and if there is no correlation between the outlier occurrence period and the operation work information, issues the abnormality notification. Effect of the Invention
[0007] According to the present invention, it is possible to give an appropriate notification to a system administrator. Problems, configurations and effects other than those described above will become apparent from the description of the following embodiments. [Brief description of the drawings]
[0008] [Figure 1] FIG. 1 is a diagram showing a configuration of a monitoring system. [Diagram 2]FIG. 2 is a diagram illustrating an example of analysis in the metrics analysis service. [Diagram 3] FIG. 3 is a diagram illustrating an example of detection of an operation task in the operation log collection service. [Figure 4] FIG. 4 is a diagram showing an example of an operation work schedule stored in the operation work information storage unit. [Diagram 5] FIG. 5 is a diagram illustrating the operation of the notification determination unit. [Figure 6] FIG. 6 is a diagram illustrating a method for detecting an outlier occurrence period performed by the notification determination unit. [Figure 7] FIG. 7 is a diagram illustrating a method for determining the association between an outlier occurrence period and an operation task, which is performed by the notification determination unit. [Figure 8] FIG. 8 is a diagram showing an example of a display of the IF section. [Figure 9] FIG. 9 is a diagram showing the operation and effect of the first embodiment. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0009] Hereinafter, an embodiment of the present invention will be described with reference to the drawings. Note that the present invention is not limited to the embodiment. In addition, in the description of the drawings, the same parts are denoted by the same reference numerals.
[0010] In this disclosure, "cloud service" refers to the provision of infrastructure (hereinafter also referred to as "infrastructure") and communication resources such as networks, servers, storage, software, and data through a communication network such as the Internet, or the infrastructure and communication resources that are provided. Infrastructure and computer resources also include services. Furthermore, when the term "service" is used, for example, "information collection service," it means infrastructure and computer resources for realizing the function of information collection.
[0011] An "operating system (OS)" is the basic software that functions as a user interface between a computer and a user. An application (hereafter referred to as an "app") is software that runs on a computer's OS. A "virtual machine (VM)" refers to a computer implemented on software that is not based on a physical hardware configuration. The term "program" generally refers to software, but in this disclosure it also includes the functions and systems provided by cloud services.
[0012] [First embodiment] (Monitoring system configuration) 1 is a diagram showing the configuration of a monitoring system 1. The monitoring system 1 is made up of an infrastructure management service 10, a metrics analysis service 20, an operation log collection service 30, and a visualization notification service 40.
[0013] (Infrastructure management services) The infrastructure management service 10 is a system configured by cloud services. The infrastructure management service 10 includes a business system 11, a database (DB) unit 16, a metrics monitoring service 17, an operation log monitoring service 18, and a network 19.
[0014] The business system 11 is a system configured to perform a specific business in a company, and includes, for example, an inventory management system, an accounting management system, a customer management system, etc. The business system 11 is a virtual machine having a virtual memory function and a virtual CPU function. The business system 11 has an OS 12, antivirus software 13, a business application 14, and an information collection agent 15.
[0015] The OS 12 is basic software in the business system 11. The OS 12 runs the antivirus software 13, the business application 14, and the information collection agent 15 based on the input operation of the operation worker. The antivirus software 13 is software for protecting the business system 11 from viruses. For example, the antivirus software 13 removes viruses that have invaded the business system 11, and checks whether files output from the business system 11 contain viruses. The antivirus software 13 may also have a firewall function that monitors the communication status between the business system 11 and external computers and virtual machines to prevent the intrusion of viruses. The business application 14 is an application for performing a specific function required for the business system 11.
[0016] The configuration included in the business system 11 is not limited to this. For example, general-purpose applications for document creation and e-mail may be included.
[0017] The database (DB) unit 16 stores data used in the business system 11 or data generated in the business system 11 .
[0018] The metrics monitoring service 17 collects information on the metrics of resources in the infrastructure management service 10. Specifically, the metrics include the server resource status (CPU utilization (operation rate), memory usage, etc.) and service status (latency, transaction volume, error rate, etc.). The metrics monitoring service 17 transmits the collected metrics information to the metrics analysis service 20 described later.
[0019] The information collection agent 15 is software having a function of collecting metrics information related to resources in the business system 11. The information collection agent 15 can obtain more detailed information than the metrics information obtained by the metrics monitoring service 17. For example, with regard to CPU usage, it can obtain "user CPU usage" and "system CPU usage". It can also obtain "number of requests / second", "request error rate / second", and "response time" with regard to business applications. The information collection agent 15 transmits the collected metrics information to the metrics analysis service 20 described below.
[0020] The operation log monitoring service 18 collects information regarding operations performed by operation workers on the business system 11, and stores the information as an operation log. The operation log includes the operation worker's login information, the operation history of the information, the time when the information was accessed, etc. The operation log monitoring service 18 transmits the operation log to the operation log collection service 30, which will be described later.
[0021] The metrics monitoring service 17 and the operation log monitoring service 18 realize the above-mentioned functions by using the information resources of the infrastructure management service 10. A network 19 is provided between the business system 11 and the metrics monitoring service 17, and between the business system 11 and the operation log monitoring service 18, and information is transmitted via the network 19.
[0022] In this disclosure, the business system 11 will be described as a virtual machine (VM1) that is a monitoring target for detecting anomalies, but the number of virtual machines is not limited to one. A plurality of virtual machines may be formed, and each virtual machine may be a detection target.
[0023] (Metrics Analysis Service) The metrics analysis service 20 has a function of analyzing information related to metrics. For example, the metrics analysis service 20 calculates a baseline that indicates a range in which the metrics are considered to be normal. The function of the metrics analysis service 20 will be described later.
[0024] (Operation log collection service) The operation log collection service 30 has a function of acquiring operation work information indicating the operation work performed on the business system 11 and the period during which the operation work was performed, based on the operation log included in the monitoring data. The function of the operation log collection service 30 will be described later.
[0025] (Visualization notification service) The visualization notification service 40 includes information acquisition units 41 and 43, a monitoring / analysis information storage unit 42, an operation log storage unit 44, an operational work information storage unit 45, a notification determination unit 46, an interface unit (hereinafter also referred to as the "IF unit") 47, an external notification unit 47a, a sub-interface unit (hereinafter also referred to as the "sub-IF unit") 48, and a sub-external notification unit 48a.
[0026] The information acquisition unit 41 is a program for acquiring information on metrics and metrics analysis data included in the monitoring data from the metrics analysis service 20, and storing the information in the monitoring and analysis information storage unit 42. The monitoring and analysis information storage unit 42 stores metrics monitoring data and analysis data. The information acquisition unit 43 acquires information on operation logs and operational work from the operation log collection service 30, and stores the information in the operation log storage unit 44. The operation log storage unit 44 stores information on the operation logs and operational work. The operation work information storage unit 45 stores information on the period during which operational work is performed.
[0027] The notification determination unit 46 acquires information from the monitoring and analysis information storage unit 42, the operation log storage unit 44, and the operation work information storage unit 45, and verifies the operation work and monitoring data. The notification determination unit 46 issues a notification based on the baseline acquired from the monitoring and analysis information storage unit 42 and the operation work information acquired from the operation log storage unit 44 or the operation work information storage unit 45. The notification determination unit 46 determines whether to notify the system administrator or the operation worker.
[0028] The IF unit 47 indicates the operating status of the business system 11, and is provided for the system administrator who operates the monitoring system. The IF unit 47 has, for example, a display function as a user interface. The IF unit 47 also has a function of accepting input operations by the system administrator. For example, the IF unit 47 can accept a work schedule for operation work, as described below, and input the work schedule into the operation work information storage unit 45. The sub-IF unit 48 mainly issues notifications to operation workers. The external notification unit 47a notifies the system administrator via a notification service external to the visualization notification service 40, such as email or a chat service. The sub-external notification unit 48a notifies the operation operator via a notification service external to the visualization notification service 40.
[0029] The configuration of the monitoring system 1 has been described above, but the configuration of the monitoring system is not limited to this, and the configuration can be set appropriately. As a specific example, the monitoring system 1 is a monitoring system that monitors the business system 11 and notifies of an abnormality, and can include a monitoring index analysis unit 50 that acquires monitoring indexes indicating the operating status of the business system 11 and calculates a baseline indicating the range in which the monitoring index is considered to be normal, an operation work information acquisition unit 60 that acquires operation work information indicating the operation work for the business system 11 and the implementation period of the operation work, a notification determination unit 46 that issues a notification regarding the business system 11 based on the baseline and the operation work information, and an interface unit 47 that indicates the operating status of the business system 11. The monitoring index analysis unit 50 has functions realized by the metrics monitoring service 17, the metrics analysis service 20, the information acquisition unit 41, and the monitoring and analysis information storage unit 42. The operation work information acquisition unit 60 has functions realized by the operation log monitoring service 18, the operation log collection service 30, the information acquisition unit 43, the operation log storage unit 44, and the operation work information storage unit 45.
[0030] It is assumed that the infrastructure management service 10, the metrics analysis service 20, the operation log collection service 30, and the visualization notification service 40 are provided by different cloud services, but the present disclosure is not limited to this. They may be provided by the same service provider. In addition, the present disclosure is not limited to cloud services, and can also be applied to an on-premise form. Also, although the IF unit 47, the external notification unit 47a, the sub IF unit 48, and the sub external notification unit 48a are shown as separate components, they may have multiple functions through a common component. For example, it is also possible for the IF unit 47 and the sub IF unit 48 to be a single component, with the interface functions being performed separately for the system administrator and for the operation worker. It is also possible for the external notification unit 47a and the sub external notification unit 48a to be a single component, with the notification function being performed separately for the system administrator and for the operation worker.
[0031] (Example of obtaining monitoring data) 2 is a diagram showing an example of analysis in the metrics analysis service 20. Here, a case is shown in which CPU usage and memory usage are used as metrics.
[0032] FIG. 2(a) is a diagram showing a metrics table 21 showing an example of metrics acquired and stored by the metrics analysis service 20. The item "Monitoring target" refers to a target for which monitoring data is detected. Here, the monitoring target is VM1, which is the business system 11. The item "Detection date and time" indicates the date and time when monitoring data was detected. For example, metrics are acquired at a predetermined time interval. The item "Metrics" indicates the metrics for which monitoring data is acquired. Here, CPU usage or memory usage is the monitoring data acquisition target. The item "Value" indicates the value of the monitoring data of the item "Metrics". As shown in FIG. 2(a), for the monitoring target VM1, at date and time (date1, time1), the CPU usage is c1 and the memory usage is m1. Also, at date and time (date2, time2), the CPU usage is c2 and the memory usage is m2. At date and time (date3, time3), the CPU usage is c3 and the memory usage is m3.
[0033] The monitoring target is not limited to VM1, and other virtual machines (VM2, VM3, ...) may be monitored. Furthermore, the metrics acquired as monitoring data are not limited to two, and other indicators may be detected as metrics.
[0034] 2(b) is a diagram showing an example of CPU utilization predicted by the metrics analysis service 20. A predicted value curve 22 indicated by a solid line indicates CPU utilization for a predetermined period, for example, the next month (from mmdd0 to mmdd1). A baseline 23, which is a band-like area indicated by a dotted line, indicates a range in which CPU utilization is considered to be normal. The baseline 23 can be set to a range of ±10% of the value indicated by the predicted value curve 22, for example.
[0035] As a method of deriving the predicted value curve 22, for example, it is possible to detect periodicity of the CPU utilization rate based on monitoring data for the past three months and use it as the predicted value curve 22. The method of setting the predicted value curve 22 and the baseline 23 is not limited to this method and may be selected appropriately. It is also possible to configure it so that the system administrator specifies it via the interface unit 47.
[0036] Information regarding the metrics table 21, the CPU utilization predicted value curve 22, and the baseline 23 is stored in a monitoring and analysis information storage unit 42.
[0037] FIG. 3 is a diagram showing an example of detection of operation work in the operation log collection service 30. FIG. 3(a) is a diagram showing judgment criteria 31 for judging the operation work performed by an operation worker on a monitoring target. The item "operation work" indicates the type of operation work performed by the operation worker. The item "work procedure" indicates the procedure of operations performed during the operation work. The operation log collection service 30 detects the operation log included in the monitoring data, judges that the operation was performed according to the work procedure, and identifies that the operation work was performed.
[0038] Taking a Linux (registered trademark) OS as an example, the OS update, which is one of the operational tasks, is performed as follows: operation 1 is to log in to the VM (business system 11) using SSH (Secure Shell). operation 2 is to download the latest stable kernel package. operation 3 is to install the downloaded kernel. operation 4 is to reboot the VM.
[0039] Furthermore, as part of operational tasks, when updating a business application, operation 1 involves logging in to the VM. Operation 2 involves downloading and installing the required packages. Operation 3 involves logging in to the VM using SSH. Operation 4 involves downloading the latest application package from a specific repository. Operation 5 involves installing the downloaded application package. Note that operations 1 and 2 are for adding a package and are performed as necessary before updating a business application. Therefore, operations 1 and 2 can be omitted.
[0040] As for the operation tasks, the antivirus software update involves logging in to the VM using SSH as operation 1. The latest antivirus software package or software update program is downloaded from a specific repository as operation 2. The antivirus software update is performed as operation 3, that is, the downloaded package is installed or the update program is executed.
[0041] FIG. 3(b) is a diagram showing an example of an operation work table 32 that shows operation work information detected by the operation log collection service 30. The operation work information is information that shows the operation work and the period during which the operation work was performed. The item "Monitoring target" shows the target that was monitored and for which the operation work was performed. The item "Operation work" shows the operation work that was performed. The item "Start date and time" shows the date and time when the operation work started. The item "End date and time" shows the date and time when the operation work ended.
[0042] As shown in FIG. 3(b), for monitored VM1, the OS update operation started at the start date and time (date10, time10) and ended at the end date and time (date11, time11). The start date and time is the date and time when operation 1 of the OS update operation, "Log in to the VM via SSH," was performed. The end date and time is the date and time when operation 3 of the OS update operation, "Restart the VM," was performed. Similarly, the app update started at the start date and time (date12, time12) and ended at the end date and time (date13, time13). The antivirus software update started at the start date and time (date14, time14) and ended at the end date and time (date15, time15).
[0043] The operation log and information related to the operation work table 32 are stored in the operation log storage unit 44 .
[0044] The monitoring target is not limited to VM1, and other virtual machines (VM2, VM3, . . . ) may be monitored. The judgment criteria 31 may be specified by a system administrator via the interface unit 47.
[0045] In addition, although a method of using an operation log performed by an operation worker as the judgment criterion 31 has been described, the present disclosure is not limited thereto. In some cases, some operations for updating business applications are automated by CI / CD (Continuous Integration / Continuous Delivery (Deployment)). In this case, it is possible to detect that a business application has been updated by monitoring the behavior of each tool that executes CI / CD, such as the start time and end time of deployment, or the mean time to repair in the case of an update failure. In addition, when an update of a business application is automated, the metrics monitoring service 17 and the metrics analysis service 20 may detect that the business application has been updated.
[0046] 4 is a diagram showing an example of an operation work schedule 451 stored in the operation work information storage unit 45. The operation work schedule 451 is input by a system administrator via the IF unit 47. As in the operation work table 32, the operation work schedule 451 also shows operation work information indicating operation tasks and the period during which the operation tasks are to be performed.
[0047] The operation work schedule 451 indicates the date and time of the planned operation work. The item "operation work" indicates the planned operation work. The item "target" indicates the target on which the operation work is performed. The item "scheduled start date and time" indicates the date and time when the operation work is scheduled to start. The item "scheduled end date and time" indicates the date and time when the operation work is scheduled to be completed. As shown in FIG. 4, an OS update is performed for VM1, and is scheduled to start at a scheduled start date and time (date20, time20) and to be completed at a scheduled end date and time (date21, time21). An update of a business application is scheduled to start at a scheduled start date and time (date22, time22) and to be completed at a scheduled end date and time (date23, time23) for VM1. An update of antivirus software is scheduled to start at a scheduled start date and time (date24, time24) and to be completed at a scheduled end date and time (date25, time25) for VM1.
[0048] Note that the items of the operation work schedule 451 are not limited to these. For example, operation workers can also be added as an item.
[0049] (Verification of operational tasks and metrics) The notification determination unit 46 detects whether or not the metrics contain outliers, based on information acquired from the monitoring and analysis information storage unit 42, the operation log storage unit 44, and the operation work information storage unit 45. The notification determination unit 46 detects outlier occurrence periods, which are periods during which the monitoring indicators deviate from the baseline. A method for detecting outlier occurrence periods, which are periods during which outliers occur, will be described with reference to Figures 5 and 6.
[0050] Fig. 5 is a diagram for explaining the operation of the notification determination unit 46. Fig. 5(a) is a diagram for explaining outliers of metrics.
[0051] Before outlier detection, a metric is specified and a detection range 461 is set as a period during which outlier detection of the specified metric is performed. In FIG. 5(a), CPU usage is specified as the metric, and the detection range 461 is from 00:00 to 15:00. Note that the intervals of the scale on the time axis are changed in size for ease of understanding. In addition, the notification determination unit 46 acquires the metric value detected in the detection range 461 from the metrics analysis service 20 and the baseline 23a in the detection range 461. The metrics curve 463 indicates the metric value detected in the detection range 461. The metrics curve 463 is acquired by the metrics analysis service 20, and indicates the CPU usage from 00:00 to t1, t2, ..., 15:00.
[0052] First, the metrics at time 00:00 are referenced to determine whether they are outliers. Here, the CPU utilization at time 00:00 is within the baseline 23a, so a determination is made for the CPU utilization at the next time t1. Thereafter, the CPU utilization at the next time is referenced and a determination is made until an outlier is detected.
[0053] When the determination is repeated, it is determined that the CPU utilization at time 10:05 exceeds the baseline 23a. The time 10:05, which is the time when an outlier is first determined, is recorded as the outlier determination time outlier_start.
[0054] The CPU usage rate from 10:05 onward is also referenced and a judgment is made as to whether it is an outlier. While it is judged to be an outlier, the reference and judgment of the CPU usage rate are repeated.
[0055] If the determination is repeated, it is determined that the CPU utilization at time 10:52 is included in the baseline 23a. The time 10:52, which is the first time that the CPU utilization is not determined to be an outlier after the outlier period continues, is recorded as the outlier occurrence end time outier_end.
[0056] After 10:52, the CPU utilization rate continues to be referenced and judged, and continues until the time 12:00. In this manner, the outlier occurrence period 464 is detected.
[0057] FIG. 6 is a diagram showing a method for detecting an outlier occurrence period performed by the notification determination unit 46. In FIG.
[0058] First, the notification determination unit 46 refers to the metrics at the start time of the detection range 461 (step S2) and determines whether or not it is an outlier (step S3). The notification determination unit 46 determines the CPU utilization rate at the next time until an outlier is detected (if the result in step S3 is No, the process proceeds to step S9 and then returns to step S3).
[0059] When the notification determination unit 46 determines that the value is an outlier (Yes in step S3), the notification determination unit 46 acquires the time at which the outlier occurred as the outlier occurrence start time outlier_start (step S4).
[0060] The notification determination unit 46 also refers to the CPU utilization rate after the outlier occurrence start time and determines whether it is an outlier. While it is determined to be an outlier, the notification determination unit 46 repeats the reference to and determination of the CPU utilization rate (steps S5 to S7).
[0061] When the judgment is repeated, the notification judgment unit 46 acquires the time when the outlier is no longer judged to be an outlier after the outlier period has continued as the outlier occurrence end time outier_end (if the result is No in step S7, the process proceeds to step S8).
[0062] The notification determination unit 46 repeats the reference and determination of the CPU usage until the end of the detection range 461. When the reference to the metrics within the detection range 461 has ended (No in step S1), the notification determination unit 46 ends the verification of the outlier occurrence period 464.
[0063] (Relationship between outlier occurrence period and operational work) Next, a method for determining the association between an outlier occurrence period 464 and an operation task will be described with reference to Figs. 5(b) and 5(c) in addition to Fig. 5(a). Fig. 5(b) is a diagram showing an allowable period condition 465 stored by the notification determination unit 46. Fig. 5(c) is a diagram showing an operation task schedule 451a acquired by the notification determination unit 46 from the operation task information storage unit 45. In the first embodiment, the operation tasks and the planned period for carrying out the operation tasks shown in the operation task schedule 451a are treated as operation task information. Note that for simplicity, in the item "Planned start date and time" in Fig. 5(b), the date is omitted and only the time is displayed.
[0064] The allowable period condition 465 indicates an allowable range of time difference that treats the outlier occurrence period 464 and the implementation period of the operation work as being related to each other even if there is no overlap between them. Here, there are operation works that are preferably performed as scheduled and those that do not need to be performed according to the schedule. For example, since it is preferable that an OS update is performed as scheduled, the allowable time is set to within 10 minutes. On the other hand, since an antivirus software update does not cause a major problem in the operation of the business system even if it is not performed as scheduled, the allowable time is set to within 60 minutes. Note that the present disclosure is not limited to these numerical values, and these numerical values may be set as appropriate.
[0065] First, the outlier occurrence start time outlier_start and the outlier occurrence end time outier_end of the outlier occurrence period 464 are referenced.
[0066] Next, for the outlier occurrence period 464, the longest allowable period is selected from the allowable period conditions 465 to calculate the expected period that is the maximum range that can be considered to include the implementation period of the operation work. Referring to the allowable period conditions 465, the maximum allowable period is 60 minutes for updating the antivirus software. Therefore, the earliest start time of the expected period is start_max=outlier_start-60 minutes=09:05, and the latest end time of the expected period is end_max=outlier_end+60 minutes=11:52.
[0067] Next, the operation work that can be performed during the expected period is detected. According to the operation work schedule 451a, the update of the business application is scheduled to start at 9:30 and end at 10:00. The update of the business application is detected as a candidate for the operation work that can be performed during the expected period.
[0068] If there is no operation work scheduled for the earliest start time start_max and the latest end time end_max, it is assumed that the cause of the outlier occurrence period 464 is not an operation work. In this case, the situation is notified to the system administrator.
[0069] Next, it is determined whether there is an actual correlation between the outlier occurrence period 464 and the estimated operation work. The period during which the update of the business application, which is the estimated operation work, can be performed, is set as the expected period. Furthermore, the allowable period for the update of the business application is 30 minutes. The earliest start time of the expected period for the update of the business application is calculated as start = outlier_start - 30 minutes = 09:35, and the latest end time of the expected period is calculated as end = outier_end + 10 minutes = 11:22.
[0070] The expected period overlaps with the period for updating the business system on the operation work schedule 451a. From this, it is determined that there is a correlation between the occurrence of the outlier occurrence period 464 and the work of updating the business system. Since there is a correlation between the period in which the outlier occurs and the period during which the operation work is carried out, it is assumed that the cause of the outlier is the operation work. In this case, the situation is first communicated to the operation worker. After the operation worker checks the operating status of the business system, the operation company will communicate the situation to the system administrator if necessary.
[0071] If no correlation can be found between the forecast period and the operational tasks, it will be necessary to separately investigate the cause of the outlier in CPU usage. In this case, the system administrator will be notified of the situation.
[0072] Since the verification of the outlier occurrence period 464 has been completed, the verification continues for the next outlier occurrence period.
[0073] 7 is a diagram showing a method for determining the association between an outlier occurrence period and an operational task performed by the notification determination unit 46. When there is an association between the outlier occurrence period and the operational task information, the notification determination unit 46 does not issue an anomaly notification, which is a notification indicating an abnormality, and when there is no association between the outlier occurrence period and the operational task information, it issues an anomaly notification. Details are described below.
[0074] The notification determination unit 46 refers to the outlier occurrence start time outlier_start and the outlier occurrence end time outlier_end of the outlier occurrence period 464 (step S12).
[0075] Next, the notification determination unit 46 selects the maximum allowable period among the allowable period conditions 465 for the outlier occurrence period 464, and calculates an expected period that is the maximum range that can be considered to include the implementation period of the operation work. The notification determination unit 46 calculates the earliest start time of the expected period as start_max=outlier_start-maximum allowable period, and the latest end time of the expected period as end_max=outlier_end+maximum allowable period (step S13).
[0076] Next, the notification determination unit 46 detects operation tasks that may be performed in the expected period from the operation task information shown in the operation task schedule 451a (S14). If no operation task is detected (No in step S14), the notification determination unit 46 determines that there is no association between the outlier occurrence period 464 and the operation task information. The notification determination unit 46 issues a notification using the IF unit 47, and notifies the system administrator of the abnormality (step S19).
[0077] Next, the notification determination unit 46 refers to the allowable period of the detected operation work (step S15). The notification determination unit 46 also refers to the allowable period of the detected operation work. For the expected period in which the detected operation work may be performed, the notification determination unit 46 calculates the earliest start time of the expected period start=outlier_start-the allowable period of the detected operation work and the latest end time of the expected period end=outlier_end+the allowable period of the detected operation work (step S16).
[0078] The notification determination unit 46 determines whether there is an overlap between the expected period and the implementation period on the operation work schedule 451a for the detected operation work (step S17). If there is no overlap, the notification determination unit 46 determines that there is no association between the outlier occurrence period and the operation work information. The notification determination unit 46 uses the IF unit 47 to notify the system administrator of the abnormality (step S19). If there is an overlap, the notification determination unit 46 determines that there is an association between the outlier occurrence period and the operation work information. The notification determination unit 46 uses the sub IF unit 48 to notify the operation worker of the abnormality (step S18).
[0079] If no correlation can be found between the expected period and the operation work, it becomes necessary to separately investigate the cause of the outlier in the CPU usage. In this case, the notification determination unit 46 uses the IF unit 47 to notify the system administrator of the abnormality (step S19).
[0080] The notification determination unit 46 removes the verified outlier occurrence period from the processing target (step S20), and verifies the next outlier occurrence period (step S11).
[0081] In addition, in step S14, if a plurality of operational tasks that may be performed in the expected period are detected, steps S15 to S17 are performed for each of the detected operational tasks.
[0082] Also, although the IF unit 47 is used in step S19 and the sub-IF unit 48 is used in step S18, the present disclosure is not limited thereto. For example, the notification determination unit 46 can issue a notification indicating an abnormality using the external notification unit 47a instead of or together with the IF unit 47. Also, the notification determination unit 46 can issue a notification indicating an abnormality using the sub-external notification unit 48a instead of or together with the sub-IF unit 48. For example, the external notification unit 47a notifies the system administrator of the abnormality through a terminal device different from the terminal device connected to the visualization notification service 40. In other words, the external notification unit 47a notifies via a notification service external to the monitoring system 1 that is not included in the monitoring system 1. The notification determination unit 46 notifies the abnormality using at least one of the IF unit 47 or the external notification unit 47a. In this way, even if the notification is not confirmed through the IF unit 47 of the visualization notification service 40, it is possible to notify the system administrator. Similarly, the sub-external notification unit 48a notifies the operation worker of the abnormality through a terminal device different from the terminal device connected to the visualization notification service 40. In other words, the sub-external notification unit 48a notifies via a notification service external to the monitoring system 1 that is not included in the monitoring system 1. The notification determination unit 46 notifies the operation worker of the abnormality using at least one of the sub-IF unit 48 or the sub-external notification unit 48a. In this way, even if the notification is not confirmed through the sub-IF unit 48 of the visualization notification service 40, it is possible to notify the operation worker.
[0083] (Notification to system administrator) FIG. 8 is a diagram showing an example of the display of the IF unit 47. The IF unit 47 displays multiple data in a list format. The outlier table 471 shows the detection results of outliers detected in a predetermined cumulative period. The item "rank" indicates the number of times an outlier was detected. The item "monitoring target" indicates the target for detecting anomalies. The item "metrics" indicates the index in which an outlier was detected. The item "number of outliers" indicates the number of times an outlier occurred. For example, as shown in the label 470, in the one month of December 2022, outliers were detected only 1258 times in VM1 with respect to CPU usage. Also, in VM2, outliers were detected only 1003 times with respect to memory usage.
[0084] The line graph 474 includes a metrics curve 475 and a baseline 23b. The metrics curve 475 indicates the CPU usage of VM1 specified by the pull-down lists 472 and 473. The baseline 23b indicates the range of values considered to be normal for the CPU usage of VM1. In addition, the text "outlier a", "outlier b", and "outlier c" are displayed at the locations where outliers occur in the metrics curve 475.
[0085] Lollipop plot 477 indicates the period when operational work was performed. Bar 478 indicates the period when OS updates were performed. Bar 479 indicates the period when business applications were updated. Bar 480 indicates the period when antivirus software updates were performed.
[0086] Here, a dashed line is drawn between outlier a and bar 478, and a dashed line is drawn between outlier c and bar 480. This indicates that there is a correlation between the occurrence of the outlier and the occurrence of an operational task. On the other hand, for outlier b, no associated operational task is indicated. In the case of outlier B, a warning display 476 is displayed to notify the system administrator. Also, in the cases of outlier a and outlier c, they occurred in relation to operational tasks. As shown in line graph 474, no warning display is given.
[0087] Incidentally, outliers a and c also include cases where, although abnormal, the system administrator does not need to take immediate action. The notification determination unit 46 notifies the operation operator via the sub-IF unit 48. The sub-IF unit 48 displays, for example, on the display unit of the business system 11 operated by the operation operator, a message indicating that CPU usage has increased during the operation work period.
[0088] 8 is an example, and the present disclosure is not limited thereto. Instead of warning display 476, metrics curve 475 corresponding to outlier b and the time may be highlighted so as to clearly indicate the abnormality of outlier b. The display unit of IF unit 47 may be a unit having only a display function, such as a liquid crystal panel, or may be a unit having a display function and an input function for receiving user input, such as a touch panel display.
[0089] It should be noted that items 481 to 483 can display an operation schedule for the operation indicated by each item when a selection is received from the system administrator. It is also possible to display an input display that can receive input for operation tasks by the system administrator.
[0090] (Action and effect) Fig. 9 is a diagram showing the operation and effect of the first embodiment. Fig. 9(a) shows a case where a notification is made directly to the system administrator. Fig. 9(b) shows a case where a notification is not made to the system administrator.
[0091] 9(a) shows a case where an outlier occurs in the CPU utilization rate, and no operational work is performed around the time of the outlier. Since the outlier is not caused by operational work, it is necessary to identify the abnormality. In this case, the system administrator is notified via the IF unit 47, so that the cause of the outlier can be identified quickly.
[0092] On the other hand, Fig. 9(b) shows a case where an outlier occurrence period occurs and an operational work period occurs close to the outlier occurrence period. Although the outlier is abnormal, it is assumed that the cause of the outlier is the operational work. In this case, first, the operation worker is notified via the sub-IF unit 48. Since the system administrator is not directly notified, the system administrator does not need to take unnecessary action.
[0093] In this way, according to the first embodiment, it is determined that an outlier has occurred in a metric based on the baseline, and it is determined whether there is a correlation between the period in which the outlier occurred and the period in which the operation work is performed. It is determined whether the occurrence of the outlier is a behavior within the expected range caused by the operation work, or a behavior outside the expected range that is not caused by the operation work. Since the occurrence of the outlier is notified after distinguishing whether it is expected or not, for example, it is possible to set it so that the system administrator is not notified when an expected outlier occurs, but is notified when an unexpected outlier occurs. By distinguishing the occurrence of the outlier in this way before notifying, it is possible to provide an appropriate notification to the system administrator. In the first embodiment, the notification is shown as the warning display 476 in the IF unit 48 and the notification by text information such as an email sent by the external notification unit 47a and the sub external notification unit 48a, but the present disclosure is not limited to this. It is also possible to use a notification method for conveying warning information to the user, such as a notification using a voice or a haptic device.
[0094] [Second embodiment] The second embodiment differs from the first embodiment in that the notification determination unit 46 uses the operation work table 32 recorded by the operation log collection service 30 instead of the operation work schedule 451a acquired from the operation work information storage unit 45. In the following description, components that are the same as or equivalent to those in the above-described first embodiment are given the same reference numerals, and the description thereof will be simplified or omitted.
[0095] In the first embodiment, as shown in step S14 of Fig. 7, operation tasks that may be included in the expected period are extracted from the operation task schedule 451a. In contrast, in the second embodiment, operation tasks that may be included in the expected period are extracted from the operation task table 32.
[0096] The operation task table 32 indicates operation tasks and implementation periods detected based on the operation logs performed in the business system 11. In the second embodiment, even if the system administrator does not input the operation task schedule, it is possible to verify the association between the outlier occurrence period and operation task information.
[0097] Although the embodiment of the present invention has been described above, the present invention is not limited to the above-described embodiment, and various modifications are possible without departing from the gist of the present invention. For example, the first embodiment and the second embodiment may be combined. It is also possible to verify the association between the outlier occurrence period and the operation work information after determining the consistency of the operation work and the execution period based on the operation work schedule 451a and the operation work table 32. In this way, it is possible to improve the accuracy of identifying the cause of the outlier occurrence period, and to appropriately notify the system administrator.
[0098] [Other embodiments] The present disclosure also includes the following aspects. (Aspect 1) A monitoring system that monitors a business system and notifies of an abnormality, a monitoring index analysis unit that acquires monitoring indexes indicating the operating status of the business system and calculates a baseline indicating a range in which the monitoring indexes are considered to be normal; an operation work information acquisition unit that acquires operation work information indicating an operation work for the business system and a period during which the operation work is to be performed; a notification determination unit that performs a notification regarding the business system based on the baseline and the operation work information, The notification determination unit Detecting an outlier occurrence period, which is a period during which the monitoring index deviates from the baseline; When there is a correlation between the outlier occurrence period and the operation work information, an abnormality notification is not issued, which is a notification indicating an abnormality; The monitoring system performs the abnormality notification when there is no correlation between the outlier occurrence period and the operation work information. (Aspect 2) 2. The monitoring system according to claim 1, The notification determination unit If there is no overlap between the outlier occurrence period and the implementation period, the abnormality notification is not performed, The monitoring system performs the abnormality notification when there is an overlap between the outlier occurrence period and the implementation period. (Aspect 3) 3. The monitoring system according to claim 1 or 2, The notification determination unit If the difference between the outlier occurrence period and the implementation period is within an allowable period, the monitoring system assumes that there is an overlap between the outlier occurrence period and the implementation period, and issues the abnormality notification. (Aspect 4) A monitoring system according to any one of aspects 1 to 3, comprising: A monitoring system in which the operational work information is input by a system administrator of the business system. (Aspect 5) A monitoring system according to any one of aspects 1 to 4, comprising: The notification determination unit obtains a log of operations performed on the business system, and detects the operational task and the implementation period based on the operation log. (Aspect 6) 6. The monitoring system according to any one of aspects 1 to 5, further comprising: an interface unit that indicates the operation status of the business system; and an external notification unit that notifies the monitoring system via a notification service external to the monitoring system. The notification determination unit When there is a correlation between the outlier occurrence period and the operation work information, the abnormality notification is not sent to the interface unit, When there is no correlation between the outlier occurrence period and the operational work information, the monitoring system at least performs one of notifying the interface unit of the abnormality and causing the external notification unit to notify the abnormality. (Aspect 7) 7. The monitoring system of any one of aspects 1 to 6, comprising: A monitoring system, wherein the business system is a virtual machine. (Aspect 8) A monitoring method for monitoring a business system and notifying an abnormality, comprising: a monitoring index analysis step of acquiring monitoring indexes indicating the operation status of the business system and calculating a baseline indicating a range in which the monitoring indexes are considered to be normal; an operation work information acquisition step of acquiring operation work information indicating an operation work for the business system and an implementation period of the operation work; a notification determination step of issuing a notification regarding the business system based on the baseline and the operation work information, The notification determination step includes: a detection step of detecting an outlier occurrence period, which is a period during which the monitoring index deviates from the baseline; When there is a correlation between the outlier occurrence period and the operation work information, an abnormality notification is not issued, which is a notification indicating an abnormality; The monitoring method further comprises an abnormality notification step of issuing the abnormality notification when there is no correlation between the outlier occurrence period and the operation work information. [Explanation of symbols]
[0099] 1 monitoring system, 10 infrastructure management service, 11 business system, 12 OS, 13 antivirus software, 14 business application, 15 information collection agent, 16 database (DB) section, 17 metrics monitoring service, 18 operation log monitoring service, 19 network, 20 metrics analysis service, 21 metrics table, 22 predicted value curve, 23, 23a, 23b baseline, 30 operation log collection service, 31 judgment criteria, 32 operation work table, 40 visualization notification service, 41 information acquisition section, 42 monitoring and analysis information storage section, 43 information acquisition section, 44 operation log storage section, 45 operation work information storage section, 46 notification judgment section, 47 interface (IF) section, 47a external notification section, 48 secondary interface (secondary IF) section, 48a secondary external notification section, 50 monitoring index analysis section, 60 Operation work information acquisition unit, 451, 451a Operation work schedule, 461 Detection range, 463 Metric curve, 464 Outlier occurrence period, 465 Tolerance period condition, 470 Label, 471 Outlier table, 472, 473 Pull-down list, 474 Line graph, 475 Metric curve, 476 Warning display, 477 Lollipop plot, 478-479 Bar, 481-483 Items
Claims
1. A monitoring system that monitors a business system and notifies of an abnormality, a monitoring index analysis unit that acquires monitoring indexes indicating the operating status of the business system and calculates a baseline indicating a range in which the monitoring indexes are considered to be normal; an operation work information acquisition unit that acquires operation work information indicating an operation work for the business system and a period during which the operation work is to be performed; a notification determination unit that performs a notification regarding the business system based on the baseline and the operation work information, The notification determination unit, Detecting an outlier occurrence period, which is a period during which the monitoring index deviates from the baseline; When there is a correlation between the outlier occurrence period and the operation work information, an abnormality notification is not issued, which is a notification indicating an abnormality; The monitoring system performs the abnormality notification when there is no correlation between the outlier occurrence period and the operation work information.
2. 2. The monitoring system of claim 1, The notification determination unit, If there is no overlap between the outlier occurrence period and the implementation period, the abnormality notification is not performed, The monitoring system performs the abnormality notification when there is an overlap between the outlier occurrence period and the implementation period.
3. 3. The monitoring system according to claim 2, The notification determination unit, If the difference between the outlier occurrence period and the implementation period is within an allowable period, the monitoring system assumes that there is an overlap between the outlier occurrence period and the implementation period, and issues the abnormality notification.
4. 2. The monitoring system of claim 1, A monitoring system in which the operational work information is input by a system administrator of the business system.
5. 2. The monitoring system of claim 1, The notification determination unit acquires a log of operations performed on the business system, and detects the operational task and the implementation period based on the operation log.
6. 2. The monitoring system of claim 1, an interface unit that indicates the operation status of the business system; and an external notification unit that notifies the monitoring system via a notification service external to the monitoring system. The notification determination unit, When there is a correlation between the outlier occurrence period and the operation work information, the abnormality notification is not performed using the interface unit, When there is no correlation between the outlier occurrence period and the operation work information, the abnormality notification is performed using at least one of the interface unit and the external notification unit.
7. 2. The monitoring system of claim 1, A monitoring system, wherein the business system is a virtual machine.
8. A monitoring method for monitoring a business system and notifying an abnormality, comprising: a monitoring index analysis step of acquiring monitoring indexes indicating the operation status of the business system and calculating a baseline indicating a range in which the monitoring indexes are considered to be normal; an operation work information acquisition step of acquiring operation work information indicating an operation work for the business system and an implementation period of the operation work; a notification determination step of issuing a notification regarding the business system based on the baseline and the operation work information, The notification determination step includes: a detection step of detecting an outlier occurrence period, which is a period during which the monitoring index deviates from the baseline; When there is a correlation between the outlier occurrence period and the operation work information, an abnormality notification is not issued, which is a notification indicating an abnormality; The monitoring method further comprises an abnormality notification step of issuing the abnormality notification when there is no correlation between the outlier occurrence period and the operation work information.
Citation Information
Patent Citations
Equipment managing device and equipment managing method and storage medium and program
JP2002251217A
Alarm management apparatus and alarm management method
JP2007156869A
Systems and methods for cyber security alert triage
US20210126938A1
Computer device, computer system, and event management method
JP2022028208A
